Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARB201300174 Application 2013-11-26
Albemarle Co 'V `.. Community Development Department 1 401 ( tire Road Charlottesville,VA 22902-4596 12 Planning Application Voice:(434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION TMP 032G0-00-00-000A0 Owner(s): WOODBRIAR ASSOCIATES Application # ARB201300174 PROPERTY INFORMATION Legal Description TRACT A Magisterial Dist. Rio Land Use Primary Forest Current AFD Not in A/F District Current Zoning Primary Cl Commercial APPLICATION INFORMATION Street Address Entered By Todd Shifnett Application Type Architectural Review Board 11/26/2013 Project Briarwood Commercial Lots Received Date 11/25/13 Received Date Final Submittal Date 11/25/13 Total Fees Closing File Date Submittal Date Final Total Paid Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub Applicati Comment Preliminary Site Development Plan 11/25/13 I 'APPLICANT/ CONTACT INFORMATION ContactType f. Name Address I CityState I Zip ( Phony PhoneCell { Dwner/Applicant ,WOODBRIAR ASSOCIATES P©BOX 9$48 i HAR O TESVILL':,X2905 Primary Contact SCOTT COLLINS 200 GARRETT STREET,SUITE CHARLOTTESVILL 22902 4342933719 Signature of Contractor or Authorized Agent Date Architectural' .view Board Applicatit.t r Part A: Applicant, Contact and Parcel Information Project Name: BRIARWOOD COMMERCIAL LOTS Tax map and parcel(s): 032G0-00-00-000A0&032G0-00-00-000B0 Physical Street Address: BRIARWOOD DRIVE Contact Person: SCOTT COLLINS Business Name: COLLINS ENGINEERING Address 200 GARRETT STREET, SUITE K City CHARLOTTESVILLE State VA Zip 22902 Daytime Phone(434) 293-3719 Fax#( ) E-mail scoff @collins-engineering.com Owner of Record: WOODBRIAR ASSOCIATES Address P.O. BOX 5548 City CHARLOTTESVILLE State VA Zip 22905 Daytime Phone( ) Fax#( ) E-mail Part B: Review Type and Fee Select review type Review by the Architectural Review Board Conceptual Plan/Advisory Review(for a Special Use Permit or a Rezoning) No Fee X Preliminary Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1000.00 Amendment to an approved Certificate of Appropriateness $225.00 Building Permit Review $590.00 County-wide Certificate of Appropriateness Structures 750' or more from the EC,no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50%or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount$ Date Paid By who? Receipt# Check# By County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126 11/2010 Page 1 of 2 OVER—> Part C: Description of Proposal Describe your proposal.Attach a separate sheet if necessary. see attached separate sheet Part D: Applicant Agreement Applicant must read and sign • Each application package must contain(8)folded copies of all plans and documents being submitted. Only (1)set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate,true, and correct to the best of my knowledge, and that the attached plans contain all info ation required by the appropriate checklist. 'ignatur- o owner, owner's representative Date or contract purchaser IS V (- s Printed name,Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to,the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency.Attach the owner's written consent. 11/2010 Page 2 of 2 OVER—. Architectural Review Board r�, Preliminary Review of a Site Development Plan Submittal Requirements Checklist Part A: Applicant Contact and Parcel Information Project name: Briarwood Commercial Site ARB Plan Tax map and parcel#: 032G, parcel A & 032G, parcel B Physical street address(if assigned): Location of property(landmarks, intersections, or other): Intersection of Briarwood and US29 Contact person: Scott Collins Business name: Collins Engineering Address: 200 Garrett Street, Suite K City: Cville State: VA zip: 22902 Daytime phone: 434-293-3719 Fax: Email: scott @collins-engineering.com Part B: Preliminary Site Development Plan Requirements Checklist Important Note: Submittal packages must contain(8)collated copies of all information unless otherwise indicated. A. Written description of the proposal ® Provide a general description of all proposed work. ® Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan showing the following (drawn to the scale of 1"=201,clearly legible and folded): ® Location(s) of proposed building(s)on the site. ® Schematic layout of parking, travelways, and other improvements. ® Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater. 13 Existing and proposed topography drawn with contour intervals of 2-feet, and with sufficient off-site topography to describe prominent and pertinent off-site features and physical characteristics, but in no case less than 50-feet outside of the site. ® Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. ® Conceptual stormwater management plan. ® Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines. Sheet number, total number of sheets,date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. 1 Revised 7/28/10 '.. NNW '41•11161 C. Appearance of the proposed building(s) ® Show a representation of the appearance of the proposed building(s). This must include architectural elevations drawn to the scale of at least 1/16"=1'-0". This may also include perspective sketches, or photos of the proposed building(s). These documents should provide a basic understanding of: MI The size, form, and scale of the building. ® The architectural style of the building. ® The proposed building materials and color(s). D. Additional material Q Provide labeled, color, 8'/2" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ® The applicant is welcome to submit any additional material that will make the preliminary review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. ® Site sections may be useful. Part D: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a preliminary site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, I hereby state that the information provided on this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. 2 Si nature of m I in p son et g checklist Date Wu(d€61 t)' d Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434)296-5832 Tel, (434) 972-4126 Fax www.albemarle.orq 2 Revised 7/28/10