Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARB201400054 Application 2014-04-17
Albemarle 'ounty `' �"' Community Development Department 401 McIntire Road Charlottesville,VA 22902 4596 <� U Planning Application Voice:(434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION TMPI 06000-00-00-06500 Owner(s): Application # ARB201400054 BARRACKS HEIGHTS LLC PROPERTY INFORMATION Legal Description ACREAGE OUT OF BOUNDS Magisterial Dist. Jack Jouett Land Use Primary Residential --Single-family(incl. modular homes) Current AFD Not in A/F District Current Zoning Primary Neighborhood Model District APPLICATION INFORMATION Street Address 225 OUT OF BOUNDS RD CHARLOTTESVILLE, 22901 Entered By Application Type Architectural Review Board Judy Martin 104/17/2014 1 Project lout of Bounds- Final Received Date 04/17/14 Received Date Final I Submittal Date 04/21/14 Total Fees 1000 Closing File Date Submittal Date Final Total Paid 1000 Revision Number Comments Legal Ad SUB APPLICATION(s) . .,.... TYPe Comment Final.°Site Deve - io .. en ;:° 1APPLICANT/ CONTACT INFORMATION ContactType ! Name I Address CityState Zip I, Phone PhoneCell Owner/A,Ppliic lit $ARRACKS HEIGHTS tic' ;195 RIVi Rift NA DR ;CHAR�]7TES11II L;22911 Primary Contact VITO CETTA 1730 OWENSFIELD DRIVE CHARLOTTESVILL 22901 4345312192 Signature of Contractor or Authorized Agent Date ArchitecturReview Board Applicion '- J Part A: Applicant,Contact and Parcel Information Project Name: O OF o Tax map and parcel(s): Physical Street Address: CUT ©r- 1IY? Contact Person: V TO E7M Business Name: Address 113D n 7 1 o pg- City L V ffjt°V1,V`4 State VA— Zip 2-1frts I Daytime Phone( s3i —2ti tfax#( ) E-mail V 1 t u 6WTTA. c e-.0 Owner of Record:��ryry'� Address )7 S DP- City 614g6sOzTiLVi State VPr Zip 2-2AO i Daytime Phone(4-4 —1-VV2 Fax#( ) E-mail V I ►O C, (/A ✓i Part B: Review Type and Fee Select review type Review by the Architectural Review Board Conceptual Plan/Advisory Review(for a Special Use Permit or a Rezoning) No Fee Preliminary Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1000.00 Amendment to an approved Certificate of Appropriateness $225.00 Building Permit Review $590.00 County-wide Certificate of Appropriateness Structures 750' or more from the EC,no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50%or less of the altered elevation No Fee NOTE: For SIGNS,use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICC USE ONLY BP# ARB# Fee Amount$ 1 ,()CC) Date Paid 4 -o-t4 By who? ) 4.1 % eceipt# q >{ ('}Check# Icy,,it , By 1, County of Albemarle Dept of Conunnnity Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126 11/2010 Page I of 2 OVER--a Part C: Description of Proposal Describe your proposal.Attach a separate sheet if necessary. (v Tt J J UN1T5 7191 F-'Yid S YD n , 0 . • - 1OvJt fl-t) Part D: Applicant Agreement Applicant must read and sign • Each application package must contain(8)folded copies of all plans and documents being submitted. Only (1)set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist,completed, signed,and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached plans co tain all information required by the appropriate checklist. Signature of owner, owner's representative Date or contract purchaser y Printed name, Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2of2 OVER—* 1 ' i-, t-�l Architectural Review Board j:..,. Final Review of a Site Development Plan `., Submittal Requirements Checklist Part A: Applicant,Contact and Parcel Information Project Name: OUT OF W)"N D io Tax map and parcel(s): Physical street address: OT 0l= St()l■405 Contact Person: �!V I TO C .T.T7it Business Name: l</ EC-46 1 bfT� j '1.1;C-- 0-E state E T c7 P P City Gl�Sr'-w r "''VI L state vfrr Ziip:'2cfb 1 Daytime Phone(414 S Jl- '71- Fax#( ) E-mail V T C IA C° o• Lam Part B: Submittal Requirements Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated. A. Written description of the proposal ❑ Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate specifically how each ARB comment from the preliminary review has been addressed. If there are no changes proposed, then explain why. ❑ Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan showing the following (drawn to the scale of 1"=20', clearly legible and folded): Er Location(s) of proposed building(s) on the site. Location of proposed parking, travelways, walkways and other improvements. Q--Mechanical equipment, trash containers, loading and service areas, other similar features and improvements, and associated screening. E' Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient off-site topography to describe prominent and