Loading...
HomeMy WebLinkAboutWPO202100033 Calculations 2022-10-10Albemarle County Virginia Engineering Manual For Troxell Poultry Hosue April 21, 2021 Revised July 06, 2021 Revised August 12, 2021 Revised September 3, 2021 Resubmitted May 19, 2022 Amended September 16, 2022 Amended September 23, 2022 ;;ASNLTH pp U NATIic. "Opp Lic. No. 4 0 74 9/23/22 o�`�aNAL �d APPROVED by the Albemarle County Commu/ 10 pDepartment Date l d File WP0202100033 -amendment 1 Blackwell Engineering, PLC 566 East Market St. - Harrisonburg, Virginia 22801 - (540) 432-9555 - www.BlackwellEngineering.com Table of Contents Description Page ESC Narrative 1 Soils Map Energy Balance Calcs TC Calcs Flow Calcs Ditch Cross sections LD-229 & 347 Hydroflow calcs 1 Year Storm Event 2 Year Storm Event 10 Year Storm Event 25 Year Storm Event 100 Year Storm Event (For Sediment Basin) Farm Equipment Crossing Culvert Cross Section Outlet Protection Sizing VA 20 22 28 34 41 43 68 fkY 116 11*3 161 G1*4 VRRM 165 BE 2888 - Troxell Poultry House — ESC Plan Erosion and Sediment Control Narrative Project Description The purpose of this project is the construction of two 63'x704' poultry houses and a litter storage shed on an existing 399.71 acre farm. The site is located off of Dyers Mill Ln, approximately 3 miles Northwest of Scottsville. A total of 8.51 acres will be disturbed during construction. Existing Site Conditions The location of the proposed buildings is an existing cropfield. There is a farm road and barn nearby. The site slopes to the west with the steepest grades at about 12 percent and around 200 feet long. Adjacent Property The site is bounded by woods and farm land on all sides. Offsite Area No site material will need to be exported from the site. If any material needs to be imported to the site, it shall come from a permitted borrow site. In the case that any offsite areas are to be used, the County will be notified and all permit requirements will be met. Soils The soil erodability K factor is .32-.37. See attached soil map for more information. Critical Erosion Areas There are 3:1 slopes on site that should be treated as critical erosion areas. Erosion and Sediment Control Measures Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Regulations, latest edition. The minimum Blackwell Engineering, PLC 566 East Market St Harrisonburg VA 22801 1 BE 2888 - Troxell Poultry House — ESC Plan standards of the handbook shall be adhered to unless otherwise waived or approved by a variance. Structural Practices 1. Silt Fence — 3.05 A temporary sediment barrier constructed of posts, filter fabric and, in some cases, a wire support fence, placed across or at the toe of a slope or in a minor drainage way to intercept and detain sediment and decrease flow velocities from drainage areas of limited size; applicable where sheet and rill erosion or small concentrated flows may be a problem. Contractor to install silt fence where deemed necessary to avoid sediment runoff. 2. Storm Drain Inlet Protection— 3.07 A sediment filter shall be installed at all curb and drop inlets to storm drains that have become functional to prevent sediment from entering and accumulating in and being transferred by the culvert and associated drainage system prior to permanent stabilization of a disturbed project area. 3. Culvert Inlet Protection — 3.08 A sediment filter shall be constructed on the upstream end of storm drain pipes to reduce sediment laden runoff from entering the pipe. 4. Temporary Diversion Dike — 3.09 A channel and berm shall be installed where shown on the plans to channel runoff to temporary sediment trap or basin. 5. Temporary Sediment Basin — 3.14 A temporary barrier or dam with a controlled storm water release structure formed by constructing an embankment of compacted soil across a drainageway shall be constructed as shown on the plans. 6. Outlet Protection — 3.18 Riprap shall be placed at the outlets of all pipes and storm water structures. 7. Rock Check Dams — 3.20 Small temporary stone dams constructed across a swale or drainage ditch shall be constructed as shown on the plans. 8. Surface Roughening 3.29 Providing a rough soil surface with horizontal depressions created by operating a tillage or other suitable implement on the contour, or by leaving slopes in a roughened condition by not frie-grading them. Blackwell Engineering, PLC E3 566 East Market St Harrisonburg VA 22801 2 BE 2888 - Troxell Poultry House — ESC Plan 9. Topsoiling — 3.30 Topsoil shall be applied to rough graded areas and fine graded to achieve finished grade before permanent seeding is applied. 10. Temporary Seeding— 3.31 Temporary seeding shall be applied to disturbed areas that will not be brought to final grade for a period of more than 14 days. 11. Permanent Seeding— 3.32 Permanent seeding shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. 12. Mulching 3.35 Mulch shall be applied to denuded surfaces at finished grade not otherwise stabilized with vegetative ground cover. 13. Soil Stabilization Blankets and Matting— 3.36 Soil stabilization matting shall be installed on a prepared planting area where shown on the plan. 14. Dust Control— 3.39 Dust control measures shall be applied to disturbed areas of the site to reduce the presence of airborne dust. Other practices shall be provided if determined by the Engineer or County E&SC Administrator. Vegetative Practices 1. Ton soiling (stockpile) Topsoil shall be reused and uniformly distributed to a minimum compacted depth of 2 inches on 3:1 or steeper slopes and 4 inches on flatter slopes prior to seeding. Any irregularities in the surface, resulting from topsoiling, shall be corrected in order to prevent the formation of depressions. 2. Erosion Control Blankets or Mulch and Seeding Erosion control blankets (VDOT Standard EC-2), if needed, shall be installed over fill slopes greater than 2.5:1 which have been brought to final grade and have been seeded to protect the slopes from rill and gully erosion and to allow seed to germinate properly. Mulch (straw or fiber) shall be used on relatively flat areas and shall be applied as a second step in the seeding operation. Blackwell Engineering, PLC E3 566 East Market St Harrisonburg VA 22801 3 BE 2888 - Troxell Poultry House — ESC Plan 3. Temporary and Permanent Seeding Temporary and permanent seeding shall be installed (appropriate to the time of year) according to Seeding and Mulching Table detail on the plan. 4. Surface Roughening Where possible, provide a rough soil surface with horizontal depressions created by operating a tillage or other suitable implement on the contour, or by leaving slopes in a roughened condition by not fine -grading them. Management Strategies 1. Perimeter sediment trapping measures to be installed prior to any excavation on site. 2. Construction shall be conducted so that existing cover will not be disturbed anymore than necessary. 3. Construction shall be sequenced so that grading operations can begin and end as quickly as possible. 4. Permanent seeding and other stabilization shall follow immediately after grading. 5. Areas that will be disturbed shall be clearly marked by flags, signs, etc. 6. The job superintendent shall be responsible for the installation and maintenance of all erosion and sediment control practices. 7. After achieving adequate stabilization to the satisfaction of the E&SC Administrator, the temporary E&S controls shall be removed. Permanent Stabilization All areas disturbed by construction and not otherwise stabilized, shall be stabilized with permanent seeding within 7 days following finish grading. Seeding shall be done according to standard & specification 3.32, PERMANENT SEEDING, of the handbook. Seeding shall be applied depending on time of the year according to E&SC handbook specifications. In all seeding operations, seed, fertilizer, and lime shall be applied prior to mulching. Erosion control blankets shall be installed over fill slopes which have been brought to final grade and have been seeded to protect the slopes from rill and gully erosion and to allow seed to germinate properly. Mulch (straw or fiber) shall be used on relatively flat areas. Blackwell Engineering, PLC 566 East Market St Harrisonburg VA 22801 4 BE 2888 - Troxell Poultry House — ESC Plan Stormwater Management/Water Quality Post development water from the site collects in a dry pond on site. From the pond, the water discharges through a manmade to a tributary of Totier Creek. Totier Creek drains into Middle James- Buffalo (HUC 20802031103.00) where no known pollutants are at significant levels. Water quality is satisfied by open space as shown on the VRRM spreadsheet. The site is broken into 2 drainage area (EB 41 & #2) and meets channel protection via the energy balance equation in 9VAC25-870-66.B3 at both. For EB analysis Point #1, the water from the dry pond is outlet into a man-made ditch that begins at the toe of the pond berm. The ditch can contain the water per section 9VAC25-870-66.B. La. Part way down the ditch (labeled on Sheet 3 of the plans, the site meets energy balance (9VAC25- 870-66.B3). The ditch will outlet directly to Totier Creek. At analysis Point B, where the ditch discharges to Totier Creek, and at Point C, right before the 1 % point, the peak flow is being reduced for both the 2 & 10 year stone events, satisfying 9VAC25-870-66.C.3.a. At the EB analysis Point 42, 2.23 acres of crop land is reduced to 0.47 acres of managed turf, lowering the volume and the peak flow. The water leaves this section of the site as sheet flow as it rolls down the northern side of the poultry house pad. Stormwater was analyzed at Point A (where the water meets the stream). At this point there was no flooding and velocities were slow enough that no erosion will occur. As such this section satisfies the law via 9VAC25-870-66.D. This point of analysis is also the 1% point per 9VAC25-870-66.C.3.a. Maintenance in general, all erosion and sediment control measures shall be checked daily and after each significant rainfall. The following items shall be checked in particular: 1. Silt fences shall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer required shall be dressed to conform with the existing grade, prepared and seeded. Blackwell Engineering, PLC 566 East Market St Harrisonburg VA 22801 5 BE 2888 - Troxell Poultry House — ESC Plan 2. The Storm Drain Inlet Protection structures shall be inspected after each rain and repairs made as needed. Sediment shall be removed and the trap restored to its original dimensions when the sediment has accumulated to one half the design depth of the trap. Removed sediment shall be deposited in a suitable area and in such a manner that it will not erode. Structures shall be removed and the area stabilized when the remaining drainage area has been properly stabilized. 3. The culvert inlet protection shall be checked to make sure inlet protection is in place, clean and structurally sound. Allowance for water storage needs shall be checked for sedimentation after each storm and to be cleaned out as needed. 4. The diversion dike shall be inspected and repaired after every rain storm event, flow channel, outlet or sediment trapping facility, as necessary. Once every two weeks, whether a storm event has occurred or not, the measure shall be inspected and repairs made if needed. Damages caused by construction traffic or other activity must be repaired before the end of each working day. 5. The sediment basin embankment shall be checked to ensure that it is structurally sound and has not been damaged by erosion or construction equipment. The emergency spillway should be checked regularly to ensure that its lining is well established and erosion -resistant. The basin should be checked after each runoff -producing rainfall for sediment cleanout. When the sediment reaches the clean -out level, it shall be removed and properly disposed of. 6. Outlet protection once placed shall be checked for sediment deposit and excessive sediment removed. Check dams must be checked for sediment accumulation after each runoff -producing storm event. Sediment should be removed when it reaches one half of the original height of the measure. Regular inspections should be made to ensure that the center of the dam is lower than the edges. Erosion caused by high flows around the edges of the dam should be corrected immediately. 