HomeMy WebLinkAboutWPO201400034 Application 2014-04-18 kJ,' Albemarle Munty Community Development Department
401 McIntire Road Charlottesville,VA 22902-4596
c Planning Application Voice:(434)296-5832 Fax:(434)972-4126
1PARCEL/ OWNER INFORMATION
TMP 07700-00-00-011E0 Owner(s):
AVON HOLDINGS LLC
Application # WP0201400034
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Scottsville Land Use Primary Commercial
Current AFD Not in A/F District Current Zoning Primary Planned Development Shopping Center
APPLICATION INFORMATION
Street Address Entered By
Judy Martin
Application Type Water Protection Ordinances 104/18/2014
Project 'Fifth Street Station
Received Date 04/18/14 Received Date Final Submittal Date Total Fees 150
Closing File Date Submittal Date Final Total Paid 150
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
.. T I Sub Applicati. ..... .. Comment
Stream Suffer.Mitigation Plan : r! ::. ,. .:: : '. ._::: ::::
....�...���u-W �,.....,�W�-��...r::�r_.�1�_.-�W�ww�;..�udd�na-..�u�,.w��W���,.:.�W;,w��W..:.:.:.,.w:�,;,,��:w:.:..,.;.�_w; r
(APPLICANT/ CONTACT INFORMATION
ContactType 1 Name Address I CityState I Zip Phone PhoneCell
Owner/Applicant AVON HOLDINGS LLC P 0:BOX 1467 CHARLOTTESVILL 122902
Primary Contact DANIEL R. HINES, P.E. 28 BLACKWELL PARK LANE, S WARRENTON,VA 20186 5403494500
General Contractor BRENT SCARBROUGH&CO.,INC. 155 ROBINSON DRIVE FAYETTVILLE,GA 30214 7704618603
Plan Preparer ,BOHLER ENGINEERING, DANIEL R. HINE 28 BLACKWELL PARK LANE,S WARRENTON, VA 20186 5403494500
Signature of Contractor or Authorized Agent Date
`'Application for Review of `... +-
Fitt
•
Erosion & Sediment Control Plan & Stormwater ManagementBMP Plan & ,,
Stream Buffer Mitigation Plan
❑ Erosion & Sediment Control Plan ❑ Stormwater Management/BMP Plan IN Stream Buffer Mitigation Plan
❑ E&S Plan Amendment El SWM Plan Amendment
(Previous Plan# ) (Previous Plan # )
❑ E&S Plan with Variance El Request for Exception
#of Variances ❑ SWM Plan Resubmittal
❑ E&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 copies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: Fifth Street Station
007700-00-00-011E0;0076M1-00-00-002A0;
Tax map and parcel: 0076M1-00-00-00280;0076M1-00-00-004A0 Zoning: PD-SC
Amount of Land Disturbance: 57.60 Acres
Location of property(landmarks,intersections,or other): Intersection of 5th Street and Bent Creek Road
Contact Person(Who should we call/write concerning this project?): Daniel R. Hines, P.E.
Address 28 Blackwell Park Lane, Ste. 201 City Warrenton State VA Zip 20186
Daytime Phone(540) 349-4500 Fax#(540)349-0321 E-mail dhines@bohlereng.com
owner of Record Avon Holding, LLC/New Era Properties, LLC
Address P.O. Box 1467 City Charlottesville State VA Zip 22902
Daytime Phone(434)245-4932 Fax#(434) 245-4909 E-mail alan.taylor @redlightmanagement.com
Contractor Brent Scarbrough & Company, Inc.
Address 155 Robinson Drive City Fayettville State GA Zip 30214
Daytime Phone(770)461-8603 Fax#(770) 461-0470 E-mail
Plan Preparer Bohler Engineering, Daniel R. Hines, P.E.
Address 28 Blackwell Park Lane, Ste. 201 city Warrenton State VA Zip 20186
Daytime Phone(540) 349-4500 Fax#(540)349-0321 E-mail dhines @bohlereng.com
Owner/Applicant Must Read and Sign
By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
ManagementBMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
developme n t subjecA operty. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure
complianc t th a 1 I 1 . .
1
Sign re of Owne ,C tr Purchaser Date
f.„) „ ,.,,Q,,r, L.3q — (/S — 0
`L J
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO# 1-
Fee Amount$Kd•0 t-) Date Paid 9)1%)I' By who;014'r Exy i”-eA,w"', Receipt 1:9 S 3 0 Ck# 2 1 14C By: D
VA, LLC
Revised November 14,2011 Page 1 of 3
I
NOW' %lige
EROSION CONTROL PLAN: (SUBMIT 2 COPIES)
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(RE INSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review, Disturbed Area Less Than One Acre $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees, Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees, Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review, Disturbed Area One Acre or Larger $300 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $150/per request
(TO BE PAID AT TIME OF APPLICATION)
18. SUBTOTAL EROSION CONTROL PLAN $
Revised November 14,2011 Page 2 of 3
STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan... $300/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22. Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23. Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $150
(TO BE PAID AT TIME OF APPLICATION)
25.SUBTOTAL SWM/BMP PLAN $ 150.00
TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 150 00
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
Revised November 14,2011 Page 3 of 3