Loading...
HomeMy WebLinkAboutWPO202200040 Plan - VSMP 2022-09-21CENERAL NOTES OWNERS: TMP 046Eo-oq-oo-000Ao STANLEY MARTIN HOMES, LLC ii7io PLAZA AMERICA DRIVE RESTON, VA 20190 TMP 0461mo-io-oo-000lzo STANLEY MARTIN HOMES, LLC ii7io PLAZA AMERICA DRIVE RESTON, VA 20190 TMP 0405-00-00-002CO COUNTY OF ALBEMARLE C/O FINANCE ADMINISTRATION 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 DEVELOPER: RIVERBEND DEVELOPMENT, INC. 455 SECOND STREET SE, SUITE 201 CHARLOTTESVILLE, VA 22902 ENGINEER: COLLINS ENGINEERING 2oo GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 TAX MAP: TMP 046Eo-oq-oo-000Ao INSTRUMENT #202200004923 8.12 ACRES (PORTION OF) TMP 0461no-io-oo-000lzo INSTRUMENT#202200004923 0-72ACRES TMP 0405-00-00-002CO D.B.!1973, PG. 437 4-75ACRES TOTAL PROJECT AREA: 8-04ACRES ZONING: NEIGHBORHOOD MODEL DEVELOPMENT DISTRICT (ZMA2o-i8000i:L WITH PROFFERS - APPROVED BYTHE BOARD OF SUPERVISORS ON JULY 17,20-19) THE CODE OF DEVELOPMENT AND AND APPLICATION PLAN FROM ZMA20:1500007 ARE STILL VALID AND STILL APPLY TO THE BROOKHILL PROJECT. ENTRANCE CORRIDOR OVERLAY (EC), AIRPORT IMPACT OVERLAY (AIA), MANAGED AND PRESERVED SLOPES OVERLAY DISTRICT, AND FLOOD HAZARD OVERLAY (FH) ZONING DISTRICT. PROPOSED USE: EXTENSION OF ARCHER AVENUE TO CONNECTTO ASHWOOD DRIVE WATERSHED: SOUTH FORK RIVANNA RIVER AGRICULTURAL/FORESTAL DISTRICT: NONE TOPOGRAPHY & SURVEY: TOPOGRAPHY WAS COMPILED FROM SURVEY BY LINCOLN SURVEYING AND BELL LAND SURVEYS, JANUARY 20:15. BOUNDARY INFORMATION WAS COMPILED BY LINCOLN SURVEYING ON MARCH 7, 2015. FIELD VERIFIED BY COLLINS ENGINEERING IN JUNE OF 2021. DATUM: NAVID -1988 EXISTING VEGETATION: MOSTLYWOODED PRESERVED/MANAGED SLOPES: PRESERVED AND MANAGED STEEP SLOPES ARE SHOWN WITHIN THE LIMITS OF THE PROPERTY. SEE EXISTING CONDITIONS SHEET FOR LOCATIONS. BURIAL SITES: NO CEMETERIES WERE FOUND DURING FIELD INVESTIGATION WITHIN THE PROJECT AREA FOR THIS ROADIMPROVEMENTSPLAN. FLOODPLAIN: THERE IS A FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID 51003CO28oD DATED FEBRUARY 4, 2005. IN ADDITION, A DAM BREACH INUNDATION ZONE EXISTS ON THE PROPERTY FOR THE SOUTH RIVANNA DAM, WHICH IS A FEDERAL DAM LOCATED UPSTREAM OF THE PROPERTY. RETAINING WALLS: NO RETAINING WALLS ARE PROPOSED WITH THIS PROJECT. UTILITIES: ALBEMARLE COUNTY WATER & SEWER BROOKHILL = ARCHER AVENUE EXTENSION VSMP PLAN RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA KOCH COURT 0 1 ) C�i SHEET LAYOUT SCALE: 1" = 80' Poto G`Ou/�Vnsz-40 VICINITY MAP SCALE: 1" = 2000' Sheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS 3 EROSION & SEDIMENT CONTROL NOTES, NARRATIVE & DETAILS 4 EROSION & SEDIMENT CONTROL PHASE I PLAN 5 EROSION & SEDIMENT CONTROL PHASE 11 PLAN 6 EROSION & SEDIMENT CONTROL PHASE III PLAN 7 EROSION & SEDIMENT CONTROL NOTES & DETAILS 8 PRE -DEVELOPMENT STORMWATER MANAGEMENT PLAN 9 POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN 10 STORMWATER QUALITY PLAN 11 STORMWATER MANAGEMENT NOTES & DETAILS 12 STORMWATER MANAGEMENT NOTES & DETAILS 13 OVERALL BROOKHILL STORMWATER QUALITY SUMMARY 13 TOTAL SHEETS LEGEND: 1IRGINIA EROSION & SEDIMENT CON7ROL EROSION CONTROL HANDBOOK SPECIRCATON NUMBER CONSTRUCTION ENTRANCE 3.02 CONSTRUCT70N ROAD J. 0i STABILIZA TION SF X X X SIL T FENCE 3.05 ST SEDIMENT TRAP J. ii OU7LET PROTECT70N J. 18 RIPRAP J. 19 CHECK DAM J. 20 __QS)_ TEMPORARY SEEDING 3.31 PERMANENT SEEDING 3.32 TREE PROTECT70N J. J8 0 DUST CONTROL J. 39 SITE PLAN EDGE OF PA VEMEN T CURB PROPOSED ASPHALT PAVEMENT GREEN WAY BUFFER PROPOSED EASEMENT fl DROP INLET DRAINAGE PIPE -200- — — — EXISTING CONTOUR 2oo PROPOSED CONTOUR PRESERVED STEEP SLOPES MANAGED STEEP SLOPES I PROPOSED CONCRETE PROPOSED STREAM IMPACTS (D 0 0 (0 100 YR. FLOODPLAIN APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONrNG ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT Lic. No. 035791 8/22/22 ��j U 2: z 0 'n 0 z _j < E z U) LU w r4 L9 c1r) z cy) CN c\I c:) > (3) w < 0 w > Im-4 - V) W z_j LU W LL, x LU L90 LU _j Lu 10� z< > z: LU 0 C) > U w < w LU Ul U) U F-7 c� z w < U) w D� \"00 10� < 0 (D 0 c:) lln� c:) 0 CN F_ U F- U LU 0 JOB NO. 182150 SCALE ASSHOWN SHEET NO. H ul, XISTING FIRE HYDRANT XISTING 12" DI WATERLINE SO 1INSZ XISTING CG-2 CURB Lie. No. 035791,'t, 8/22/22 _j XISTING 18" 1 CULVERT GENERAL NOTES: 0 1. THERE IS A FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID z 51003CO280D DATED FEBRUARY 4, 2005. IN ADDITION, A DAM 'S'101VAL V, BREACH INUNDATION ZONE EXISTS ON THE PROPERTY FOR THE w _j EXISTING FENCE SOUTH RIVANNA DAM, WHICH IS A FEDERAL DAM LOCATED UPSTREAM OF THE PROPERTY. 2. A PROPOSED GREENWAY IS SHOWN ON THE SUBJECT PROPERTY. q 3. BEFORE BEGINNING SITE WORK, THE CONTRACTOR SHALL 0 TMP: 046BS-oo-oo-ooiCo EXISTING TREELINE INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF 0 OWNER: COUNTY OF ALBEMARLE UNDERGROUND UTILITIES, MECHANICAL AND ELECTRICAL SYSTEMS, 0 ACREAGE: 4 t AND OTHER CONSTRUCTION AFFECTING THE WORK. BEFORE .75 AC ZONING: PUD CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION x\ - �Tl 046135-oo-oo-000To TION OF SANITARY D. B./PG.: 1973/473 AND INVERT ELEVATIONS AT POINTS OF CONNEC u t I III OWNER: FOREST LAKES SEWER, STORM SEWER, AND WATER -SERVICE PIPING; Ij I I I I I -C, COMMUNITY ASSOCIATION Il UNDERGROUND ELECTRICAL SERVICES, AND OTHER UTILITIES. THE A ZONING: PUD CONTRACTOR SHALL FURNISH LOCATION DATA FOR WORK RELATED CREAGE: 4.12 AC TO PROJECT THAT MUST BE PERFORMED BY PUBLIC UTILITIES z \�71 2973/473 SERVING THE PROJECT SITE. 0 < E x 4. CONTRACTOR SHALL VERIFY SIZE, TYPE & LOCATION OF EXISTING U) WATER LINES ON THE SITE. u X F Ln 1:13 w M Ln z 0 FOR' N OF EXISTING l SWIv I L I I TT ;E REMOVED \,NOODCQuRT TING SANITARY SEW ui -oo-000Eo Ice TMP: 046Eo-io OWNER: STANLEY MARTIN HOMES, LLC 0 ALBEMARLE COUNTY m%-KrAur: 0.72 AC v, SLOPES� !/r 1\1 MANAGED STEEP �VIAIINQ: INIVIU EXISTING WETLA DS (T P.) 7 INSTRUMENT# 202200004923 �/// \Z r III, t t y - - - - — - - - - - .0 --------- ------- 7 -T-� --- 7-/77-7 7-/-71- - ---------- �- Lu r1i -og-oo-000Ao 174 TMP: 046Eo TING TREELINE EXI ;5. OWNER: STANLEY MARTIN HOMES, LLC EXISTING STREAM N ACREAGE: 8.12 AC ZONING: NMD I INSTRUMENT# 202200004923 \V 0 ALBEMARLE COUNTY I 4 PRESERVED S TEEP SLOPES., EXISTING SANITARY SEWER AND EXISTING SWM FACIE! 14 ilk 20 SANITARY SEWER EASEMENT (D.B. 1450, PG -313) L9 NOTE: SEE BROOKHILL BLOCK u 9-11 VSMP PLAN FOR EXISTING SWM DESIGN INFORMATION 00 < 0 0 (WP0201800086) C7) > _j 01i 0 EXISTING WETLANDS (TYP.) > LIMITS OF GRE WAY EN EXISTING FIRE HYDRANT BLOC EXISTING 1.2" Ell WATERLINE 9 D.B. S512, PG. 282 C:) 1j, I I I I \ '11, 6 1 1 1 - I [ 0) v TMp 0-19169 OPEN SPACE yl - GREEN,\A(AY PARCEL < N/F BROOKRILE MASTER y�Il - / / / / / / > L I SOCIATION, INC. TINT 46119BB' V) AS - - - - - - -- LL] __j I I EX TINGROAD- DB PG TMP: 04600-oo-oo-oi8B )I I � I I \ 282 CROCKETT 0 �Z_ 0 1 - � z -, / / / / I Is OWNER: HORNE LAND CORPORATION j DRAINAGE SYSTEM CORPORATION I _j V� _j ACREAGE: 46 DB 5626, PG Lu -43 AC IT— 0 -484 \ Lr) -[BLOCK 12 ZONING: RURAL LLI Jai -b LOCKi > U) C) DB/PG: 624/191 FLORA LANE 0� IL4— - - Lu ROJECT BOUNDARY (TYP.) I a: \\\ LU S _j 0 <0 r y7l, Q� 0 L9 < u 0 Lu V111 (D o'SANITARY SEWER EASEMENT /EXISTING SANITARY SEWER AND X (D. B. 14SO, PG 313) Lij > I Lu Lu x 0 E �j U z 01�q xs� LLJ VZ_ LIMITS OF GREENWAY cl� _j _j F 0 BE ClKia LIMITS OF SUl Lu A - DAY DAM BREACH I J I <"SWM l E,51EN ... I > (D ).B. S121, PG. 644 7T 111t I I c) A 0 x z 0 101 Lu ------- -- - - - LIMITS OF GREENWAY -18A2 TMP D.B. 5512, PG. 282 46 C CKETT u tu E CO RATION I D 0 0 ILLJ IL ------ 0 DB. 80, FIG. 43 Lf) Ill JOB NO. 182150 0 /G SCALE) L RAPHIC SCME Jill I \j 0 '00 1 =100, SHEET NO. (g IN FEET Z� & 2 1 inch tOO ft. V MIL �Ik &' ,FIBLOCK 2 CD L CK 1LBp If, 1992 3.38 EROSION & SEDIMENT CONTROL EROSION CONTROL NOTES DESCRIPTION OF EROSION & SEDIMENT EROSION CONTROL NOTES & NARRATIVE MEASURES: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO 7HE CONTROL MEASURES: PRE-CONS7RUC77ON CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND - PROJECT DESCRIP770N.- STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECRON. THE PURPOSE OF THIS LAND DISTURBANCE AC77WTY IS TO CONSTRUCT TIE ARCHER AVENUE ROAD EXTENSION FROM 7HE BROOKILL ACCORDANCE NTH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND EROSION AND SEDIMENT CONTROL MEASURES: SUBDIVISION TO ASHWOOD BOULEVARD. A POR77ON OF THIS PROJECT IS WITHIN THE LAND DISTURBANCE LIMITS APPROVED KITH THE S7RUCTURAL PRAC77CES USED IN THIS SEC77ON CONSIST OF THE FOLLOWING: MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICA77ONS OF THE VIRGINIA IT IS ANT7CIPA TED TO USE A CONSTRUCTION ENTRANCE, RIPRAP, OUTLET PROTECTION, BROOKHILL BLOCKS 9, 10, & 11 VSMP PLAN (WPO202000004). 7HIS PROJECT PROPOSES TO DIS77JRB AND ADDIT70NAL ,144 cc. OF LAND. EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULA77ONS VR DIVERSIONS, SEDIMENT TRAPS, A UTILITY STREAM CROSSING, AND SILT FENCES TO CONTROL 774E PROJECT WILL BEGIN ITS CONSTRUC77ON WITH THE PROPOSED ESC MEASURES IMMEDIATELY FOLLOWING PLAN APPROVAL, WHICH IS 3.01 SAFETY FENCE., 625-02-00 EROSION AND SEDIMENT CON7ROL REGULATIONS. SURFACE DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL LAND ANTICIPATED TO BE IN THE MN7ER OF 2022 THE WORK IS ANTICIPATED TO BE COMPI WITHIN 12 MONTHS AND TO CONCLUDE IN THE A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT 77-IE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY 774E PUBLIC. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR DISTURBANCE ACTIVITIES. TEMPORARY STOCKPILE AREAS ARE NOT BE REQUIRED NTH THIS WINTER OF 2023. APPLICABLE TO ANY CONT70L MEASURE OR SERIES OF MEASURES WHICH CAN BE AS THE FIRST STEP IN CLEARING. PROPOSED DESIGN. SHOULD FIELD ADJUSTMENTS NECESSITATE A SMALL STOCKPILE AREA, IT EXIS77NG S17E COND177ONS, CONSIDERED UNSAFE BY VIRTUE OF P07EN77AL ACCESS BY THE PUBLIC. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CON7ROL PLAN SHALL BE SHALL BE DISCUSSED KITH THE ESC INSPECTOR AHEAD OF 77ME THE STOCKPILE WILL NEED TO THE AREA OF THE PROPOSED DEVELOPMENT IS LARGELY WOODED AREAS WITH OPEN SPACES AND LIGHT UNDERBRUSH. 7HIS S17F MAINTAINED ON THE SITE AT ALL TIMES. GENERALLY SLOPES FROM THE WEST TO THE EAST, AND FROM THE NORTH TO THE SOUTH. 7HE S17E IS GENERALLY STEEP AND IS WELL 3.02 CONSTRUCTION ENTRANCE. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIW77ES IN AREAS OTHER THAN BE MAINTAINED AND STORED FOR LATER SPREADING. STOCKPILE LOCA77ONS SHALL BE ON SITE DRAINED. A STABILIZED CONSTRUCTION EN7RANCE LOCATED AT POINTS OF VEHICULAR INGRESS AND INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIM17ED TO, OFF -SITE BORROW OR AND SHALL BE STABILIZED KITH A TEMPORARY VEGETATIVE COVER. PERMANENT SEEDING KILL ADJACENT AREAS: EGRESS ON A CONSTRUCT70N S17E TO REDUCE THE AMOUNT OF MUD TTANSPI ONTO WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE THIS SITE IS BORDERED ON THE EAST BY EXIS77NG FOREST LAKES RESIDEN77AL DEVELOPMENT. NORTH OF THE PROPOSED S17E IS PA WD PUBLIC ROADS BY MOTOR WHICLES OR RUNOFF. CONSTRUCTION EN7RANCES SHALL CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING CONSTRUCTION ACTIVITIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ASHWOOD BOULEVARD. WEST OF THE DEVELOPMENT IS ROUTE 29, AND THE BROOKHILL DEVELOPMENT EXISTS TO THE SOUTV. BE INSTALLED AS SHOM ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TTANSFORTED AUTHORITY. OFFS17E LAND DISTURBANCE, ONTO PUBLIC ROADWAYS. 6. 7HE CONTTACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELEC77ON OF OFFS17E LAND DISTURBANCE IS LIM17ED TO PUBLIC RIGHT-OF-WAY AND AREAS LOCATED WITHIN THE OVERALL BROOKHILL DEVELOPMENT 3.03 CONSTRUCTION ROAD STABILIZATION., CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTA77ON AS SEED MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. TEMPORARY SEEDING KILL BE BOUNDARY. THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS PARKING AREAS DETERMINED BY THE PLAN APPROVING AUTHORITY. PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN SEVEN SOILS, AND 07HER SITE VEHICLE TRANSPORTA71ON ROUTES W7H STONE IMMEDIATELY AFTER 7 ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CON7POL MEASURES DAYS. THESE AREAS SHALL BE SEEDED NTH FAST GERMINATING VEGETA77ON IMMEDIATELY SEE SOIL DESCRIP77ONS ON THIS PAGE AND 7HE PHASE I EROSION & SEDIMENT CONTROL PLAN FOR BOUNDARIES SOIL TYPES AND SOIL GRADING. TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CON57RUCTION 7RAFFIC AT ALL 77MES DURING LAND DISTURBING AC77W77ES AND DURING SITE DEVELOPMENT FOLLOWING GRADING OF THOSE AREAS. SELECT70N OF SEED MIXTURE WILL DEPEND ON THE 77ME DESCRIP 77ONS. DURING WET WEATHER AND TO REDUCE EROSION AND SUBSEQUENT REGARDING OF UN77L FINAL STABILIZA77ON IS ACHIEVED. OF YEAR APPLIED. CRI77CAL AREAS. PERMANENT ROADBEDS BETWEEN 774E 77ME OF IN177AL GRADING AND FINAL STABILIZA 770N. 8. DURING DEWATERING OPERATIONS, WATER KILL BE PUMPED INTO AN APPROVED EXIS77NG WETLANDS AND INTERMITTENT STREAMS ARE LOCATED ON THE PROJECT SITE 774ESE AREAS, IN ADDIT70N TO THE MANAGED AND USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE CONSTRUCTED, IWE7HER FILTERING DEVICE. PRESERVED STEEP SLOPES, ARE CONSIDERED TO BE CRI77CAL AREAS THE CON7RACTOR SHALL GIVE EXMA AT7ENT70N AND CAUTION IN PERMANENT OR TEMPORARY, FOR USE BY CONS7RUC77ON 7RAFFIC. 