8. The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as needed. Blackwell Engineering, PLC 566 East Market St Harrisonburg VA 22801 6 37- W 21' N 3r 4939'N 3 Soil Map —Albemarle County, Virginia 3 � IR fl R a � I 8 Y A4 WN 714a3 714MO 714700 114Q00 715100 11mm 71mm 115/00 71500 MOO 3 3 = Map Smile: 1:6,99D'€primFedmAlarx6Lwape(11"xa.S')sllert. m IN metes n 0 im 310 400 600 ,\ 0 400 BDD low 24W Map projafion: vVeb Motor Carnermardinatec: WGS84 Edge ti6: U1M Zo 17N WGS&r Psi)% Natural Resources Web Soil Survey 4/1/2021 011111111111 Conservation Service National Cooperative Soil Survey Page 1 of MAPLEGEND Area of Interest (AOI) O Area of Interest(AOI) Soils Q Soil Map Unit Polygons w/ Soil Map Unit Lines Soil Map Unit Points Special Point Features V Blowout ® Borrow Pit Clay Spot 0 Closed Depression Gravel Pit Gravelly Spot O Landfill A. Lava Flow 4I4 Marsh or swamp �. Mine or Quarry O Miscellaneous Water O Perennial Water V Rock Outcrop + Saline Spot Sandy Spot 40 Severely Eroded Spot ® Sinkhole Slide or Slip Ar $odic Spot Soil Map —Albemarle County, Virginia lig Spoil Area Q Stony Spot w Very Stony Spot U Wet Spot Other •� Special Line Features Water Features Streams and Canals Transportation Ny Rails 0%0 Interstate Highways N US Routes Major Roads Local Roads Background . Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 2019--Oct 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ®SDA Natural Resources Web Soil Survey 4/1/2021 Conservation Service National Cooperative Soil Survey Page 2 of 4 Soil Map -Albemarle County.. Virginia Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 18B Lackslow loam, 2 to 7 percent 4.4 1.5% slopes 24B Banister silt loam, 2 to 7 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 4.9 1.6% percent slopes 43D Minesville channery silt loam, 4.4 1.4% 15 to 25 percent slopes 46B Grassland silt loam, 2 to 7 15.6 5.1 % percent slopes 51B Bugley channery silt loam, 2 to 6.4 2.1 % 7 percent slopes 51C Bugley channery silt loam, 7 to 22.4 7.4% 15 percent slopes 51D Bugley channery silt loam, 15 11.7 3.8% to 25 percent slopes 51E Bugley channery silt loam, 25 0.0 0.0% to 45 percent slopes 62B Buffstat silt loam, 2 to 7 1.0 0.3% percent slopes 62C BuBstat silt loam, 7 to 15 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 percent 6.5 2.1 % slopes 68C Penn silt loam, 7 to 15 percent 36.6 12.1 % slopes 72B3 Rabun Gay, 2 to 7 percent 16.4 5.4% slopes, severely eroded 74B Rapidan silt loam, 2 to 7 26.7 8.8% percent slopes 74C Rapidan sill loam, 7 to 15 22.6 7.5% percent slopes 74D Rapidan silt loam, 15 to 25 3.9 1.3% percent slopes 75C3 Rapidan silly clay loam, 7 to 15 20.7 6.8% percent slopes, severely eroded 75D3 Rapidan silty clay loam, 15 to 28.8 9.5% 25 percent slopes, severely eroded 77 Dan River-Codorus complex, 0 24.4 8.0% to 2 percent slopes, occasionally flooded waNatural Resources Web Soil Survey 4112021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Soil Map —Albemarle County, Virginia Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 78 Rowland silt loam, 0 to 2 2.2 0.7% percent slopes, occassionaly flooded 79B Meadowville silt loam, 2 to 7 2.6 0.9% percent slopes 80B Littlejoe silt loam, 2 to 7 5.3 1.7% percent slopes 80C Littlejoe silt loam, 7 to 15 4.1 1.4% percent slopes 84B Totier silt loam, 2 to 7 percent 8.3 2.7% slopes 84C Totier silt loam, 7 to 15 percent 8.3 2.7% slopes Totals for Area of Interest 303.3 100.0% waNatural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 4 of 4 37° W 21' N 3r 4939'N 3 K Factor, Whole Soil —Albemarle County, Virginia 3 � IR Fi R a � I 8 Y A4 WN 714 714MO 714700 7149M MOD 71MM 71MM 715100 715000 TlBlm 3 3 m Map Sole: 1:6,99D'€pnWmAlarxlixaPe (11"x6.S')sheet. N McR+s 0 109 31n 400 600 A 0 400 80D low 24W rIaP Prof: vIeb Motor CalwrMadlnate;: WG584 Edge tim: U1M Zone 17N V4G584 35DA Natural Resources Web Soil Survey 4/1/2021 aiiiiiiiiiii Conservation Service National Cooperative Soil Survey Pagel of 4 Area of Interest (AOI) O Area of Interest(AOI) Solis Soil Rating Polygons . .02 . .05 ® .10 0 .15 o .17 Q 20 O .24 0 .28 0 .32 0 .37 0 .43 . .49 . .55 - .64 0 Not rated or not available Soil Rating Lines y .02 n/ .05 K Factor, Whole Soil —Albemarle County, Virginia MAPLEGEND . 0 .24 • 0 .28 r r .32 'y .37 �y .43 N .49 N .55 .64 . . Not rated or not available Soil Rating Points 02 05 p 10 15 17 p 20 p 24 0 28 32 37 0 .43 p 49 55 64 Not rated or not available Water Features Streams and Canals Transportation *44 Rails yq/ Interstate Highways N US Routes Major Roads Local Roads MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Background Please rely on the bar scale on each map sheet for map . Aerial Photography measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 2019--Oct 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 62DA Natural Resources Web Soil Survey 4/1/2021 Conservation Service National Cooperative Soil Survey Page 2 of 4 K Factor, Whole Soil -Albemarle County, Virginia K Factor, Whole Soil Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 18B Lackstom loam, 2 to 7 .37 4.4 1.5% percent slopes 24B Banister silt loam, 2 to 7 .49 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 37 4.9 1.6% percent slopes 43D Klinesville channery silt 28 4.4 1.4% loam, 15 to 25 percent slopes 46B Grassland silt loam, 2 to .49 15.6 5.1 % 7 percent slopes 51B Bugley channery silt .20 6.4 2.1% loam, 2 to 7 percent slopes 51C Bugley channery silt 20 22.4 7.4% loam, 7 to 15 percent slopes 51D Bugley channery silt 20 11.7 3.8% loam, 15 to 25 percent slopes 51E Bugley channery silt .20 0.0 0.0% loam, 25 to 45 percent slopes 62B Buffstat silt loam, 2 to 7 .37 1.0 0.3% percent slopes 62C Buffstat silt loam, 7 to 15 37 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 .37 6.5 2.1 % percent slopes 68C Penn silt loam, 7 to 15 .37 36.6 12.1 % percent slopes 72B3 Rabun clay, 2 to 7 .20 16.4 5.4% percent slopes, severely eroded 74B Rapidan silt loam, 2 to 7 .37 26.7 8.8% percent slopes 74C Rapidan silt loam, 7 to .37 22.6 7.5% 15 percent slopes 74D Rapidan silt loam, 15 to 37 3.9 1.3% 25 percent slopes 75C3 Rapidan silty clay loam, .37 20.7 6.8% 7 to 15 percent slopes, severely eroded Natural Resources Web Soil Survey 411 2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 13 K Factor, Whole Soil —Albemarle County, Virginia Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 75133 Rapidan silty clay loam, .37 28.8 9.5% 15 to 25 percent slopes, severely eroded 77 Dan River-Codorus .32 24.4 8.0% complex, 0 to 2 percent slopes, occasionally flooded 78 Rowland silt loam, 0 to 2 .37 2.2 0.7% percent slopes, occassionally flooded 79B Meadowville silt loam, 2 .37 2.6 0.9% to 7 percent slopes 80B Littlejoe silt loam, 2 to 7 .37 5.3 1.7% percent slopes 80C Littlejoe sift loam, 7 to .37 4.1 1.4% 15 percent slopes 84B Toter silt loam, 2 to 7 .32 8.3 2.7% percent slopes 84C Toter silt loam, 7 to 15 .32 8.3 2.7% percent slopes Totals for Area of Interest 303.3 100.0% Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Factor K does not apply to organic horizons and is not reported for those layers. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable) Natural Resources Web Soil Survey 4112021 Conservation Service National Cooperative Soil Survey Page 4 of 4 14 37° W 21' N 3r 4939'N 3 Hydrologic Soil Group —Albemarle County, Virginia 3 fl R a � Y A4 WN 714 714MO 714700 7i49m 715100 11mm 71mm 115100 71500 MOD 3 3 m Map Sole: 1:6,99D'€pnWmAlarx6LxaPe (11"x6.S')sMet N metes a 109 31n 400 600 A 0 400 a1D low 24W rAaP Prof: vVeb Motor Canvrwardinate : WG584 Edge ti6: U1M Zo 17N WG584 NSDA Natural Resources Web Soil Survey 4/1/2021 aiiiiiiiiiii Conservation Service National Cooperative Soil Survey Page 1 of 5 MAPLEGEND Area of Interest (AOI) Area of Interest (AD[) Soils Soil Rating Polygons 0 A Q AID Q B Q B/D o C 0 CID 0 D O Not rated or not available Soil Rating Lines ~ A ~ AID N B �y B/D N C N C/D N D 0 Not rated or not available Soil Rating Points A e AID ❑ B ❑ B/D Hydrologic Soil Group —Albemarle County, Virginia ❑ C p CID D 0 Not rated or not available Water Features Streams and Canals Transportation H Rails N Interstate Highways ,.� US Routes Major Roads Local Roads Background . Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 2019--Oct 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. IIiSDA Natural Resources Web Soil Survey 4/1/2021 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group -Albemarle County, Virginia Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 18B Lackstom loam, 2 to 7 D 4.4 1.5% percent slopes 24B Banister silt loam, 2 to 7 C 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 C 4.9 1.6% percent slopes 43D Minesville channery silt D 4.4 1.4% loam, 15 to 25 percent slopes 46B Grassland silt loam, 2 to D 15.6 5.1 % 7 percent slopes 51B Bugley channery silt D 6.4 2.1% loam, 2 to 7 percent slopes 51C Bugley channery silt D 22.4 7.4% loam, 7 to 15 percent slopes 51D Bugley channery silt D 11.7 3.8% loam, 15 to 25 percent slopes 51E Bugley channery silt D 0.0 0.0% loam, 25 to 45 percent slopes 62B Buffstat silt loam, 2 to 7 B 1.0 0.3% percent slopes 62C Buffstat silt loam, 7 to 15 B 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 B 6.5 2.1 % percent slopes 68C Penn silt loam, 7 to 15 B 36.6 12.1 % percent slopes 72B3 Rabun clay, 2 to 7 B 16.4 5.4% percent slopes, severely eroded 74B Rapidan silt loam, 2 to 7 B 26.7 8.8% percent slopes 74C Rapidan silt loam, 7 to B 22.6 7.5% 15 percent slopes 74D Rapidan silt loam, 15 to B 3.9 1.3% 25 percent slopes 75C3 Rapidan silty clay loam, B 20.7 6.8% 7 to 15 percent slopes, severely eroded Natural Resources Web Soil Survey 411 2021 Conservation Service National Cooperative Soil Survey Page 3 of 5 IVA Hydrologic Soil Group —Albemarle County, Virginia Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 75133 Rapidan silty clay loam, B 28.8 9.5% 15 to 25 percent slopes, severely eroded 77 Dan River-Codorus B 24.4 8.0% complex, 0 to 2 percent slopes, occasionally flooded 78 Rowland silt loam, 0 to 2 C 2.2 0.7% percent slopes, occassionally flooded 79B Meadowville silt loam, 2 B 2.6 0.9% to 7 percent slopes 80B Littlejoe silt loam, 2 to 7 B 5.3 1.7% percent slopes 80C LitBejoe sift loam, 7 to B 4.1 1.4% 15 percent slopes 84B Toter silt loam, 2 to 7 B 8.3 2.7% percent slopes 84C Toter silt loam, 7 to 15 B 8.3 2.7% percent slopes Totals for Area of Interest 303.3 100.0% gQNatural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 4 of 5 IF.? Hydrologic Soil Group —Albemarle County, Virginia Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.. None Specked Tie -break Rule: Higher Natural Resources Web Soil Survey 4112021 Conservation Service National Cooperative Soil Survey Page 5 of 5 19 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 Blackwell Engineering PLC 566 East Market Street Harrisonburg, VA 22801 (540)432-9555 Storm Water Quantity Energy Equation Compliance 1 Year Storm Event Project Name Troxell Poultry House Project Number 2888 1 Year Storm Event Energy Equation Compliance POND Energy Balance 1 I.F. (Improvement Factor) equals 0.8 for sites > 1 acre or 0.9 for sites <_ 1 acre. Is site larger than 1 acre? Yes --> 0.8 QPost= Allowable post -development peak discharge from site (includes offsite run-on) QD= 22.46 CFS QPre, sae Pre -development peak discharge from site QPre, sae= 8.34 US RVPre. site = Pre -development runoff volume from site RVPre, site= 19190 cu ft RVPost, sae = Post -development runoff volume from site RVPost, sae= 33082 cu ft QPost, off site Post -development peak discharge from off site Qosst, off sae= 22.18 US *QPost < I. F.