Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201400005 Application 2014-02-10
Application for Review of `°" Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & , Stream Buffer Mitigation Plan ❑ Erosion & Sediment Control Plan ❑ Stormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑ Request for Exception #of Variances gSWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application # (2-0/y•-.5- WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: /V) Q N 1& f i ye:, K Tax map and parcel: 4/g--/8 e Zoning: A 1 Amount of Land Disturbance: _ir ,� 01 2cres Location of property(landmarks,intersections,or other): .✓G'vTA) S/1 e 0' POC P &rekiN 7-� eax)a `i f Li.0t' ew sr t?J /c t'VT & 2 Cl Contact Person(Who should we call/write concerning this project?): T1f7�/ /'V)/(,(, en- y� Address I/ 7 5-4)C�t/t\ '4i)C e:, 57-r a. City C�11.MM I.Cr/EMI,t. State /N Zip ZI Cr 0 tl Daytime Phone(`1y) 85'7-'0)2. 1 Fax#( ) E-mail T1/1/LLt7ZQ/t4e/i1x2/,,,vig36 (Otv J Owner of Record C'J?a C>w'err C aYY/'P itk iJ 7"i C v Address '/3SSS��/�/�Q( lC 57 City C)J)Qi 1., TT(3 V/GGt State V 1 Zip 22 i01 L Daytime Phone IL 0 n . !c, U I P J Fax#( ) E-mail J /9r(,./C41), 7 G ntrtteter /4 0r,./TI C eY,G. C (j/ti)Te K? s C C en, Address C4/3- gil l/L VJ 1--7L,10 C E City Ci) OTTe I C State ✓A Zip Z Z? i Daytime Phone(q ) 2 u7"777 1 Fax#( ) E-mail Plan Preparer /'VU1 ?t/0/4/V et..4; V/Viffbr 6/z vi (�! / Address / /..? ✓' C t ..1 r?4 f: C ,;i C City Call irl t t Cl'76 f V/6( I State V4) ZipaZ / 6 f p Daytime Phone(//l yy) 852-012 1 Fax#( ) E-mail 1141 L Eli C'f4 L j ,1/YjtikJPE. COiv\ Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP'Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and developme on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compli ce tth ro an. % 'ice s,29— /y Sig ature of Owner, ontract Purch Date ; ,,�ci� V. 7 tc� %3y- 2 y - 7 i y Print Name / Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# °" 14 By ?� Receipt _ Ck# 2SA By: (Y144_/ Fee Amount Date Pai B who. Recei t# `r'1 y: U,nL r $ Milli . Revised November 14,2011 Page 1 of 3 EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review,Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger $300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ Revised November 14,2011 Page 2 of 3 Nese *awl STORMWATER MANAGEMENT/BMP PLAN&MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan. $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAF 1 ER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22.Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23.Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ 3OO 90 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 3oo. o o THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 X14' Albemarle COun`y Community Development Department 401 McIntire Road Charlottesville,VA 22902-4596 `' ._ u Planning Application Voice:(434)296-5832 Fax:(434)972 4126 PARCEL/ OWNER INFORMATION TMPI 04600-00-00-018C0 Owner(s): Application # WP0201400005 CROCKETT CORPORATION PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Rivanna Land Use Primary Forest Current AFD Not in A/F District Current Zoning Primary Rural Areas APPLICATION INFORMATION Street Address Entered By Application Type Water Protection Ordinances Judy Martin 102/10/2014 Project IMonu Park I Received Date 02/06/14 Received Date Final I I Submittal Date 02/10/14 Total Fees 750 Closing File Date Submittal Date Final Total Paid 750 Revision Number Comments Legal Ad SUB APPLICATION(s) „ r .:..:. .:... Type,:,...;;. , :;..:, Sub P P Comment and Sedimien ':Coni Plan Stormwater Management/BMp Plan Stream Buffer Mitigation Plan (APPLICANT/ CONTACT INFORMATION ContactType Name 1 Address CityState Zip, Phone PhoneCell Owner/Appl1cant `CROCKETT CORPORATI©N S ;, ;435F"ARKST ;CHARLOITESVILt: ;22901." Primary Contact TIM MILLER 1413 SACHEM PLACE,STE. 2 CHARLOTTESVILL 22901 4348820121 Applicant MONTICELLO UNITED SOCCER 1645 RAVENS PLACE CHARLOTTESVILL 22901 4434249777 Plan Preparer MERIDIAN PLANNING GROUP 1413 SACHEN OKACEM STE, ,CHARLOTTESVILL 22901 4348820121 Signature of Contractor or Authorized Agent Date Application for Review of II IIII Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & 4m ;� Stream Buffer Mitigation Plan gErosion& Sediment Control Plan KStormwater Management/BMP Plan 14 Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑ SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑Request for Exception #of Variances ❑ SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: /V) 0 N (A X1<)}°2 K Tax map and parcel: .96--/8 C Zoning: A 1 Amount of Land Disturbance: /• 2 5 Acres Location of property(landmarks,intersections,or other): .SQvfr() S)tE 04,,c- f( ® altOoviAt eQ rW 91 l 1,4„, e sr OP /Z Wt/7 2 Contact Person(Who should we call/write concerning this project?): -rlm /II/ Le"- Address/5//7 S'>J C d 5}'\ 104 4 c sret City Cox/Run-7E5740;1 State Vjv Zip Z2 9 a Daytime Phone(`13/) 8®Z`O)2.1 Fax#( ) E-mail TM/LL02,41/v1 eniCii 1/Wer, IffitA Owner of Record Cd2 CC'1Gerr Cart P(7vZJOrThiI Address '3.S me)c... 57- City C 1,14 12.L Orr-4'014,E° State VA Zip 22101 Daytime Phone( ) Fax#( ) E-mail N ./GOitir C-ntr er A4aNTl Ct'L -G' (!Akre' SGCLen-- Address fC7 S' RPt 2 1Vi PL,0C T City Cl31t1 f (,rreml 14,6 State Lf() Zip ZV/ Daytime Phone(4'M) 24/f-777 If Fax#( ) E-mail Plan Preparer //ujz -t,W ?