9. THE CON7RACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY 3.01 SAFETY FENCE- TO DISCOURAGE ACCESS TO A PAR77CULAR AREA. AND AROUND THESE AREAS TO ENSURE SEDIMENT IS NOT DEPOSITED ON 7HEM OUTSIDE THE SCOPE OF 7HE PROPOSED PLAN. T?EE 3.05 SILT FENCE: AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR 3.02 CONSTRUCT70N ENTRANCE - TO REDUCE THE AMOUNT OF MUD 7RANSPORTED ONTO PAVED PR07EC77ON FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES SHALL ALSO BE INSTALLED AS A FIRST STEP IN LAND A TEMPORARY SEDIMENT BARRIER CONSIS77NG OF A SM7HET7C FILTER FABRIC STRETCHED CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. DISTURBANCE TO ENSURE THESE CRI77CAL AREAS ARE MAINTAINED. ACROSS AND ATTACHED TO SUPPOR77NG POSTS AND ENTRENCHED, TO INTERCEPT AND 10. BE MADE IMMEDIATELY ALL FILL MA TERIAL TO BE TAKEN FROM AN APPROVED, DESIGNA TED BORROW AREA. 3.03 CONSTRUC77ON ROAD STABILIZAT70N - TO REDUCE 7HE EROSION OF TEMPORARY SEQUENCE OF CONS7RUC770N. DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONS7RUC770N 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EAR7H FILL ROADBEDS BY CONSTRUCT70N TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT 1. CONTRACTOR SHALL N077FY 7HE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A OPERA 77ONS IN ORDER TO PREVENT SEDIMENT FROM LEA VING THE SITE, AND TO DECREASE PRE-CONSNUCTION MEETING. THE VELOCITY OF SHEET FLOWS AND LOW­70-MODERATF LEVEL CHANNEL FLOWS. THE SILT SHALL BE INERT MATERIALS ONLY FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND REGARDING OF PERMANENT ROADBEDS BETWEEN THE TIME OF IN177AL GRADING AND FINAL 2. PRIOR TO DIS7URBANCES, THE LIMITS OF DIS7URBANCE AND PRESERVED SLOPES SHALL BE FLAGGED AND THE MEE PR07EC77ON FENCE BARRIERS SHALL BE INSTALLED DOM SLOPE OF AREAS W7H MINIMAL GRADES TO 0 THER DEBRIS STABILIZAPON. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE CONTRACTOR FENCING SHALL BE INSTALLED. NO GRADING MAY BEGIN UN77L 7HE LIM17:5 OF DIS77JRBANCE AND PRESERVED SLOPES HAVE BEEN FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. 774EY SHALL BE 12 BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLE77ON PARKING & STAGING AREAS AS NEEDED. FLAGGED AND THE TREE PR07EC77ON HAS BEEN INSTALLED. INSPECTED IMMEDIA TEL Y AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE W7H THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH) PER ZONING ORDINANCE SEC77ON 5.1.28. 3,05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. J. NO EROSION CON7ROL MEASURES MAY BE REMOVED DURING THE CONSTRUC77ON PROCESS KlTHOUT 7HE APPROVAL FROM 7HE 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE NTH SECT70N 13-301 INSPECTOR ON THE PROJECT OF THE CODE OF ALBEMARLE. 3,07 STORM DRAIN INLET PROTECTION- INLET PROTECTION IS PROPOSED ON INLETS� WHERE 4. INSTALLA77ON OF THE PROPOSED CONSTTUCTION ENDTANCE SHALL OCCUR NEXT. THE CONTTACTOR SHALL APPLY CONSTTUCRON 3.07 STORM DRAIN INLET PRI A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP 14. BORROW, FILL OR WASTE AC77WTY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHOWN ON THE PLANS. ROAD STABILIZA77ON AS NEEDED. CONTRACTOR SHALL ENSURE THE CONSTRUC77ON ENTRANCE DRAINS TO AN ADEQUATE E&S INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS SHALL BE LIMITED TO THE HOURS OF 7. 00 AM TO 9: 00 PM. 3.09 DIVERSION- PERIMETER DIVERSIONS ARE PROPOSED KHERE SHOWN ON THE PLANS TO MEASURE THE CONTYACTOR SHALL INSTALL SEDIMENT TRAP #1 FOR VEHICULAR WASH OFT, ALONG NTH THE ASSOCIATED DIVERSION PRIOR TO PERMANENT STABILIZA77ON OF THE DIS77JRBED AREA. INLET PR07EC77ON APPLIES 15. BORROW, FILL OR WASTE AC77WTY SHALL BE CONDUCTED IN A SAFE MANNER THAT DIRECT RUNOFF INTO A SEDIMENT 7RAPPING DEWCE. BERMS AND RIGHT OF WAY DIVERSION BERM. CONS7RUC77ON EN]TRANCE TO BE INSTALLED WHERE CONSTTLICT70N VEHICLE ROUTES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERAT70NAL BEFORE PERMANENT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, J. 13 SEDIMENT TRI SEDIMENT TRAPS ARE PROPOSED WHERE SHOWN ON THE PLANS. INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING STABILIZAT70N OF THE CORRESPONDING DISTURBED DRAINAGE AREA. PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY ONTO 7HE PAVED SURFACE IIIHERE SEDIMENT IS 7RANSPORTED ONTO A PUBLIC ROAD SURFACE, 7HE ROAD SHALL BE CLEANED PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. J. 18 OUTLET PROTECTION -OUTLET PR07ECTION IS PROPOSED AT 7HE OUTLET OF PIPES. 3.19 THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND 3.09 TEMPORARY DIVERSION DIKE. 16. TLIE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR RIPRAP- RIPRAP IS PROPOSED AT THE OUTLET OF PIPES. 7RANSPOR77NG TO A SEDIMENT CON7ROL DISPOSAL AREA. STTEET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REA40VED A TEMPORARY RIDGE OF COMPACTED SOIL CONS7RUC7ED AT 7HE TOP OR BASE OF A CONVERT TO PERMANENT STORMWA TER MANAGEMENT FACILITIES WHERE APPLICABLE 3.25 UTILITY STREAM CROSSING -A U77LITY STREAM CROSSING IS PROPOSED FOR THE IN 7HIS MANNER SEDIMENT LADEN RUN-OFF FROM THE CONS7RUC77ON ENTTANCE AND DISTURBED AREA WITHIN THE DRAINAGE SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS ALL EROSION CON7ROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE CONSTRUCTION OF ARCHER AVENUE'S EXTENSION. AREA TO SEDIMENT TRAP #5 SHALL BE ROUTED TO THE TRAP NTH THE INSTALLAT70N OF THE DIVERSION BERMS AND ROW AWAY FROM UNPROTECTED DIS77JRBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO SALE OF ANY LOT, UNIT BUILDING OR OTHER PORT70N OF THE PROPERTY. DIVERSION BERM DIVERT SEDIMENT -LADEN RUNOFF FROM A DIS77JRBED AREA TO A SEDIMENT-7RAPPING 17 TEMPORARY STABILIZA77ON SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING 3.J2 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED NTH THIS PLAN. 5. ONCE THE CONSTRUC77ON ENTRANCE HAS BEEN INSTALLED ALONG K17H SEDIMENT TRAP #1 AND ITS ASSOCIATED DIVERSION BERMS FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWA TER 7 70 1.11 ..��=. 77�.l A.In OJID^=�n^II,1 �cc nm^=�77,1,,, I� no ^�Cn .� 7�1� M A�l ORING I : : :X. : - . K . ::.,... - . �::::::: . - _�W_ooi - CORRECT TRUNK ARMORING go 001 TRIANGULAR BOARD FENCE RUNOFF MUST BE TEMPORARILY DIVERTED TO PR07ECT DISTURBED AREAS AND SLOPES OR IS TO BE AT 75 LBSIACRE, AND IN THE MONTHS SEPTEMBER TO FEBRUARY TO - AND RIGHT OF WAY DIVERSION BERM, THE CONMACTOR SHALL RE-ROU7E THE EXIS G BLOCK 9, 10, & 11 SWU BASIN OUTFALL, RETAIN SEDIMENT ON S17E DURING CONSTRUC77ON THESE STRUCTURES GENERALLY HAVE A CONSIST A 50150 MIX OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH SEE THE ESC PLAN FOR 7HE REQUIRED LOCA77ONS THEN INSTALL THE U77LITY STREAM CROSSING (PROPOSED CULWRT CROSSING.) LIFE EXPECTANCY OF 18 MONTHS OR LESS, MICH CAN BE PROLONGED W774 PROPER AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF J.J9 DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED KITH THIS PLAN. 6. THE CONMACTOR SHALL INSTALL THE 6' WIDE 2:1 SIDE SLOPE TYPE B U77LITY SMEAM CROSSING AS SHOWN AND N07ED ON PHASE Source: Va. DSVIC MAINTENANCE. GERMAN MILLET. SMA W MULCH IS TO BE APPLIED A T 80LBS1100SF. AL 7ERNA 77VES I OF 7HE EROSION AND SEDIMENT CONTTOL PLANS. 7H/S SHALL INCLUDE THE STREAM DIVERSION AND THE INSTALLAT70N OF THE ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. CULVERT ONCE THE COUNTY AND VDOT INSPECTORS HAVE APPROVED THE CULVERT INSTALLATION, THE CONTRACTOR MAY INSTALL 3.11 TEMPORARYRIGHT-OF-WAY DIVERSION., 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND AJA1A1T9-A1AA1rC'- THE FILL MATERIAL OVERALL 7HE CULVERT. 7HE DOWNSTREAM EROSION CON7ROL MEASURES SHALL BE INSTALLED PRIOR TO THE Paved construction entrance for erosion control plans � .. I `­.W,�, . . 1� 11. �11� V� .�M Y., Uvl�� .I- . �1. MULCH AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS11000SF, INSTALLA T70N OF THE FILL TERIAL, INCLUDING THE WIRE SILT FENCE. 7HE CONTRACTOR SHALL ONLY INSTALL ENOUGH FILL DIS77JRBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW LENGTH INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT IN GENERAL, DURING CONSTRUC77ON THE RLD OR CON7RACTOR ON-S17E WILL CHECK ALL EROSION MATERIAL OVIER THE CULVERT PIPE TO ACCESS THE AREAS ON 774E NORTH SIDE OF THE CULVERT PIPE WITHIN A SLOPING RIGHT-OF-WAY THEREBY REDUCING 7HE EROSION P07EN77AL BY DIVERTING STORM RUNOFF TO A STABILIZED OUTLET GENERALLY, EARTHEN DIVERSIONS ARE 1000LBSIACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT RAINFALL. MONITORING 7 ONCE ENOUGH FILL MATERIAL HAS BEEN INSTALLED FOR A STTEAM CROSSING KITH TLIE EARTH MOVING EQUIPMENT THE APPLICABLE WHERE 774ERE WILL BE LITTLE OR NO CONSTRUCTION TRAFFIC WITHIN THE SHALL BE APPLIED AT 180LBSIACRE AND CONSIST OF 957 KENTUCKY J1 OR TALL REPORTS WILL BE REQUIRED FROM 7HE RLD IF NEEDED. SPECIFIC ATTENTION WILL BE GIVEN TO CONTRACTOR SHALL CON77NUE TO INSTALL THE REMAINING ESC CONSTRUCTION MEASURES, AS SHOWV ON 77-IE PHASE I EROSION & RIGHT-OF-WAY GRAVEL STRUCTURES ARE MORE APPLICABLE TO ROADS AND 07HER FESCUE AND 0-57 PERENNIAL RYGRASS OR KENTUCKY BLUEGRASS. S7RAW MULCH IS THE FOLLOWING ITEMS., SEDIMENT CONTTOL PLAN. 7HE MEASURES INCLUDE INSTALLING 7HE PERIMETER SILT FENCE AND PERIMETER DIVERSION BERMS. PERIMETER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSNUCTED AS A FIRST STEP K17H ANY LAND DISTURBANCE RIGHTS -OF -WAY WHICH ACCOMMI VEHICULAR TRAFFIC TO BE APPLIED AT 80LBS1100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE a.SEDIMENT BASINS ANDIOR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE WITLI AC77WTY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 3.1.3 TEMPORARY SEDIMENT TRAP.* EROSION CONIFROL INSPECTOR. THE VIRGINIA EROSION & SEDIMENT CON7ROL HANDBOOK. b. ALL GRA VEL OU 7LETS WILL BE CHECKED REGULARL Y FOR SEDIMEN T BUILDUP THA T WILL 8. ONCE THE PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND THE COUNTY INSPECTOR HAS APPROVED THESE A TEMPORARY PONDING AREA FORMED BY CONS7RUC77NG AN EAR774EN EMBANKMENT W7H A 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH PREVENT PROPER DRAINAGE IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL WILL BE MEASURES, THE CONTRACTOR MAY PROCEED WITH THE LAND CLEARING OPERA T70NS FOR 77-IE INSTALLA77ON OF THE SEDIMENT TRAPS. STONE OUMET TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED REMOVED AND CLEANED, OR IT WILL BE REPLACED. 7HE CONNACTOR SHALL BEGIN BY CLEARING 7HE AREAS REQUIRED TO ACCESS TIE LOCAT70NS OF SEDIMENT 7RAPS 2 & J. ENOUGH TO ALLOW 7HE MAJORITY OF 774E SEDIMENT TO SET7LE OUT. USE BELOW IMMEDIATELY SILT MAPS ARE TO BE CLEANED WHEN 507 OF THE WET STORAGE c. ALL SIL T FENCE BARRIERS WILL BE CHECKED REGULARL Y FOR UNDERMINING OR DETERIORA 77ON INSTALLA T70N OF SEDIMENT 7RAPS #2 & #3 SHALL IMMEDIA 7EL Y FOLLOW THE SELECTIVE CLEARING. FOLLOWING THE INSTALLA 77ON OF DISTURBED AREAS IIHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS 774AN J ACRES, VOLUME IS FILLED NTH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE REMOVED WHEN 7HE LEVEL 774ESE MEASURES, THE CONTTACTOR SHALL INSTALL 77-IE DIVERSIONS. ANY REMAINING EROSION CONMOL 17EMS AS SHOWN ON 7HE WHERE THE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MONTHS AND IT MAY BE NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION OF SEDIMENT DEPOS177ON REACHED HALF WAY TO 7HE TOP OF THE BARRIER PHASE I EROSION CON7ROL PLAN SHALL ALSO BE CONSTTUCTFD AT THIS TIME. CONSTRUCTED E1774ER INDEPENDENTLY OR IN CONJUNC77ON WITH A TEMPORARY DIVERSION DYKES WHICH ARE COLLEC77NG SEDIMENT TO HALF 7HEIR HEIGHT MUST BE CLEANED d. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE TLIA T A GOOD STAND IS 9. ONCE ALL 77-IE PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, DRAINAGE IS PROPERLY CONVEYED TO DIKE. AND REPAIRED IMMEDIATELY MAINTAINED. AREAS SHOULD BE FER77LIZED AND RESEEDED AS NEEDED. THESE MEASURES, AND 7HE ESC INSPECTOR HAS GRANTED APPROVAL, 7HE CONTRACTOR CAN BEGIN CLEARING THE REMAINDER OF 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED IN CASE OF EMERGENCY THE PRIMARY CONTACT FOR 7HE PROJECT WILL BE THE RLD OR THE S17E TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. 