`(QPre, Sae*(RVPre, SaeIRVPost, site)+QPre, off sae 22.46 <_ 26.05 'Equation from DEC's Plan Reviewer for Stormwater Management; Module 5; p.36 & 37 Qdeveloped < or = QPre-Developed YES Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 20 File: 2888- TC 8 FLOW CALCS Printed: W3/2022 Blackwell Engineering PLC 566 East Market Street Harrisonburg, VA22801 (540)432-9555 Storm Water Quantity Energy Equation Compliance 1 Year Storm Event Project Name Troxell Poultry House Project Number 2888 1 Year Storm Event Energy Equation Compliance Energy Balance 2 I.F. (Improvement Factor) equals 0.8 for sites > 1 acre or 0.9 for sites <_ 1 acre. Is site larger than 1 acre? Yes 4 0.8 QDeveloped = The peak flow rate of runoff from the developed site. QD= 0.08 CFS RVDeveloped = The volume of runoff from the site in the developed condition. RVD= 381 cu ft QPre Developed = The peak flow rate of runoff from the site in the pre -developed condition. Qp= 3.57 CFS RVpre-Developed = The volume of runoff from the site in pre -developed condition. RVp= 8,162 cu ft QDeveloped :5 LF*(QPre-developed* RVPre-Developed)IRVDeveloped 0.08 <_ 61.10 Qdeveloped < or = QPre-Developed YES Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 21 Printed: 9/23/2022 1.) Area = TC Calculations - Rational Method Existing Site 0.00 ac 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) a. Overland: (200' max) L = 100 ft. Height = 4 ft. VDOT Drainage Manual Appendix 6D-1: T, = 8.2 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 238 ft. Height = 16 ft. Average velocity = 4.2 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.9 min. Tc = U60V Subtotal T, = 0.9 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. Subtotal Tc = 0.0 min. d. Total T,: T, = 9.1 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 4.0% 6.7% WJ File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 Runoff Calculations - Rational Method Ex/Pro Offsite to EB 1 3.) Time of Concentration a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T, = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T� = 0.0 min. L = 1000 ft. Height = 86 ft. Average velocity = 4.7 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 3.5 min. T� = U60V Subtotal TC = 3.5 min. Slope 6.0% 8.6% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 280 ft. Height = 14 ft.(unpaved; 5.0% VDOT Drainage Manual Appendix 6D-5: Tc = 2.0 min. Subtotal T, = 2.0 min. d. Total TC: TC = 13.1 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 23 Printed: 9/23/2022 1.) Area = TC Calculations - Rational Method Site to Pond 0.00 ac 3.) Time of Concentration Project Name: Project # IDF: Troxell Poultry House 2888 Albemarle (Zone 2) a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T, = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 176 ft. Height = 19 ft. Average velocity = 5.3 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.6 min. Tc = U60V Subtotal T, = 0.6 min. Slope 6.0% 10.8% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 281 ft. Height = 2.7 ft.(unpaved; 1.0% VDOT Drainage Manual Appendix 6D-5: Tc = 3.8 min. Subtotal Tc = 3.8 min. d. Total T,: Tc = 11.9 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 24 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 Runoff Calculations - Rational Method Additional Area to Point B 3.) Time of Concentration a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T, = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 290 ft. Height = 26 ft. Average velocity = 4.8 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 1.0 min. T� = U60V Subtotal TC = 1.0 min. Slope 6.0% 9.0% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 335 ft. Height = 12 ft.(unpaved; 3.6% VDOT Drainage Manual Appendix 6D-5: Tc = 2.6 min. Subtotal T, = 2.6 min. d. Total TC: Tc = 11.2 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 M Printed: 9/23/2022 Runoff Calculations - Rational Method Offsite to Point C 3.) Time of Concentration a. Overland: (200' max) L = 0 ft. Height = 0 ft. VDOT Drainage Manual Appendix 6D-1: T, = 0.0 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. Tc = U60V Subtotal T, = 0.0 min. Slope c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 5000 ft. Height = 140 ft.(unpaved; 2.8% VDOT Drainage Manual Appendix 6D-5: Tc = 21.9 min. Subtotal Tc = 21.9 min. d. Total Tc: Tc = 21.9 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 K., File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 TC Calculations - Rational Method Existing Site Area to Energy Balance Point 2 3.) Time of Concentration a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T, = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 286.5 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: Tc _ T� = U60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 16 ft. 3.8 fps(unpaved) 1.3 min. 1.3 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. Subtotal T, = 0.0 min. d. Total TC: T, = 8.8 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 6.0% 5.6% 0A Printed: 9/23/2022 1.) Area = Runoff Calculations - Rational Method DI #1-4 0.50 ac 2.) C = 0.71 Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.17 ac @ 0.35 Grass 0.33 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other 3.) Time of Concentration a. Overland: (200' max) L = 43 ft. Height = 2 ft. VDOT Drainage Manual Appendix 6D-1: T, = 2.8 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.0 min. L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.0 min. T, = U60V Subtotal T, = 0.0 min. Slope 4.7% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 151 ft. Height = 1.5 ft.(unpaved; 1.0% VDOT Drainage Manual Appendix 6D-5: T, = 2.4 min. Subtotal T, = 2.4 min. d. Total T,: T, = 5.2 min. 4.) Rainfall Intensities: For T,= 5 5.) Proposed Flows: min. 12 = 5.04 iph 125 = 7.48 iph Ito = 6.54 iph Itoo = 8.59 iph Q=ACI Q2 = 1.80 cfs ()25 = 2.66 cfs ()to = 2.33 cfs ()too = 3.06 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 0.. File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 1.) Area = Runoff Calculations - Rational Method Culvert #1 0.85 ac 2.) C = 0.56 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.52 ac @ 0.35 Grass 0.33 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: Tc = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.0 min. T, = L/60V Subtotal TC = 0.0 min. Slope 6.0% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 170 ft. Height = 3.8 ft.(unpaved; 2.2% VDOT Drainage Manual Appendix 6D-5: T, = 1.9 min. Subtotal T, = 1.9 min. d. Total TC: T, = 9.5 min. 4.) Rainfall Intensities: For T. 9 min. 12 = 4.19 iph 110 = 5.47 iph 5.) Proposed Flows: Q=ACI Q2 = 2.01 cfs Clio = 2.62 cfs 125 = 6.28 iph 1100 = 7.23 iph Q25 = 3.01 cfs Q100 = 3.46 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 29 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 1.) Area = Runoff Calculations - Rational Method Culvert #2 0.62 ac 2.) C = 0.58 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.36 ac @ 0.35 Grass 0.26 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other a. Overland: (200' max) L = 47 ft. Height = 3 ft. VDOT Drainage Manual Appendix 6D-1: Tc = 5.5 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 0.0 min. T, = L/60V Subtotal TC = 0.0 min. Slope 6.4% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 151 ft. Height = 4.8 ft.(unpaved; 3.2% VDOT Drainage Manual Appendix 6D-5: T, = 1.5 min. Subtotal T, = 1.5 min. Total T.: TC = 7.0 min. 4.) Rainfall Intensities: For T. 7 min. 12 = 4.57 iph 110 = 5.95 iph 5.) Proposed Flows: Q=ACI Q2 = 1.65 cfs Q,o = 2.14 cfs 125 = 6.81 iph 1100 = 7.84 iph Q25 = 2.45 cfs Q100 = 2.82 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 30 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 1.) Area = Runoff Calculations - Rational Method Ditch #1 1.63 ac 2.) C = 0.52 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.51 ac @ 0.35 Grass 0.37 ac @ 0.90 Impervious 0.75 ac @ 0.45 Agriculture a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: Tc = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 176 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ Tc = L/60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 19 ft. 5.3 fps (unpaved) 0.6 min. 0.6 min. Slope 6.0% 10.8% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 247 ft. Height = 2.7 ft.(unpaved; 1.1% VDOT Drainage Manual Appendix 6D-5: T� = 3.3 min. Subtotal T, = 3.3 min. d. Total TC: T, = 11.4 min. 4.) Rainfall Intensities: For T. 11 min. 12 = 3.87 iph 110 = 5.07 iph 5.) Proposed Flows: Q=ACI Q2 = 3.28 cfs Q10 = 4.31 cfs 125 = 5.83 iph 1100 = 6.73 iph Q25 = 4.95 cfs Q100 = 5.71 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 31 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 1.) Area = Runoff Calculations - Rational Method Ex Area to Point A 14.97 ac 2.) C = 0.40 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.00 ac @ 0.35 Grass 0.00 ac @ 0.90 Impervious 14.97 ac @ 0.40 Other a. Overland: (200' max) L = 100 ft. Height = 15 ft. VDOT Drainage Manual Appendix 6D-1: Tc = 6.4 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 984 ft. Height = 80 ft. Average velocity = 4.6 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Tc = 3.6 min. T, = L/60V Subtotal TC = 3.6 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: T� = 0.0 min. Subtotal T, = 0.0 min. d. Total TC: TC = 9.9 min. 4.) Rainfall Intensities: For T. 10 min. 12 = 4.02 iph 110 = 5.26 iph 5.) Proposed Flows: Q=ACI Q2 = 24.07 cfs Q10 = 31.51 cfs 125 = 6.05 iph hoo = 6.97 iph Q25 = 36.20 cfs Q100 = 41.71 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 15.0% 8.1 % 32 File: 2888- TC 8 FLOW CALCS Pnnted: W3/2022 1.) Area = Runoff Calculations - Rational Method Pro Area to Point A 13.88 ac 2.) C = 0.40 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.47 ac @ 0.35 Grass 0.00 ac @ 0.90 Impervious 13.41 ac @ 0.40 Crops a. Overland: (200' max) L = 100 ft. Height = 15 ft. VDOT Drainage Manual Appendix 6D-1: Tc = 6.4 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 974 ft. Height = 80 ft. Average velocity = 4.6 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: Te = 3.5 min. T, = L/60V Subtotal TC = 3.5 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: T� = 0.0 min. Subtotal T, = 0.0 min. d. Total TC: TC = 9.9 min. 4.) Rainfall Intensities: For T. 10 min. 12 = 4.02 iph Ito = 5.26 iph 5.) Proposed Flows: Q=ACI Q2 = 22.23 cfs Qlo = 29.09 cfs 125 = 6.05 iph hoo = 6.97 iph Q25 = 33.42 cfs Q100 = 38.51 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 15.0% 8.2% 33 File: 2888- TC 8 FLOW CALCS Pnnted: W3Y1022 Project Name: Troxell Poultry House Project # : 2888 DI #1-4 -Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 1.80 cfs 2.33 cfs Channel Slope (S) = 1.00 % 1.00 % Retardance Level = D (Mowed Grass) D (Mowed Grass) Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 0 ft 0 ft Total Depth = 1.3 ft 1.3 ft 2 Year 10 Year Flow Depth d = 0.94 0.87 Flow Area A = 2.68 sf 2.26 sf Hydraulic radius R = 0.45 ft 0.41 It V x R = 0.301 0.425 Manning's n = 0.130 0.080 Flowrate = 1.80 cfs 2.33 cfs Manning's Equation Velocity = 0.67 fps 1.03 fps Freeboard = 0.36 ft 0.43 ft 1.4 1.2 1 .t 0.8 a 0 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 2 4 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 12 14 � Ditch —2Yr ---1OYr File: 2888- TC 8 FLOW CALCS Pnnted: W3Y2022 Project Name: Troxell Poultry House Project # : 2888 Culvert #1 - Velocity and Depth Calculations 2 Year Discharge (Q) = 2.01 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 :1 Right side slope = 3 : 1 Bottom width = 0 ft Total Depth = 1.5 ft 2 Year Flow Depth d = 0.98 Flow Area A = 2.91 sf Hydraulic radius R = 0.47 It VxR= 0.322 Manning's n = 0.130 Flowrate = 2.01 cfs Manning's Equation Velocity = 0.69 fps Freeboard = 0.52 ft 1.6 1.4 1.2 s 1 v 0.8 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 2 4 6 8 10 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 2.62 cfs 1.00 % D (Mowed Grass) 3:1 3:1 Oft 1.5 ft 10 Year 0.91 2.47 sf 0.43 It 0.456 0.080 2.62 cfs 1.06 fps 0.59 ft 12 Ditch —2Yr ---10 Yr 35 File: 2888- TC 8 FLOW CALCS Pnnted: 9/2312022 Project Name: Troxell Poultry House Project # : 2888 Culvert #2 - Velocity and Depth Calculations 2 Year Discharge (Q) = 1.65 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 : 1 Right side slope = 3 : 1 Bottom width = 0 ft Total Depth = 1.5 ft 2 Year Flow Depth d = 0.91 Flow Area A = 2.50 sf Hydraulic radius R = 0.43 ft VxR= 0.284 Manning's n = 0.130 Flowrate = 1.64 cfs Manning's Equation Velocity = 0.66 fps Freeboard = 0.59 ft 1.6 1.4 1.2 1 L v 0.8 0.6 0.4 0.2 0 DITCH CROSS-SECTION 0 2 4 6 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 2.14 cfs 1.00 % D (Mowed Grass) 3:1 3:1 Oft 1.5 ft 10 Year 1.01 3.05 sf 0.48 It 0.335 0.130 2.14 cfs 0.70 fps 0.49 ft Ditch —2 Yr ---10 Yr 12 36 File: 2888- TC 8 FLOW CALCS Pnnted: 9/2312022 Project Name: Troxell Poultry House Project # : 2888 Ditch #1 - Velocity and Depth Calculations 2 Year Discharge (Q) = 3.28 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 :1 Right side slope = 10 : 1 Bottom width = 0 ft Total Depth = 1.25 ft 2 Year Flow Depth d = 0.88 ft Flow Area A = 5.02 sf Hydraulic radius R = 0.43 ft VxR= 0.283 Manning's n = 0.130 Flowrate = 3.29 cfs Manning's Equation Velocity = 0.66 fps Freeboard = 0.37 ft 1.4 1.2 1 s 0.8 n p 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 5 10 15 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 4.31 cfs 1.00 % D (Mowed Grass) 3:1 10 :1 Oft 