Loading...
HomeMy WebLinkAboutZMA202100016 Review Comments Zoning Map Amendment 2022-09-21COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 September 19, 2022 County of Albemarle Department of Community Development 401 McIntire Rd Charlottesville VA 22902 Attn: Kevin McDermott Re: North Fork Residences — Rezonning Request ZMA-2021-00016 Review #2 Dear Mr. McDermott: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section has reviewed the above -referenced TIA as prepared by Timmons Group dated June 03, 2022, and offer the following comments. • Page 17 It was assumed that VDOT will retime the traffic signals along US Route 29 periodically due to expected background development and overall growth in the study area. To reflect this, the traffic signal timings and offsets were optimized for all total future conditions (2026, 2031, and 2037). To better gauge the impact extent, the Background condition signal timing data should match the Future condition under discussion. A separate Mitigation condition can then be developed with the proposed modified signal timing data • Page 11 Per our Road Design Manual (RDM), Double (dual) left -turn lanes (DLTLs) shall be considered where peak left -turn movements exceed 350 vph. Please reference the appropriate phases when the necessary conditions are met and ensure all requirements in our RDM can be accommodated for the DLTLs • Pages 11, 87, 93 (Table 11-3), 98 VirginiaDOT.org WE KEEP VIRGINIA MOVING Please explain why the proposed Median U-turn (MUT) mitigation was not modeled to better explore the innovative intersection improvement at US Route 29/Airport Rd? A model would help evaluate the possible impact on the intersection and U-turn locations. Page 93 shows results from a model but the Synchro files could not be located with the submission. It would also be prudent to model all the other scenarios and conditions to better gauge the interactions at the possible U-turn locations Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards regulations or other requirements. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If you have further questions, please contact Willis Bedsaul at (434) 422-9866. Sincerely, John Wilson, P.E. Assistant Resident Engineer -Land Use Charlottesville Residency