Loading...
HomeMy WebLinkAboutWPO202100060 Review Comments WPO VSMP 2022-09-02$ County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: Discount Tire Project file number: WPO202100060 Plan preparer: Bohler [ryauger@bohlereng.com] Owner or rep.: Bill Shrum [Bill.Shrum@discounttire.com] Plan received date: Nov. 2, 2021 Jan. 21, 2022 April 8, 2022 Aug. 15, 2022 Date of comments: Dec. 3, 2021 March 11, 2022 (Rev. 1) May 4, 2022 (Rev. 2) Sept. 2, 2022 (Rev. 3) Reviewer: David James [djames2@albemarle.org] 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Section 8 - Complete. (Rev.1) Please complete prior to pre -con request. (Rev.2/3) Acknowledged. 2. Section 9 - Sign & date. (Rev.1) Please complete prior to plan approval. (Rev.2/3) Not addressed. 3. Section 10 - Complete. (Rev.1) Please complete prior to pre -con request. (Rev.2/3) Acknowledged. 4. (Rev.3) Please update all SWPPP sections with the approved versions prior to pre -con, including PPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Provide concrete washout detail. (Rev.1) Addressed. 2. Show stockpile area, clearing/grading/demo activities, locations where concentrated stormwater discharges. (Rev.1) Addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is denied, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. Engineering Review Comments Page 2 of 3 1. [C-901] The pre -/post- development drainage areas should include the off -site areas for the purposes of SWM analysis. (Rev.1) Addressed. 2. [C-901] Use the 1-year design storm values in your Energy Balance to determine if you meet compliance. 2-yr was used/shown. (Rev.1) See below and revise values, EB worksheet where needed. Change value from 3.65" to 3.01". (Rev.2) Addressed. 3. [C-903] 4. 5. for the design storms: (Rev.1) Not addressed. (Rev.2) Addressed. Show the HydroCAD routing diagram. (Rev.1) Addressed. Show SWM Facility Easement over SWM vault system. See detail from ACDSM, pg. Revise Hydrographs: NOAA Atlas 14 lists the 24-hr i(in) as these 3A7 3.65 4.66 5.57 24 (2.71 3.38) (3.28 4.10) 14.1; 231 15 for width requirement. (Rev.1) Addressed. 6. Provide cross-section & profile views of the SWM vault. Details should include all dimension and materials used for installation. Include installation specifications from the manufacturer. a. Water -tight joints are required for all CMP joints and connections. b. CMP must meet or exceed the minimum required design thickness. (Rev.1) Addressed. 7. Provide required maintenance, including maintenance schedule & timing, refuse disposal, access requirements for the SWM vault. (Rev.1) Addressed. 8. Include our VSMP CRD & As -built checklist on the plans. (Rev.1) Addressed. https://www.a I bemarle.org/home/showpu b I isheddocu ment/3381/6373275105367000 00 9. Provide Letter of availability from nutrient credit provider on the plans. (Rev.1) Addressed. 10. Record the SWM Maintenance agreement. Response: Acknowledged; SWM Maintenance agreement to be approved and recorded prior to plan approval. (Rev.1/2) Not addressed. (Rev.3) Addressed. 11. Note: SWM easement plat & deed will need to be recorded. 12. Note: Purchase of credits needed prior to permit Ge. bond request. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. The erosion control plan content requirements can be found in County Code section 17-402. 1. [Cover] Add WPO202100060 under title. (Rev.1) Addressed. 2. Show an existing conditions & demo operations sheet. (Rev.1) Addressed. 3. [C-601/C-602] Reduce the linetype boldness (width) of drainage divides/areas for clarity or grey them out. (Rev.1) Addressed. 4. [C-601] Show a 70' long pave construction entrance. a. Provide Paved Wash Rack detail (ACDSM, p.8). (Rev.1) Addressed. 5. Limits of disturbance outside of property line will need to be shown in an easement. Offsite easements will need to be recorded. (Rev.1) Addressed. 6. [C-602] Provide dust control (DC). (Rev.1) Addressed. 7. [C-602] Provide MU or B/M on slopes. (Rev.1) Addressed. Engineering Review Comments Page 3 of 3 Note: VDOT entrance permit required prior to grading permit issuance. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.albemarle.org/govern ment/community-development/apply-for/engineeri ng-applications