Loading...
HomeMy WebLinkAboutSDP202100072 Letter of Revision Letter of Revision 1 2022-09-30Application for Letter of Revision 0 Letter of Revision - $118.86 + $4.75 Technology Fee = $123.61 This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be required as required by the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal. Final Site Plan Name and Number: Avon Fuel Station - SDP 202100072 Contact (who should we contact about this project) Michael A. Rakes Street Address 10 ChirCh City Roanoke S.E. Plaza Suite 10 Phone Number (540) 342-6001 Email Mrakes@spectrumpc.com Owner of RecordR.J. Narkie, City of Charlottesville Street Address PO Box 911 City Charlottesville StateVirginia Zip Code22901 Phone Number (434) 970-3664 Email Narkie@Charlottesville.gov Applicant Spectrum Design P.C. C/O Michael A. Rakes Street Address 10 Church Ave, S.E. Plaza Suite 10 City Roanoke StateVirginia Zip Code24011 Phone Number (540) 342-6001 Email Mrakes@spectrumpc.com ® The appropriate fee, ® The site plan number that the change applies to, 0 A request letter describing the proposed changes from the owner or authorized agent, 0 4 copies of the plan that shows the proposed changes, Changes must be shown on the sheet or sheets from the approved final site plan, or on an I I'W IT' copy of that portion of the approved final site plan Owner/Applicant Must Read and Sign I hereby certify that the information provided on this application and accompanying information is accurate, true and correct to the best of my knowledge and belief. Signature of Owner, Agent Michael A. rakes Print Name FOR OFFICE USE ONLY LOR # Fee Amount $ Date Paid By who? 8/2512022 Date (540) 342-6001 Daytime phone number of Signatory Receipt # Ck# By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 (REVISED 7/l/2021 (Fee Update) Page 1 of 1 A, III,2:k_ SPECTRUM DESIGN architects I engineers AVON FUEL STATION August 25, 2022 Project No. 21034 Page 1 of 1 Letter of Revision This letter's purpose is to reflect the changes made to the project for Avon Fuel Station — SDP202100072 and are as follows: 1. The size of the storage tank for gas has been changed from 10,000 gallons to 12,000 gallons. 2. The size on the storage tank for Diesel has been changed from 12,000 gallons to 10,000 gallons. 3. The plan south canopy has been shifted to the north slightly. 4. The air compressor, emergency spill box, and absorbent barrel have been moved closer together along the back side of the diesel tank. 5. Electrical plans shave shifted to show the proper wiring going to the appropriate fuel tanks. 6. Architectural plans have changed to display the corrected locations of the fuel tanks. For any questions or concerns please contact Michael A Rakes at Mrakes@spectrumpc.com. Thank You