3.14 TEMPORARY SEDIMENT RASIN: A TEMPORARY BARRIER OR DAM KITH A CONTROLLED STORMWATER RELEASE STRUCTURE WITHIN JO DAYS OF FINAL SITE STABILIZATFON, WHEN MEASURES ARE NO LONGER CONTRACTOR ON -SITE. THE CONTRACTOR AT THIS 77ME IS DIGS. BROOK WOOD NTH DIGS MAY 10. AFTTR CLEARING THE PROPOSED AREAS, THE CONMACTOR CAN PROCEED TO PHASE 11 OF THE EROSION & SEDIMENT CONT70L PLAN. FORMED BY CONSTRUCTING AN EMBANKMENT OF COMI SOIL ACROSS A NEEDED, SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. BE REACHED AT (434) 978-44J5. IN ADD177ON THE OWNER MAY BE CONTACTED. UPON THE CONNACTOR SHALL BEGIN ROUGH GRADING 7HE SITE TO THE CONTOURS SHOWN ON THE PHASE // EROSION & SEDIMENT DRAINAGEWAY. TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS 21. 774E E&S INSPECTOR HAS THE AUTLIORITY TO ADD OR DELETE E&S CONTROLS AS COMPLETION OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE FOR SITE MAINTFNANCE. CONTROL PLAN. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP W774 ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCT70NAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. IN "WET" AND 'DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO IvCL,Ca0^ff I 'IV Inc rlc�u ^a a, 1IZ UU , "vivo GnAvGI 'IV � I "VIV, Ivu acu"I I SETTLE OUT APPLIES BELOW DISTURBED AREAS WIERE THE TOTAL CONTRIBUTING DRAINAGE BASIN OR 7RAP CAN BE REA40VED WITHOUT WRITTEN AUTHORIZA770N. AREA IS EQUAL TO OR GREATER THAN THREE ACRES. THERE MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR TIE CONSTTUCT70N OF A TEMPORARY IMPOUNDMENT. 3.18 OUTLET PROTECTION.* SOIL DET'SCRIPTION S7RUCTURALL Y LINED APRO q OR 0774ER ACCEPTABLE ENERGY DISSIPA TING DEVICES PLACED SECTIONS. TO PREVENT SCOUR AT 278-ELIOAK LOAII TO 77 SLOPES, SOIL /S WELL DRAINED WITH A MEDIUM RUNOFF STORMWATFR OUTLETS� TO PR07ECT THE OUTLET S7RUCTURE, AND TO MINIMIZE THE CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE POTENTIAL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80" ' CONCENTRATED STORMWATER FLOWS APPLICABLE TO THE OUTLETS OF ALL PIPES AND 27C-ELIOAK LOAM-7 TO 157 SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF ENGINEERED CHANNEL SECTIONS CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE 3.19 RIPRAP: DEPTH TO THE WA TER TABLE IS GENERALLY MORE THAN 80'� A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE NTH J90-HAZEL LOAM-15 TO 25% SLOPES. SOIL IS EXCESSIVELY DRAINED WITH A MEDIUM FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT THE SOIL FROM THE EROSIVE RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-10" FORCES OF CONCEN7RATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE THICK THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". ENHANCING THE P07EN77AL FOR INFIL7RA770N, AND TO STABILIZE SLOPES W77-1 SEEPAGE PROBLEMS, ANDIOR NON -COHESIVE SOILS USE WHEREVER SOIL AND WATER INTERFACE REFERENCE., WEB SOIL SURVEY ONLINE DATABASE, FOUND AT AND TIE SOIL CONDITIONS, WATER TURBULENCE AND VELOCITY, EXPECTED VEGETA77VE http://�ebsoilsurvey.nrcs.usda.govloppIWebSoilSurvey.aspx COVER, ETC., ARE SUCH THAT THE SOIL MAY ERODE UNDER THE DESIGN FLOW CONDITIONS. 3.25 U77LITY STREAM CROSSING., A S7RA7EGY FOR CROSSING SMALL WATERWAYS WHEN IN-S7REAM U77LITY CONSTRUCTION IS INVOLVED. TO HELP PR07ECT SEDIMENT FROM ENTERING 7HE STREAM FROM CONSTRUCTION EROSION CONTROL NOTES WTHIN APPROACH AREAS. TO MINIMIZE THE AMOUNT OF DISTURBANCE WITHIN THE STREAM ITSELF. GENERALLY APPLICABLE TO FLOWING STREAMS WITH DRAINAGE AREAS LESS THAN ES-1: UNLESS OTHERWISE INDICA TED, ALL VIEGETA 77VE AND STRUCTURAL EROSION ONE SQUARE MILE. AND SEDIMENT CONTROL PRAC77CES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICA77ONS OF THE VIRGINIA 3.31 TEMPORARY SEEDING, THE ESTABLISHMENT OF A TEMPORARY VEGETA77VE COVER ON DISTURBED AREAS BY SEEDING EROSION AND SEDIMENT CON7ROL HANDBOOK AND VIRGINIA REGULA77ONS VT WIN APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. TO REDUCE EROSION AND 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. SEDIMENTA 77ON BY STABILIZING DIS77JRBED AREAS 7HA T WLL NOT BE BROUGHT TO FINAL ES-2.7HE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK PRIOR TO GRADE FOR A PERIOD OF MORE THAN JO DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND 7HE PRE-CONSTRUC77ON CONFERENCE, ONE WEEK PRIOR TO THE RUNOFF TO DOMS7REAM OR OFF -SITE AREAS, AND TO PROVIDE PR07EC77ON TO BARE COMMENCEMENT OF LAND DIS71IRBING ACT70TY AND ONE WEEK PRIOR TO TABLE 3.31-B ACCEPTABLE TEIVIPORARY SEEDING PLANT MATERIAIS NQUICK REFERENCE FOR ALL REGIONS" Rai ig Dates Species Q&j - Feb. 15 50/50 Mix of Annual Ryegrass (Lolium multi-flonun) & R0 Cereal (Winter) Rye acojg, cu-caW i - Apr. 30 Annual Ryegrass 60 (Lolium multi-florum) - Aug 31 German Millet (Setaria italic ) SOILS EXPOSED DURING CONSTRUCTION UIV77L PER14ANENT VEGETA77ON OR OTHER EROSION THE FINAL INSPECTION. � CONTROL MEASURES CAN BE ESTABLISHED. ES-J.,ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR Source: Va. DSWC TO OR AS THE FIRST STEP IN CLEARING. 3.32 PERMANENT STABILIZATION. ES-4. A C Y THE APPROVED EROSION AND SEDIMENT CON]FROL PLAN SHALL THE ESTABLISHMENT OF PERENNIAL VEGETA 77VE COVER ON DISTURBED AREAS BY PLANTING BE MAIN TAINED ON THE SITE AT ALL TIMES. SEED. TO REDUCE EROSION AND DECREASE SEDIMENT WELD FROM DISTURBED AREAS TO ES-5*PRIOR TO COMMENCING LAND DISTURBING ACTIW77ES IN AREAS OTHER 7HAN PERMANENTLY STABILIZE DIS77JRBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF -SITE TO S17F CONDITIONS, AND ALLOWS SELEC77ON OF THE MOST APPROPRIATE PLANT MATERIALS TO IMPROVE WILDLIFE HABITAT TO ENHANCE NATURAL BEAUTY UPON COMPLE77ON OF BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION ACTIVITIES, ALL AREAS WILL RECE/W A PERMANENT VEGETATIVE COVER. SUPPLEMENTARY EROSION CON7ROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY 7HE PLAN APPROVING AU7HORITY. 3.38 TREE PRESERVA770M AND PROTECTION: ES-6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDIT70NAL PROTEC77ON OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND DISTURBING AND CONSTRUCTION ACTIVITY TO ENSURE 7HE SURVIVAL OF DESIRABLE 7REES SEDIMENTA77ON AS DETERMINED BY THE PLAN APPROVING AUTHORITY. WERE THEY WLL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED ES-7.,ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL PRI LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, MEASURES AT ALL 77MES DURING LAND DISTURBING ACTIV471ES AND DURING SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONWRTED FROM S17E DEVELOPMENT UN77L FINAL STABILIZA77ON IS ACHIEVED. COMPACTIM) SOIL �__ 3' KINIII ___� FILTER FABRIC ENTRENCHED 6" - I I I I - ter 10. zIII � - -I __1 : I =1 I - - I 111111111111- I - _--ir- I _: I -I -I 1=1 I 1=1 I I- I I- I 1-1 I LL� _111-LI- t �- - - - 7M %511 I - I TA7 I I I 1=1 1=1 I I [I- - - - - I � � 11��IJF=111�=11-111111, 11 I R ��I It -- i III - - - ___ � - I __ 6,911119 � G TEMPORARY 18" DIVERSION BERM . I 11 ."Y_ I 11� . �11�1 1I`Y ,��'.. . �.� 1..'�� I 11 Lm. ES-8., DURING DEW4 TTRING OPERA TONS, WA TER WILL BE PUMPED IN TO AN DISTURBING ACTIVITIES. APPROVED WATER FILTERING DEVICE. ES-9.7HE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES 1. SET POSTS AND EXCA VA TE A 4"X4" 3.39 DUST CONTROL, PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT ANY REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL177ON AND TRENCH UPSLOPE ALONG 7HE LINE CONS7RUC77ON ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM NECESSARY REPAIRS OR CLEANUP TO MAINTAIN 7HE EFFEC77VENESS OF THE OF POSTS. EXPOSED SOIL SURFACES AND REDUCE 7HE PRESENCE OF AIRBORNE SUBSTANCES WHICH EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY MA Y PRESENT HEAL 7H HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR . - MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN - ��-� ,:�7- ACCORDANCE NTH THE VESCH. I - - �5_7 I- I , _�, i TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gal ons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 Source: Va. DSWC GENERAL SLOPE (31 OR LESS) PER ACRE I I 1_� TOTAL LBS � KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CRO 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLE[ AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STE) 3.35. PERMANENT SEEDING SCHEDULE (�� NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) _� -1 : - - -111 -I11-111- FLOW III III I ��J__I I I� J. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EX7END IT INTO THE TRENCH. _�_ , �_ ,�­_11­_ 2. STAPLE WIRE FENCING TO 4. BACKFILL AND COMPACT THE EXCA VA TED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TTENCH. ,!WPER SILT FENC5 , (9 (WITH WIRE -BACK ED NO SCALE 1992 11. THE CONTRACTOR SHALL INSTALL ANY REMAINING EROSION CONTROL 17EMS AS SHOW ON 7HE PHASE fl EROSION CONTROL PLAN. TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONMOL SHALL BE IMPLEMENTrD AS REQUIRED. 12. PERMANENT OR TEMPORARY SOIL STABILIZAT70N SHALL BE APPLIED TO DENUDED AREAS W7HIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORT70N OF THE SITE. TEMPORARY SOIL STABILIZA77ON SHALL BE APPLIED WTHIN SEVEN DAYS TO DENUDED AREAS 7HA T MA Y NOT BE A T FINAL GRADE BUT KILL REMAIN DORMANT (UNDISTURBED) FOR LONGER 7HAN 30 DA Y5. PERMANENT STABILIZA 77ON SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 13. ONCE 7HE SITE IS ROUGH GRADED, THE CON7RACTOR SHALL BEGIN PHASE N OF THE EROSION & SEDIMENT CONTROL PLAN. 7HE CONTRACTOR CAN BEGIN INSTALLA770M OF 7HE UTILITIES, CURB AND GUTTER, AND ROADS. INLET PR07EC77ON SHALL ALSO INSTALLED AS THE STORM SEWER IS CONSTYUCTED. INLET PR07EC77ON SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FIL TER BECOMES CLOGGED NTH SEDIMENT SO TIA T IT NO LONGER ADEQUA TEL Y PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED A WAY AND CLEANED ANDIOR REPLACED. 14. TIE CONMACTOR SHALL WORK NTH THE ESC INSPECTOR ON 7HE TIMING OF THE REMOVAL OF SEDIMENT TRAPS #1 & #2. SEDIMENT 7RAPS #1 & #2 SHALL BE REMOVED AFTER THE STORY SEWER AND INLET PR07ECTION ARE INSTALLED AND ARE MADE OPERA RONAL. TIE CONTRACTOR SHALL FILL SEDIMENT TRAPS #1 & #2 AS 7HESE LAST AREAS ARE BROUGHT UP TO FINISHED GRADE AND PAVEDI SEEDED. THE CONTRACTOR SHALL PA Y SPECIAL A TTEN77ON TO THE SIL T FENCE BENEA 7H THESE AREAS A T THIS 77ME AND ENSURE IT CON77NUES TO BE EFFECTIVE. 15. ONCE PHASE N OF CONS7RUCT70N IS COMPLETE, THE S17F IS STABILIZED AND 7HE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN THEN CONVERT SEDIMENT TRAP #J INTO THE PROPOSED SWU FACILITY & INSTALL 77-IE PROPOSED LEVEL SPREADER. AT TVIS TIME, THE CONTRACTOR CAN REMOVE NE REMAINDER OF 7HE EROSION & SEDIMENT CONTTOL MEASURES. NO 17EM SHALL BE REMOVED, THROUGHOUT ALL PHASES OF CONSTRUCTION, UNLESS 7HE UPSTREAM AREAS ARE STABILIZED AND 7HE INSPECTOR GIVES PERMISSION. 16. 7HE CON7RACTOR SHALL MAINTAIN ALL EROSION CONDTOL MEASURES AS SPECIFIED IN 7HE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY 77-IE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE K177-1 77-IE VIRGINIA EROSION AND SEDIMENT CON7ROL HANDBOOK. 1Z ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZAT70N OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRA TOR TRAPPED SEDIMENT AND 7HE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVIENT FURTHER EROSION AND SEDIMENTATION. 3.01 1992 - M'' 111 III 7T___ : 1-TL' N ,�_ I - I __ . - ­_ ..;,�: ... - ... I : --- 11 I ...... I. .. 1 I- - , ... V, 11 �,, :Mk � �" � 00 �War - I - - _o4 --- ;:;:;.&.-:;:.-:g:;:;:z w*j*;*g6;*;&;*;*;4; 5:V024472MV04; :5:;-,-t:;:;:;:;:;:; - - . - ago; - p;*';:X4I 17 1_4�21;:Wt . ILtl�1-111' I I - - I * is - w - *:, ,;* - - - - . - I , - 14- - 5 0 GI RI � � I � , � � I I I , I ��_ .__z: , 1�_, 4-�11, __ , - � I AX, \ V!--. � a 7 - �, _ I - �, I I I - � -, ­ I - � N:I !;:;:;.-;SIj'-.-;:1I I,- "' � .I ............ Offflne.150:0-9 MUNI .:.:.:....I:....:...:.. :::::::I N'.11-RINI I :::.-::::1-15.!;!�.`N9 - . - I. i .-M 11 , 11111111111111 � 1111111 � 1111111���illill�illilli�illillilillill��I I M Source: Adapted from Conwed Plastics and VDOT Road and Bridge Standards Plate 3.38-2 -70* VIN, 3' SM-2A ASPHALT TOP COURSE , I /I 2X PA,. 1,.­,��.�­,-_,�. 1'�Z_ �­., I III �5' ". 21 A AGGREGATE SAM PROFIL - 70* 1,04. ASPHALT PAM F-0 T WAI I EXISTING PAIAMIENTJ 1 2X 12% 12' WN.- ` I I *MST EXTEND FLILL WIDTH LO I . POSITIVE DRAINAGE I � OF INGRESS AND EGRESS I OPERATION ELM I POSIIUVE DRAINAGE 12' 10N. 1 2% TO SEDIMENT � TRAPPING DEVICE - ----- �, I �_ ____ ". I ­_ -.I ­1 .. - - - - 7 II - - -1 1'_� � I .1 I I I-, � I � 3.25 1992 . 0 .." . . 11.1 ......... . I ::::::: .. 11. IIII � �� . , III Al I- I. , - I , I III .�,, .r.-,_-.- 1217" ZGI r_-,- - I A ,�-,�C,I: f I � .- - :,,, It : FLOW BARRIER 7. ,.. __ .. , Z�' I .., � " I �, .. � - 11 I � . ..