✓ p oviA ace VP Address /72,? .�I cJ ti AC�" t City C f it k Coll T V/ CR.. State Z'PZZ 9 0 Daytime Phone(4/11/) o 852-01,1 Fax#L ) E-mail TM male fv iO/ia v8(. cQ Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure rg iiirce with the a roN75 plan. ��,,,� - Ler r`(- 2 -6'_ /c/ Signature of U ner,Co act Purchaser Date 1 Print Name baytime phone number of Signatory FOR OFFICE USE ONLY WPO# p G�+'' L' C' l- 1 Fee Amount$7K0.0 t5 Date Paid /'4o I I /By who? ifOrr+' all '`liN' Receipt# (ILI 4 3 /Ck# 71-4C By: I62-. Revised November 14,2011 Page 1 of 3 Now EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review,Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger $300 p e 4, - (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 ' (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 3 0 0 Revised November 14,2011 Page 2 of 3 NNW STORMWATER MANAGEMENT/BMP PLAN& MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan... $300/per plan review 3 (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan 4101 (TO BE PAID AT TIME OF APPLICATION) C 25. SUBTOTAL SWM/BMP PLAN $ N J 0 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 750 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 EROSION AND SEDIMENT CONTROL NARRATIVE FOR MONU SOCCER PARK January 20, 2014 LOCATION: Tax Map 46, Parcel 18C Albemarle County, Virginia PROPERTY OWNER: Crockett Corporation 435 Park Street Charlottesville, VA 22901 APPLICANT: Monticello United Soccer 1645 Ravens Place Charlottesville, VA 22911 PREPARED BY: Meridian Planning Group, LLC 1413 Sachem Place, Ste 1 Charlottesville, VA 22901 434.882.0121 p6 TIM ,f-YR AYMLLE Lic. 30342 %,N+ Z s,� MONU Soccer Park 2 of 6 All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with 'sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. MONU Soccer Park 3 of 6 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet.protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Non-erodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches c. Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. MONU Soccer Park 4 of 6 Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently _stabilized to prevent further erosion and sediment. 19. ADEQUACY OF.RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. B1. PROJECT DESCRIPTION: The purpose of this project is to construct a soccer park and associated parking. The total area to be disturbed by this project will be approximately 1.25 acres. B2. EXISTING SITE CONDITIONS: The site is primarily grass and trees. It is located on the south side of Polo Grounds Road and 1,400-feet east of Route 29. B3. ADJACENT AREAS: The site is located in Tax Map 46, Parcel 18C, in the Rio District of Albemarle County. The parcel is bounded on the west and north by public roads, on the east by agricultural land, and on the south by the South Fork Rivanna River. B4. SOIL DESCRIPTIONS: According to the Albemarle County Soils Survey conducted by the United States Department of Agriculture Soil Conservation Service, the primary soil types that may be disturbed during this scope of work have been identified as the following: 1. Buncome loamy sand, 0 to 2 percent slope (10) — Hydrologic Group A. Available water capacity is low. Drainage class is excessively drained. 2. Chewacla silt loam, 0 to 2 percent slope (16) — Hydrologic Group B/D. Available water capacity is high. Drainage class is excessively drained. 3. Hazel Loam, 15 to 25 percent slope (39D) — Hydrologic Group B. Available water capacity is low. Drainage class is excessively drained. 4. Toccoa fine sandy loam, 0 to 2 percent slope (83) — Hydrologic Group A. Available water capacity is moderate. Drainage class is excessively drained. 