Loading...
HomeMy WebLinkAboutWPO201300083 Application 2013-12-31 Albemarle CoL y Community Development Department 401`IClCintire Road Charlottesville,VA 22902-4596 a Planning Application Voice: (434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION TMPI 06100-00-00-18400 I Owner(s): Application # WP0201300083 RIO ROAD HOLDINGS LLC PROPERTY INFORMATION Legal Description RIO ROAD EAST Magisterial Dist. Rio Land Use Primary Residential --Single-family(incl. modular homes) Current AFD Not in A/F District Current Zoning Primary R4 Residential APPLICATION INFORMATION Street Address Entered By Application Type Water Protection Ordinances Todd Shifflett 12/31/2013 Project IStonewater Subdivision -Townhouses Received Date 12/30/13 Received Date Final Submittal Date Total Fees 180 Closing File Date Submittal Date Final Total Paid 180 Revision Number Comments Legal Ad (SUB APPLICATION(s) Type I Sub Applicati Comment Erosiop aued Sediment C4ntro[Plain 'APPLICANT/ CONTACT INFORMATION ContactType I Name I Address CityState Zip Phone I PhoneCell ;Owner/Applicant RIO ROAD HOLC INNS LLC 1900 ARLINGTON BLVD SUIT CHARLOTTESVILL t2Z903 Primary Contact COLLINS ENGINEERING 200 GARRETT STREET,SUITE CHARLOTTESVILL 22902 4342933719 Plan Preparer COLLINS ENGINEERING Signature of Contractor or Authorized Agent Date LC:11-G Application for Review of ,• Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & ,art Stream Buffer Mitigation Plan El Erosion & Sediment Control Plan ❑ Stormwater Management/BMP Plan El Stream Buffer Mitigation Plan ® E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# 1Q I -13 ) (Previous Plan# ) ❑ E&S Plan with Variance ❑ Request for Exception #of Variances ❑ SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: Stonewater Subdivision -Townhouses Tax map and parcel: Al A1-01-04-01RF1 A1-n1-nR-nlzoning: R-4 Amount of Land Disturbance: 0.78 Acres Location of property(landmarks,intersections,or other): intersection of Penfield Lane and Rio Road Contact Person(Who should we call/write concerning this project?): Collins Engineering Address 200 Garrett Street, Suite K City Cville State Va Zip 22902 Daytime Phone(434 293-3719 Fax#( ) E-mail scott@collins-engineering.com Owner of Record Rio Road Holdings, LLLc Address 1900 Arlington Blvd I Jack_ A City Cville State Va Zip 22903 Daytime Phone( ) Fax#( ) E-mail Contractor Address City State Zip Daytime Phone( ) Fax#( ) E-mail Plan Preparer Collins Engineering Address 200 Garrett Street, Suite K City Cville State Va Zip 22902 Daytime Phone( ) Fax#( ) E-mail Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance wit he ap ved pla 1. Signature of• e,Co rac •urc'er Date l,u :ei L (rail'0\ 4 - 14 • iiips Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# Fee Amount$ ,c)1 Date Paid /0Q)15 y who? . �.a N 41 171 c)Receipt#'-1 401 Ck# 3 0 By: DR Revised November 14,2011 Page 1 of 3 New EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees, Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review, Disturbed Area One Acre or Larger $300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan d 180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 180.00 Revised November 14,20 11 Page 2 of 3 Nrr -woe STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 180.00 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3