HomeMy WebLinkAboutARB201400059 Application 2014-05-06Albemarle County
Planning Application
Community Development Department
401 McIntire Road Charlottesville, VA 22902 -4596
Voice : (434) 296 -5832 Fax: (434) 972 -4126
TMP 04500 -00 -00 -11100 Owner(s): FIRST GOLD LEAF LAND TRUST WENDELL W WOOD,
Application # ARB201400059 I TRUSTEE
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Rio Land Use Primary Public
Current AFD Not in A/F District Current Zoning Primary Highway Commercial
APPLICATION INFORMATION
Street Address 425 GANDER DR CHARLOTTESVILLE, 22901 Entered By
Jud Martin
Application Type Architectural Review Board 05/06/2014
Project Northtown Center -Sonic Drive Thru Rest. - Final
Received Date 05/05/14 Received Date Final Submittal Date 05/05/14 Total Fees 1000
Closing File Date Submittal Date Final Total Paid 1000
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type
County-wide Fencing
Sub Applicati
Comment
County -wide Equipment
County -wide Lighting
APPLICANT CONTACT INFORMATION
ContactType Name Address_________]__
Owner /Applicant FIRST GILD LEAF LAND TRUST LNENDEL y PO BOX 5548
Primary Contact SCOTT COLLINS / COLLINS ENGINEERING 200 GARRETT ST., STE. K
CityState Zip Phone PhoneCell
1 CHARLOTTESVILL 22905
CHARLOTFESVILL 22902 4342933719
Signature of Contractor or Authorized Agent Date
Architecturai Review Board Application
Part A: Applicant, Contact and Parcel Information
Project Name: NORTHTOWN CENTER - SONIC DRIVE THRU RESTAURANT
Tax map and parcel(s): 04500 -00 -00 -11100 Physical Street Address: 425 GANDER DRIVE
Contact Person: SCOTT COLLINS
Business Name: COLLINS ENGINEERING
Address 200 GARRETT STREET, SUITE K City CHARLOTTESVILLE State VA Zip 22902
Daytime Phone (434 ) 293 -3719 Fax # () E -mail Scott @collins - engineering.com
Owner of Record: FIRST GOLD LEAF LAND TRUST; WENDALL WOOD, TRUSTEE
Address P.O. BOX 1333 City CHARLOTTESVILLE State VA Zip 22902
Daytime Phone ( ) Fax # ( ) E -mail
Part B: Review Type and Fee
Select
NOTE:
review
type
Review by the Architectural Review Board
Conceptual Plan /Advisory Review (for a Special Use Permit or a Rezoning) No Fee
Preliminary Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1000.00
Amendment to an approved Certificate of Appropriateness $ 225.00
Building Permit Review $ 590.00
County -wide Certificate of Appropriateness
Structures 750' or more from the EC, no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB- approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50% or less of the altered elevation No Fee
For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
X
X
FOR OFFICE USE ONLY BP# ARB#j.
" 1.1 a" n
Fee Amount $ j Date Paid By who? �J ; i 1 Receipt #Y5 7 p
1 Check # /0 ByD
An�scruivft
County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126
1 1 /2010 Page I of 2
OVER —
Part C: Description of Proposal
Describe your proposal. Attach a separate sheet if necessary.
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted. Only
(1) set of building material samples is required. All submittal items, including building material samples,
become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all
submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
Q. - A - -4y� ���
Signature of owner, owner's repre entative
or contract purchaser
Printed name, 'title
;- / Z
— %I::/-/ Date If
cj,3 y _--�96 -art-)
Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER
,� pF
Architectural Review Board
Final Review of a Site Development Plan
Submittal Requirements Checklist
Part A: Annlicant, Contact and Parcel Information
j
Project Name: v),4` -h w4 Joen+n, (Sonic bY,Vi -- IhYu Ka INtYCch
Tax map and parcel(s): 46-iii Physical street address: 425 COCKdCr 'Lri Vc
Contact Person: (5(t;k C 6 `("
Business Name: C'cl I a+S GY161111 LLYI�R
Address )-Ob &Y ✓t4+ Sictf Suc'>}'t K- City rltQVlc cSVi E State zip 12.70
Daytime Phone ( 5,4 Z63.37iq Fax # ( ) E -mail
�iticel -; �, can
Part B: Submittal Requirements
Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed, then explain why.
[A Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of I"=20', clearly legible and folded):
[� Location(s) of proposed building(s) on the site.
[r� Location of proposed parking, travelways, walkways and other improvements.
[f Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
�j Existing and proposed topography drawn with contour intervals of 5 -feet or less, and with sufficient
off -site topography to describe prominent and pertinent off -site features and physical characteristics,
but in no case less than 50 -feet outside of the site.
Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
[� Stormwater management plan.
4ALocation of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials, with material and color samples.
[� Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
I
OVER
C. Landscape plan showing the following (drawn to the scale of 1 " =20' or larger, clearly legible and folded):
[✓] Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
Existing landscaping to be removed. Include the location, size, and species.
�J Landscape key including all landscape symbols and a description of what they represent.
[A Location of existing and proposed tree lines and tree save areas.
Location of existing natural features.
[� Location of individual trees of 6 -inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
[A Location and height of above - ground utilities and associated easements, and location of below -
ground utilities and associated easements.
[,f Stormwater facilities.
®A Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
[�] Include tree protection fencing and limits of work on the landscape, grading and E &S plans.
D. Lighting plan showing the following (drawn to the scale of 1 " =20' or larger, clearly legible and folded):
Location of all proposed building and site lighting.
Lighting schedule identifying all proposed light fixtures, poles and brackets.
[,1 Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color, finish, and installation height.
Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections):
[A Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8 "= 1' -0 ". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
Color perspective sketches that show the proposed development as seen from the Entrance Corridor.
[� Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and
roof height(s) relative to the natural elevations along the Entrance Corridor.
One set of all building materials / colors.
A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
Provide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
F Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
[ The applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping, or other unique or unusual conditions are welcome.
2
OVER
Part C. Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided in this application, and all accompanying information, is accurate, true and correct to
the best of my knowledge, and that the attached plans contain all information required by this checklist.
Signature of person completing checklist
Printed Name / Title
5�5 %Zo�4
Date
434- 2y3-37t��
Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902 -4596
(434) 296 -5832 Tel, (434) 972 -4126 Fax
www.albemarle.orq
3
OVER -
COLLINS
TRANSMITTAL
❑ FAX ❑ MAIL N DELIVERY
TO: FROM:
klkyi4 ryf /i, k S z-cta ski I l c�
C c
)0 GARRETT ST. SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins - engineering.com
COMPANY: v /� 1 DATE:
AbI&Marl e. LLB I I y f✓ 5%zc M
FAX: TOTAL NO. OF PAGES INCLUDING COVER:
PHONE NUMBER: SENDER'S PHONE NUMBER:
.l53- 37i
PROJECT /SUBJECT:
�i�II
/h Ceofrr - 5�,k, c, bhve °7hru
A IZ.6- 20/ 3 - i g -3
PLEASE FIND ENCLOSED:
NO. COPIES DATE DE{SSCRIPTION
1� l f,+,s
j Avcl, c&bn
Ca I �
i
'by cry CAfs
NOTES/ COMMENTS:
RECEIVED BY:
SIGNATURE DATE