1.25 ft 10 Year 0.81 ft 4.27 sf 0.40 ft 0.402 0.080 4.31 cfs 1.01 fps 0.44 ft 20 Ditch —2Yr ---10 Yr 37 File: 2888- TC 8 FLOW CALCS Pnnted: 9/2312022 Project Name: Troxell Poultry House Project # : 2888 Proposed Pond Outlet (Ditch Section A) - Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 2.35 cfs 11.77 cfs Channel Slope (S) = 4.40 % 4.40 % Retardance Level = Hay Hay Left side slope = 5 :1 5 :1 Right side slope = 5 :1 5 :1 Bottom width = 0 ft 0 ft Total Depth = 1 ft 1 ft Flow Depth d = Flow Area A = Hydraulic radius R = VxR= Manning's n = Flowrate = Manning's Equation Velocity = Freeboard = 1.2 1 0.8 s v 0.6 0.4 0.2 0 0 2 Year 10 Year 0.30 ft 0.56 ft 0.46 sf 1.55 sf 0.15 ft 0.27 ft 0.375 1.025 0.035 0.035 1.17 cfs 5.82 cfs 2.51 fps 3.76 fps 0.70 ft 0.44 ft DITCH CROSS-SECTION 2 4 6 8 10 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 12 Ditch —2Yr ---10 Yr (Hydroflow #7) 38 File: 2888- TC 8 FLOW CALCS Pnnted: W3Y2022 Project Name: Troxell Poultry House Project # : 2888 Proposed to EB#1 (Ditch Section B) - Velocitv and Depth Calculations 2 Year 10 Year Discharge (Q) = 32.06 cfs 63.56 cfs Channel Slope (S) = 11.70 % 11.70 % Retardance Level = Trees Trees Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 10 ft 10 ft Total Depth = 1.5 ft 1.5 ft 2 Year 10 Year Flow Depth d = 0.72 ft 1.06 ft Flow Area A = 8.81 sf 14.03 sf Hydraulic radius R = 0.60 ft 0.84 ft V x R = 2.200 3.801 Manning's n = 0.100 0.100 Flowrate = 32.07 cfs 63.58 cfs Manning's Equation Velocity = 3.64 fps 4.53 fps Freeboard = 0.78 ft 0.44 ft 1.6 1.4 1.2 s 1 v 0.8 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION s 10 is Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 20 Ditch —2Yr ---10 Yr (Hydroflow #10) 39 File: 2888- TC 8 FLOW CALCS Pnnted: W3Y2022 Project Name: Troxell Poultry House Project # : 2888 ProDOsed to Point B (Ditch Section C)- Velocity and Deoth Calculations 2 Year 10 Year Discharge (Q) = 36.69 cfs 71.77 cfs Channel Slope (S) = 4.00 % 4.00 % Retardance Level = Trees Trees Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 10 ft 10 ft Total Depth = 2 ft 2 ft 2 Year 10 Year Flow Depth d = 1.06 ft 1.52 ft Flow Area A = 13.90 sf 22.20 sf Hydraulic radius R = 0.83 ft 1.13 ft V x R = 2.199 3.656 Manning's n = 0.100 0.100 Flowrate = 36.68 cfs 71.79 cfs Manning's Equation Velocity = 2.64 fps 3.23 fps Freeboard = 0.94 ft 0.48 ft ra.7 2 DITCH CROSS-SECTION 20 25 30 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Ditch —2Yr ---10 Yr (Hydroflow #16) 40 File: 2888 LD-229.xlsm Printed: 4/19/2021 STORM SEWER DESIGN COMPUTATIONS LD-229 Troxell Pou try House (BE #2888) FROM POINT TO POINT AREA DRAIN ACRES RUNOFF COEF C C A INLET TIME RAIN FALL RUNOFF Q INVERT ELEVATIONS LENGTH SLOPE DAMCITY CAPA- VEL FLOW TIME INCRE MENT ACCUM ULATED T, min IN/HR CFS UPPER LOWER FT FT/FT IN CFS FPS SEC 4 3 0.85 0.53 0.45 0.45 9.50 5.26 2.37 497.20 496.20 90.50' 0.0110 15" 6.80 4.83 18.8 3 2 0.50 0.71 0.36 0.81 9.81 5.26 4.24 496.10 495.70 37.00' 0.0108 15" 6.73 5.87 6.3 2 1 0.50 0.71 0.36 1.16 9.92 5.26 6.11 495.60 494.50 96.50' 0.0114 15" 6.91 6.48 14.9 4.1 3.1 0.62 0.58 0.36 0.36 7.00 5.95 2.14 497.20 496.10 90.50' 0.0122 15" 7.13 4.71 19.2 3.1 2.1 0.50 0.71 0.36 0.71 7.32 5.95 4.25 496.00 495.50 37.00' 0.0135 15" 7.52 6.44 5.7 2.1 1.1 0.50 0.71 0.36 1.07 7.42 5.95 6.36 495.40 494.00 103.00' 0.0136 15 7.52 7.01 14.7 Note: Mannin 's "n" adjusted for pipe type and diameter. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 File: 2888 LD-229.x1sm HYDRAULIC GRADE LINE LD-347 Printed: 4/19/2021 Troxell Poultry House (BE #2888) INLET # Outlet WSE Do Q. L. Sro % Ht JUNCTION LOSS Final H Inlet WSE Rim Elev. Vo Ho QI Vi QiVi y 2g Hi Angle K HD Ht 1.3 Ht 0.5 Ht 2 495.50 15" 6.11 97' 0.90 0.87 6.48 0.16 4.24 5.87 24.88 0.54 0.19 0.00 0.00 0.16 0.21 0.11 0.98 496.48 500.30 3 496.70 15" 4.24 37' 0.44 0.16 5.87 0.13 2.37 4.83 11.44 0.36 0.13 0.35 0.13 0.13 0.17 0.09 0.25 496.95 500.30 4 497.20 15" 2.37 91' 0.14 0.12 4.83 0.09 - - - - 0.00 - 0.00 0.09 0.12 0.06 0.18 497.38 501.00 2.1 495.00 15" 6.36 103' 0.98 1.01 7.01 0.19 4.25 6.44 27.38 0.64 0.23 0.00 0.00 0.19 0.25 0.12 1.14 496.14 500.30 3.1 496.50 15" 4.25 37' 0.44 0.16 6.44 0.16 2.14 4.71 10.08 0.34 0.12 0.52 0.18 0.16 0.21 0.10 0.27 496.77 500.30 4.1 497.10 15" 2.14 91' 0.11 0.10 4.71 0.09 - - 0.00 0.00 0.09 0.11 0.06 0.16 497.26 501.00 Mannings "n" = 0.013 90'K=0.70 70'K=0.61 50'K=0.50 30'K=0.35 20'K=0.25 10'K=0.13 80°K=0.66 60°K=0.56 40°K=0.43 25°K=0.30 15°K=0.19 5°K=0.06 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 8.335 1 720 19,190 Existing Site 2 SCS Runoff 22.18 1 722 57,150 Existing Offsite to EB 1 3 Reach 17.62 1 727 57,146 2 Ex Site to EB 1 4 Combine 37.56 1 723 114,296 2,3 — — Total Existing at EB 1 6 SCS Runoff 13.05 1 721 33,082 — Site to Pond 7 Reservoir 1.617 1 751 33,080 6 493.43 12,986 Sediment Basin/Pond 8 Reach 1.644 1 751 33,071 7 Pond to EB 1 9 SCS Runoff 21.10 1 722 54,374 Pro Offsite to EB 1 10 Combine 22.46 1 722 87,445 8,9 Total Proposed Volume to EB 1 12 Reach 36.73 1 725 114,295 4 ---- Ex EB 1 to Point B 13 Reach 21.77 1 724 87,428 10 Pro EB 1 to Point B 14 SCS Runoff 4.666 1 720 11,305 Additional Offsite to Point B 15 Combine 40.24 1 725 125,600 12,14 -- -- Ex Total at Point B 16 Combine 25.82 1 723 98,733 13, 14, -- -- Pro Total at Point B 18 Reach 40.14 1 726 125,600 15 -- -- Ex B to Point C 19 Reach 25.65 1 725 98,732 16 -- Pro B to Point C 20 SCS Runoff 120.71 1 728 497,606 Offsite to Point C 21 Combine 159.74 1 728 623,206 18,20 --- Ex To Point C 22 Combine 144.10 1 727 596,338 19, 20, -- -- Prot To Point C 24 SCS Runoff 3.565 1 720 8,162 -- Existing Site Area to EB 2 25 SCS Runoff 0.080 1 721 381 Pro Site to EB 2 27 SCS Runoff 2.588 1 718 5,251 -- Additional Area to to Culverts 28 Combine 3.875 1 718 38,331 7,27 Total to Culverts Ponds -Updated 9-13-22.gpw Return Period: 1 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Peak discharge = 8.335 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 19,190 cult Drainage area = 5.540 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.10 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] 15.540 Q (cfs) 10.00 MA . M 4.00 a ffl Existing Site Hyd. No. 1 -- 1 Year Q (cfs) 10.00 1M M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) :1V Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Composite (Area/CN) = [(12.370 x 75) + (2.660 x 86)] / 15.030 Q (cfs) 24.00 20.00 16.00 12.00 ERA 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 1 Year Friday, 09/16/2022 = 22.18 cfs = 722 min = 57,150 tuft = 77` = 0 ft = 13.10 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) aR Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® civil 3D@ by Autodesk, Inc. J2022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 - Existing Offsite to EB 1 Reach length = 898.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 0.586 Ave. velocity = 1.63 ft/s Modified Aft -Kin routing method used. Q (cfs) 24.00 20.00 16.00 12.00 : U9 4.00 0.00 0 120 240 Hyd No. 3 360 480 600 — Hyd No. 2 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex Site to EB 1 Hyd. No. 3 -- 1 Year Friday, 09/16/2022 = 17.62 cfs = 727 min = 57,146 tuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1410 Q (cfs) 24.00 20.00 16.00 12.00 4.00 ' ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) M. Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 37.56 cfs Storm frequency = 1 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 114,296 cult Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Total Existing at EB 1 Q (Cfs) Hyd. No. 4 -- 1 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) -!A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs 14.00 12.00 10.00 M1 '. 1 Al 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 1 Year Friday, 09 / 1612022 = 13.05 cfs = 721 min = 33,082 cult = 81* = 0 ft = 11.90 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 MI . 1I 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 6 - Site to Pond Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used. Q (cfs 14.00 12.00 10.00 '. 1 Al 4.00 2.00 Sediment Basin/Pond Hyd. No. 7 -- 1 Year Friday, 09/16/2022 = 1.617 cfs = 751 min = 33,080 cuft = 493.43 ft = 12,986 tuft Q (cfs) 14.00 12.00 10.00 L.&IIJ . 11 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 —Hyd No. 6 ®Total storage used = 12,986 cuff Time (min) sz Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2022 Friday, 09 / 16 12022 Pond No. 1 - Sediment Basin/Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 490.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 490.00 00 0 0 2.00 492.00 3,190 2,126 2,126 4.00 494.00 13,117 15,182 17,309 6.00 496.00 22,111 34,835 52,144 8.00 498.00 31,646 53,468 105,612 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 6.00 6.00 Inactive Crest Len (ft) = 7.85 20.00 0.00 0.00 Span (in) = 18.00 6.00 6.00 0.00 Crest El. (ft) = 494.40 495.70 0.00 0.00 No. Barrels = 1 1 1 1 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 490.00 490.00 493.40 0.00 Weir Type = 1 Ciplti - --- Length (ft) = 52.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes Yes TW Elev. (ft) = 0.00 Note: CuNerVOrifice outflows are analyzed under inlet (ic) add outlet (oc) watm. Weir risers checked for orifice conditions (ic) and submergence (a). Stage (it) Stage / Discharge Elev (ft) 8.00 498.00 6.00 496.00 4.00 494.00 2.00 492.00 0.00 490.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 Total O Discharge (cfs) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 8 Pond to EB 1 Hydrograph type Storm frequency Time interval Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity Modified Att-Kin routing method used. Q (cfs) 2.00 1.00 = Reach = 1 yrs = 1 min = 7 - Sediment Basin/Pond = 946.0 ft = 0.025 = 6.0:1 = 75.312 = 183989.36 ft/s Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Pond to EB 1 Hyd. No. 8 -- 1 Year Friday, 09 / 1612022 = 1.644 cfs = 751 min = 33,071 cuft = Trapezoidal = 7.4 % = 0.1 ft = 1.5 ft = 0.330 = 1.9990 180 360 540 720 900 1080 1260 1440 Hyd No. 8 — Hyd No. 7 Q (cfs) 2.00 1.00 ■- 0.00 1620 Time (min) 51 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 14.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs ` Composite (Area/CN) = [(11.650 x 75) + (2.650 x 86)] / 14.300 Q (cfs) 24.00 20.00 16.00 12.00 :M 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Offsite to EB 1 Hyd. No. 9 -- 1 Year Friday, 09/16/2022 = 21.10 cfs = 722 min = 54,374 tuft = 77` = 0 ft = 13.10 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 52 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 22.46 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 87,445 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Q (Cfs) 24.00 20.00 16.00 12.00 : U9 4.00 Total Proposed Volume to EB 1 Hyd. No. 10 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 4.00 1 — — 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 12 Ex EB 1 to Point B Hydrograph type = Reach Peak discharge = 36.73 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 114,295 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 2.30 ft/s Routing coeff. = 0.4582 Modified Att-Kin routing method used. Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 12 Ex EB 1 to Point B Hyd. No. 12 -- 1 Year 360 480 600 — Hyd No. 4 720 840 960 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 1440 1560 Time (min) 611I Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® OW 3D@ by Autodesk, Inc. J2022 Hyd. No. 13 Pro EB 1 to Point B Hydrograph type = Reach Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 10 - Total Proposed Volume toTfation type Reach length = 300.0 ft Channel slope Manning's n = 0.100 Bottom width Side slope = 3.0:1 Max. depth Rating curve x = 1.019 Rating curve m Ave. velocity = 2.05 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 24.00 20.00 16.00 12.00 : U9 4.00 0.00 0 120 240 Hyd No. 13 Pro EB 1 to Point B Hyd. No. 13 -- 1 Year 360 480 600 — Hyd No. 10 720 840 Friday, 09/16/2022 = 21.77 cfs = 724 min = 87,428 tuft = Trapezoidal = 4.0 % = 5.0 ft = 2.0 ft = 1.292 = 0.4185 Q (cfs) 24.00 20.00 16.00 12.00 4.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 14 Additional Offsite to Point B Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Q (cfs) 5.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Mite to Point B Hyd. No. 14 -- 1 Year Friday, 09 / 1612022 = 4.666 cfs = 720 min = 11,305 cult = 86 = 0 ft = 11.20 min = Type II = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) N7. Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 15 Ex Total at Point B Hydrograph type = Combine Peak discharge = 40.24 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 125,600 cuft Inflow hyds. = 12, 14 Contrib. drain. area = 1.850 ac Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 15 Ex Total at Point B Hyd. No. 15 -- 1 Year 360 480 600 — Hyd No. 12 720 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 16 Pro Total at Point B Hydrograph type = Combine Peak discharge = 25.82 cfs Storm frequency = 1 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 98,733 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 1.850 ac Pro Total at Point B Q (Cfs) Hyd. No. 16 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 —Hyd No. 13 —Hyd No. 14 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 18 Ex B to Point C Hydrograph type = Reach Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 15 - Ex Total at Point B Reach length = 560.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 6.112 Ave. velocity = 9.35 ft/s Modified Att-Kin routing method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 18 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex B to Point C Hyd. No. 18 -- 1 Year 360 480 600 — Hyd No. 15 Friday, 09 / 1612022 = 40.14 cfs = 726 min = 125,600 cuft = Trapezoidal = 9.0 % = 5.0 ft = 2.0 ft = 1.292 = 0.7859 Q (cfs) 50.00 40.00 30.00 20.00 10.00 . 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) W Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® OW 3D@ by Autodesk, Inc. J2022 Hyd. No. 19 Pro B to Point C Hydrograph type = Reach Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 16 - Pro Total at Point B Section type Reach length = 560.0 ft Channel slope Manning's n = 0.025 Bottom width Side slope = 3.0:1 Max. depth Rating curve x = 6.112 Rating curve m Ave. velocity = 8.46 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 28.00 24.00 20.00 16.00 12.00 : W 4.00 0.00 0 120 240 Hyd No. 19 Pro B to Point C Hyd. No. 19 -- 1 Year 360 480 600 — Hyd No. 16 720 840 Friday, 09/16/2022 = 25.65 cfs = 725 min = 98,732 cuft = Trapezoidal = 9.0 % = 5.0 ft = 2.0 ft = 1.292 = 0.7386 Q (cfs) 28.00 24.00 20.00 16.00 12.00 � 4.00 ' ' ' ' 0.00 960 1080 1200 1320 1440 1560 Time (min) [Of; Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 20 Offsite to Point C Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 234.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor * Composite (Area/CN) _ [(26.110 x 80) + (62.920 x 61) + (68.540 x 55) + (76.520 x 77)] 1234.090 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Mite to Point C Hyd. No. 20 -- 1 Year Friday, 09 / 1612022 = 120.71 cfs = 728 min = 497,606 cuft = 67* = 0 ft = 21.90 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 1 1 1 1 110.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Time (min) 61 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 21 Ex To Point C Hydrograph type = Combine Peak discharge = 159.74 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 623,206 cuft Inflow hyds. = 18, 20 Contrib. drain. area = 234.090 ac Ex To Point C Q (cfs) Hyd. No. 21 -- 1 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 000 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 —Hyd No. 18 —Hyd No. 20 Time (min) 11% Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 22 Prot To Point C Hydrograph type = Combine Peak discharge = 144.10 cfs Storm frequency = 1 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 596,338 cuft Inflow hyds. = 19, 20 Contrib. drain. area = 234.090 ac Q (cfs 160.00 140.00 120.00 100.00 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 —Hyd No. 19 —Hyd No. 20 Time (min) 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 24 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Peak discharge = 3.565 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 8,162 cuft Drainage area = 2.230 ac Curve number = 76* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.80 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 24 Existing Site Area to EB 2 Hyd. No. 24 -- 1 Year 360 480 600 720 840 960 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 64 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 25 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Composite (Area/CN) = [(0.470 x 56)110.470 Friday, 09/16/2022 Peak discharge = 0.080 cfs Time to peak = 721 min Hyd. volume = 381 cuft Curve number = 56` Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Pro Site to EB 2 Q (cfs) Hyd. No. 25 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 000 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 25 Time (min) W Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 27 Additional Area to to Culverts Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Area to to Culverts Hyd. No. 27 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 27 Friday, 09 / 1612022 = 2.588 cfs = 718 min = 5,251 cuft = 75 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) M Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 28 Total to Culverts Hydrograph type = Combine Peak discharge = 3.875 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 38,331 cuft Inflow hyds. = 7,27 Contrib. drain. area = 1.470 ac Q (Cfs) 4.00 3.00 2.00 1.00 Total to Culverts Hyd. No. 28 -- 1 Year 120 240 360 480 600 Hyd No. 28 — Hyd No. 7 720 Q (Cfs) 4.00 3.00 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 — Hyd No. 27 Time (min) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cub) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 12.29 1 720 27,901 Existing Site 2 SCS Runoff 32.13 1 721 81,647 Existing Offsite to EB 1 3 Reach 26.43 1 726 81,643 2 Ex Site to EB 1 4 Combine 55.66 1 723 163,290 2,.3 — — Total Existing at EB 1 6 SCS Runoff 18.12 1 721 45,760 Site to Pond 7 Reservoir 2.348 1 749 45,757 6 494.08 18,625 Sediment Basin/Pond 8 Reach 2.368 1 749 45,749 7 Pond to EB 1 9 SCS Runoff 30.57 1 721 77,682 Pro Offsite to EB 1 10 Combine 32.06 1 721 123,430 8,9 Total Proposed Volume to EB 1 12 Reach 54.69 1 725 163,290 4 Ex EB 1 to Point B 13 Reach 31.15 1 724 123,411 10 — Pro EB 1 to Point B 14 SCS Runoff 8.182 1 720 15,071 Additional Mite to Point B 15 Combine 59.31 1 724 178,361 12,14 -- -- Ex Total at Point B 16 Combine 36.69 1 723 138,482 13, 14, -- -- Pro Total at Point B 18 Reach 59.25 1 726 178,361 15 -- -- Ex B to Point C 19 Reach 36.53 1 724 138,478 16 -- Pro B to Point C 20 SCS Runoff 213.06 1 727 787,848 Offsde to Point C 21 Combine 271.56 1 727 966,209 18,20 --- Ex To Point C 22 Combine 246.96 1 727 926,326 19, 20, -- -- Prot To Point C 24 SCS Runoff 5.191 1 720 11,762 -- Existing Site Area to EB 2 25 SCS Runoff 0.262 1 719 745 Pro Site to EB 2 27 SCS Runoff 3.799 1 718 7,635 -- Additional Area to to Culverts 28 Combine 5.195 1 718 53,392 7,27 Total to Culverts Ponds-Upsated 9-13-22.gpw Return Period: 2 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Peak discharge = 12.29 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 27,901 cult Drainage area = 5.540 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.10 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] 15.540 Q (cfs) 14.00 12.00 10.00 '. 1 Al 4.00 2.00 Existing Site Hyd. No. 1 -- 2 Year Q (cfs) 14.00 12.00 10.00 . IM 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(12.370 x 75) + (2.660 x 86)] 115.030 Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 2 Year EPEE Friday, 09 / 1612022 = 32.13 cfs = 721 min = 81,647 cult = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 2 - Existing Offsite to EB 1 Reach length = 898.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 0.586 Ave. velocity = 1.81 ft/s Modified Att-Kin routing method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex Site to EB 1 Hyd. No. 3 -- 2 Year Friday, 09 / 1612022 = 26.43 cfs = 726 min = 81,643 cuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1554 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) 71 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 55.66 cfs Storm frequency = 2 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 163,290 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Total Existing at EB 1 Q (Cfs) Hyd. No. 4 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) VA Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Peak discharge = 18.12 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 45,760 cult Drainage area = 7.090 ac Curve number = 81* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.90 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs) 21.00 18.00 15.00 12.00 • 11 . M 3.00 Site to Pond Hyd. No. 6 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 • 11 M 3.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 73 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 6 - Site to Pond Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 • �t . m 3.00 Sediment Basin/Pond Hyd. No. 7 -- 2 Year Friday, 09/16/2022 = 2.348 cfs = 749 min = 45,757 tuft = 494.08 ft = 18,625 tuft Q (cfs) 21.00 18.00 15.00 12.00 • 11 l 3.00 0.00 ' — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 —Hyd No. 6 ®Total storage used = 18,625 cult Time (min) 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 2.368 cfs Storm frequency = 2 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 45,749 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Trapezoidal Reach length = 946.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 0.1 ft Side slope = 6.0:1 Max. depth = 1.5 ft Rating curve x = 75.312 Rating curve m = 0.330 Ave. velocity = 86189.03 ft/s Routing coeff. = 1.9978 Modified Att-Kin routing method used Q (cfs) 3.00 2.00 1.00 Pond to EB 1 Hyd. No. 8 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 8 — Hyd No. 7 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Peak discharge = 30.57 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 77,682 cult Drainage area = 14.300 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.10 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) _ [(11.650 x 75) + (2.650 x 86)] 114.300 Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Pro Offsite to EB 1 Hyd. No. 9 -- 2 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 76 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 32.06 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 123,430 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Total Proposed Volume to EB 1 Hyd. No. 10 -- 2 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) m Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 12 Ex EB 1 to Point B Hydrograph type = Reach Peak discharge = 54.69 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 163,290 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 2.51 ft/s Routing coeff. = 0.4903 Modified Att-Kin routing method used. Ex EB 1 to Point B Q (cfs) Q (cfs) Hyd. No. 12 -- 2 Year 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 n nn 10.00 n nn 0 120 240 Hyd No. 12 360 480 600 — Hyd No. 4 720 840 960 1080 1200 1320 1440 1560 Time (min) 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 13 Pro EB 1 to Point B Hydrograph type = Reach Peak discharge = 31.15 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 123,411 cuft Inflow hyd. No. = 10 - Total Proposed Volume t0Tuetlbn type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 2.22 ft/s Routing coeff. = 0.4457 Modified Att-Kin routing method used. Pro EB 1 to Point B Q (cfs) Q (cfs) Hyd. No. 13 -- 2 Year 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 If 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 13 —Hyd No. 10 Time (min) Ve: Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 14 Additional Offsite to Point B Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Mite to Point B Hyd. No. 14 -- 2 Year Friday, 09 / 1612022 = 6.182 cfs = 720 min = 15,071 cult = 86 = 0 ft = 11.20 min = Type II = 484 Q (cfs) 7.00 . I� 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) 80 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 15 Ex Total at Point B Hydrograph type = Combine Peak discharge = 59.31 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 178,361 cuft Inflow hyds. = 12, 14 Contrib. drain. area = 1.850 ac 50.00 40.00 20.00 10.00 Mug Ex Total at Point B 81 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 16 Pro Total at Point B Hydrograph type = Combine Peak discharge = 36.69 cfs Storm frequency = 2 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 138,482 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 1.850 ac Pro Total at Point B Q (Cfs) Hyd. No. 16 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 —Hyd No. 13 —Hyd No. 14 Time (min) I.% Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 18 Ex B to Point C Hydrograph type = Reach Peak discharge = 59.25 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 178,361 cuft Inflow hyd. No. = 15 - Ex Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 10.21 ft/s Routing coeff. = 0.8281 Modified Att-Kin routing method used. Ex B to Point C Q (cfs) Q (cfs) Hyd. No. 18 -- 2 Year 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 n nn 10.00 n nn D 120 240 Hyd No. 18 360 480 600 — Hyd No. 15 720 840 960 1080 1200 1320 1440 1560 Time (min) 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 19 Pro B to Point C Hydrograph type = Reach Peak discharge = 36.53 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 138,478 cuft Inflow hyd. No. = 16 - Pro Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 9.16 ft/s Routing coeff. = 0.7760 Modified Att-Kin routing method used Pro B to Point C Q (cfs) Q (cfs) Hyd. No. 19 -- 2 Year 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 —Hyd No. 16 Time (min) 84 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 20 Offsite to Point C Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 234.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor ' Composite (Area/CN) = [(26.110 x 80) + (62.920 x 61) + (68.540 x 55) + (76.520 x 77)] 1234.090 Q (Cfs) 240.00 210.00 180.00 150.00 120.00 30.00 Offsite to Point C Hyd. No. 20 -- 2 Year Friday, 09/16/2022 = 213.06 cfs = 727 min = 787,848 cuft = 67` = 0 ft = 21.90 min = Type II = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 1 1 1 1 1 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Time (min) 85 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 21 Ex To Point C Hydrograph type = Combine Peak discharge = 271.56 cfs Storm frequency = 2 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 966,209 cuft Inflow hyds. = 18, 20 Contrib. drain. area = 234.090 ac Q (CfSjO 280.00 240.00 200.00 160.00 120.00 40.00 fs) 280.00 O 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 —Hyd No. 18 —Hyd No. 20 Time (min) MV Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 22 Prot To Point C Hydrograph type = Combine Peak discharge = 246.96 cfs Storm frequency = 2 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 926,326 cuft Inflow hyds. = 19, 20 Contrib. drain. area = 234.090 ac Q (CfSjO 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 —Hyd No. 19 —Hyd No. 20 Time (min) 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 24 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs ` Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 24 -- 2 Year Friday, 09 / 1612022 = 5.191 cfs = 720 min = 11,762 cult = 76* = 0 ft = 8.80 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 24 Time (min) r.1a Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 25 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Composite (Area/CN) = [(0.470 x 56)110.470 Friday, 09/16/2022 Peak discharge = 0.262 cfs Time to peak = 719 min Hyd. volume = 745 cuft Curve number = 56` Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Pro Site to EB 2 Q (cfs) Hyd. No. 25 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 25 Time (min) rx; Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 27 Additional Area to to Culverts Hydrograph type = SCS Runoff Peak discharge = 3.799 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 7,635 cuft Drainage area = 1.470 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 27 Additional Area to to Culverts Hyd. No. 27 -- 2 Year 360 480 600 720 840 960 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 90 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® OW 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 28 Total to Culverts Hydrograph type = Combine Peak discharge = 5.195 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 53,392 cuft Inflow hyds. = 7,27 Contrib. drain. area = 1.470 ac Total to Culverts JIL _MEN oil Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 25.19 1 719 57,024 Existing Site 2 SCS Runoff 64.14 1 721 162,236 Existing Offsite to EB 1 3 Reach 55.46 1 725 162,233 2 Ex Site to EB 1 4 Combine 114.67 1 723 324,468 2,3 — — Total Existing at EB 1 6 SCS Runoff 33.82 1 721 86,242 — Site to Pond 7 Reservoir 11.77 1 732 86,240 6 494.90 32,966 Sediment Basin/Pond 8 Reach 12.24 1 732 86,230 7 Pond to EB 1 9 SCS Runoff 61.02 1 721 154,356 -- Pro Offsite to EB 1 10 Combine 63.56 1 721 240,586 8,9 Total Proposed Volume to EB 1 12 Reach 113.33 1 724 324,468 4 ---- ---- Ex EB 1 to Point B 13 Reach 62.27 1 723 240,575 10 -- Pro EB 1 to Point B 14 SCS Runoff 10.71 1 720 26,712 --- Additional Offsite to Point B 15 Combine 122.04 1 724 351,179 12,14 -- -- Ex Total at Point B 16 Combine 71.77 1 723 267,287 13, 14, -- --- Pro Total at Point B 18 Reach 121.93 1 725 351,179 15 -- -- Ex B to Point C 19 Reach 71.71 1 724 267,287 16 -- --- Pro B to Point C 20 SCS Runoff 544.49 1 727 1,833,800 Offsite to Point C 21 Combine 664.62 1 726 2,184,979 18,20 --- Ex To Point C 22 Combine 612.61 1 726 2,101,089 19, 20, -- -- Prot To Point C 24 SCS Runoff 10.46 1 719 23,699 -- -- Existing Site Area to EB 2 25 SCS Runoff 1.075 1 718 2,275 Pro Site to EB 2 27 SCS Runoff 7.705 1 718 15,604 -- Additional Area to to Culverts 28 Combine 12.82 1 732 101,844 7,27 Total to Culverts Ponds-UpW ated 9-13-22.gpw Return Period: 10 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 5.540 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.47 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] / 5.540 Q (Cfs) 28.00 24.00 20.00 16.00 fife 1161 :M 4.00 Existing Site Hyd. No. 1 -- 10 Year Friday, 09/16/2022 = 25.19 cfs = 719 min = 57,024 tuft = 75` = 0 ft = 9.10 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' I I— ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 93 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(12.370 x 75) + (2.660 x 86)] 115.030 Q (cfs) 70.00 MIN 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 10 Year Friday, 09 / 1612022 = 64.14 cfs = 721 min = 162,236 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) a Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Existing Offsite to EB 1 Reach length = 898.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 0.586 Ave. velocity = 2.20 ft/s Modified Att-Kin routing method used. Q (cfs) 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex Site to EB 1 Hyd. No. 3 -- 10 Year Friday, 09 / 1612022 = 55.46 cfs = 725 min = 162,233 cuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1857 Q (cfs) 70.00 .1 1a 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) 4i Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 114.67 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 324,468 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Total Existing at EB 1 100.00 80.00 oil — I WIN X., Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Peak discharge = 33.82 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 86,242 cult Drainage area = 7.090 ac Curve number = 81* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.90 min Total precip. = 5.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Site to Pond Hyd. No. 6 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 —r ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 97 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 6 - Site to Pond Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used. Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Friday, 09/16/2022 = 11.77 cfs = 732 min = 86,240 cuft = 494.90 ft = 32,966 cuft Q (C1s) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 —Hyd No. 6 ®Total storage used = 32,966 cuff Time (min) XV Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 12.24 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 86,230 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Trapezoidal Reach length = 946.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 0.1 ft Side slope = 6.0:1 Max. depth = 1.5 ft Rating curve x = 75.312 Rating curve m = 0.330 Ave. velocity = 3264.13 ft/s Routing coeff. = 1.9431 Modified Att-Kin routing method used. Q (cfs) 12.00 10.00 . M 4.00 2.00 0.00 0 120 240 Hyd No. 8 Pond to EB 1 Hyd. No. 8 -- 10 Year 360 480 600 — Hyd No. 7 720 840 960 Q (cfs) 12.00 10.00 e, 4.00 2.00 � 0.00 1080 1200 1320 1440 1560 Time (min) ix: Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 14.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(11.650 x 75) + (2.650 x 86)] 114.300 Q (cfs) 70.00 MIN 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Offsite to EB 1 Hyd. No. 9 -- 10 Year Friday, 09 / 1612022 = 61.02 cfs = 721 min = 154,356 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 100 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 63.56 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 240,586 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 Total Proposed Volume to EB 1 Hyd. No. 10 -- 10 Year Q (cfs) 70.00 .1 1a 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) `u>ii Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 12 Ex EB 1 to Point B Hydrograph type = Reach Peak discharge = 113.33 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 324,468 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 2.96 ft/s Routing coeff. = 0.5532 Modified Att-Kin routing method used. Q (cfs) 120.00 100.00 40.00 20.00 0.00 0 120 240 Hyd No. 12 Ex EB 1 to Point B Hyd. No. 12 -- 10 Year 360 480 600 — Hyd No. 4 720 840 960 Q (cfs) 120.00 100.00 40.00 20.00 0.00 1080 1200 1320 1440 1560 Time (min) `X Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 13 Pro EB 1 to Point B Hydrograph type = Reach Peak discharge = 62.27 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 240,575 cuft Inflow hyd. No. = 10 - Total Proposed Volume t0Tuetlbn type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 2.59 ft/s Routing coeff. = 0.5015 Modified Att-Kin routing method used. Q (cfs) 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 13 Pro EB 1 to Point B Hyd. No. 13 -- 10 Year 360 480 600 — Hyd No. 10 720 840 Q (cfs) 70.00 .1 1a 50.00 40.00 30.00 20.00 10.00 � 0.00 960 1080 1200 1320 1440 1560 Time (min) `ux Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 14 Additional Offsite to Point B Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 . M 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Mite to Point B Hyd. No. 14 -- 10 Year Friday, 09 / 1612022 = 10.71 cfs = 720 min = 26,712 cult = 86 = 0 ft = 11.20 min = Type II = 484 Q (cfs) 12.00 10.00 : 14 M 4.00 2.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) `ut! Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 15 Ex Total at Point B Hydrograph type = Combine Peak discharge = 122.04 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 351,179 cuft Inflow hyds. = 12, 14 Contrib. drain. area = 1.850 ac Q (Cfs) 140.00 120.00 100.00 40.00 20.00 Ex Total at Point B Hyd. No. 15 -- 10 Year Q (cfs) 140.00 120.00 100.00 .1 41 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 15 —Hyd No. 12 —Hyd No. 14 Time (min) 114ii Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 16 Pro Total at Point B Hydrograph type = Combine Peak discharge = 71.77 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 267,287 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 1.850 ac Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Pro Total at Point B Hyd. No. 16 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 —Hyd No. 13 —Hyd No. 14 Time (min) fBb: Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 18 Ex B to Point C Hydrograph type = Reach Peak discharge = 121.93 cfs Storm frequency = 10 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 351,179 cuft Inflow hyd. No. = 15 - Ex Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 12.02 ft/s Routing coeff. = 0.9081 Modified Att-Kin routing method used Q (cfs) 140.00 120.00 100.00 40.00 20.00 Ex B to Point C Hyd. No. 18 -- 10 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 1 1 1' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 —Hyd No. 15 Time (min) `urA Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 19 Pro B to Point C Hydrograph type = Reach Peak discharge = 71.71 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 267,287 cuft Inflow hyd. No. = 16 - Pro Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 10.66 ft/s Routing coeff. = 0.8490 Modified Att-Kin routing method used Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Pro B to Point C Hyd. No. 19 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 r ' ' I ' I I . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 —Hyd No. 16 Time (min) ItDU Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 20 Offsite to Point C Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 234.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor * Composite (Area/CN) _ [(26.110 x 80) + (62.920 x 61) + (68.540 x 55) + (76.520 x 77)] 1234.090 Q (cfs) 560.00 -5 15 400.00 320.00 240.00 160.00 Mite to Point C Hyd. No. 20 -- 10 Year Friday, 09 / 1612022 = 544.49 cfs = 727 min = 1,833,800 cuft = 67* = 0 ft = 21.90 min = Type II = 484 Q (cfs) 560.00 400.00 320.00 240.00 160.00 0.00 1 1 1 1 1' ' ' ' ' ' " 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Time (min) HOW Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 21 Ex To Point C Hydrograph type = Combine Peak discharge = 664.62 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 2,184,979 cuft Inflow hyds. = 18, 20 Contrib. drain. area = 234.090 ac Q (Cfs) 700.00 . I II II II 500.00 400.00 300.00 200.00 100.00 Ex To Point C Hyd. No. 21 -- 10 Year Q (cfs) 700.00 500.00 400.00 300.00 200.00 100.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 —Hyd No. 18 —Hyd No. 20 Time (min) r`n: Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 22 Prot To Point C Hydrograph type = Combine Peak discharge = 612.61 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 2,101,089 cuft Inflow hyds. = 19, 20 Contrib. drain. area = 234.090 ac Q (cfs) 630.00 540.00 450.00 360.00 270.00 180.00 Prot To Point C Hyd. No. 22 -- 10 Year Q (cfs) 630.00 540.00 450.00 270.00 180.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 —Hyd No. 19 —Hyd No. 20 Time (min) 111 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 24 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs) 12.00 10.00 of . M 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 24 -- 10 Year Friday, 09 / 1612022 = 10.46 cfs = 719 min = 23,699 cult = 76* = 0 ft = 8.80 min = Type II = 484 Q (cfs) 12.00 10.00 ffl 14 M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 24 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 25 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) = [(0.470 x 56)] 10.470 Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Site to EB 2 Hyd. No. 25 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 25 Friday, 09 / 1612022 = 1.075 cfs = 718 min = 2,275 cuft = 56* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 113 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 27 Additional Area to to Culverts Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Q (cfs) 8.00 4.00 2.00 0.00 0 120 240 Hyd No. 27 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Area to to Culverts Hyd. No. 27 -- 10 Year 360 480 600 720 840 960 Friday, 09 / 1612022 = 7.705 cfs = 718 min = 15,604 cult = 75 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 8.00 . 11 4.00 2.00 0.00 1080 1200 1320 1440 Time (min) 114 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 28 Total to Culverts Hydrograph type = Combine Peak discharge = 12.82 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 101,844 cuft Inflow hyds. = 7,27 Contrib. drain. area = 1.470 ac Q (cfs) 14.00 12.00 10.00 '. Al 4.00 2.00 Total to Culverts Hyd. No. 28 -- 10 Year Q (cfs) 14.00 12.00 10.00 . I1 4.00 2.00 0.00 ' I I' ' ' � 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 28 —Hyd No. 7 —Hyd No. 27 Time (min) `P Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 34.40 1 719 78,329 Existing Site 2 SCS Runoff 86.62 1 721 220,523 Existing Offsite to EB 1 3 Reach 76.29 1 725 220,521 2 Ex Site to EB 1 4 Combine 157.03 1 722 441,045 2,3 — — Total Existing at EB 1 6 SCS Runoff 44.60 1 721 114,917 Site to Pond 7 Reservoir 17.78 1 731 114,915 6 495.37 41,208 Sediment Basin/Pond 8 Reach 18.01 1 730 114,905 7 Pond to EB 1 9 SCS Runoff 82.42 1 721 209,813 Pro Offsite to EB 1 10 Combine 92.18 1 722 324,718 8,9 Total Proposed Volume to EB 1 12 Reach 155.47 1 724 441,044 4 ---- Ex EB 1 to Point B 13 Reach 90.72 1 724 324,707 10 Pro EB 1 to Point B 14 SCS Runoff 13.74 1 720 34,774 Additional Offsite to Point B 15 Combine 166.60 1 724 475,818 12,14 -- -- Ex Total at Point B 16 Combine 101.85 1 724 359,480 13, 14, -- -- Pro Total at Point B 18 Reach 166.55 1 725 475,817 15 -- -- Ex B to Point C 19 Reach 101.80 1 725 359,481 16 -- Pro B to Point C 20 SCS Runoff 796.86 1 726 2,640,118 Offsite to Point C 21 Combine 961.42 1 726 3,115,935 18,20 --- Ex To Point C 22 Combine 897.20 1 726 2,999,597 19, 20, -- -- Prot To Point C 24 SCS Runoff 14.19 1 719 32,381 -- -- Existing Site Area to EB 2 25 SCS Runoff 1.754 1 718 3,575 Pro Site to EB 2 27 SCS Runoff 10.46 1 718 21,433 -- Additional Area to to Culverts 28 Combine 19.81 1 725 136,348 7,27 Total to Culverts Ponds-Updinted 9-13-22.gpw Return Period: 25 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Peak discharge = 34.40 cfs Storm frequency = 25 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 78,329 cult Drainage area = 5.540 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.10 min Total precip. = 6.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] 15.540 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Existing Site Hyd. No. 1 -- 25 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) `Km Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs Composite (Area/CN) = [(12.370 x 75) + (2.660 x 86)] / 15.030 Q (cfs) 90.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 25 Year Friday, 09/16/2022 = 86.62 cfs = 721 min = 220,523 cuft = 77` = 0 ft = 13.10 min = Type II = 484 Q (cfs) 90.00 70.00 50.00 40.00 30.00 s411111 f 10.00 0.00 ' ' I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 118 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® civil 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge = 76.29 cfs Storm frequency = 25 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 220,521 cuft Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type = Trapezoidal Reach length = 898.0 ft Channel slope = 8.7 % Manning's n = 0.025 Bottom width = 164.0 ft Side slope = 3.0:1 Max. depth = 0.1 ft Rating curve x = 0.586 Rating curve m = 1.392 Ave. velocity = 2.39 ft/s Routing coeff. = 0.2004 Modified Aft -Kin routing method used Q (cfs) 90.00 70.00 50.00 40.00 30.00 20.00 10.00 Ex Site to EB 1 Hyd. No. 3 -- 25 Year Q (cfs) 90.00 70.00 50.00 40.00 30.00 10.00 0.00 ' I I -I I ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) 11V Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 157.03 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 441,045 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Q (cfs 160.00 140.00 120.00 100.00 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) 1PW Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs * Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs) 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 25 Year Friday, 09 / 1612022 = 44.60 cfs = 721 min = 114,917 tuft = 81* = 0 ft = 11.90 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 121 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 17.78 cfs Storm frequency = 25 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 114,915 cult Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 495.37 ft Reservoir name = Sediment Basin/Pond Max. Storage = 41,208 cuft Storage Indication method used Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 7 Sediment Basin/Pond Hyd. No. 7 -- 25 Year 360 480 600 — Hyd No. 6 720 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 ® Total storage used = 41,208 cult Time (min) ire Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2022 Friday, 09 / 16 12022 Pond No. 1 - Sediment Basin/Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 490.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 490.00 00 0 0 2.00 492.00 3,190 2,126 2,126 4.00 494.00 13,117 15,182 17,309 6.00 496.00 22,111 34,835 52,144 8.00 498.00 31,646 53,468 105,612 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 6.00 6.00 Inactive Crest Len (ft) = 7.85 20.00 0.00 0.00 Span (in) = 18.00 6.00 6.00 0.00 Crest El. (ft) = 494.40 495.70 0.00 0.00 No. Barrels = 1 1 1 1 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 490.00 490.00 493.40 0.00 Weir Type = 1 Ciplti - --- Length (ft) = 52.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes Yes TW Elev. (ft) = 0.00 Note: CuNerVOrifice outflows are analyzed under inlet (ic) add outlet (oc) watm. Weir risers checked for orifice conditions (ic) and submergence (a). Stage (it) Stage / Discharge Elev (ft) 8.00 498.00 6.00 496.00 4.00 494.00 2.00 492.00 0.00 490.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 Total O Discharge (cfs) 123 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® OW 3D@ by Autodesk, Inc. J2022 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 7 - Sediment Basin/Pond Section type Reach length = 946.0 ft Channel slope Manning's n = 0.025 Bottom width Side slope = 6.0:1 Max. depth Rating curve x = 75.312 Rating curve m Ave. velocity = 1413.38 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 18.00 15.00 12.00 •m .M 3.00 0.00 0 120 240 Hyd No. 8 Pond to EB 1 Hyd. No. 8 -- 25 Year 360 480 600 — Hyd No. 7 720 840 960 Friday, 09/16/2022 = 18.01 cfs = 730 min = 114,905 cuft = Trapezoidal = 7.4 % = 0.1 ft = 1.5 ft = 0.330 = 1.8733 Q (cfs) 18.00 15.00 12.00 . e1 3.00 ' ' 0.00 1080 1200 1320 1440 1560 Time (min) 124 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3130 by Autodesk, Inc. J2022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 14.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs ` Composite (Area/CN) = [(11.650 x 75) + (2.650 x 86)] / 14.300 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 Friday, 09/16/2022 Peak discharge = 82.42 cfs Time to peak = 721 min Hyd. volume = 209,813 cuft Curve number = 77` Hydraulic length = 0 ft Time of conc. (Tc) = 13.10 min Distribution = Type II Shape factor = 484 Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Pro Offsite to EB 1 Hyd. No. 9 -- 25 Year 125 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 92.18 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 324,718 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Total Proposed Volume to EB 1 Q (Gf5) Hyd. No. 10 -- 25 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) 126 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cub) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 51.49 1 719 118,965 Existing Site 2 SCS Runoff 128.08 1 721 330,923 Existing Offsite to EB 1 3 Reach 115.10 1 724 330,921 2 Ex Site to EB 1 4 Combine 235.93 1 722 661,845 2,3 — — Total Existing at EB 1 6 SCS Runoff 64.22 1 721 168,549 ---- -- Site to Pond 7 Reservoir 37.91 1 728 168,547 6 496.12 55,275 Sediment Basin/Pond 8 Reach 37.93 1 729 168,533 7 Pond to EB 1 9 SCS Runoff 121.86 1 721 314,851 Pro Offsite to EB 1 10 Combine 140.07 1 721 483,384 8,9 Total Proposed Volume to EB 1 12 Reach 233.76 1 724 661,844 4 Ex EB 1 to Point B 13 Reach 138.45 1 723 483,377 10 — Pro EB 1 to Point B 14 SCS Runoff 19.22 1 720 49,658 Additional Offsite to Point B 15 Combine 249.47 1 723 711,502 12,14 Ex Total at Point B 16 Combine 155.61 1 722 533,034 13, 14, Pro Total at Point B 18 Reach 249.42 1 724 711,501 15 -- Ex B to Point C 19 Reach 155.42 1 723 533,035 16 -- Pro B to Point C 20 SCS Runoff 1287.62 1 726 4,229,597 -- -- Offsite to Point C 21 Combine 1532.53 1 726 4,941,102 18,20 Ex To Point C 22 Combine 1438.93 1 726 4,762,633 19, 20, -- Prot To Point C 24 SCS Runoff 21.09 1 719 48,883 -- -- Existing Site Area to EB 2 25 SCS Runoff 3.137 1 718 6,300 -- Pro Site to EB 2 27 SCS Runoff 15.61 1 717 32,553 -- -- Additional Area to to Culverts 28 Combine 40.31 1 727 201,100 7,27 -- Total to Culverts Ponds -Updated 9-13-22.gpw Return Period: 100 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 5.540 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] 15.540 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 100 Year Friday, 09 / 1612022 = 51.49 cfs = 719 min = 118,965 cuft = 75* = 0 ft = 9.10 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1-'- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(12.370 x 75) + (2.660 x 86)] 115.030 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 100 Year Friday, 09 / 1612022 = 128.08 cfs = 721 min = 330,923 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 129 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge = 115.10 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 330,921 cuft Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type = Trapezoidal Reach length = 898.0 ft Channel slope = 8.7 % Manning's n = 0.025 Bottom width = 164.0 ft Side slope = 3.0:1 Max. depth = 0.1 ft Rating curve x = 0.586 Rating curve m = 1.392 Ave. velocity = 2.67 ft/s Routing coeff. = 0.2212 Modified Att-Kin routing method used Q (cfs) 140.00 120.00 100.00 40.00 20.00 Ex Site to EB 1 Hyd. No. 3 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) `Kn: Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 235.93 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 661,845 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 Total Existing at EB 1 Hyd. No. 4 -- 100 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 —' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) 131 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs * Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 100 Year Friday, 09 / 1612022 = 64.22 cfs = 721 min = 168,549 cuft = 81* = 0 ft = 11.90 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 132 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 37.91 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 168,547 cuft Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 496.12 ft Reservoir name = Sediment Basin/Pond Max. Storage = 55,275 cult Storage Indication method used. Q (cfs) 70.00 50.00 30.00 20.00 10.00 Sediment Basin/Pond Hyd. No. 7 -- 100 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 —Hyd No. 6 ®Total storage used = 55,275 cult Time (min) 133 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 37.93 cfs Storm frequency = 100 yrs Time to peak = 729 min Time interval = 1 min Hyd. volume = 168,533 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Trapezoidal Reach length = 946.