�_ . � ORIGINAL � STRI - - I � .... I SEE , 1, I -4 - I I I I "I � ,a I I ; - � I, - � I I -Ott I 1� FLOW HAMER , (RPRAIP. SANDRAGS. PLYWOOD. JERSEY WPRIJICHI� HAI OR 5KEI TR04CHING RUNG5 CIPEPATION T�__ PLACE RIPW I AT TRAIIISITION I L � PERSPECTIVE VIEW - Plate 3.01-1 Source: Va. DSWC SECTION Az 1, uunium"11 wat" Iap (A I OILII IIIIIA fie ut'laved with a justauliall I U1111 bAI I Andollt %ahe.qupphI au&,hhv�ewft a (WI of 1 5 &II lo adetpute "Pustailiplessive WaI watel Initst lie I. mileil avI houl die eub nice to an .11)pltl%,Otlseltlul2mealolellio\,e�C(laiietit .All.qe(t�iiesitsliAbtpFL%,adedfioin ,1111cluuzstojiuch'11111� III watefk.,Itj,� NO SCIIII - DIVERSION CHANNEL CROSSING ACCEPTABLE LININGS (CROSS SECTION A -A OF PLATE 3.25-1) SILT FENCE PI`� POST SILT FENCE / I/ TYPE A DIVERSION POLYETHYLENE (5 MIL. VW.� 'I OI GRASS LNER -7---Jq " ,�_ EXJSTI� GROUND I EXISMW GROUND �__ I. - 0 1`1 TYPE B DIVERSION -S*I- 13 RIPRAP FILLEQ 2_07� .1� k DISTING GROUND .�? rk, EXISMING GROI . 10 6' WII TYPE C DIVERSION IYPRAP FILTER _r � OR &AIIII)BAG LINER I EXISYNG GROLIND -�., V ND - 6' MINIMUM OR WIDTH OF EXISTING STREAM WHICHEVER IS LESS -- ENTRENCH SILT FENCE AND FLIER CLOTH IN SAK tKHI I Plat.3.25.1 Source: Adapted from VDOT Standard Sheets 3.25 Plate 3.25-2 SCOTT/R. C73-LLINSZ ' Lic. No. 035791.z�_ k 8/22/22 PA �C,�46.�) %iI �C,� I wo) z 0 _, . < t r � U) CII L.) 2: Ln 00 z 11.1 :D a Ln Z _J 0 0 < . F_ " In . 5 z 11.1 V) 10� IM04 > LU W . . 1 0 C � � N r4 W " � !�E rN d CIJ ;6� CY) L9 V_ PI Z U) - CY) cyi III _j - < CY) CN _3 a- �-- A� 4 LU CY) 'I 0- C) I 0! 2: 0,6 cl�j C:) U) > LU �! CC\I)l WIII 2: F -­ < 0 < 0� W > 11-IIIIIIIIIIII U) O� LU _j Z < Z _j LU > U) F-- X - U) _EI LU - `­'i LU LU �__ � L9 0 LU 0 =) z Q� < z z _j 0 T_ Q LU > O� WI . < F___ z �� 0� 0 LU III LU C) I F-­ Ul=) C/) U z IIIII 0� LU < 2 ZLU LJLIA ri� I 0 IIIII- � CO _j LU U) IIIII- _j 11-IIIIIIIIIIII 06 jIIIII- Lu [)� = �z Z jQ� < 0 0 - (-D 0 U) 0 C) C:) 0� 0 Of CN CID LLJ U - -.1 F- H � III JOB NO. 182150 SCALE N/A SHEET NO. 3 I D > I I I � � . > � 0 � D - � v � 0 a 5 a > = j 5 j v � - v - 5 - j z I D - � - - D a z 5 D - 0 � � D D j � - 0 � � v n 5 - > j � I - ) D I � J J I D I J 0 - j j D � 0 � a D a v > A 0 � � v V n � - � = 11 T 0 4�' SCOTT R. LINSZ 7 1­` LAU. INO. 8/22/22 Z_ 0 Z_ ,45� SOIL TVPE A- 27B\ A Ar / R lgj \ \ \ I z 0 u (A /\—SOIL BOUNDARY (TYP w M 40 Z < (40 0 le DRAINAGE DIVIDE (TYP.) Z//z PROPOSED LIMITS A -A OF DISTURBANCE IJKUPUbt: LIMITS OF DISTURBANCE EXIS I ING STREAM Lu PROPOS�D LIMITS OF TREE CLEARING PAPOSED 'SAFETY FENCE, 4!lNb I ALL SIGNS "WARNING/ ol PROPOSED bUTF E p ,�e,,QUICK SAND, KEEP OUT" PROPOSED ALL,SL:E -FOCKPILL ALL S 41- SWM SHEETS FOR DEiTAILS / 4 SURROUNDED 7 V", N BY SILT FENCE -Ij �x r)p r PHASE I DRA NAGE AREA TO D SEDIMENT TRAP #2 2.06 ACRES F STEEP SLOPES (TYP.) S% r-4 S EXI_5��INMANAGE I �WIRE' t4l uj 4 :E 4f SUPPORT r4 LIMITS OF DISTURBANCE APPROVED SOIL DESCRIPTION (TYR) SOIL BOUNDARY gyp­)L�z WITH WP0202000004 - BROOKHILL Cb BLOCKS 9, 10, & 11 VSMP PLAN T -Sui DESCRIPTION w It 0 1 L Y-PE :(TYP /WIRE S yp� SUPPORT 7C SOIL�YPE nTp 27C PROPOSED 18" DIVERSION. CONTRACTOR '0\ PROP 8" 151VER TOR ---- OSED I St6N. CONTRAc SHALL ENSURE POSITIVE SLOPE I SHALL ENSURE POSITIVE SLOPE IS DID CY) PROPOSED FLOW BARRIER (SANDBAG 3, PLYWOOD, JERSEY BARRIERS OR MAINTAINED. BERM SHALL BE STABILIZED MAINTAINED. BERM SHALL BE STABILIZED r Lu EQUIVALENT). SEE SHEET 3 FOR ADDITIONAL STREAM CROSSING DETAILS. I AS A FIRST STEP IN DISTURBANCE.� CONTRACTOR SHALL REMOVE PROPOSED FLOW BARRIER & STREAM AS A FIRST STEP IN DISTURBANCE. DIVERSION ONLY AFTER THE CULVERT INSTALLATION HAS BEEN COMPLETED, PROPOSED RIPRAP' PROP 65ED SAFETY FENCE, SIF W/WIRE/' Co RR 'WARNING SU7ORT _j ACCEPTED BY VDOT AND THE ESC INSPECTOR GRANTS APPROVAE AT TRANSITION imITS CY) SAF INSTALL SIGNS' PROPC ED L QUICK SAND, KEEP OUT" CN 0 OF DIS URBAN-_C EAIS�TIN'G SWM OUTFALL TO BE RE- c1l) PRIOR TO THE INSTALLATION OF THE PROPOSED STREAM DIVERSION & CULVERT CROS POSED LIMITS lb OF TREE CLLARINU V) (N DIJI L �\T �E > Swm FACILITY APPROVED WITH *WIR!E-- CY) 39D\\ r�4 WP0202000004 - BROOKHILL Rl!� C` cc BLOCKS 9, 10, & 11 VSMP PLAN "IRE OL W/WIRE S �o 1 1 \�w IN I SF < UPPOR] SOILTYF�E S t2i > 27B W/WIRE RAINAGE DIVIDE (TYP.) XISTfNG STREAM 0 I Lil vc� SU JA y y \I p _j Lu F- 0 UL :RTINSI > TP U) u P Po :D ALIGNMENT CONTRACTOR SHALL INSTALLAND MAINTAINA6'WIDE WITH 2:1SIDE SLOPESTYPE B STREAM Lij -\\STREAM DIVERSION WHILE FLOW DIVERSION PER DIVERSION CHANNEL CROSSING VESCH DETAIL 3.25-1 AND 3.25-2 DURING us LLJ CULVERT IS INSTALLED L ENTIRE CULVERT CONSTRUCTION OPERATION. y I - -_ - 2. SILT FENCE SHALL BE INSTALLED ON BOTH SIDES OF THE PROPOSED STREAM DIVERSION CHANNEL. 0 Lu Lu PROP S D LIMI OF DjSTURBAN E THE CONTRACTOR SHALL INSTALL AND ADJUSTSILT FENCE AS NECESSARYTO PREVENT SOIL FROM L9 V ENTERING STREAM. RIPRAP SHALL BE PROVIDED WITHIN THE EXISTING STREAM BED ATTHE 0 O\ TRANSITION FROM THE EXISTING STREAMBED TO THE PROPOSED DIVERSION CHANNEL, AND AT < Lu THE TRANSITION BACK FROM THE DIVERSION CHANNEL TO THE EXISTING STREAMBED. AN Lu (f) PROPOSED SAFETY FENCE APPROVED FLOW BARRIER (SANDBAGS, PLYWOOD, JERSEY BARRIER, OR EQUIVALENT) WILL BE 0 0 INS I ALL SIGNS "WARNING' SAF INSTALLED BEHIND THE RIPRAP TRANSITION. > 06 v QUICKSAND KEEP Oul /3- THE DIVERSION CHANNEL CROSSING MUST BE OPERATIONAL BEFORE WORK IS PERFORMED IN THE 0 /A RIPRAP STREAM (CONSTRUCTION OF DIVERSION SHALL BE PERFORMED "IN THE DRY"). O\ SOIL TYP� IRR PROPOSED UPON COMPLETION OF THE CULVERT CONSTRUCTION AND WITH INSPECTOR APPROVAL, THE Al 11-161TION 4. w CONTRACTOR SHALL REMOVE THE STREAM DIVERSION AND ALLOW STREAM FLOW TO RESUME UJ THROUGH THE CULVERT. 0 0�\ `­�14_` 1 RUCTION ENTRANCE WASHOFF RUNOFF. �,PROPOSED FLOW BARRIER (SAI 'T_H F� M TRAP #1 TO'BE UTILIZEDIFOR - V KIN _T/REA COVEI�ED UNDER VIRGIN I�A WATER PROTECTION (V , \ I DBAGS, PLYWOOD, JERSEY BARRIERS OF T NUMBER 16-1133 FOR THE BROOKHILL PROJECT. Co U Lu O\ EQUIVALENT). SEE SHEET 3 FOR ADDITIONAL STREAM CROSSING DETAILS. INDIVIDUALPERMI ul ST1 CONTRACTOR SHALL REMOVE PROPOSED FLOW BARRIER & STREAM 0� 1­4 A\ If DIVERSION ONLY AFTER THE CULVERT INSTALLATION HAS BEEN COMPLETED, Lij < Lu ol w Lf) ACCEPTED BY VDOT AND THE ESC INSPECTOR GRANTS APPROVAL. < 0 WI j _j 10 PP�RT U) _j T p--q v� EXISTING STREAM C� > w/WIRE 00 PHASE I DRAINAGE AREA TO )SUPPORT I SEDIMENT TRAP #2 - 0.48 ACRES NC DRAINAGE DIVIDE 11 IS, LIMITS'dF'DISTURBA /'E APPROVED C OPOS'�D CONTRACTOR' I D WITH WP0202000004 - BROOKHILL LEGEND LEGEND 0 C�OR BLOCKS 9, 10, & 11 VSMP PLAN GR�pffl� SCALE SAFETY FENCE PER VESCH 3. 01 LIMITS OF LAND DISTURBANCE C:) PARKING & STAGING AREA I PROPOSED 18" DIVERSION. CONTRA SHALL ENSURE POSITIVE SLOPE IS 8 C:) CONSTRUCTION ENTRANCE PER VESCH 3.02 DIVERSION DIKE (N MAINTAINED. BERM SHALL BE STABILIZED AS A FI T,STEP IN DISTURBANCE. SUPER SILT FENCE PER VESCH 3.05 BOUNDARYLINE —SSF—SSF— vd, SILTFENCE PROPOSED CO IN F�ET INLET PROTECTION PER VESCH 3.07 DIRECTION OF FLOW WA HOLT AREA inch 7 40 f 1�1 THE FUELING TANK SHALL BE C �ELY WO NO D YA 653.75— PROPOSED CONTOUR 0 'E" �E'PI 2'WIIDE ' /1� u .�M 6 // B DIVERSION DIKE PER VESCH 3.09 u Lu `-I tu DRAINAGE DIVIDE 0 C - - - - - - - - - C� EARTHEN BERM WITH A HEAVY MIL POLYETHYLENE LINING, OR BE PLA 'ED IN AN/ RIGHT OF WAY DIVERSION PER VESCH3.11 IMPERVIOUS OPEN -TOP DUMPSTER. THE PROPOSED BERM OR DUMPSTER SHALL SOILS LINE a- (n LOCATION OF FUELING A EA CONTAIN FUEL IN THE EVENT OF A SPILL. CONTRACTOR SHALL ENSURE VOLUME SEDIMENT TRAP PER VESCH 3.13 JOB NO. WATER WAY OUTLET PROTECTION PER VESCH 3. 18 & NUMPSTd CAPACITY IS 10% LARGER THAN THE MAXIMUM VOLUME OF STORED FUEL TREELINE 182150 ICATION OF 15c\v PROPOSED PAVED CONSTYUCTION ENTRANCE TEMPORARY SEEDING PER VESCH 3.31 SCALE 0� (12'00' MIN.) w/ WASH RACK & DOWN GRADIENT --- EXISTING PRESERVED PERMANENT SEEDING PER VESCH 3.32 PRESERVED SLOPES 10 DIVERSION - SEDIME�T TRAf PING DEVICE STEEP SLOPES (TYP.) MANAGED SLOPES 1 it =40' I \ \1 % SWM FOREST & SOIL STABILIZATION BLANKET PER VESCH 3.36 LO TION OF -- ------ OPEN SPACE EASEMENT SHEEFNO. C� \ , \ \I V\ TREE PROTECTION TAPE PER VESCH 3.38 1 0 PORTA-POTTIES v CH 3.39 4 DUST CONTROL PER VES 1� 4b.— IM 4� + sC( LINSZ 0 U Lic. No. 035791,�� 16 8/22/22 S"tOINVAL S —458— or 1_� 09, z 145� ,z A - goo A- p C # v 0 A\ 00 x 10 u 10� =3 OWNS 0 < Ao 06f m Lo DRAINAGE DIVIDE (TYP.) 0 FKUFUSED LIMITS 401, N-av, 6 5� FIKUFU�DED LIMITS OF DISTURBANCE , / _/ Z' SF Lu EXISTING STREAM OF DISTURBANCE / / / / / / I I \N PROPOSED 18 DIVERION. CONTRACTOR PROPOSED /LIMITS SHALL ENSURE POSITIVE SLOPE IS tie OF TREE L�ARING PAPOSED SAFETY FENCE, MAINTAINED. BERM SHALL BE STABILIZED �5� A ANSTALL SIGNS "WARNING/ AS A ;PST STEP IN DISTURBANCE. E, QUICKSAND, KEEP OUT" 4-i PROPOSED' > PROPOSED bUTFALL SEE SWM SHEETS FOR DETAILS STOCKPILE sAF--- 4F PROPOSED VDOT STD. EC-1, CLASS AI RIPRAP LINED OUTLET PROT C ON WITH FILTER FAB 'IC BY SILT F ENCE 4f UNDERLAYMENT (L=19'±, W1=10', W2=19', D=18"). STONETO BE INSTALLED FLAT&TO EXTEND T 4f THE CHANNEL'S BANK. FILTER FABRIC SHALL BE KEYED INTO THE EXISTING GROUND AT A MINIMUM OF 9" AT THE END & ALONG THE PERIMETER. EDGES OF FYRIC SHALL OVE qSF r iq 111IN. Or 9 r-i IRE SUPPORT r14 XISTING MANAGED L P SLOPES (TYP.) LIMITS OF DISTURBANCE APPROVED- STEE PHASEIII 00 009, 1� 1� WITH WP0202000004 - BROOKHILL DIMENT TRAP ;F3 l.q.J AU "BLOCKS 9, 10, & 11 VSMP PLAN ST _SE s TP S w/WIRE E UPPORI w/WIRE F 0 IP IRT C D UPSTREAM ERGY DISSIPATER, DD FIKUPOSED VDOT CL. AI RIPRAP LINE FILTER FABRIC UNDERLAYMENT. FILTER FABRIC TO BE KEYED INTO --------- ------ DC DRAIN GE DIVIDE (TYP.) THE EXISTING GROUND A MINIMUM OF 9" AT THE ENDS AND ALONG THE PERIMETER, AND THE STRIPS OF FABRIC SHALL OVERLAP A IINIMUM OF Lu r�_ 12". ENERGY DISSIPATER DIMENSIONS: 35' LONG, 10'WIDE AT THE�` L.ULYCKI IAIN,� WPE AT THE END. S�PNE THICKNESS= IS." \ 0� vy,/ wl > 3' SUPPYRT PROPOSED LIMITS CN AUt AKtA I r) OF DI URBANCE SEDIMENT TRAP #2 = 1.1 X, -440r- 0 z PR POSED LIMITS KEE CLEARING > 04 U) C:) SWM FACILITY APPROVED WITH CY) > -v4 Wl R E­_ WP0202000004 PROPOSED 18" DIVERSION. CONTRACTOR - BROOKHILL SHALL ENSURE POSITIVE SLOPE IS CC, 10, & 11 VSMP PLAN xz� I MAINTAINED. BERM SHALL BE STABILIZED BLOCKS 9 ASA FIRST ST - EP IN DISTA7ANCE 0 < > 0 �INAGE DIVIDE (TY ce 0 NG STREAM LLi Ll \10 K6PO/SED SAF�T46NCE, X NSTALL SIGNS "WARNING' Lu > 0 I ICK SAND, KEEP OUT" 0 WDC u vd�\ H L DNAL AS LOI U) x l"AS POSSIBLE, AS DESIGNED& SHOWN. SEDIMENT TRAP j Lu F- F Lu OT BE REMOVED UNTIL THE UPLAND STORM SEWER IS LLJ \.PROPUDLU L11-11 I a7 \ND IS OPERATIONAL. SEDIMENT TRAP #2 SHALL NOT 0 Lu 2: OF'OISTURBANJE _B� REMOVED NTIL THE ES/C INSPECTPR APPRCV S ITS REMOVAL. w/WIRE uj \0\ PPORT < 2: 0\ -46 L% T_ Lu /Su 0 > C6 DROP SED SAFETY"FENCE, 0 C� INSTALL SIGNS "WARNING \A/ QUICK SAND, KEEP OUT" v 0 C� f Lu Lu U) 0 > _0p C� 0 > /�EDIMENT TRAP #1 TO BE LITILIZED-FOR DR CL. Al RIPRA'P LINED DOWNSTREAM 0 T PR TECTION, WITH FI ER FABRIC V P SED VDOT UNDERLAYMENT. FILTER FABRIC TO BE KEYED INTO THE EXISTING GROUND A MINIMUM OF 91, AT THE ENDS AND cj� NOFF. co Lu ALONG THE PERIMETER, AND THE STRIPS OF FABRIC SHALL OVERLAP A MINIMUM OF 12". ENERGY DISSIPATER I , , ul CONSTRUCTION ENTRANCE WASHOFF RUNOFF. DIMENSIONS: 16.' LONG, 10' WIDE AT THE CULVERT AND 25'WIDE AT THE END. STONE THICKNESS=18" Lu PROPOSED 18" DIVERSION. CONTRACTOR —SHALL ENSURE POSITIVE SLOPE IS Lu LLI v(j MAINTAINED. BERM SHALL BE STABILIZED < AS A FIRST S7P IN DISTYRBANCE wl p = )PPORI �2 C/) _j A F_ Lu > w/WIRE EXISTING STREAM ry X PHASE II DRAINAGE AREA T 0 40p, )�)SUPPORT —::::::45 zz SEDIMENT TRAP #1 0.48 ACI DRAINAGE DIVIDE (TYP\)\ RS IMITS-dF'DI'STURBA 'CE A(PPROVED LEGEND LEGEND WITH WPO 02000004 - BROOKHILL 0 2 PROI ONTRACTOR"' DD 'BLOCKS 9, 10, & 11 VSMP PLAN SAFETY FENCE PER VESCH 3. 01 LIMITS OF LAND DISTURBANCE C:) PARKING & STAGING AREA CONSTRUCTION ENTRANCE PER VESCH 3.02 PROPO ED 18" 6�v 'SION . C6NT' R 0 4 44 4 DIVERSION DIKE SHALL ENSURE POSITIVE SLOPE is SUPER SILT FENCE PER VESCH 3.05 mmvmffimmm� BOUNDARYLINE MAINTAINED. BERM SHALL BE STABILIZED SILT FENCE w PROPOSE6 CO RETE INLET PROTECTION PER VESCH 3.07 C) AS A FIRST STEP IN DISTURBANCE. WA H, Ui DIRECTION OF FLOW ktuj DIVERSION DIKE PER VESCH 3.09 u 0 THE FUELING TANK SHALL BE CO LETELY kkOUNDED BY A 2' DEEP, 2� WIDE —653.75— PROPOSED CONTOUR Lu tu- E EARTHEN BERM WITH A HEAVY MIL POLYETHYLENE LINING, OR BE PLACED IN AN/ RIGHT OF WAY DIVERSION PER VESCH 3AI - - - - - - - - - DRAINAGE DIVIDE 0 6 vc� IMPERVIOUS OPEN -TOP DUMPSTER. THE PROPOSED BERM OR DUMPSTER SHALL L CATION OF FUELING A EA CONTAIN FUEL IN THE EVENT OF A SPILL. CONTRACTOR SHALL ENSURE VOLUME SEDIMENT TRAP PER VESCH 3.13 SOILS LINE JOB NO. WATER WAY CAPACITY IS 10% LARGER THAN THE MAXIMUM VOLUME OF STORED FUEL. GRAPHI SCALE OUTLET PROTEC77ON PER VESCH 3.18 . . .... — 9� LOCATION OF 15cy bUMPST6IRr TREELINE 182150 0 0 2� 40 8. 