Loading...
HomeMy WebLinkAboutWPO201300030 Application 2013-04-19 Albemarle COUP Community Development Department 401 hire Road Charlottesville,VA 22902-4596 '' Planning Application Voice:(434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION TMP 06100-00-00-167C0 Owner(s): WETSEL, THOMAS D &CLARENCE H WETSEL&ANN W Application # WP0201300030 HUFFMAN & MARY W HOOD PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Rio Land Use Primary Open Current AFD Not in A/F District Current Zoning Primary R4 Residential APPLICATION INFORMATION Street Address Entered By Todd Shifflett Application Type Water Protection Ordinances 04/19/2013 Project 1250 Bypass Interchange at McIntire Road _ ( Received Date 04/18/13 Received Date Final Submittal Date Total Fees 300 Closing File Date Submittal Date Final Total Paid 300 Revision Number Comments Legal Ad SUB APPLICATION(s) Type I Sub Applicati I Comment Erosion and Sediment Control Plan x.04/18113 'APPLICANT/ CONTACT INFORMATION ContactType Name I Address I CityState I Zip Phone PhoneCell Owner/Applicant WEISEL,THOMAS D&`CtARENCE II WE 878 E:RIO ROAD CHARLQTTESVILL;22901: Primary Contact TYLER AUSTIN 312 WEST MAIN ST. LURAY,VA 22835 5407439227 General Contractor WILLIAM ASHWELL, GENERAL EXCAVATI 9757 RIDER ROAD WARRENTON,VA 20187 5404392202 Plan Preparer TYLER AUSTIN, RACEY ENGINEERING, P 312 WEST MAIN ST. LURAY,VA 22835 5407439227 Signature of Contractor or Authorized Agent Date Ariptication for Review of ,91 Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & 4 g , Stream Buffer Mitigation Plan El Erosion& Sediment Control Plan ❑ Stormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑Request for Exception #of Variances ❑ SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: RTE. 250 Bypass Interchange at McIntire Road Parcel I D:06100-00-00-167C0 Vacant Residential R1-R15 Tax map and parcel: Zoning: Amount of Land Disturbance: 3.06 Acres Location of property(landmarks,intersections,or other): To the southwest of the Intersection of East Rio Road and Dunlora Dr. Contact Person(Who should we call/write concerning this project?): Tyler Austin Address 312 West Main St. ---City Luray State VA Zip 22835 Daytime Phone( 540) 743-9227 Fax ( ) E-mail 540 743-6118 austints@vt.edu # Owner ofRecord Thomas D. Wetsel, Clarence H. Wetsel, Ann W. Huffman, & Mary W. Hood Address 878 E. Rio Road City Charlottesville State VA Zip 22901 Daytime Phone(434) 978-7840 Fax# ( ) E-mail Contractor William Ashwell, General Excavation, Inc. Address 9757 Rider Road City Warrenton State VA Zip 20187 Phone Daytime 540 439-2202 y ( ) Fax#( ) E-mail Plan Preparer Tyler Austin, Racey Engineering, PLLC Address 312 West Main St. City Luray State VA Zip 22835 Daytime Phone( 540) 743-9227 Fax ( )540 743-6118 austints vt.edu # E-mail Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plan. j /Jt:11144— ti, tJ i t �. L l 46447 '/. 67,3 Signature of Owner,Contract Purchaser Date I) J), ote.Ti 17 c178)-785,0 Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# Fee Amount$ �1y4�-•b_Date Paid:_- By who ) l\k0 1\1& l l Receipt# Ck# k 9 By: ___., Revised November 14,2011 Page 1 of 3 Niue EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review,Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger $300 per revs w (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) ' 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) J 18. SUBTOTAL EROSION CONTROL PLAN $ ∎16.6; Revised November 14,2011 Page 2 of 3 Nye." STORMWATER MANAGEMENTBMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ TOTAL APPLICATION FEE: (Add lines 18 and 25) $ THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3