Loading...
HomeMy WebLinkAboutSP200700032 Action Letter COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 August 16, 2007 Wendell Wood PO Box 5548 Charlottesville , VA 22905 RE: ZMA # 2007-00003 & SP# 2007-00031 & SP# 2007-00032 Tax Map 33, Parcels 1 D & 1 F (portions of) Dear Mr. Wood: On August 1, 2007 the Albemarle County Board of Supervisor took action on the above-noted projects. Regardina ZMA-2007 -003 Your rezoning from RA - Rural Areas to CO - Commercial Office was approved in accordance with the attached proffers dated August 1, 2007. An application plan dated June 12, 2007 was approved as part of the rezoning. Please refer to these documents for any future applications and requests on this property. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have be~n met. This includes: . compliance with applicable PROFFERS; . compliance with conditions of the SPECIAL USE PERMITS; . approval of and compliance with a SITE PLAN; and . approval of a ZONING COMPLIANCE CLEARANCE. Regarding SP-2007-00031 The Board of Supervisors took action to allow a 120 unit three-story apartment building at a gross density of 8.0 units per acre. This special use permit was approved based on the following condition: 1. A maximum number of one hundred twenty (120) apartment units shall be permitted. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: . compliance with conditions of the SPECIAL USE PERMIT; . approval of and compliance with a SITE PLAN; and . approval of a ZONING COMPLIANCE CLEARANCE. -~~ In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." Reaardina SP-2007-00032 The Board of Supervisors took action to allow research & development uses within CO Zoning District Office Buildings (178,800 square feet of office space in two 4-story buildings of 89,400 square feet each). This special use permit was approved based on the following conditions: 1. Each occupant proposing to engage in a research and development use shall submit a certified engineer's report to the County Engineer for review and recommendation. The certified engineer's report shall describe the proposed operation and all machines, processes, products and by-products; state the nature and expected levels of emissions or discharges to land, air and/or water or liquid, solid or gaseous effluent and electrical impulses and noise under normal operations (collectively, "emissions and discharges"); and state the specifications for treatment methods and mechanisms to be used to control such emissions or discharges. The County Engineer shall review the certified engineer's report for compliance with this condition. The report also shall demonstrate to the satisfaction of the County Engineer that emissions and discharges from the proposed use will be adequately controlled. The County Engineer shall then provide comments and recommendations regarding the report to the Zoning Administrator prior to final site plan approval or issuance of the zoning compliance clearance; and 2. If any discharge of other than domestic wastes into the public sewer system is expected, the Albemarle County Service Authority (ACSA) shall be so notified prior to site plan approval. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: · compliance with conditions of the SPECIAL USE PERMIT; · approval of and compliance with a SITE PLAN; and · approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted actions, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, U eL v.w~~rg Direc:~~~/ti:~~~g Cc: Next Generation L L Box 5548 Charlottesville, VA 22905 Scott Collins 800 East Jefferson Street Charlottesville, VA 22902 T ex Weaver Sherri Proctor Sarah Baldwin Bruce Woodzell (Real Estate)