Loading...
HomeMy WebLinkAboutSP200600031 Action Letter " .. G COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 January 28, 2008 Glenmore Associates Limited Partnership c/o Michael Barnes Po Box 5207 Charlottesville, VA 22905 RE: SP2006-00031 Glen Oaks Stream Crossing Dear Mr. Barnes: On November 14,2007, the Albemarle County Board of Supervisors took action on SP2006- 00031 to allow the fill in the floodplain of Limestone Creek for a road crossing over the creek to provide access for residential development on Tax Map 94, Parcels 15, 16 & 16A in the Scottsville District. This special use permit was approved based on the following conditions: 1) The stream crossing shall be built in general accord with the plan titled "SP 06-031 Application Plan," revised "Aug. 01,2007," and prepared by Roudabush, Gale, & Associates, Inc.; 2) Any subdivision on the portion of the property designated as Rural Areas in the Comprehensive Plan shall be designed in general accord with the plan titled Glenoaks, dated "8/1/07", and prepared by "kg Associates." The development lots east of Limestone Creek and Lot 26 shall be developed as a Rural Preservation Development in accord with Section 10.3.3.3 of the Zoning Ordinance, with Lot 26 as the preservation tract. As part of the same subdivision, the applicant shall convey to the County a portion of Lot 10 (whose boundaries are approved by the Parks and Recreation department) for use as a greenway; 3) The dam shall allow for a continuation of the base flow in the stream; and 4) The following conditions shall be met prior to issuance of a grading permit to allow installation of the stream crossing or submittal of the final subdivision plat, whichever comes first: a) The applicant must obtain a map revision, letter of revision, or letter of amendment as required from the Federal Emergency Management Agency (FEMA) and copy the County Engineer on all correspondence between the applicant and FEMA; b) County approval of an erosion and sediment control plan for the stream crossing; c) County approval of the final lane configuration over the stream crossing with the final road plans; d) Natural Resources Manager approval of a stream buffer mitigation plan in general accord with the conceptual plan shown on the plan titled "SP 06-031 Application Plan," revised "Aug. 01,2007," and prepared by Roudabush, Gale, & . . " Associates, Inc; e) County approval of final design plans and hydrologic/hydraulic computations for the stream crossing; f) Army Corp of Engineers, Virginia Department of Environmental Quality, and other necessary state and federal agency approvals must be obtained prior to issuance of grading permits; and g) Approval of the final design of the dam by the Department of Conservation and Recreation, as necessary. 5) Prior to final plat approval of the private road across the creek, there shall be a private road maintenance agreement that includes provisions for maintenance, repair and future replacement of the dam, when necessary, in a form acceptable to the County as approved by the County Attorney. All costs of this maintenance or repair agreement shall be privately funded. The landowner's private responsibility for dam maintenance or repair shall be stated in every deed transferring ownership of the lots served by this crossing in a statement approved in form and content by the County Attorney. The County shall not be responsible for any costs of the maintenance, repair or future replacement of the private road or dam. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: · compliance with conditions of the SPECIAL USE PERMIT; · approval of and compliance with a SITE PLAN and/or SUBDIVISION PLAT; · approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Cc: T ex Weaver Chuck Proctor Sherri Proctor File