pertinent off-site features and physical characteristics, but in no case less than 50-feet outside of the site. Er Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. Stormwater management plan. /ier0 Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed /�' materials, with material and color samples. heet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings, clearly identify revisions made. 1 OVER C. Landscape plan sholrrg the following(drawn to the scale of 1"=20v.ilarger,clearly legible and folded): a Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines. [r Existing landscaping to be removed. Include the location, size, and species. a Landscape key including all landscape symbols and a description of what they represent. 121 Location of existing and proposed tree lines and tree save areas. El Location of existing natural features. ❑ Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by botanical name and caliper. Location and height of above-ground utilities and associated easements, and location of below- ground utilities and associated easements. Stormwater facilities. / , ❑ Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans. �(/ ,t ❑ Include tree protection fencing and limits of work on the landscape, grading and E&S plans. D. Lighting plan showing the following (drawn to the scale of 1"=261'or larger,clearly legible and folded): ❑ L• ocation of all proposed building and site lighting. 1y 0 L4(j(-tT 02-e)ft1 ❑ Lighting schedule identifying all proposed light fixtures, poles and brackets. ❑ M• anufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type, intensity, style, shielding, color, finish, and installation height. ❑ Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of Section 4.17 of the Zoning Ordinance. ❑ Coordination of lighting with landscaping and other site elements. E. Appearance of the building(s) (architectural elevations,color perspective sketches,site sections): mensioned architectural elevations of the proposed building(s). Elevations must be drawn to the scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings. Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the overall building design. ❑ Color perspective sketches that show the proposed development as seen from the Entrance Corridor. ti:1- Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and roof height(s) relative to the natural elevations along the Entrance Corridor. ( One set of all building materials/colors. ❑ A floor plan adequate to show exterior walls, windows and doors. F. Additional material ❑ Provide labeled, color, 8-1/2" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ Any additional material that is necessary to address comments made by the ARB at the preliminary review with a memo itemizing how each of the preliminary comments have been addressed. ❑ The applicant is welcome to submit any additional material that will make the final site development review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. 2 OVER---* ''Mlrf + . Part Awhcant-Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a final site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, I hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. C?/1- 4. 1S. 14- Signature of person completing checklist Date V fl C---11[1k/ ? 1� z-- 45+ s31 -21 1 r Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434)296-5832 Tel, (434) 972-4126 Fax www.albemarle.orq 3 OVER-+ 4.16.14 To: Margaret Maliszewski County Of Albemarle Charlottesville, VA. 22902 From: Vito Cetta Re: ARB-2014-06 Out of Bounds The attached is our resubmission to the ARB. The ARB reviewed this project on 2 previous occasions, March 17, 2014 and April 7, 2014. This letter describes our resubmittal materials. 1. The comments made in the March 21 letter to us have all been made and shown on the attached drawings. The issues were related to landscaping, fencing etc 2. Site sections are attached and show that only the top of the homes being built on Bennington are visible from Barracks Road. 3. Elevations and floor plans of the 8 affordable townhouses are attached. These are 3 story 16' wide townhouses. 4. Attached also find the slightly revised elevations of the (2) 3 unit buildings facing Barracks Road. All buildings will have the same colors for the roof, siding and trim. A photo of a built building is attached showing those finishes. 5. The exterior colors for the affordable units are shown on the attached color board. 6. Design for the 3 units behind the main existing house have not been prepared since they most likely will never be built and are hardly visible from Barracks Road. Sincerely, V Vito Cetta, aia