Loading...
HomeMy WebLinkAboutWPO202100033 Approval - County 2022-10-10�q oe atg 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone:434-296-5832 m COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG �racrrrt'"-: VSMP Permit Plan Review Project title: Troxell Poultry House Project file number: WP0202100033 - Amendment 1 Plan preparer: Brian Kinzie [Brian@blackwellengineering.com] Owner or rep.: Broc Troxell [troxellfarms@gmail.com] Plan received date: 09/16/2022 Rev. 1 Received: 09/23/2022 Date of comments: 09/21/22 Rev. 1 Comments: 10/07/22 Approved: 10/10/22 Reviewer: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide an updated SWPPP with the latest plans. Rev. 1: Comment addressed. Ensure stamped, approved plans are inserted in SWPPP in the field. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Ensure the PPP in the SWPPP is project specific and is updated with the latest plan. Rev. 1: Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Please show the total limits of disturbance on the plans. Has it changed with this revision? If so, please provide an updated registration statement with new area. Rev. 1: Comment addressed. 2. Please label the cover sheet as WP0202100033 - Amendment 1. Rev. 1: Comment addressed. 3. Please specify the EC-1 for each ditch in chart shown (rip -rap is shown at beginning and Engineering Review Comments Page 2 of 2 _ PWIDTH 0x TYPICAL D17'('11 SECTION FOR PROPOSED POND OUTFALL Wns RPPPJMMI swPE Ppno NTCx D N IS YNIMIY MITTH Cf CONSTPUGTED DRCN. COMPR M TO "IT"YiWMUN DOCN CPOSS-SECTIp! M Sx N 1N2WGx EXISTING SWW& giCx OILCx DEPIxpEPlxiP5SwPEVIER1'0.'6R.5A4IIEC-1 10 TR. R M. B M�I 1.3'1.1'J.6 ILJ{ EL -IC R' 1S' Y.8 4-0F EC -I end, but not for each ditch section): Comment addressed. Rev. 1: 4. Why are there two 20'- 24" pipes in the channels? Please explain. It is unclear if the calculations for these are in the engineering manual. Also, ditch A, B, C do not appear in engineering manual. Please clarify and ensure all labels match on the plan and the calculations. Rev. 1: Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 01 Provide E&S perimeter controls for construction of the ditch. fence on the red line shown here addressed. R- 1_: Please add silt 2: Comment