5. Wehadkee silt loam, 0 to 2 percent slope (95) — Hydrologic Group B/D. Available water capacity is high. Drainage class is excessively drained. MONU Soccer Park 5 of 6 B5. CRITICAL AREAS: The critical area on this parcel is the South Fork Rivanna River. B6. EROSION AND SEDIMENT CONTROL MEASURES: Unless otherwise indicated, all erosion and sediment control practices will be constructed and maintained according to the minimum standards and specifications as set forth in the Virginia Erosion and Sediment Control Handbook, latest edition. The minimum standards of the Virginia Erosion and Sediment Control Regulations shall be adhered to unless otherwise waived or approved by variance. TEMPORARY CONSTRUCTION ENTRANCE (CE) —3.02. A temporary paved construction entrance shall be constructed at the entrance of the project site to provide a means of removing sediment from the tires of construction vehicles leaving the work site. The Contractor shall remove any mud from the existing road surface by means of sweeping and shoveling, in the event the pad is not adequate in sediment removal. SILT FENCE (SF) —3.05 Silt fencing will be installed as a first step in construction activities. Location and details are shown on the plans. B7. PERMANENT AND TEMPORARY STABILIZATION: SURFACE ROUGHENING —3.29 Disturbed areas to be seeded and mulched shall be left in a roughened condition to help decrease runoff velocities and aid in the establishment of vegetation. TOPSOILING —3.30 Topsoil may be stripped from the area to be graded and stockpiles for later use. All stockpiles that will be left dormant for more than 30 days shall be temporarily seeded. A topsoil stockpile may be selected onsite by the developer and shall be temporarily protected with surrounding silt fencing. TEMPORARY SEEDING—3.31 Temporary soil stabilization shall be applied within 7 days to denuded areas that may not be at final grade, but will remain dormant (undisturbed) for longer than 30 days and less than 1 year. This includes, but is not limited to areas such as soil stockpiles. Seeded 4. areas shall be limed when.necessary at a rate of 2 tons per acre, and fertilized at a rate of 450 lbs. per acre of 10-20-20 (10 lbs. per 1,000 square feet) or equivalent. A Temporary Seeding Schedule is on plan. PERMANENT SEEDING —3.32 A perennial vegetative covering shall be established on disturbed areas within 7 days of being brought to final grade on areas not otherwise protected. Selection of the seed mixture shall depend on the time of year it is to be applied according to the Permanent Seed Schedule as shown on the drawing. Seeded areas shall be limed when necessary at a rate of 2 tons per acres, and fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. MONU Soccer Park 6 of 6 MULCHING —3.35 All seeded areas shall be mulched with straw immediately following seeding operations. Straw mulch shall be applied at a rate of two tons per acre. SOIL STABILIZATION BLANKETS AND MATTING —3.36 Soil stabilization matting shall be applied in the conveyance areas of the designed diversions to help reduce velocities and aid in the establishment of vegetation. A detail showing the proper materials and installation is shown on the plan. B8. SOIL STOCKPILES AND BORROW AREAS No offsite activities are expected for this project. B9. STORM WATER MANAGEMENT: The 1% rule applies to this parcel so volume control of storm water is not required. A bio- filter will be constructed for storm water quality. 610. MAINTENANCE SCHEDULE: A program of maintenance for the erosion and sediment controls specified in this narrative and shown on the plans are recommended as follows: 1. The Site Superintendent or his representative shall make a visual inspection of all erosion and sediment controls on a daily basis until the site is stabilized and especially after a heavy rainfall to assure that all controls are in place and that none have been damaged. Any damaged control shall be repaired prior to the end of each workday to include re-seeding if necessary. 2. All silt trapping devices shall be cleaned out at 50 percent capacity and sediment shall be disposed of by spreading on site or hauling away if not suitable for fill. 3. Gravel outlets shall be checked regularly for sediment buildup that may prevent drainage. Controls shall be inspected and repaired after each rainfall and cleaned if sediment has accumulated to half of the device's original height. 4. All earthen structures such as diversion dikes and berms shall be checked daily during construction for breaching by equipment. Repairs shall be made immediately. 5. Silt fences shall be checked after each rainstorm to assure they have not fallen or become clogged with silt. All repairs shall be made immediately. 6. All seeded areas shall be inspected regularly to see that good stand is maintained. Areas will be re-fertilized and re-seeded as necessary. 7. After construction operations have ended and disturbed areas have been stabilized, or after-a phase.II erosion control plan has been approved and implemented, all berms and sediment-trapping devices may be removed. After removal, the ground shall be restored to its natural or proposed condition to include establishment of permanent vegetation. Removal of any control is contingent upon approval of the County Inspector.