0 -PROPOSED PAVED CONSffUCTION ENTRANCE TEMPORARY SEEDING PER VESCH 3.31 SCALE 0 CE (12'00' MIN.) w/ WASH RACK & DOWN GRADIENT EXISTING PRESERV PERMANENT SEEDING PER VESCH 3.32 10 ED PRESERVED SLOPES 0�\ It c DIVERSION SEDIMENTT PPING DEVICE STEEP SLOPES (TYP.) MANAGED SLOPES 1 =40' 0 1�� �I9w" , I \ 1� SOIL STABILIZATION BLANKET PER VESCH 3.36 IN �FEET C --------- SWM FOREST & 0 1 inch 49 1 t. - j OPEN SPACE EASEMENT SHEEFNO. 0 LOCATION OF d\ TREE PROTECTION TAPE PER VESCH 3.38 PORTA-POTTIES 0 5 DUST CONTROL PER VESCH 3.39 Z_ 452 r 00" 62 z on In Z o> EXISTING STREAM lz� lo� PROPOSED bUTFALL, SEE > SWM SHEETS FOR DETAILS FROF OSED VDOT STD. EC-1, CLASS AI RIPRAP LINED OUTLET PROTE`CTION WITH FILTER 'FABRIC UNDERLAYMENT (L=19'±, Wl=lo" W2=19', D=18"). STONE TO BE INSTALLED FLAT &TO EXTEND TO THE CHANNEL'S BANK. FILTER FABRIC SHALL BE KEYED INTO THE EXISTING GROUND AT A MINIMUM OF 9"AT THE END & ALONG THE PERIMETER. EDGES OF FTRIC SHALL OVE P MIN. OF 9,-, �XISTING MANAGED STEEP SLOPES (TYP.), LIMITS OF DISTURBANCE APPROVED WITH WP0202000004 - BROOKHILL - H 0 zz �4SCOTT R. 4s�� 1C. 0. 8/22/22 a2kl IONAL V, zl- v )/o) M //// , / I \ 4 wealm; CIP Mvi,/ Iwo z 0 Fj x (/) ,v P 4p z 0 DRAINAGE DIVIDE (I Tr.) Lu I W/w wl cr, #0 PROPOSED LIMITS PROPOSED Lli'll I D OF DISTURBANCE > OF DISTURBANCE, \N ui PROPOSED 3.8" DIVERsioTj. PROPOSED LIMITS CONTRACTOR SHALL ENSURE OF TREE CLEARING PeOPOSED SAFETY FENCE' POSITIVE SLOPE IS MAINTAINED /INSTALL SIGNS "WARNING BERM SHALL BE STABILIZED AS A QUICKSAND, KEEP OUT" FIRST TEP IN DISTURBANCE SAF SUPPORT T 00 BLOCKS 9, 10, & 11 VSMP PLAN /WIR SF w/WIRE IP F SED VDOT CL. AI RIPRAP LINED UPSTREAM ERG DISSIPATE. WITH FILTER FABRIC UNDERLAYMENT. FILTER FABRIC TO B KEYED INTO THE EXISTING GROUND A MINIMUM OF 9" AT THE ENDS AND ALONG THE L9 Ir PERIMETER, AND THE STRIPS OF FABRIC SHALL OVERLAP A MINIMUM OF r�_ 12 E N ERGY DISSIPATER DIM ENSION S: 35' LONG, 10' WI D E AT TH E IV? CULVERT AND-16'WPE AT THE E S w/WIRE < _ND.,$jTONE_THICKNE S=18" cy) P Op _j ED LIMITS 04 wo PRbPO E LI ITS I OF TR LE RIN C) > Swm FACILITY APPROVED WITH 3 /WIRE 00 < -202000004 - BROOKHILL (N _j BLOCKS 9, 10, & 11 VSMP PLAN PPORT zzzz < 0 _j 4; 'x > 0 zz N TREAM pl� Xzz z vo Lu _j _j Lu 0 > u P, -PROPOSED LEVEL SPREADER, U) x Lu SEE SWM SHEETS FOR DETAILS Lu Lu 0" Lu 0 OF DISTURBANJE _j PROP LIM ZD 0 wj\�JOE' z < Lu UPPORT U) LuO\ C) 66 PROPOS9D FLAT VDOT CLASS AI COARSE AGGREGATE OUTLET PROTECTION W/ - O\ 7�-* GEOTEXTILE FILTER FABRIC UNDERLAYMENT. FABRIC TO BE KEYED INTO EX. O�\ GROUND 9" MIN. AT ENDS & ALONG PERIMETER. FABRIC TO OVERLAP A MIN. OF 9" 0 v (L=10', W1=4', W2=10', D=18" MIN.) Z/ / r- y op t Lu 0 Lu C 7 OSEDVDOTCL. AI RIPRAP LINED DO'WN'ST'REAm uT TPROTECT WITH �LfElk B / UNDERLAYMENT. FILTER FABRIC TO BE KEYED INTO THE EXISTING GROUND A MINIMUM OF 9" AT THE ENDS AND V /WIRE ALONG THE PERIMETER, AND THE STRIPS OF FABRIC SHALL OVERLAP A MINIMUM OF 12'.. ENERGY DISSIPATER U) U UJI PPO DIMENSIONS: 16' LONG, 10' WIDE AT THE CULVERT AND 25'WIDEATTHE END. STONE THICKNESS= 18" ul F__4 A, Lu Lu Lr) LLI /_A < U) 1 5 _j & 0<1 Ps w/WIRE > SF EXISTING STREAM 00 SUPPORT LIMITS'dF `14�tURBAN/CE APPROVED < 0 LEGEND LEGEND ITH WP0202100004 - BROOKHILL (D 0 'BLOCKS 9 10, & 11 VSMP PLAN SAFETY FENCE PER VESCH 3. 01 LIMITS OF LAND DISTURBANCE CD CONSTRUCTION ENTRANCE PER VESCH 3.02 4 4 4 DIVERSION DIKE Co BOUNDARY LINE SUPER SILT FENCE PER VESCH 3. 05 f —SSF—SSF— SILT FENCE GRAPHIC SCALE INLET PROTECTION PER VESCH 3.07 DIRECTION OF FLOW 40 0 �o 40 'SUkIiOUNDED BY A 2- 5EEP, 2'IWIDE 653.75— PROPOSED CONTOUR tHE FUELING TANK SHALL B L �\E'L Y' u 0 E CO%M E DIVERSION DIKE PER VESCH 3.09 :ARTHEN BERM WITH A HEAVY MIL POLYETHYLENE LINING, OR BE PLACED IN AN/ RIGHT OF WAY DIVERSION PER VESCH 3. 11 - - - - - - - - - DRAINAGE DIVIDE 0 w APERVIOUS OPEN -TOP DUMPSTER. THE PROPOSED BERM OR DUMPSTER SHALL SEDIMENT TRAPPER VESCH 3.13 SOILS LINE ILn 0\ LOCATION OF FUELING EA CONTAIN FUEL IN THE EVENT OF A SPILL. CONTRACTOR SHALL ENSURE VOLUME IN FEET WATER WAY JOB NO. CAPACITY IS 10% LARGER THAN THE MAXIMUM VOLUME OF STORED FUEL. I inch 40 ft. OUTLET PROTECTION PER VESCH 3.18 d`\ LOCATION'OF15cy UMPSTIR TREELINE 182150 31 Nv)CTIbN EXISTING PRESERVED PRESERVED SLOPES 1�� TEMPORARY SEEDING PER VESCH 3. PROPOSED PAVED CONSTR SCALE O\ PERMANENT SEEDING PER VESCH 3.32 ENTRANCE (12 x70' MIN.) STEEP SLOPES (TYP.) MANAGED SLOPES 1 11=401 LOCATION OF TREE PROTECTION TAPE PER VESCH 3.38 SOIL STABILIZATION BLANKET PER VESCH 3.36 --------- S WM FOREST& 0�\ PORTA-PoTTIES 0� OPEN SPACE EASEMENT SHEET NO. DUST CONTROL PER VESCH 3.39 6 SEDIMENT TRAP #1 DETAIL SCALE 1 "=20' 446- A Sediment Trap #1 Design drainage area (acres) (<3) 0.48 trap volumes: elevation (ft) area (so volume(co volume(cy) 443 898 0 0.0 444 1174 1,033 38.3 446 1817 4,001 148.2 PR9POSED 2.9'x2O' "P LINED SPILLWAY BOTTOM ILEV.=444.00, V TOP ELE =445.00 5,- PROPOSED SAFETY FENCE, 411" INSTALL SIGNS "WARNING 4f QUICK SAND, KEEP OUT" 14 1 11 wimiix . I rTII­1 ORGINW_ CREST OF STONE WEIR L �'_J G�ND ELIN. . Q� DRYSTORAGE WET STORAGE (�ATED) wet storage: -ME PLATE 3 1�1 wet storage required (cy) (67*DA) 32.2 bottom of stone weir (ft) 444.0 wet storage provided at this elevation (cy) 38.3 slope of wet storage sides 2:1 weir length (ft) (6xDA) dry storage: bottom of trap elevation (ft) dry storage required (cy) (67*DA) 32�2 bottom trap dimensions: crest of stone weir 4450 top of dam elevation (ft) dry storage provided at this elevation (cy) 490 top width of dam (R) slope of dry storage sides 2-1 top trap dimensions 1992 1ARWI �CINAL G�.O ELIN C� AGGRECAR CI.ASS I RIPR�P 2.9 443 20111 446 4 321:K61' SEDIMENT TRAP #2 DETAIL SCALE 1 "=20' \PROPOSE 12_. \RIPRA\P LINEC PILL A BOTTOM ELE =419.25 PROPOSED SAFETY f ENCI INSTALL SIGNS "WARNIN QUICK SAND, KEEP OUT" -440- ass ASS - 27 -430- Cb TOP ELE .=42,1. 0 424--,, �Ss ASS iss ASS ass 4,101 0I 1 .0 Sediment Trap #2 Design drainage area (acres) (<3) 206 trap volumes: elevation (ft) area (so volume(co volume(cy) GROUND 417 1344 0 0.0 418 1664 1,501 55.6 420 2400 5,543 205.3 422 3264 11.185 414.2 I I, I vmiAiI I I r7� CREST OF STONE WEIR I I,, I DRY STORAGE WET STORAGE 0CAWTED> wet storage: -ME PLATE 113-1 wet storage required (cy) (67*DA) 138.0 bottom of stone weir (ft) 419.25 wet storage provided at this elevation (cy) 144.3 slope of wet storage sides 2:1 weir length (ft) (6xDA) dry storage: bottom of trap elevation (ft) dry storage required (cy) (67*13A) 1380 bottom trap dimensions, crest of stone weir 4210 top of dam elevation (ft) dry storage provided at this elevation (GY) 1575 top width of dam (ft) slope of dry storage sides 2-1 top trap dimensions 3.18 PIPE OUTLET COIVDITIONS A A L `IPE OUTLET TO FLAT REA WITH NO DEFINED !HANNEL L 0 % d F-4 -f- SECTION A -A FILTER CLOTH KEY IN 6--9"; RECOMMENDED FOR ENTIRE PERIMETER I 3do (MIN.) PIPE OUTLET TO WELL DEFINED CHANNEL PLAN VIEW a 0 It SECTION A -A T _F FILTER CLOTH KEY IN e-y'; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP. GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHFS. Source: Va. DSWC Plate 3.18-1 1992 V MAIL \ I FILTER CLOTH �IUL GROL0.D " \ ft� C�E �EGATE C�S I RP� 12.4 417 2ft4g 422 4! 4ft69 SILT FENCE CULVERT INLET PROTECTION .......... 'DISTANCE IS 6' MINIMUM IF FLOW LFLOW IS TOWARD EMBANKMENT OPTIONAL STONE COMBINATION FLOW VDOT J3, #357 OR J5 TO REPLACE SILT FrNCE HIGH VELOCITY OF FLOW IS EXPECXD Source: Adapted from VDOT Standard Sheets and Va. IDSWC I RIPRAP 0 Plate 3.08-1 SEDIMENT TRAP #3 PETAI'L NOTE /'CONTPACT`0/R TO INSfA SA(M/FACIL'ITY RISER/, SCALE 1 11=20 BARREL, AND OUTFALL PER PLAX ALL ORIFICES SHALL REMAIN PLUGGED LIN THJE SEDIMENT TRAP IS 46* CONVERTED TO A RMANENT SWM FACILITY. J* PROPOSED VDOT STD. EC-1, CLASS Al RIPRAP LINED OUTLET ,TA IT Tl' RMI PROTECTION WITH FILTER FABRIC UNDERLAYMENT (L=19'±, W1=10', TO PREVENT FLOTATION THE RISER BASE W2=19', D=18'). STONE TO BE4NSTALLED FLAT & TO EXTEND TO --SHALL BE FIRMLY EMBEDDED 6" INTO AN 18" STREAM THE CHANNEL's BANK. FILTER'FABRIC SHALL BE KEYED INTO THE THICKREIN FORCED CONCRETE FOUNDATION LIMITS, TYP. EXISTING GROUND AT A MINIMUM OF 9" AT THE END &ALONG THE PERIMETER. EDGES OF FABRIC SHALL OVERLAP A MIN.,OF 9". M�\ T IS 8�x&, AND -BURIED BELOW GROUND. PROPOSED VDOT STD. EW-1 PROPOSED 24" HDPE BARREL INV. IN=430.00, INV. OUI L=lo4.74', S=9.55% A 4S 0 15 0 X PROPOSED 8 6'x36' RIPRAP LINEDI SPILLWAY PROPOSED SAFETY FENCE, BOTTOM ELEV.=443, 010 INSTALL SIGNS "WARNING TOP ELFV.=4451.,(06 QUICK SAND, KEEP OUT" �4�RCP RISER 'PROPOSED RIM=443.50 GRAPHIC SCALE 0 �O 40 IN FEET 1 inch = 20 ft. Sediment Trap #3 Design drainage area (acres) (<3) 1.43 trap volumes- ORIGINAL CREST OF STONE WEIR elevation (ft) area (so volume(cf) volume(cy) ORDUND 436 141 0 0.0 ELIN. 438 399 518 192 DRY STORAGE 440 783 1,679 622 442 1293 3,734 138.3 444 1926 6,932 256.7 WET STORAGE 4- MkC 446 2666 11,504 426.1 (DIC"TED) FILTER CLOTH OfflGINAL G�NO wet storage, 6SEE PtAx xf�l C� ACGREGATE CIASS I RIPRAP wet storage required (cy) (67*DA) 95.8 bottom of stone weir (ft) 4430 wet storage provided at this elevation (cy) 197.6 slope of wet storage sides 2-1 weir length (ft) (6xDA) 86 dry storage: bottom of trap elevation (ft) 436 dry storage required (cy) (67*13A) 958 bottom trap dimensions: 15�x 15' crest of stone weir 4450 top of dam elevation (ft) 446 dry storage provided at this elevation (cy) 1439 top width of dam (ft) 12' slope of dry storage sides 2-1 top trap dimensions 641:K64' 1992 3.07 GRAVEL CURB INLET SEDIMENT FIL TER GRAVEL FILTER 12 RUNOFF WATER WIRE MESH FILTERED WATER SEDI ENT C NCR E GUTTER 12"� CURB INLET SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE. Source: Va. DSWC Plate 3.07-6 1992 3.36 TYPICAL ORIENTATION OF TREA TMENT - I (SOIL STABILIZATION BLANKET) SHALLOW SLOPE ON SHALL SLOPES, STRIPS OF NETTING PROTECTIVE COVERINGS MAY BE APPLIED ACROSS THE SLOPE. BERM WHERE THERE IS A BERM AT THE TOP OF THE SLOPE. BRING THE MATERIAL UI THE BERM AND ANCHOR rr BEHIND THE BERM. STEU SLOPE ON ST SLOPES, APPLY PROTECTIVE OUVIERINQ PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. 4- BRING MATERIAL DOWN TO A LEVEL AREA BEFORE TERMINI THE INSTALLATION. TURN THE END UNDER Ir AND STAPLE AT If INTERVALS. DITCH FLOW IN DITCHES. APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW. USE CHECK SLOTS AS REQUIRED. AVOID JOINING MATERIAL IN THE CENTER OF THE DITCH IF AT ALL POSSIBLE Source: Adapted from Ludlow Products Brochure Plate 3.36-1 1� SC OTT /R.IC1,LLINS7� Lic. No. 035791 8/22/22 z 0 z Ln W CO =) 0 0 Z 0 U) < In LU W 00 0 CY) 00 (Vi CY) 17�4 04 U) C:) > C7) (j) < 0 _j II < > (j) F-- LU _j LU 0 _j LU _j > 0 C0 x Q� LU LU F-- Z L9 F-- 0 LU 0 _j U 0� F- z: z< z: LU LU > W < LU U) LL] F__ LU 66 Ul co U 0 F-: LU < 0 z LU 10� Lu F- U) F- _j F- LU < 0 (3 0 C:) cl� C:) CNJ U U 0 0� Lu LLI M CL. Fn I JOB NO. 182150 SCALE 1 11=20' W, D /Z 0 TH 0 L r R N S �Z' sc 0 1 1 H. LLINS' 0 LL 91 TT Li rcN 035791,1�, 0 0 5 8/ 0 22/22 -17 �7- -174 471 8' -47� 01 L A -7 VA _77 47 A A A A Z:� 9—XISTING -7- ROUT�E29 '�7 ---------- -TSOUTHOGUNIffy- �7 7-- EXISTING --7-/—RO-Tg- —7Z UTE — ------ 7Z- -MRTFrBOM jl\ Dj— W -M 7��M "7 ------------ Z 4V# 4f# 41V u go in mi 00 APPROVED POST-DEVELOPKEN E V) co N-74, TC'= 0-42'hirs. 0 U) 0 < F- U-) —47 41-- -474 46o LOT LOT LOT 32 LEVEL II WET Lu LC r POND 22 —7 41� 23 LOT 2* 3 Z -mvT ------- APPROVED LOT, 7- LOT* SWM FACILITY LOT ------- -- 4F/ 94P 41 "000�* man 00 P, LOT -A L - 5 PRE-DEV LOT LOT 6 I LOT LOT LOT LO LO \ , . I - 0.70 ac. Ll PRE-DEV 4 CN=56 T I * , \' --, l--1 --� t)UbAKEA 4B: Or 411� ---- - - Tc=0.13..,.. W, Amp 1.36 ac. /APPROVED BLOCK 9 458 CN=60 (SUB 202 00082) I* SM All Ar cy) 458 ....... !�Ar#*4w _Tc= - 0 - .16 hrs. L9 4,6 1 OF OLF\\w// A -Ev-3, AW IN LOIW 15 454--- 5''OF CONC.\ F�OW wl A EL / EV.