Loading...
HomeMy WebLinkAboutWPO201300008 Application 2013-01-30 imecki(e, 2o(3 -q • Application for Review of Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & Stream Buffer Mitigation Plan ❑ Erosion & Sediment Control Plan ❑ Stormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑ Request for Exception #of Variances ` ] SWM Plan Resubmittal &S Plan Resubmittal ww�,,AA,��w WPO Application# ZE? 7 t 2CX 4Q WPO Application# Za)7-�`Tv Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: CO (o /N vv AL[ 1"[,ULI I- F I LI Tax map and parcel: 61 VV ,3 - 1 -i Zoning: R.1 Amount of Land Disturbance: I. 1 2- Acres Location of property(landmarks,intersections,or other): )MMC.v04vGAL �I 1 7' 21 1/.&: 6/Ic or — ,a7`5. Contact Person(Who should we call/write concerning this project?):/�//ICt4 62,.. A4j6Y25, Pc /,1c, 1/NIy 6-7--)� .• Address 17Z s• ?f4117P '� n2 • City /01-1,401A'rreA/t tr State ( 1 Zip L'(/ Daytime Phone Wj) 471- g/ L/ Fax#(.'3q `771 l ` U / E-mail Olisite rs 'edu/n//I, 0-er Owner of Record r100119—e5 E5 C 9y CAND r "r5/- LAAE R 2AA Address a • d• f3,O)( Gj 3 City C+4,SUOIreSVIL.Le State VA Zip 2(,C7N Daytime Phone(T31 11,-? { Fax#( ) E-mail I(,�ti I bO( R( .(om Contractor iNPr Address [ City State Zip Daytime Phone( ) Fax#( ) E-mail Plan Preparer dA46 S CJ CT P Address City State Zip Daytime Phone( ) Fax#( ) E-mail Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and developme on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure complian it he approved plan. 41//6//1 Sig ture of Owner,Contract Purchaser Date e C dfr-►nn 4.1 -, — 2-7) c Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY 7WPO# Fee Amount S�-YO�C JOt% Date Paid-1.1 1?�Sy who'?Lcurv, Runt( Receipt# tl3R8 Ck#7661 By: iii L9/Z Revised November 14,2011 Page 1 of 3 EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review,Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL.APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 1. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BF PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger $300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 3 00 Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan. $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ TOTAL APPLICATION FEE: (Add lines 18 and 25) $ COO THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 n --3 Albemarle Cou,,,_ „ �/ Community Development Department "�'l 401 ntire Road Charlottesville,VA 22902-4596 Planning Application Voice:(434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION TMP 061W0-03-00-01400 Owner(s): MOORES CREEK LAND LLC Application # WP0201300008 PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Jack Jouett Land Use Primary Open Current AFD Not in A/F District Current Zoning Primary R15 Residential APPLICATION INFORMATION Street Address Entered By Todd Shiffett Application Type Water Protection Ordinances 01/30/2013 Project Commonwealth Townhomes Received Date 01/29/13 Received Date Final Submittal Date Total Fees 600 Closing File Date Submittal Date Final Total Paid 600 Revision Number Comments Legal Ad SUB APPLICATION(s) Type J Sub Applicati Comment Erasion and Sediment Control Plan 01/30f t Stormwater Management/BMP Plan 01/30/13 � � �� jAPPLICANT/ CONTACT INFORMATION ContactType I Name J Address I CityState Zip Phone PhoneCell Ownerfokoplitant ;MOORES CREEK LAND LLC PO BOX 5384 CHARLOTTESVILL =22905 Primary Contact LANE BONNER 620 PLANTATION CT. CHARLOTTESVILL 22903 4342966518 Date Signature of Contractor or Authorized Agent A •cation for Review of Erosion & Sediment Controlan & Stormwater Managemen` MP Plan & Stream Buffer Mitigation Plan j.Erosion & Sediment Control Plan Er Stormwater Man agement/BMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# ) (Previous Plan# ❑ E&S Plan with Variance ❑ Request for Exception #of Variances El SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: Cy m e t", w l v (4 T-u t ,, eloviJe I Tax map and parcel: 6 IL/ I LI Zoning: R Amount of Land Disturbance: el2a2g , S- Acres (Pc ra ( 1 J /. 3 CI c /„`�, property( ) 40 L c>> ((d f 1 7))/dQ11 `.1 / t,1/' (7' /mil X Location of (landmarks,intersections,or other): /° LN/j� 1- h [ � �L^/�� Contact Person(Who should we call/write concerning this project?): n e 6 O:An y Address 2 0 P IGt nt cfi rt)• ( City (4)j)fel v, /it State v4- Zip 2 '25 L` Daytime Phone( � ) 216�if I Fax#�3 ) L ".1� " 2c'i?6 E-mail /6 /6 .a,,re/'. S/r, 1, If L' Owner of Record Address City State Zip Daytime Phone( ) Fax#( ) E-mail Contractor Address City State Zip Daytime Phone( ) Fax#( ) E-mail Plan Preparer Address City State Zip Daytime Phone( ) Fax#( ) E-mail Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure complia ce with the approved plan. /A/a S gnature o caner, Contract Purchaser Date kt/Ira` L 1i' 113'1- G -6S-/E Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# 11 By ?l,�t`e�.• 11Y r _ Receipt 4� 116 Y !� Fee Amount ,� Date Paid B who. Recei t# Ck# B Revised November 14,2011 Page 1 of 3 EROSION CONTROL PLAN: (SL,r,,,iIIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees, Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees, Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED _ PLAN REQUIREMENTS) 12. Plan Review, Disturbed Area One Acre or Larger $300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTLR UNTIL APPROVAL) 13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 00 18. SUBTOTAL EROSION CONTROL PLAN $ Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENTMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan... $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ '366 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 66 a THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3