HomeMy WebLinkAboutWPO201300030 Application 2013-04-19 Albemarle COUP Community Development Department
401 hire Road Charlottesville,VA 22902-4596
'' Planning Application Voice:(434)296-5832 Fax:(434)972-4126
PARCEL/ OWNER INFORMATION
TMP 06100-00-00-167C0 Owner(s): WETSEL, THOMAS D &CLARENCE H WETSEL&ANN W
Application # WP0201300030 HUFFMAN & MARY W HOOD
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Rio Land Use Primary Open
Current AFD Not in A/F District Current Zoning Primary R4 Residential
APPLICATION INFORMATION
Street Address Entered By
Todd Shifflett
Application Type Water Protection Ordinances 04/19/2013
Project 1250 Bypass Interchange at McIntire Road _ (
Received Date 04/18/13 Received Date Final Submittal Date Total Fees 300
Closing File Date Submittal Date Final Total Paid 300
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type I Sub Applicati I Comment
Erosion and Sediment Control Plan x.04/18113
'APPLICANT/ CONTACT INFORMATION
ContactType Name I Address I CityState I Zip Phone PhoneCell
Owner/Applicant WEISEL,THOMAS D&`CtARENCE II WE 878 E:RIO ROAD CHARLQTTESVILL;22901:
Primary Contact TYLER AUSTIN 312 WEST MAIN ST. LURAY,VA 22835 5407439227
General Contractor WILLIAM ASHWELL, GENERAL EXCAVATI 9757 RIDER ROAD WARRENTON,VA 20187 5404392202
Plan Preparer TYLER AUSTIN, RACEY ENGINEERING, P 312 WEST MAIN ST. LURAY,VA 22835 5407439227
Signature of Contractor or Authorized Agent Date
Ariptication for Review of ,91
Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & 4
g ,
Stream Buffer Mitigation Plan
El Erosion& Sediment Control Plan ❑ Stormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan
❑ E&S Plan Amendment ❑ SWM Plan Amendment
(Previous Plan# ) (Previous Plan# )
❑ E&S Plan with Variance ❑Request for Exception
#of Variances ❑ SWM Plan Resubmittal
❑ E&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 copies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: RTE. 250 Bypass Interchange at McIntire Road
Parcel I D:06100-00-00-167C0 Vacant Residential R1-R15
Tax map and parcel: Zoning:
Amount of Land Disturbance: 3.06 Acres
Location of property(landmarks,intersections,or other): To the southwest of the Intersection of East Rio Road and Dunlora Dr.
Contact Person(Who should we call/write concerning this project?): Tyler Austin
Address 312 West Main St. ---City Luray State VA Zip 22835
Daytime Phone(
540) 743-9227
Fax ( ) E-mail 540 743-6118 austints@vt.edu
#
Owner ofRecord Thomas D. Wetsel, Clarence H. Wetsel, Ann W. Huffman, & Mary W. Hood
Address 878 E. Rio Road
City Charlottesville State VA Zip 22901
Daytime Phone(434) 978-7840 Fax#
( ) E-mail
Contractor William Ashwell, General Excavation, Inc.
Address 9757 Rider Road City Warrenton
State VA Zip 20187
Phone
Daytime 540 439-2202
y ( ) Fax#( ) E-mail
Plan Preparer Tyler Austin, Racey Engineering, PLLC
Address 312 West Main St. City Luray
State VA Zip 22835
Daytime Phone(
540) 743-9227
Fax ( )540 743-6118 austints vt.edu
# E-mail
Owner/Applicant Must Read and Sign
By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure
compliance with the approved plan.
j
/Jt:11144— ti, tJ i t �. L l 46447 '/. 67,3
Signature of Owner,Contract Purchaser Date
I) J), ote.Ti 17 c178)-785,0
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO#
Fee Amount$ �1y4�-•b_Date Paid:_- By who ) l\k0 1\1& l l Receipt# Ck# k 9 By: ___.,
Revised November 14,2011 Page 1 of 3
Niue
EROSION CONTROL PLAN: (SUBMIT 2 COPIES)
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review,Disturbed Area Less Than One Acre $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review,Disturbed Area One Acre or Larger $300 per revs w
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) '
13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $150/per request
(TO BE PAID AT TIME OF APPLICATION) J
18. SUBTOTAL EROSION CONTROL PLAN $ ∎16.6;
Revised November 14,2011 Page 2 of 3
Nye."
STORMWATER MANAGEMENTBMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan $300/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22. Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23. Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $150
(TO BE PAID AT TIME OF APPLICATION)
25. SUBTOTAL SWM/BMP PLAN $
TOTAL APPLICATION FEE: (Add lines 18 and 25) $
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
Revised November 14,2011 Page 3 of 3