HomeMy WebLinkAboutSUB202200155 Review Comments Final Plat 2022-09-29County of Albemarle
Sli COMMUNITY DEVELOPMENT DEPARTMENT
Memorandum
To: Tim Miller (tmiller@meridianwbe.com)
From: Kevin McCollum, Senior Planner
Division: Planning
Date: September 29, 2022
Subject: SLTB202200155 TMP 78-20 Two Lot Division
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone:434-296-5832
WW W.ALBEMARLE.ORG
The County of Albemarle Planning Division will grant or recommend approval of the plat referenced above once
the following comments have been addressed: [Each comment is preceded by the applicable reference, which is
to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [14-302(A)(4)(5)] Provide the recorded instrument number for all easements. It appears there is a drainage
and sight distance easement that is missing deed book and page references on the callout.
2. [14-302(B)(5)] Include a note that the property is subject to the Flood Hazard and Steep Slopes — Managed
and Preserved Overlay Districts.
3. [14-302(B)(7)] Clarify note 7 that the Rivanna River Watershed is not a Water Supply Watershed.
4. [14-302(B)(9)(10)] Revise the plat to show the Water Protection Ordinance Buffer (Stream Buffer),
Floodplain, and Dam Break Inundation Zone. It appears the Dam Break Inundation Zone is shown correctly,
but the line type for the Floodplain and Stream Buffer should be different. As you can see on the County
GIS these two layers don't exactly line-up:
https://gisweb.albemarle.org//gpv 51Niewer.aspx?state=829829730217
5. [14-302(B)(10)] Provide the note: "The stream buffer(s) shown hereon shall be managed in accordance with
the Albemarle County Water Protection Ordinance."
6. [14-316] VDOT approval is required prior to final plat approval. VDOT's review is pending.
7. [14-302(B)(8)] Provide the applicable setbacks as a note on the plat.
8. [14-302(B)(1)] Please include a date of revision.
Please contact Kevin McCollum in the Planning Division by using kmccollum@albemarle.org or 434-296-5832
ext.3141 for further information.
Comments from Other Reviewers:
Virginia Department of Transportation (VDOT) — John Wilson, john.c.wilson@vdot.vir ig nia.gov — Review
pending.