-11' 55' OF CHNL. FLOW AT 5 ft/ s W-ft ** < "Ni we � I / 0) -Too, I O�F A ELEV��i 3 A 0 --6,5' OF QTC. FL W 4 z T N HIGH POINT OF PRE-DEV. SUBAREA 4A COINCIDES WITH cy) LOI i z -11 BERM & SWALE I HE LOCATION OF THE APPROVED BLKS 9 vl� uj )VED�B 10' LOT 56 THAT DIRECTS RUNOFF INTO THE WET POND. APPROVED < PORTION OF ARCHER AVENUE, AS EVIDENCED IN THE jTa ojl�_ (SUB 2020ITa a, OT BLKS 9-11 WET POND WAS DESIGNED TO HANDLE THIS APPROVED BERM & SWALE SHOWN ON THIS SHEET. > 1-4 LLJ T LOT Ld L ) - I / s / I a - < I I --- a 36 P0, 53 z Lu 52 co Lu LOT C9 11 LLJ % z 411111111 Lu 'S T L9 A PROPOSED, //'J' < Lu TYPICAL /y/ c) > Lo T : I Or GRE NWAY J 5� TT V Lr) 4WI I PROPOSED TPAILWAY LUI p 48 uj z 42 LU V1 ul co u 2 LOT I r) :77 LOT 58 APP OT 59 Irs Pre -Development Post -Development I Area, a c. A--- -- DA 4A 0.70 u 'u DA 413 1.36 1:36 2.06 2.06 T OT LO L 7' 0 60 JERSHED SUMMARY FOR SUBAREA 4A LOT — — — — — — — — 78 1 1� Area, 1-year Flow, 2-year Flow, 10-year Flow, 6 CN LOT ac. cfs cfs cfs J, LOT DA 4A (Pre-Dev.) 56 0.70 0.12 0.24 1.29 b2 GRA,' c LE L T 76 30 60 12 60 LOT it WATERSHED SUMMARY FOR SUBAREA 4B Area, 1-year Flow, 2-year Flow, 10-year Flow, 63 LOT 63 CN ac. cfs cfs cfs 7S V) L IN FEET i----EpA 4B —(Prepey 60 1.36 0.37 1.13 3.09 LOT Al inch = 60 Lu -j Lu cf) Lu Lu Lu 0� 0 (D 0 c:) cl� c:) N u') 3013 NO. 182150 SCALE 1 11=60' SHEET NO. 8 z 0 z z 0 0 x 0 9 0 0 0 STORMWATER MANAGEMENT NARRATIVE: z op! OVERVIEW THIS PROJECT IS FOR THE EXTENSION OF ARCHER AVENUE AND IS PART OF THE DEVELOPMENT. STORMWATER TREATMENT IS PROVIDED TO MITIGATE THE IMPAC -494 P KHILL OM FOR THE C� ADDITIONAL DETAILS. SEE THE ACCOMPANYING STORMWATER MANAGEMENT CALCULATIONS PACKET FOR �L_Y_ r, SCOTT R.. LINS PROPOSED IMPROVEMENTS AND THE PLANS COMPLY WITH PART IIS REQUIREMENTS. PLEASE C) j U Lic. No. 035791 WATER QUALITY SUMMARY ------------ YO 8/22/22 -474- THIS DEVELOPMENT REQUIRES THE REMOVAL OF 1.82 Ibs/yr OF PHOSPHOROUS. THIS A 47 REMOVAL RATE IS BASED ON THE DEQ VRRM SPREADSHEET. THE PHOSPHOROUS REMOVAL RATE COMPLIANCE IS MET THROUGH TWO BEST MANAGEMENT PRACTICES. A LEVEL SPREADER A A A OUTFALLING INTO A VEGETATED FILTER STRIP WITH TYPE B SOILS TREATS SUBAREA 4B. 7 101VAL EXISTING AFTER THE IMPLEMENTATION OF THIS BMP, A NUTRIENT CREDIT PURCHASE OF 1.00 Ibs/yr OF PHOSPHOROUS HAS BEEN PROVIDED TO MEET THE REMAINDER OF THE WATER QUALITY REQUIREMENTS. i�OUT�E29 ----------- z WATER QUANTITY SUMMARY �7 THE PROPOSED ROAD EXTENSION CREATES TWO (2) CONCENTRATED OUTFALLS, WHICH ARE TWO (2) POINTS 7/ - SHOWN AND LABELED ON THIS SHEET AS POINTS OF ANALYSIS #1 & #2. THE �7_ - OF ANALYSIS WERE USED IN THE CHANNEL AND FLOOD PROTECTION ANALYSES. EXISTING 1z_RUU_TET9_ 7Z- - - - - - - — POINT OF ANALYSIS #1 IS DOWNSTREAM FROM SUBAREA 4A AND THE PROPOSED CULVERT -MRTFrBOMDJ— W - CROSSING. POST -DEVELOPMENT RUNOFF IS CONVEYED TO A RIPRAP LINED OUTLET - PROTECTION LOCATED IN THE STREAM's BED VIA NEW CONCRETE -LINED STORM SEWER. THE 'Ilk - 2-YEAR DESIGN STORM IS NOT EROSIVE ON THE CONCRETE LINED PIPE AND RIPRAP OUTLET M Z__ PROTECTION, AND THE 10-YEAR DESIGN STORM HYDRAULIC GRADE LINES ARE CONTAINED WITHIN THE SYSTEM, AS SHOWN ON THE ROAD PLAN's SHEET 10. CHANNEL PR( COMPLIANCE IS THEREFORE MET FOR POINT OF ANALYSIS #1 (SUBAREA 4A) VIA 9 VAC VAC 9 25-870-66, SUBSECTION B.1.a (2-YR PEAK FLOW IS NOT EROSIVE IN MANMADE PIPES AND RIPRAP). THE LIMITS OF ANALYSIS FOR THE CHANNEL PROTECTION TERMINATES AT POINT OF z 411# ANALYSIS #1, THE STREAM's RIPRAP LINED BED, SINCE THE STREAM's DRAINAGE AREA IS 100 _7�4 < TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF SUBAREA 4A. THE STREAM's *4t# DRAINAGE AREA IS 79.20 ac., AS SHOWN ON THE ROAD PLAN's SHEET 11, AND SUB.... 4,. DRAINAGE AREA IS 0.70 ac. THIS SUBSECTION 15 BA.a. FLOOD PROTECTION IS MET FOR U Ln cc SUBAREA 4A VIA 9 VAC 25-870-66, SUBSECTION C.2.a (CONFINES THE POST -DEVELOPMENT W Z) -C .. 0 U) 10-yr PEAK FLOW). PLEASE NOTE, THE AFOREMENTIONED STORM SEWER ANALYSIS CONFIRMS X z ��* ) / ) , 7 - , 0 SUBAREA 4A's RUNOFF IS CONTAINED WITHIN THE CLOSED STORM SEWER NETWORK. THE IfO Y� S ;IS FLOOD PROTECTION ANALYSIS FOR SUBAREA 4A TERMINATES AT POINT OF A� 1 —47 F- SINCE THE SITE's CONTRIBUTING DRAINAGE AREA (SUBAREA 4A) IS LESS THAN OR EQUAL TO �4 p. 1% OF THE TOTAL STREAM's WATERSHED. THIS SUBSECTION IS C.3.A. THIS METHODOLOGY 474 FOR CHANNEL AND FLOOD PROTECTION COMPLIANCE FOR POINT OF ANALYSIS #1 IS CONSISTENT WITH THE PREVIOUSLY APPROVED BROOKHILL REZONING STORMWATER - 44� MANAGEMENT MASTER PLAN. 1 444 - — P-1, EXISTING SWM FACILITY-, LOT FJUill I Ut- ANALYSIS 4FZ LEVEL 11 WET D REMAIN UNDISTURBED Uj POINT OF ANALYSIS #2 IS DOWNSTREAM FROM A PROPOSED DRY DETENTION BASIN NAMED DETENTION BASIN 4. DETENTION BASIN 4 PROVIDES STORMWATER QUANTITY TREATMENT, LOT LOT -POND 'BUT NOT STORMWATER QUALITY TREATMENT, AND DISCHARGES RUNOFF FROM LOT 23 24 43� Ice POST -DEVELOPMENT SUBAREA 4B. CHANNEL PROTECTION IS MET FOR SUBAREA 4B VIA 9 VAC 22 -7 POST-DEV. 25-870-66, SUBSECTION B.3.a (ENERGY BALANCE). THE LIMITS OF ANALYSIS FOR SUBAREA 4B's CHANNEL PROTECTION TERMINATES AT THE OUTFALL SINCE SUBSECTION B.3.a IS SUBAREA 413: SATISFIED. FLOOD PROTECTION FOR SUBAREA 4B IS MET VIA 9 VAC 25-870-66, SUBSECTION LOT 1.36 ac C.2.b (POST -DEVELOPMENT 10-yr PEAK FLOW < PRE -DEVELOPMENT 10-yr PEAK FLOW). THE q 3 1 CN=7- LIMITS OF ANALYSIS FOR THE FLOOD PROTECTION ALSO ENDS AT THE OUTFALL wNU Tc= 12 LOT, SUBSECTION C.2.b IS MET. PLEASE SEE THE CALCULATIONS PACKET FOR DETAILS. APPROVED -- ------ 90' OF OLF w/ AEL 420' OF CHNL F1 OW EV. 41 < Zz 00 L L T c LOT LO 5 7 _OT T 77t 10 LO LOT LOT ...... 14 L 3 /APPROVE O(� 16 (SUB-29 k081) It L9 NO454� CY) CY5 < C7) _j ........ 375' OF CHNL.FLOW� POINT OF ANALYSIS #1 z Cy') _j 454 - - 16303' ---SUBAREA 4A: C\l Y '\ - U_/Aj d"-- C:) THE PROPOSED ARCHER AVENUE STORM CN 92 z (N Uj ROYIED BL CK 34 -Tc=()-.LU SEWER INLETS COINCIDE WITH THE APPROVED OT rl, (SUBrPRO LOT BLKS 9-11 BERM & SWALE, HEREBY HONORING 0 2 )2 32, 55 �0 ILOT THE APPROVED WET POND's DRAINAGE DNME LU 3S THE POST- DEVELOPMENT SUBAREA 4A HIGH > POINT IS SET BY THESE INLETS. Lu < LOT T_ z LU < J 7. 2 IF 37 > U) _44 (5 OIL- Z LU X LU Lu LU < T L9 _j PROPOSED LOT OT < GREENWAY, 50 39 TYPICAL LU O� 0 > 0 40 49 U) 1_� 41 PROPOSED TRAILWAY 46 LOT LU z 1z LIJ 42 U) X/ LOT LIJ 43 < _j LnL j LL] LOT UJ > 44 LOT Post -Development Impervious Area Summary _j LLJ LOT R5 45 Subarea 4A 0 _j L LOT 4V LOT BLOCK-13- LOT F 47 LU V) 83 (PER APPROVED SUBDIVISION Subarea 4B �z 0 LOT PLAT SUB 20210 Existing Roadway 4,825 sf 0 Proposed Roadway &Sidewalks 20,975 sf < 7 25,800 sf (D 0 82 Z, Z C:) cl� y WATERSHED SUMMARY FOR SUBAREA 4A CID L Area, 1-year Flow, 2-year Flow, 10-year Flow, 0 5 CN ac. cfs cfs cfs T;� L APP INLn 92 0.70 2.42 3.07 5.06 59 k�) Old --WATERSHED SUMMARY FOR SUBAREA4113 Lu 0 LOT Area, 1-year Flow, 2-year Flow, 10-year Flow, M U) 78 LOT ---- -- CN cfs cfs cfs JOB NO. aC. 61 LOT _EDA 4B (Post-Dev.) 77 1.36 0.09 1.04 2.79 182150 77 /'111, / 62 GRA', C SCALE .--SUBAREA AND OUTFALL SUMMARIES SCALE LOT I/ 76 60 U 30 60 72 Post-Dev. Subarea Method of 9VAC25-870-66 Method of 9VAC25-870-66 Method of 9VAC25-870-66 Method of 9VAC25-870-66 "k 1 =60' L 6 (Point of Interest) Channel Protection Compliance Limits of Analysis for Channel Protection Flood Protection Compliance Limits of Analysis for Flood Protection SHEET NO. — 4A �Section B.I.a (2-yr Peak Flow is Not Erosive) Section Brgya (Subarea < 1% of Overall Watershed) -�ection C.2.a (10-yr Peak Flow is Confined) Section C.3.c (Contributing DA < 1% of Overall DA) 9 LOT (IN FEET V / ct' 4B Section B.3.a (Energy Balance) rgy Balance Satisified) 3ection C.2.b (10-yr. Post Flow < Pre Flow) N/A (10-yr. Post Flow < Pre Flow Satisified) 7S LO 1 inch = 60 =N/A (oEne z 0 z z 0 0 0 X 0 0 0 0 0 0 W 0 0 0 E 0 0 C) 0 0 E 0 0 0 0 0 W 0 0 0 E 0 0 C) 0 0 E 0 0 a COLTM OF ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of infonnation required on construction record drawings for storinwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared ky someone other titan the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional sea] of the preparing engineer or surveyor. 13. The name and address of the fim and individual preparing the drawings on the tide sheell. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but am not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe trispecition for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and proriles for all culverts, Pipes, Risers. Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipc size, weirs. materials, inlets or end treatmerl inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design. provide scaled computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted casements with dead book references labeled Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail. fences or other safety provisions - Display the constructed location of all safety provisions-, fences, guardrail, including the type. length and applied end treatments, compared to design. 12. Material layers — biofilter media, stone layers, sand layers. keyways and cores must be verified as to material types and depths. Include inspection reports. boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads — show location of access roads, surface treatment. drainage, etc, as applicable. 14. Compaction reports am required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. General Construction notes for Stormwater Monaaement Plans 1. All dams and constructed fill to be within 95% of maximum dry density and 2% of optimum moisture content. All fill material to be approved by a geotechnical engineer. A geotechnical engineer is to be present during construction of dams. 2. Pipe and riser joints are to be watertight within stormwater management facilities. 3. For temporary sediment traps or basins which are to be converted to permanent stormwater management facilities; conversion is not to take place until the site is stabilized, and permission has been obtained from the County erosion control inspector. J -=:7 '4— -446 46- 474 4� T LVI LO I X 32 29 L T -7 _7 _J LOT 3 LOT 7F APPROVED ESC LIMITS OF DISTURBANCE COVERED 454 UNDER WPO 202000004, TYP. LOT 33 LOT LOT LOT 5 34 1 /SWM FOREST & OPEN S)AC�E Sb I /,�EASEMENT(UN LOT DER SEPARATE� 5S LOT r SET OF PLANS),' ------------------------ 35 VRRM Water Quality Impervious Area Summary OT 36 z (VRRM Limitsare defined bythe Expanded ESC Limits) Existing Roadway 11,550 sf x Proposed Roadway & Sidewalks 30,800 sf 42,350 sf Nib& PROPOSED ESC LIMITS OF DISTURBANCE EXPANSION ASSOCIATED WITH THIS PLAN �6 (AREA NOT PREVIOUSLY COVERJED� UNDER A SEPARATE PERMT), 11 77 S -S S ESC LIMITS OF DISTURBANCE EXPANSION/BOUNDARY IS USED TO DEFINE THE VRRM WATER QUALITY BOUNDARY. PROPOSED LEVEL SPREADER 4 RELEASES RUNOFF INTO A VEGETATED FILTER STRIP WITH TYPE B SOILS, TREATING SUBAREA 4B.. (AREA NOT PREVIOUSLY COVt:K/rLJ LO > 5 1 LOT UNDER A - SEPARATE P�MIT), TYP LOT T LOT LOT LOT 9 -456 EA OF D \URBANCE —458 AR IST COVERED UNDER WPO % 202000004,TYP. APPROVED ESC LIMITS 0 F DISTURBANCE COVERED 154 UNDER WPO 202000004, TYP. LIMITS OF DISTURBANCE 33 LOT ESC EXPANSION/BOUNDARY IS USED TO DEFINE THE VRRM WATER QUALITY BOUNDARY. LOT 57 OREST &,. OPERSPACE LOT 56 LOT �/Swm P -//rASEMENT (UNDER SEPAKA[� 55 SETOF PLANS� G APHIC SCALE LOT 6 30 60 120 36 /71 7`,; P-, SCOTT/R. Cn�LLINSZ Lic. No. 035791,� 8/22/22 10 izk�InATAT ZU V) Co Lu Z) 0 U) 0 C) Ln LU ce 00 L9 CY) Zvr� < C7) _J cy) 1011— C\I C:) > W 0') 17�4 C\l < 0 W > Z Ld _J < Z _J LU _J > U) X OF- LLJ LU L90 LU < _J elf ZD D 0 Z 0� Z< 7- C) LU > LLl W < < LU I— LU 0 Ul U) U Z LGL�l ui I I— U) _J F— I— _J LU < 0 (D 0 C:) 0 (__J C"i U 177 JOB NO. 182150 SCALE 1 11=60' SHEET NO. 10 io'WIDETOF ELEV.=41 PH PROPOSED 8'WIDE VD( RIPRAP LINED EME SPILLWAY W/4:2 SIDE S FILTER FABRIC UNDERL/ SPILLWAY CREST ELEV. 450 4SO OF DAM- 6.od MISTING GRADE OPOSED 'RADE 445 )T CL. Al - 8' RGENCY -OPES & YMENT. :444-50'. 440 440. 0� 6 0+000+2S I DETENTION BASIN 4 SPILL 422.92- BEGINNING OF 42: PROPOSED 13'LONG FLAT LEVEL SPREADER HAVE A 12" DEEP PLUNGE POOL & A 6" WIDE RIGI TO INCLUDE AVIDOT CL. Al RIPRAP LINING AND A 3'(MIN.) VDOT CL. Al RIPRAP LINED EMBAl DOWNSTREAM FROM THE RIGID LIP EXTENDINC FILTER STRIP. ALL RIPRAP TO INCLUDE FILTEF UNDERLAYMENTS & BE A MIN. OF PROPOSED 13'WX35L'VEGETATED FILTER STRIP. FILTER STR UNIFORMLY GRADED TO THE SLOPES SHOWN TO ENSUR FLOW BELOW THE LEVEL SPREADER. CONTRACTOR TO - GRADES AT 6:1 & PREVENT SOIL COMPACTION BY HEAVY EQL WITHIN THE LIMITS OF THE FILTER STRIP. SEE SHEE ADDITIONAL FILTER STRIP DETAILS & DESIGN REQUIRI STIR. A2, A VDOT STD. B-1 (CONCRETE MANHOLE BASE WITH A 048") SHALL SERVE AS THE RISER's LOWER SECTION & SHALL BE SET IN THE PROPOSED REINFORCED CONCRETE FOUNDATION. A 048" STANDPIPE WITH A RIM ELEVATION OF 443.50' SHALL COMPLETE THE STRUCTURE. RISER TO INCLUDE (1) ONE PERMANENT 01.33" LOW -FLOW ORIFICE WITH AN INVERT ELEV.�436.00 & (1) ONE 010" MID -FLOW ORIFICE WITH AN INVERT ELEVATION =441.15'. ALL ORIFICE OPENINGS SHALL HAVE STATE APPROVED TRASHRACKS, TYPICAL. SEE THE DETAILS IN THIS SET FOR ADDITIONAL INFORMATION. io'� /I DE TOP OF DAN :LEV.=446.00' CONTRACTOF SHALL 44S INSTALL EMBA�KMENT IN ACCORDAqCE w/ THE DESIGNS SHOWN WITHIN THIS SET. EXISTING-r� 440 1 GRADE I 435 432.00 LOWER STIR. A5 CONVEYING TREATMENT VOLUME RUN ' OFFJ�� 0 TO LEVEL SPREADER 4 1430 1 UPPER STIR. Ai CONVEYING STORM EVENTS IN EXCESS OF THE TREATMENT VOLUME 425 46o 45S ___�_PROPOSI GRADE 450 445� 100-yr PEAK WSE-443.79 10-yr PEAK WSE=443.07 2-yr PEAK WSE-441.69 1-yr PEAK WSE=441.11 2m � 435 PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (o.5% MIN.) WITH POSITIVE SLOPES THROUGHOUT. -BASIN's FLOOR SHALL CONSIST OF A 12" DEEP PEA GRAVEL LAYER (TOP OF STONE ELEV.=436') AND A FILTER FABRIC UNDERLAYMENTTO REDUCETHE RISK OF CLOGGING. 425 TO PREVENT FLOTATION THE RISER BASE PROPOSED VDOT 3HALL BE FIRMLY I IMBEDDED 6" INTC AN 18" STD. EW-1 j� -HICK REINFORCED CONCRETE FOUNDATION THAT IS 8'x8', AND BURIED BELOW GROUND. 