Loading...
HomeMy WebLinkAboutWPO200400100 Checklist - Project Closeout (Administrative) 2022-09-15 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form 71, ,,��,':::' ,,;; , ,;r: release; place the completed form in the 'y of project completion and/or bond release; place Once eml have been placed aO aodde C and forward to the Imaging Center for digitaln closeout into LWPO# JU 7 Ob. �(� �U Imaging Center staff will forward to Centralized Filing / JECT TITLE e56c7(-1' '" 1"tiitil FULL NAME INSPECTOR: ------ `� 5411 FINAL ACTION DATE: 2. CountyView— ------�— l z-- Status updated Status/Status Date u `" ---- Hardco ------------ ----------- PY •—File Folder - `----- -- ----__ - chronological order(latest on top). All items listed shoul be apl ced --- -- ------_ project folder,in reverse Please check each item included in this folder. To indicate that an item is next to the check box. The Inspector/Mana not applicable to this file,place an"N/A"Bement Analyst has the" provided. a inc de any item deemed necessaryto provide clarity to the file,please indicate that item on the"Other"lines rovidtoDigital Closeout Instructions: p � or,if the document is alreadynsin • Below each item please indicate if Imo (path/name)of the document digital format,can be saved to LaserFiche. Please rovide the digital location Imaging Center is to scan ltheoc document, °current in the space provided. Ej � cation Preconstruction Meeting Form Scan ❑ Saved location ❑ Grading Permit J Scan 0 Saved location ❑ Inspection Requests [ Scan ❑ Saved location ❑ Inspection Results(Include any Scan ❑ Savinsed location tion et'memos,photos,etc.) ❑ Bond Reduction/Bond Release Notices from Inspector to Management ScanBement Analyst 0 Saved location ❑ Conservation Checklist Scan ❑ Saved location ❑ As-built/Construction Plans J Scan ❑ Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved lend clarity to the review at a later date. pp ed plans/plats'rray be placed in the file if unapproved and contain a note clarifyingIf such plans are included, they 0 Scan why it was included. the should be clearly marked as ❑ Saved location NOTES: WPO '�-`�—•------- project folders will be accepted by the Imaging ___ 1) Checklist is completed and Included in folder; Center when the following --� -- — ""' 2) Documents are Acco-fastened(except plats/plans),and in chronological orde latest de documents o 3) Documents are sufficiently identified as to which need to be scanned or saved to L If the above items are not complete,Imaging (latest on top); Engineerhfo are action. gig Center staff will circle the incomplete item and return folder to the County Draft 12-5-2013