VSMP Permit Plan Review
Southern Albemarle Convenience Center
WP0202200001
Draper Aden Associates [cbolton@daa.com]
County of Albemarle c/o Lance Stewart
Jan. 18, 2022
April 14, 2022
June 3, 2022
Feb. 17, 2022
June 28, 2022 (Rev.1)
David James [djames2@albemarle.org]
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied/approved.
The rationale is given in the comments below. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Registration Statement:
a. Please complete section I operator/permittee information.
b. Fix spelling error for project name under section 11.
c. Sign & date form prior to permit issuance.
(Rev.1) Acknowledged.
2. Complete Section 4&5: Insert reduced sized copies of the approved ESC & SWM plans.
(Rev.1) Acknowledged.
3. Complete Section 2 prior to grading permit issuance.
(Rev.1) Acknowledged.
4. Complete Section 6 prior to grading permit issuance.
(Rev.1) Acknowledged.
5. Complete Section 9 prior to approval.
(Rev.1) Not addressed.
6. Complete Section 8 & 10 prior to grading permit issuance.
(Rev.1) Acknowledged.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Provide a PPP exhibit sheet showing controls in place prior to plan approval.
(Rev.1) Addressed.
C. Stormwater Management Plan (SWMP)
Engineering Review Comments
Page 2 of 4
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved. The stormwater management plan content requirements can be
found in County Code section 17-403.
1. Sheet C5: Label 'Conserved Open Space' area as'SWM Forest and Open Space'
Easement.
a. Show amount (acres).
(Rev.1) Addressed.
2. Include note on the cover: "The SWM Forest and Open Space Easement is subject to the
guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas
will remain undisturbed in a natural, vegetated state, except for activities as approved
by the local program authority, such as forest management, control of invasive species,
replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to
maintain desired vegetative community (but no more than four times a year)."
(Rev.1) Addressed.
3. Show SWM narrative (summary) addressing water quality/quantity (Part IIB) on the plans.
(Rev.1) Addressed.
4. Ensure bioretention meets all requirements per DEQ specifications:
https://swbmpvwrrc.wp.prod.es.cloud.vt.edu/wp-content/uploads/2017/11/BM P-
Spec-No-9 BIORETENTION v1-9 03012011.pdf (Rev.1) Addressed.
5. Specifically, please do the following for Bioretention 1(w/underdrain):
a. Ensure 2-ft minimum bottom to bedrock separation. (Rev.1) Addressed.
b. Ensure 2-ft minimum bottom to seasonal high water table separation. (Rev.1)
Addressed.
c. Filter media: Please go with the 2011 standards on recommended bioretent,
soil mix composition. We have found that higher % of fines (clay content) have
caused issues with water filtrating though. (Rev.1) Addressed.
d. Filter media: Ensure an infiltration rate of 2 in/hr (min). Test will be required prior
to project termination. (Rev.1) Addressed.
e. Provide a trash rack for 3" orifice. (Rev.1) Addressed.
f. Observation well should be above and tied to underdrain (C (Rev.1) Addressed.
g. Provide impermeable liner since this project is considered a
(solid waste disposal). (Rev.1) N/A; Acknowledged.
6. Show level contour elevation along gravel diaphragm to ensure sheet flow from it. Drop
can be 2-4-in minimum (C4, C6.1). (Rev.1) Addressed.
7. SWM Calc. Packet:
a. Correct (should be'Post') on page 14 of 16
(Rev.1) Addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Cover: Show'WPO202200001' under or near title. (Rev.1) Addressed.
2. Remove sheets C3.1, C3.2 from the WPO plan. (Rev.1) Addressed.
3. Sheet Cl: We require topographic data to be field verified by the designer within the
year. Please provide date of this field verification. (Rev.1) Addressed.
4. Sheet C2:
Engineering Review Comments
Page 3 of 4
a. Show existing drainage divides. (Rev.1) Addressed; Found map in the
calculations packet, pg.162, Fig. 3.
b. Please show a paved construction entrance [ACDSM, pg. 8]. Contractor can
work with E&SC Inspector should a stone CE be sufficient.
https://www.al bemarle.org/home/showpu bl i sheddocu ment/270/63720245826
7970000 (Rev.1) Addressed.
c. Show sediment trapping device at CE location. (Rev.1) Addressed.
5. Sheet C6: Label the channels so they can be identified on C3.0. (Rev.1) Addressed.
6. Show E&SC controls for the pipe & channel. Also, show the grading for the outtall
channel. (Rev.1)Addressed.
7. Please show a phase 11 E&SC. Notes and E&SC sequence make sense and are helpful
guidance but a second sheet showing these measures in place would pro vide better
clarity. (Rev.1) Addressed.
8. Based on the final grading stormwater will enter the pretreatment area of bioretention
and likely act as a trap. It's unclear how this runoff area will reach the sediment trap.
(Rev.1) Addressed.
9. Have you considered placing the sediment trap at the bioretention location? Consider
the cost -savings. See Section 8.1 Construction Sequencing:
https://swbmpvwrrc.wp.prod.es.cloud.vt.edu/wp-content/uploads/2017/11/BM P-
Spec-No-9 BIORETENTION v1-9 03012011.pdf
(Rev.1) Acknowledged.
10. Note: Applicable VDOT entrance permit will need to be acquired prior to grading permit
issuance. (Rev.1) Acknowledged.
The VSMP permit application and all plans may be resubmitted for approval when all comments
have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete
permit package with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a
meeting to discuss this review.
Process:
.. ■_.
..._.
■
Engineering Review Comments
Page 4 of 4
ownership and signature information. The Gempleted ferm,; %A.fill need tA hP ';-_,bFRi#R_d tO the
After bonding and agreements are complete, county staff enters project information in a DEQ
database for state application processing, if a DEQ permit is required. DEQ reviews the
application information based on local VSMP authority approval. At this time, the DEQ portion of
the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with
instructions on how to pay fees. When DEQ approves the application, they will issue a permit
coverage letter, which must be posted at the construction site.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction
conference. Applicants must complete the request for a pre -construction conference form and
pay the remainder of the application fee. The form identifies the contractor and responsible land
disturber, and the fee remaining to be paid. This will be checked by county staff, and upon
approval, a pre -construction conference will be scheduled with the County inspector. At the pre -
construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
httos://www.albemarle.org/govern ment/community-development/aooly-for/engineering-aoolications