420.0 0' 420 420 PROPOSED VDOT STD. EC-1, CLASS Al RIPRAP LINED OUTLET PROTECTION WITH FILTER FABRIC UNDERLAYMENT (L=19'±, PROPOSED W,=10', W,=19', D=18"). STONE TO BE INSTALLED FLAT & STREAM TO EXTEND TO THE CHANNEL's BANK. FILTER FABRIC SHALL BE KEYED INTO THE EXISTING GROUND AT A MINIMUM OF 9" AT THE END & ALONG THE PERIMETER. EDGES OF FABRIC 415 SHALL OVERLAP A MIN. OF 9". Lu ui 0 00 0) kD 00 _j Lu LLJ o6 A 1.+ 00 Ln rn Lu 0+00 0+50 1+00 1+50 2+00 PROFILE SCALES 1"=5' (V) 1"=50' (H) NOTE: LEVELSPREADER 4ANDTHE FILTER STRIP SHALL BE INSTALLED ATTHE TIME OFTHE TEMPORARY ESC TRAP's CONVERSION TO A PERMANENT SWIM FACILITY. 455 DETENTION BASIN 4 SECT16N] 455 450 450 DETENTION BASIN 4 EXISTING- 445 GRADE 445 440 440 PROPOSED — GRADE STIR. A2, RISER PROPOSED- 012" CL. 52 L DIP W/L 435 435 I LEVEL SP READER= STIR. A3 INV. OUT UPPER STIR. Ai CONVEYING STORM EVENTS IN EXCESS OF 75- BOTTOM OF LEVEL SPREADER THE TREATMENT VOLUME ,22-75- TOP OF LEVEL SPREADER 430 430 06 4. LS TO )LIP SLOPED �STR. A4, A, JKMIENT 8" CLEANOUT TOTHE FABRIC 6" HDPE S" DEEP. 425 __�\_\-16i-73 LF- 425 611 HDPE IPTO BE - @ 3-72% E SHEET -9-46 LF LOWER STIR. A5 CONVEYING IE 13ACK A3 @ 11-41% TREATMENTVOLUME RUNOFF IPMENT TO LEVELSPREACER 4 Fi2FOR WENTS. 22.6 420 420 W Lu N It 0 0) 0 0 H 0 0 rl 0 N 0 Lu A J, 6 0 0 It It It Lu LL 0+00 0+50 1+00 1+50 2+00 2+50 1 LEVELSPREADER DETENTION BASIN #4 DETAIL, SCALE V=30' CONTRACTOR SHALL CALL THE COUNTY INSPECTOR & ENGINEERING DEPARTMENT 24-HOURS BEFORE ANYANTICIPATED CONSTRUCTION ACTIVITIES FOR THE DRY BASIN. 0 IMIT!�_ OF THE x/ BROCKHILL )EVELOPME T z z z PROPOSED VDOT STb. EC-1, CLASS AI RIPRAP- Z LINED OUTLET PROTECTION WITH FILTER FABRIC X UNDERLAYMENT (L=19'±, W1=10" W2=19.1 D�-'18-.)�l STONE TO BE INSTALLED FLAT &TO EXTEND TQ­ _�l THEtHANNEL's BANK. FILTER FABRIC SHALIABE /KEYED INTO,THEEXISTING GROUND AT A MIN ,blF ;;V THE F �V ND & ALONG THE PERIMETER. G FA OVERLAP A MIN. Or 9 ,PAIC�SHALL ly x z TO REVENT FLOTATION THE z �%,E SHALL BET-IRMLY EMBEDD EXISTING SWM 6111 TO AN 18" THICK REINFORCED PROPOSED VARIABLE WIDTH 400i* /> ��CACR�ETEFO NDATIONTHATIS_ SWIM MAINTENANCE ESMT. FACILITY TO k8' AND BUR IEID BELOW GROUND.- 7L REMAIN //8' _5� /__ - - - - l_..0 T T/ Z / / I O�y io'WIDE TOP OF DAMELEV.=446.o ROPOSED BASIN'5 FLOOR SHALL BE RISER (9.5% MINj� SLOPED TO DRAIN TO THE 0 00 WITH POSITIVE SLOPES THROUGHOLT.� PROPOSED 8'WIDEVDqTCL. Al RIPRAP LINED EMERGENCY CONTRACTOR S.HALL RELOCATE THrS PORjTjON llhr� HTLWAY wl 4-1 SIDE SLOPES & OF tHE-F_XZTNG FEN-CE,,AS SHOWN, t R FABRIC UNDERLAYMENT ACCQMMODAT&HEROAD`s P" TIE ZgDl TE SPILLWAY CREST ELEV,=/444 50'/, A �kSEE THIS SHEET FOR SCALED A.. PROFILES OF THE DRY BASIN, TYP. POSED PUBLIC ROAD, -16 EWALK AND GRASS L EDACCESSTOSERVEAS PROPOSED STIR. AS & THE 4CCESS TO THE DRY BASIN DOWNSTREAM DRAINAUt VEGETATED FILTER STRIP. SYSTEM TO CONVEY THE TREATMENT VOLUME FLOW TO LEVEL SPREADER 4 & THE VEGETATED FILTER STRIP FOR . A . A WATER QUALITY TREATMENT. Ln 0+00- 42200 5' 0-10': MAX.. SLOPE= 2% SLOPE RANGE 422 10- 1-4% 22. — 22.r _�LEVEL SPREADER�- 42 2- BE INWNG OF __L 'SPREADER 421.75 -BOTTOM OF -EVEL ------- I - E�L SPREADER 2,22.75- TOP OF LEV 4 PROPOSED IYLONG FLAT LEVEL SPREADER 4. LS TO HAVE A 12" DEEP PLUNGE PROPOSED CONSERVED POOL& A 6" WIDE RIGID LIP. LS TO INCLUDE AVDOT CL. Al RIPRAP LINING AND -OPEN SPACE EASEMENT A SLOPED Y(MIN.) VDOT CL. Al RIPRAP LINED EMBANKMENT DOWNSTREAM -FROM THE RIGID LIP EXTENDING TO THE FILTER STRIP. ALL RIPRAP TO INCLUDE FILTER FABRIC UNDERLAYMENTS & BEA MIN. OF 6" DEEP. PROPOSED 13'WX35L'VEGETATED FILTER STRIP. FILTER STRIP TO BE UNIFORMLY GRADED TO THE SLOPES SHOWN TO ENSURE SHEET FLOW BELOW THE LEVEL SPREADER. CONTRACTOR TO TIE BACK GRADES AT 6a & PREVENT SOIL COMPACTION BY HEAVY EQUIPMENT WITHIN THE LIMITS OF THE FILTER STRIP. SEE THIS SHEET FOR ADDITIONAL FILTER STRIP DETAILS & DESIGN REQUIREMENTS. ----- GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. 0 SCOTT/R. CMUNS7 Lic. No. 035791,� 8/22/22 10 Qk*-ly I nVAT u 2: ur) cc z Lu Z) 0 U) 0 C) F­ U) Lu Ce L9 L9 z w ul z mi mi 0 u 00 CY) (y) 0 CF) IN Lu CO Lu 0 _j C) Lu CO Lu Lu CO Lu Of (D C:) C:) N 0 II V) z Lu F___ x Lu Lu Z) z Lu Lu u 0 0 0� co V) Lu Q 06 L/) Lu 0 z z Lu 2 Lu LL] 0 I— Lr) JOB NO. 182150 SCALE AS SHOWN SHEET NO. 11 DRY DETENTION BASIN CONSTRUCTION NOTES: FACEL]TV PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. 2. THE PROPOSED INTERIOR SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 2:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT AULTIMES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OFTHESE COMPACTED SOILS CAN BE SO GREATTHAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BAUL-AND-BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INCANDTHE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHTTOTHE ATTENTION OF COLLINS ENGINEERING PRIORTOTHE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEETTHE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERYSTOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALLVERWYALL DIMENSIONS IN THE FIELIDAND NOTIFYTHE DESIGNER OFANYVARIANCE FROM THE PLAN. 5 ANY EXCAVATION). THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY AT 1-800-552-7001 BEFORE 6. REFER TO THE APPROVED FINAL ROAD PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTSWILLBE PREPARED FOR SHIPMENT INA MANNER THAT WILL NOT CAUSE DAMAGETOTHE BARK, BUDS, BRANCHES,STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOUDITSSOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOT STOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE (1) CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIALTHAT HAS BEEN DAMAGED BYVANDALISM, FIRE, OR OTHERACTIVITIES BEYONDTHE CONTRACTOR'S CONTROL. FACILITY CONSTRUCTION 1. DETENTION BASINS MAY SERVE AS SEDIMENT BASINS AND/011 TRAPS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE,ANDDESIGN ELEVATIONS SHALL BESET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION FACILITYIN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE FACILITY 15 COMPLETELY STABILIZED. IF THE PROPOSED BASIN's SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER, ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 4. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TO THE DESIRED SUB -GRADE. 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTAULTHE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/011 THE BARREL(s) WITH PERMANENT COLLARS DURING THE ESC PHASE. CONTRACTORSHALL ENSURETHETOP INVERT OF THE OVERFLOW WEIR ISCONSTRUCTED LIEVELATTHE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNALBERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT.THE CONTRACTOR SHALL ALSO ADHERE TO THE CLAY LINER SPECIFICATIONS OUTLINED INTABLE 14.4BELOW: Table 14.4. Clay Liner Specifications Promrity Test Method Unit specdkasm Permeability ASTM D-2434 Cirisec 1 X le Plasticity Index of Clay ASTM D-4231424 % Not less than 15 Liquid Limit of Clay ASTM D-2216 % Not less than 30 Clay Particles Passing ASTM D422 % Not less than 30 Clay Corn-dinn % 95% of standard proctor densft Virginia Stoffnwater Managment Handbook (1999) 9. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION IF APPLICABLE. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS, IF APPLICABLE. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY TH E CONTRACTOR IN TH E Fl RST YEAR FOLLOWING INSTALLATION, AND TH E OWNER THEREAFTER: I- MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL & SPILLWAY FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOI NT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS AS APPLICABLE FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT 15 FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) 5. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING IF APPLICABLE) 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) GENERAL SWIM NOTES: 2. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE THIS SHEET, OR EQUIVALENT, FOR DETAILS. 2. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH 3 14 SPECIFICATIONS. 3. CONTRACTOR SHALL HIRE A THIRD PARTY GEOTECHNICAL ENGINEER TO ENSURE THE EMBANKMENT IS STRUCTURALLY SOUND. ALL FILL MATERIAL AN D PROPOSED CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENT AND FILL AREAS, AND PRESENT DURING THE CORE SAMPLING. 4. THE DOWNSTREAM EMBANKMENTSIDE SLOPES OFALL PERMANENT FACILITIES SHALL HAVE AMAXIMUM TISLOPE. CONTRACTOR SHALL EXCAVATE SEDIMENT LADEN MATERIAL IN THE ESC SEDIMENTTRAPS & BASINS, IFAPPLICABLE, ATTHE TIME OFTHE FACILITIES - CONVERSIONS TO PERMANENT SWIM FACILITIES. AT SUCH TIME THE CONTRACTOR SHALL REGRADE THE SEDI MENT TRAPS AN D/OR BASI INS TO THE PROPOSED GRADES SHOWN ON THE SWM SHEETS. THE CONTRACTOR SHALL MINIMIZE SOIL COMPACTION DURING THE CONVERSIONS. VEGETATED FILTER STRIP & LEVEL SPREADER REQUIREMENTS MAINTENANCE INSPECTIONS: ANNUAL INSPECTIONS SHALL BE CONDUCTED IN THE NON -GROWING SEASON DURING THE FALLAND WINTER MONTHS. INSPECTIONS SHALL TRIGGER MAINTENANCE OPERATIONS, AS REQUIRED. MAINTENANCE OPERATIONS MAY INCLUDE, BUT IS NOT LIMITED TO, SEDIMENT REMOVAL, PERIODIC MOWING, REPAIR OFTHE LEVEL SPREADER AND ENSURING A DENSE, HEALTHY VEGETATED GROUNDCOVER. MOWING SHALL BE COMPLETED AT LEASTTWICE A YEAR TO PREVENT FURTHER WOODY GROWTH. SPOT RE -VEGETATION OFTHE FILTER STRIP IS REQUIRED IN ORDER TO MAINTAIN A go% MINIMUM COVERAGE RATE. THE CONTRACTOR SHALL CONDUCTTHE INSPECTIONS FOLLOWING THE FIRSTYEAR THE PROJECT IS COMPLETED, AND THE OWNER SHALL CONDUCTTHE INSPECTIONS THEREAFTER. INSPECTIONS SHALL INCLUDETHE FOLLOWING ATA MINIMUM: i. ENSURE FLOW PATHS ARE NOT SHORT-CIRCUITED IN THE LEVEL SPREADER AND THROUGH THE VEGETATED FILTER STRIP. 2. ENSURE DEBRIS AND SEDIMENT HAS NOT ACCUMULATED. 3 CHECK FOR SCOUR AND EROSION WITHIN THE LEVEL SPREADER SYSTEM AND FILTER STRIP. 4 CHECK FOR FOOT OR VEHICULAR TRAFFIC DAMAGE IN THE STONE. 5. ENSURE VEGETATIVE DENSITY MEETS OR EXCEEDS go% OF THE FILTER STRIP AREA. IN THE EVENT MAINTENANCE IS REQUIRED DURING THE ABOVE NOTED INSPECTIONS, CORRECTIVE MEASURES SHALL BE COMPLETED IMMEDIATELY. Vegetated Filter Strips Planting Requirements Vegetated Filter Strips shall be planted at such a density to achieve a 90% grass/herbaceous cover after the second growing season. Vegetated Filter Strips shall be seeded, not sodded. Seeding establishes deeper roots, and sod may have muck soil that is not conducive to infiltration (Wisconsin DNR, 2007). The filter strip vegetation shall consist of turf grasses, meadow grasses, other herbaceous plants, shrubs, and trees, as long as the primary goal of at least 90% coverage with grasses and/or other herbaceous plants is achieved. Vegetation at the toe of the filter, where temporary ponding may occur behind the permeable berm, shall be able to withstand both wet and dry periods. The planting areas can be divided into zones to account for differences in inundation and slope. Additionally, the trees selected to be planted shall be 10' on -center and shall be an even mix of River Birch (Betula Nigra), Red Maple (Acer Rubrum) and Sweetgum (Liquidambar Styraciflua). Table 2.4. Vegetated Filter Strip Materials Specifications Material Specification Ouantity Pea Gravel (#8 or ASTM equivalent) or Diaphragm should be 2 feet wide, 1 Gravel where steep (6% +) use dean bank -run foot deep, and at least 2 inches Diaphragm VDOT #57 or ASTM equivalent (1-inch below the edge of pavement. maximum). Permeable 40% excavated soil, 40% sand, and 20% pea gravel to serve as the media for the Berm berm. Filter Fabric Geotextile material appropriately selected for placement under rip rap or gravel to effectively separate the stone from the ground below Fngineered Level Spreader lip should be concrete, metal, Umber, or other rigid material,- Level Reinforced channel on upstream of lip: VDOT EC-3- Spreader See Hathaway and Hunt (2006) or Henrico County Program Manual for alternate designs - Erosion Control Where flow velocities dictate, use woven biodegradable erosion control fabric or Fabric or mats that are durable enough to last at least 2 growing seasons- (e-g.. VDOT Matting Erosion Control matting EC-3). If existing topsoil is inadequate to support dense turf growth. imported top soil (loamy sand or sandy loam teyture), wIth less than 5% clay content, corrected pH Topsoil at 6 to 7, a soluble salt content not exceeding 500 ppm, and an organic matter content of at least 2% S.hA be used- Topsoil "� be uniformly distributed and ww_ lightly compacted to a minimum depth of 6 to 8 inches Compost be derived from plant material and provided by a member of the , _ Compost U.S. Comp os ting Seal of Testing Assurance (STA) program, as outlined in Stormwater Design Specification No- 4- VAUG"faSTORMWATER DESIGN SPECIFICATION NO. 2 SHEET FLOW TO FILTER OR OPEN SPACE KEY LEVEL. SPREADER INTO EXISTING GRADE Z RIPRAP PLUNGE POOL A 1�1, RIPRIAP APRON er X W TREATED if viij�_ TIM13ERS OR CONCRETE I IP LENGTH OF LEVEL SPREADER LIP TO 13E BASED ON DESIGN FLOW At __ , 1 - AND ALLOWABLE VELOCITY k TOP OF LEVEL SPREADER SHALL BE FLAT 1-3 IN. COURSE AGGREGATE OR OTHER LINING AS DESIGNED FOR STABILITY PLAN VIEW DIMENSION BASED ON 5%C2D-.l)0RLE=S �VMETATM DESIGN DIISCHARGE FILTER STIFF OR CON� - O%N �ACZ PlAsi 10 FEET LES& 2'MIN �N 2% 3 MIN AIN -1 3 MIN 12, iL 1 MIN, DEPTH EASED 0 REQUIRED STONE SIZE L -I mI t� I IJIL_- i I ]I ill I P 17 11 1 1 1 I..j _11 SECTION A -A Figure 2.4: Level Spreader. P47eor Channel Flon, to Filter Strip orPolosomwd-Conserre Open Space LEVEL SPREADER NOTES. 