HomeMy WebLinkAboutSDP202100072 Letter of Revision Letter of Revision 1 2022-09-30Application for
Letter of Revision
0 Letter of Revision - $118.86 + $4.75 Technology Fee = $123.61
This application may require additional review by the Fire Marshal. Fees in addition to those shown on this
application may be required as required by the Fire Prevention Code Fee Schedule. A copy of the schedule is
available from the Fire Marshal.
Final Site Plan Name and Number: Avon Fuel Station - SDP 202100072
Contact (who should we contact about this project) Michael A. Rakes
Street Address 10 ChirCh
City Roanoke
S.E. Plaza Suite 10
Phone Number (540) 342-6001 Email Mrakes@spectrumpc.com
Owner of RecordR.J. Narkie, City of Charlottesville
Street Address PO Box 911
City Charlottesville StateVirginia Zip Code22901
Phone Number (434) 970-3664 Email Narkie@Charlottesville.gov
Applicant Spectrum Design P.C. C/O Michael A. Rakes
Street Address 10 Church Ave, S.E. Plaza Suite 10
City Roanoke StateVirginia Zip Code24011
Phone Number (540) 342-6001 Email Mrakes@spectrumpc.com
® The appropriate fee,
® The site plan number that the change applies to,
0 A request letter describing the proposed changes from the owner or authorized agent,
0 4 copies of the plan that shows the proposed changes,
Changes must be shown on the sheet or sheets from the approved final site plan, or on an I I'W IT' copy of that portion of the approved
final site plan
Owner/Applicant Must Read and Sign
I hereby certify that the information provided on this application and accompanying information is accurate, true and correct to the best
of my knowledge and belief.
Signature of Owner, Agent
Michael A. rakes
Print Name
FOR OFFICE USE ONLY LOR #
Fee Amount $ Date Paid By who?
8/2512022
Date
(540) 342-6001
Daytime phone number of Signatory
Receipt # Ck# By:
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
(REVISED 7/l/2021 (Fee Update) Page 1 of 1
A,
III,2:k_
SPECTRUM DESIGN
architects I engineers
AVON FUEL STATION
August 25, 2022
Project No. 21034 Page 1 of 1
Letter of Revision
This letter's purpose is to reflect the changes made to the project for Avon Fuel Station — SDP202100072
and are as follows:
1. The size of the storage tank for gas has been changed from 10,000 gallons to 12,000 gallons.
2. The size on the storage tank for Diesel has been changed from 12,000 gallons to 10,000 gallons.
3. The plan south canopy has been shifted to the north slightly.
4. The air compressor, emergency spill box, and absorbent barrel have been moved closer together
along the back side of the diesel tank.
5. Electrical plans shave shifted to show the proper wiring going to the appropriate fuel tanks.
6. Architectural plans have changed to display the corrected locations of the fuel tanks.
For any questions or concerns please contact Michael A Rakes at Mrakes@spectrumpc.com.
Thank You