Loading...
HomeMy WebLinkAboutWPO202000054 Checklist - Project Closeout (Administrative) 2022-09-15 WATER PROTECTION (CONSTRUCTIO FILE CLOSEOUT AT TIME OF COMPLETION IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form ';' ;�� ;.��;�'�;;,'W;. release;place the completed form in the Laease;pla. hee eml have been placed nL folder and Imaging to the Imaoging Centert completionor digital and/or bond Center staff gl forward to Centralized Filing WPO#� —�/ 1 PROJECT TITLE oral dl a_WO FULL NAME INSPECTOR: tria - :------- __ FINAL CTIO -- -----____�____ N DATE: -/s . ZZ CountyVlew- Status/Status Date updated --copy-File ------~_---------—------- -------------- ----------------------- chronological order(latest on top).r Closeout: All items listed should be placed in ___-- —"-"—--- - --- project folder,in reverse Please check each item included in this folder. To indicate that an item is next to the check box. The In not applicable to this file,place an"N/A" Inspector/Management ec nagtent Analyst has the discretion to inc hide any item deemed necessary provide clarity to the file,please indicate that item on the"Other"lines provided. Digital P ded. to g• Closeout Instructions: or,if the is already in digital format,Be �be saved d to e�'S�F indicate if Imaging (path/name)i th document u documentdin the ispace Centervid is to scan the document; ) provided. he• Please provide the digital location ❑ Preconstruction Meeting FormI 0 Scan � 0 Saved location ❑ Grading Permit ❑ Scan ❑ Saved location ('w ❑ Inspection Requests ❑ Scan ❑ Saved location ❑ Inspection Results(Include an ❑ Scan Y inspection tickets,memos,photos,etc.) ❑ Saved location , a Bond Reduction/Bond Release Notices from Inspector to Mana / �' Scan 0 Saved location Bement Analyst ❑ Conservation Checklist _____________w________ ❑ Scan ❑ Saved location y_ 0 As-built/Construction Plans 0 Scan ❑ Saved location Af calOther(Please explain) can �iZ Saved location 0 Other Plans - Inspector's ', lend clarity to At tthe view discretion,t copies of unapproved pla plats may be placed in the file if they as unapproved and contain a note clarifying why it was plans are included, they should be clearl❑ Scanincluded. v marked as ❑ Saved location NOTES: WPO - __—__-- project folders will be accepted by the Imaging 1) Checklist is completed and included in folder; g Center when the followig 2) Documents are Acco-fastened(except plats/plans),and in chronological orde items are complete: 3) Documents are sufficiently identified as to which need to be scanned or saved to If the above items are not complete,Imaging (latest documents on top); Engineerh are action. g g Center staff will circle the incomplete item and return folder to the County 1 1 Draft 12-5-2013 i 1 I WPO FILE CLOSEOUT CHECKLIST WPO#- 020 00- //1,1oNTice'LL0 &SC1+1181";3� AL 9 BIR Inspections ✓ BIESC performed with approved plan. /6-z'L ,A BISWM performed with As-Built plan. Required Docs (either in CV or paper copy) 6/,4 CGP VAR10 for this project: ,l1/A Al/A CGP VAR10 that treats SWM for this project: ,v/4 Albemarle County Application �,,t��s General VPDES Permit Registration Statement S C?-''' ( •i c°11 Approved E&SC and SWM Plans 41-13'z ✓ SWPPP ✓ Approved Bond Estimate xi/4 Nutrient Credit Purchase Affidavit eU/4 Recorded Documents: SWM Maintenance Agreement, Easements N/q As-Built Construction Record Drawings/Certification Manufacturing and Installation records Pipe video Current survey General VPDES Permit N.O.T. Verify all fields; verify still active; reference other VAR10 "comments" for swm Inspections: 2 minimum with photos. Photos of all swm bmps (ivo 8mp ) r✓ BIR release/reduction form Erosion Control, or SWM Performance Bond Release: For releases: Update CV review status to approved/complete G--/le-z Z For reductions: Update CV review status to-'denied/complete", and enter reasons for denial in the comments box. (94gib Es LLoc .t(, mock @ 0g1 L{3`t qBY 7573