1. FIRSr 10' FROM LEVEL SPREADER LIP MUST BE 2% OR LESS. 2. TIE BACK ENDS OF LEVEL SPREADER INTO THE SLOPE TO AVOID SCOURING. 3 CONTRACTOR SHALL NOTIFY COLLINS ENGINEERING & COUNTY ENGINEERING A MINIMUM OF � WEEK PRIOR TO THE CONSTRUCTION OF THE LEVEL SPREADER. COLLINS ENGINEERING's PRESENCE 15 REQUIRED AT THE TIME OF THE LEVEL SPREADER'S CONSTRUCTION 50 THAT THE LEVEL SPREADER's FINAL LOCATION CAN BE FIELD VERIFIED. FI NAL LOCATION MAY VARY SLIGHTLY FROM THE APPROVED PLAN IN ORDER TO PRESERVE A LARGE TREEIS). 4 CONTRACTOR SHALL USE A GEOTE)CrILE FI LTER FABRIC UNDERLAYMENT BELOW THE PROPOSED LEVEL SPREADER STONE. THE GEOTE)(TILE FILTER FABRIC SHALL BE TENSAR TX-5 TRIANGULAR GRID, OR EQUIVALENT. DID.4 U. 11.1e. r)c PIP. 1 4' RDPE p..Iv (.ptio,htl) HrIPF structnral ptantin with 2-1/8' h.I. .�d I/A" Flat. manufnek."d by Neale, 0 S.Iuti." Tm o� equal 00 000 S�. With Puz.01 PLat, HnPr IruA,,.1 pt.w� �_l /8, th,le. and I / $ &.A.red by pl.�u, 6.lvlm. I., e, eq�.l Ste' di. h. 0 0 0 0 ff+OA 0 0 0 0 Bungle 8111?11_� Tlevil I ion PLASTIC DEBRIS (*,\CTF. P 0 R.X 4386 SOLUTIONS hin&iw�r VA ?2W4 INC. Perforated cc SECTION .1-9: TYPICAL GF-A.PIIIC.AL DETALILS _-Hornogenteous fill rnin I Cit off trench-4' below suitable, Soil or rock ll�lelicll L - - - - - - - - - - - TYPICAL HOMOGENEOUS EMBANKMENT rill giravel 0( S i ols FOUNDATION DRAIN BLANKET DRAIN d�. Sahl, grawd rock dIW WW Rock or gro"I _,Rod tile drain d �Tran:iition filter �:*Trunsfflon filter CHIMNEY DRAIN TOE DRAIN nh, 17,013 k 0 Fi2ulre A-1a. Howoueneou s finbankinenis ir Seepage Controls EMBANKMENT NOTES: THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & RIPRAP AND THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CIL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHAUL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. StormRaXTM ROUND SERIES TRASH RACK (OREQUIVALENT) CONCRETE MANHOLE STANDARD 60 INCH RACK SHOWN DIMENSIONS IN INCHES PLAN SI DE VI EW Stormltaxn0` Round Series for Concrete Manhole hirt Na. DIMA DIM 6 DIMC MMID min RS-24 17 Y, 14 V4 28 - 24 30 __ 19:3-6 _2_2 14h 4031 35 43 27 1 57 RS40 27;4 ' 18Y 1 66V so 70 Plastic Solutions, Inc. o"TOME" PO Box 43M. Whches�. VA 22604 Z38 McGinee Rd. Wriheate,, VA 7Z60 :877) 877-5727 Phow P �S40) 722-ZZ 19 fax JWMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE 011"TIOUS CROSS SFUIICING FOR OVERHANG HDPE ANTI -VORTEX PLATE DATF- DPAWN Or APPI39r. M7AJL SCOTT/R. Cn�LLINSZ Lic. No. 035791,�� 8/22/22 r ZU 2: U-) DO LU Z) 0 U) Z _1 0 C) < F- U) > LU > Uj < 00 0 Z W W Z OIL- L9 Z W Ln Z U Co cl� 0') co L C\l C�4 C11 > LU _j _j > U) Uj 0 < c) Uj U) LU Uj U) Uj < (D C:) CD 04 < _j U) o Uj X LU LU Uj > < Uj U 0� < _j _j �z 0 0 co U) _j < LU 0 02s LU 0 Z Z LIJ LU 0 < Z < Lu I— < 0 JOB NO. 182150 SCALE AS SHOWN SHEET NO. 12 TH 0 Brookhill Stormwater Quality Summary Table Phosphorus Removal SurplusAmount AmountofOffsite Percent of Total Phosphorus Removal Surplus Amount Amount of Offsite Percent of Total Section Block Common Name SWM Facility ID Type of Facility achieved w/proposed plan Plan # of OffsIte Credits Credits Purchased Development Required Phosphorous Section Block Common Name SWM Facility ID Type of Facility achieved w/proposed plan Plan # of Offsite Credits Credits Purchased Development Required Phosphorous (lb/yr) Created (lb/yr) (lb/yr) Offsite Credits I%) Removal Rate (lbs/yr) 70, (lb/yr) Created (lb/yr) (lb/yr) Offsite Credits Removal Rate (lbs/yr) 5 16 Single Family Housing Level Spreader'A' Sheetflow to Conservation Area with A/B soils 6.89 WPO 20210007 0 0.0% SCOTT 0 R. LINS 1 4A Apartments Pond 11 Wet Pond 4.01 WP0201800051 5 17 Single Family Housing UGD'B' Underground Detention (No Water Quality) WPO 20210007 6.02 17.7% 17.72 U Lic. No. 035791,'z� 1 4A Apartments DP-4A Detention Pond w/ Underground Storage - WP0201800051 llc� 8/22/22 1 4A Apartments CDS-4A CDS Unit (Manufactured Device) 1.60 WP0201800051 5 18 Single Family Housing TED TBD TBD TBD TBD TBD TBD z 1 4A Apartments LS-11 Sheet f low to open space REMOVED - WP0201800051 0 1.27 5.8% 14.17 Section 5 Master Plan Comparison IONAL t Of 1 4B Apartments Pond 11 Wet Pond 0.18 WP0201800051 Phosphorus Removal Anticipated Amount of Anticipated Percent of Amount of Offsite Percent of Total Total Required z 1 4B Apartments LID-413 Isolator Row (Manufactured Device) 3.38 WP0201800051 Section SWM Facility ID Phosphorus Removal proposed achieved w/proposed plan Offsite Credits Total Development Offs1te Credits Purchased Development Phosphorous Removal 10 1 4B Apartments Pond 4B Extended Detention Pond 0.79 WP0201800051 w/master plan (lb/yr) (lb/yr) Purchased (lb/yr) Credits (%) (lb/yr) Offsite Credits [%) Rate (lbs/yr)to Date z 1 4B Apartments LS-413 Sheet f low to open space 0.74 WP0201800051 5 Pond 14A Treatment Total 4.81 TBD 87.98 1 ROW Pond 11 Wet Pond 0.18 WP0201800013 5 Pond 14B Treatment Total 6.42 TBD 0 1 ROW LS-11 Sheet f low to open space REMOVED - WP0201800013 0 1.09 5.0% 1.12 5 Pond 15A Treatment Total 5.16 TBD Total ONSITE Phosph rous 1 ROW LS-11 Sheet f low to open space REMOVED - WP0201800013 5 Pond 15B Treatment Total 5.14 TBD Removal Rate Provided 0 1 8B ROW and Block 8B Pond 10 Wet Pond 5.91 WP0201800080 5 Pond 16 Treatment Total 11.75 TBD (lbs/yr) to Date I ROW LS-10 LS-10 REMOVED - WPO201800080 0.68 1.53 7.0% 6.74 5 Grass Channel Treatment Total 2.1 TBD 66.01 0 1 - ROW LS-10 LS-10 REMOVED - WP0201800080 5 Sheet Flow to Open Space Treatment Total 1.43 6.89 0 1 3 Village Center and Pond4 Wet Pond wth Downstream 23.62 WP0201700037 0 0 0.0% 5 Blocks 16-17 Wet Pond - 0 1 3 Salamander Street LS-4.1 Sheet flow to open space (Amendment #4) Phosphorous Removal Section 5 Treatment Total 36.81 6.89 Rate Credits (lbs/yr) 1 3 Village Center LS'B' Sheet f low to vegetated filter strip 7.17 WP0201700037 0 8.96 40.8% 30.68 Section 5 Nutrient Credits Total 6.8 20.0% 1 1 1 6.02 17.7% Purchased (or Proposed to (Amendment #4) 1 3 Salamander Street Pond 11 Wet Pond 0.38 WP0201800050 be Purchased) to Date 0 1 3 Salamander Street LS-11 Sheet flow to open space REMOVED - 1 WP0201800050 1 0.08 0 0.0% Overall Treatment Totall 141.28 1 66.01 1 21.97 k: r 1 8A Senior Living Facility Pond 11 Wet Pond 3.70 WP0201900004 I Overall Nutrient Credits Purchasedi 34 100.0% 21.97 64.6% V) U 1 8A Senior Living Facility LS-11 Sheet flow to open space REMOVED WP0201900004 0.01 0 0.0% 5.68 z ur) W co n -E Section I Master Plan Comparison Anticipated Treatment Total With SWM Master Plani 175.56 Phosphorous Removal 0 (n Rate Percent Provided 0 Z 0 0 Phosphorus Removal Anticipated Amount of Anticipated Percent of Amount of Offsite Percent of Total Notes: Onsite to Date U) F- Section SWM Facility ID Phosphorus Removal proposed achieved w/proposed plan Offsite Credits Total Development Offsite Credits Purchased Development 1. To date, the total required phosphorous removal rate is 87.98 lbs/yrand the total phosphorous removal rate achieved through onsite SWIM facilities is 66.01 lbs/yr. This leaves a deficit of 21.97 lbs/yr (87.98-66.01) that is mitigated through nutrient credit purchases. in > z w/master plan (lb/yr) 75.0 W (lb/yr) Purchased (lb/yr) Credits [%) (lb/yr) Offsite Credits (%) accordance with stormwater regulations, the overall Brookhill Development is allowedto use offsite BMPs (e.g. nutrient credit purchases) totalling a maximum of 25% ofthe overall required required phosphorous removal rate. 1 Pond 4TreatmentTotal 6.77 23.62 2. Actual purchased nutrient credits assoicated withthe approved plansto date is 12.01 lb/yr. 1 Pond 7TreatmentTotal 8.11 TBD 3. Nutrient credits proposed to be purchased with VSMP 201700037 Amendment#4 is 8.96 lbs/yrand with thisVSMP plan is 1.00 lbs/yr. > .0 1 Pond 10 Treatment Total 6.94 6.59 ui 1 Pond 11 Treatment Total 9.68 8.54 1 Pond 4B Treatment Total - 0.79 0 1 Manufactured Devices Treatment Total 2.62 4.98 0 1 Infiltration Treatment Total 21.71 0 1 Level Spreader 'B' - 7.17 STORMWATER QUALITY SUMMARY NOTE 1 Level Spreader 4B 9.74 0 4 T2143 AS SUMMARIZED ABOVE IN NOTES #1-3, THE TOTAL PHOSPHOROUS REMOVAL RATE REQUIRED TO DATE IS 87.98 Ibs/yr FOR THE Section 1 BMP TreatmentTotal 65.57 Section 1 Offsite Nutrient Credits Totall 6.8 20.0% 1 1 1 12.8.5 1 38% OVERALL BROOKHILL DEVELOPMENT. ADDITIONALLY, THE TOTAL PHOSPHOROUS REMOVAL RATE PROVIDED ONSITE IS 66.01 Ibs/yr FOR THE OVERALL BROOKHILL DEVELOPMENT. A MINIMUM OF 75% OF THE REQUIRED PHOSPHOROUS REMOVAL RATE PROVIDED .0 Phosphorus Removal Surplus Amount Amount of Offsite Percent of Total Cq I Section Block Common Name SWM Facility ID Type of Facility achieved w/proposed plan Plan # of Offsite Credits Credits Purchased Development Required Phosphorous ONSITE HAS BEEN MET FOR THE BROOKHILL DEVELOPMENT. LU r-4 (lb/yr) Created (lb/yr) (lb/yr) Offsite Credits Removal Rate (lbs/yr) r1l 2 9 Townhouses Elk 9 Wet Pond Level 11 Wet Pond 5.87 WP0201800086 0 0 2 10 Townhouses Blk 10- LIGD Underground Detention (No Water Quality) - WP0201800086 0 2.10 6.2% 10.05 0 2 11 Townhouses - - WP0201800086 2 N/A Archer Avenue Extension Level Spreader 4 Level Spreader to Vegetated Filter Strip 0.82 TBID 1 0 1 1.00 1 2.9% 1.82 Section 2 Master Plan Comparison Phosphorus Removal Anticipated Amount of Anticipated Percent of I Amount of Offsite Percent of Total 0 E Section SWIVI Facility ID Phosphorus Removal proposed achieved w/proposed plan OffsIte Cred its Total Development Offsite Credits Purchased Development w/master plan (lb/yr) (lb/yr) Purchased b/yr) Credits (%) (lb/yr) Offsite Credits (%) 2 Pond 12 Treatment Total 8.06 0') 2 Sheet Flow to Open Space Treatment Total 1.67 - 2 Blk 9 Wet Pond 5.87 2 Blk 10- UGD < L: I 2 Gredit fFnFn I.A.1120201.700027-I[Removed w/ Amend. #4) i - - I i - C11) 0') -j 0 2 Level Spreader 4 0.82 C� 0 Section 2 Treatment Totall 9.73 1 6.69 co Section 2 Nutrient Credits Total 6.8 20.0% 3.10 9.1% < Phosphorus Removal Surplus Amount Amount of Offsite Percent of Total U) Section Block Common Name SWIM Facility ID Type of Facility achieved w/proposed plan Plan of Offsite Credits Credits Purchased Development Required Phosphorous (lb/yr) Created (lb/yr) (lb/yr) Offsite Credits I%) Removal Rate (lbs/yr) C--) > 3 13 TBD TBD TBID TED TBID TBD TED TBD M 3 13 TBD TBD TBD TBD TBID TED TBD TBD TBD J) 3 12 TBD TBD TBD TED TBID TBD TBD TED 0 < Section 3 Master Plan Comparison > 11-� Phosphorus Removal Anticipated Amount of Percent of Amount of Off he Percent of Total U) 0 Section SWM Facility ID Phosphorus Removal pro posed achieved w/proposed plan Offsite C 7Anticipated Total Total Development Offsite Credits Purcha:ed Development Ld < w/master plan (lb/yr) (lb/yr) Purchased Credits I%) (lb /yr) Offsite Credits Uj 3 Pond 13ATreatment Total 9.13 TBD > 3 Sheet Flow to Open Space Treatment Total -71 5.95 TBD U) Section 3 Treatment Tota 15.08 TBD U-1 10� c, Section 3 Nutrient Credits Totall 6.8 20.0% TBD I TBD Uj Phosphorus Removal Surplus Amount Amount of Offsite Percent of Total L9 0 Uj < 0 Section Block Common Name SWM Facility ID Type of Facility achieved w/proposed plan Plan # of Offsite Credits Credits Purchased Development Required Phosphorous -1 0 (lb/yr) Created (lb/yr) (lb/yr) Offsite Credits I%) Removal Rate (lbs/yr) 4 14 TBD TBD TBID TED TBD TBD TBD TBD < 4 14 TBD TBD TBID TBD TBD TBD TBD TBD LU 4 14 TBD TED TBD TBD TBD TED TBD TED TBD > U -6 0 < Section 4 Master Plan Comparison Phosphorus Removal Phosphorus Removal Anticipated Amount o Anticipated Percent of Amount of Offsite Percent of Total -j t ion SWM Facility ID proposed achieved w/proposed plan Offsite Credits Total Development Offsite Credits Purchased Development LU 0 w/master plan (lb/yr) Purchased Credits b/yr) Offsite Credits (lb/yr) (lb/yr) [%) 44 Pond 13A Treatment Total 14.05 TBD 4 Sheet Flow to Open Space Treatment Total 0.04 TBD U Section 4 Treatment Total 14.09 TBD 0 Section 4 Nutrient Credits Total 6.8 20.0% TBD 0 U z LU < (if LU CD U) _j _j < -j 0 LU LU > 0 0 0 < 0 C:) C:) IN F- U LU E 0 JOB NO. 182150 ou SCALE NONE SHEET NO. 13