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 0.1 ft Side slope = 6.0:1 Max. depth = 1.5 ft Rating curve x = 75.312 Rating curve m = 0.330 Ave. velocity = 303.63 ft/s Routing coeff. = 1.5212 Modified Att-Kin routing method used Q (cfs) 40.00 30.00 20.00 10.00 Pond to EB 1 Hyd. No. 8 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 8 — Hyd No. 7 Q (cfs) 40.00 30.00 20.00 10.00 ' _ 0.00 1080 1200 1320 1440 1560 Time (min) 134 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 14.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(11.650 x 75) + (2.650 x 86)] 114.300 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Offsite to EB 1 Hyd. No. 9 -- 100 Year Friday, 09 / 1612022 = 121.86 cfs = 721 min = 314,851 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 135 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 140.07 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 483,384 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Total Proposed Volume to EB 1 Hyd. No. 10 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) 191f, Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (tfs) Time interval (min) Time to Peak (min) Hyd. volume (cub) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 51.49 1 719 118,965 Existing Site 2 SCS Runoff 128.08 1 721 330,923 Existing Offsite to EB 1 3 Reach 115.10 1 724 330,921 2 Ex Site to EB 1 4 Combine 235.93 1 722 661,845 2,3 — — Total Existing at EB 1 6 SCS Runoff 64.22 1 721 168,549 ---- -- Site to Pond 7 Reservoir 37.91 1 728 168,547 6 496.12 55,275 Sediment Basin/Pond 8 Reach 37.93 1 729 168,533 7 Pond to EB 1 9 SCS Runoff 121.86 1 721 314,851 Pro Offsite to EB 1 10 Combine 140.07 1 721 483,384 8,9 Total Proposed Volume to EB 1 12 Reach 233.76 1 724 661,844 4 Ex EB 1 to Point B 13 Reach 138.45 1 723 483,377 10 — Pro EB 1 to Point B 14 SCS Runoff 19.22 1 720 49,658 Additional Offsite to Point B 15 Combine 249.47 1 723 711,502 12,14 Ex Total at Point B 16 Combine 155.61 1 722 533,034 13, 14, Pro Total at Point B 18 Reach 249.42 1 724 711,501 15 -- Ex B to Point C 19 Reach 155.42 1 723 533,035 16 -- Pro B to Point C 20 SCS Runoff 1287.62 1 726 4,229,597 -- -- Offsite to Point C 21 Combine 1532.53 1 726 4,941,102 18,20 Ex To Point C 22 Combine 1438.93 1 726 4,762,633 19, 20, -- Prot To Point C 24 SCS Runoff 21.09 1 719 48,883 -- -- Existing Site Area to EB 2 25 SCS Runoff 3.137 1 718 6,300 -- Pro Site to EB 2 27 SCS Runoff 15.61 1 717 32,553 -- -- Additional Area to to Culverts 28 Combine 40.31 1 727 201,100 7,27 -- Total to Culverts Ponds -Updated 9-13-22.gpw Return Period: 100 Year Friday, 09 / 16 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 5.540 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (5.290 x 75) + (0.180 x 80)] 15.540 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 100 Year Friday, 09 / 1612022 = 51.49 cfs = 719 min = 118,965 cuft = 75* = 0 ft = 9.10 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1-'- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) fUf, Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 15.030 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(12.370 x 75) + (2.660 x 86)] 115.030 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 100 Year Friday, 09 / 1612022 = 128.08 cfs = 721 min = 330,923 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 139 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge = 115.10 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 330,921 cuft Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type = Trapezoidal Reach length = 898.0 ft Channel slope = 8.7 % Manning's n = 0.025 Bottom width = 164.0 ft Side slope = 3.0:1 Max. depth = 0.1 ft Rating curve x = 0.586 Rating curve m = 1.392 Ave. velocity = 2.67 ft/s Routing coeff. = 0.2212 Modified Att-Kin routing method used Q (cfs) 140.00 120.00 100.00 40.00 20.00 Ex Site to EB 1 Hyd. No. 3 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) iElf, Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 235.93 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 661,845 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 15.030 ac Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 Total Existing at EB 1 Hyd. No. 4 -- 100 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 —' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) 141 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs * Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] 17.090 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 100 Year Friday, 09 / 1612022 = 64.22 cfs = 721 min = 168,549 cuft = 81* = 0 ft = 11.90 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) IEP4 Hydrograph Report Hydra6ow Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 37.91 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 168,547 cuft Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 496.12 ft Reservoir name = Sediment Basin/Pond Max. Storage = 55,275 cult Storage Indication method used. Q (cfs) 70.00 50.00 30.00 20.00 10.00 Sediment Basin/Pond Hyd. No. 7 -- 100 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 —Hyd No. 6 ®Total storage used = 55,275 cult Time (min) 143 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 37.93 cfs Storm frequency = 100 yrs Time to peak = 729 min Time interval = 1 min Hyd. volume = 168,533 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Trapezoidal Reach length = 946.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 0.1 ft Side slope = 6.0:1 Max. depth = 1.5 ft Rating curve x = 75.312 Rating curve m = 0.330 Ave. velocity = 303.63 ft/s Routing coeff. = 1.5212 Modified Att-Kin routing method used Q (cfs) 40.00 30.00 20.00 10.00 Pond to EB 1 Hyd. No. 8 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 8 — Hyd No. 7 Q (cfs) 40.00 30.00 20.00 10.00 ' _ 0.00 1080 1200 1320 1440 1560 Time (min) 144 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 9 Pro Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 14.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) _ [(11.650 x 75) + (2.650 x 86)] 114.300 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Offsite to EB 1 Hyd. No. 9 -- 100 Year Friday, 09 / 1612022 = 121.86 cfs = 721 min = 314,851 cuft = 77* = 0 ft = 13.10 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 145 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 10 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 140.07 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 483,384 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 14.300 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Total Proposed Volume to EB 1 Hyd. No. 10 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 —Hyd No. 8 —Hyd No. 9 Time (min) 1EIR Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 12 Ex EB 1 to Point B Hydrograph type = Reach Peak discharge = 233.76 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 661,844 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 3.48 ft/s Routing coeff. = 0.6207 Modified Att-Kin routing method used Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 Ex EB 1 to Point B Hyd. No. 12 -- 100 Year Q (cfs) 240.00 210.00 150.00 120.00 30.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 12 —Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 13 Pro EB 1 to Point B Hydrograph type = Reach Peak discharge = 138.45 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 483,377 cuft Inflow hyd. No. = 10 - Total Proposed Volume t0Tuetlbn type = Trapezoidal Reach length = 300.0 ft Channel slope = 4.0 % Manning's n = 0.100 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 1.019 Rating curve m = 1.292 Ave. velocity = 3.10 ft/s Routing coeff. = 0.5715 Modified Att-Kin routing method used. Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Pro EB 1 to Point B Hyd. No. 13 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' ' ' . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 13 —Hyd No. 10 Time (min) IEK! Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 14 Additional Offsite to Point B Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 • ue . M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Mite to Point B Hyd. No. 14 -- 100 Year Friday, 09 / 1612022 = 19.22 cfs = 720 min = 49,658 cult = 86 = 0 ft = 11.20 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M . KE 3.00 0.00 —' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 14 Time (min) `EV Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 15 Ex Total at Point B Hydrograph type = Combine Peak discharge = 249.47 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 711,502 cuft Inflow hyds. = 12, 14 Contrib. drain. area = 1.850 ac Q (Cfsli 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 15 —Hyd No. 12 —Hyd No. 14 Time (min) Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 16 Pro Total at Point B Hydrograph type = Combine Peak discharge = 155.61 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 533,034 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 1.850 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Pro Total at Point B Hyd. No. 16 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 —Hyd No. 13 —Hyd No. 14 Time (min) 11611 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 18 Ex B to Point C Hydrograph type = Reach Peak discharge = 249.42 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 711,501 cuft Inflow hyd. No. = 15 - Ex Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 14.12 ft/s Routing coeff. = 0.9886 Modified Att-Kin routing method used Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 A Ex B to Point C Hyd. No. 18 -- 100 Year Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 —Hyd No. 15 Time (min) I &Yo' Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 19 Pro B to Point C Hydrograph type = Reach Peak discharge = 155.42 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 533,035 cuft Inflow hyd. No. = 16 - Pro Total at Point B Section type = Trapezoidal Reach length = 560.0 ft Channel slope = 9.0 % Manning's n = 0.025 Bottom width = 5.0 ft Side slope = 3.0:1 Max. depth = 2.0 ft Rating curve x = 6.112 Rating curve m = 1.292 Ave. velocity = 12.70 ft/s Routing coeff. = 0.9354 Modified Att-Kin routing method used Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Pro B to Point C Hyd. No. 19 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 —Hyd No. 16 Time (min) 153 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 20 Offsite to Point C Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 234.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor * Composite (Area/CN) _ [(26.110 x 80) + (62.920 x 61) + (68.540 x 55) + (76.520 x 77)] 1234.090 Q (cfs) 1288.00 1104.00 920.00 736.00 552.00 368.00 184.00 M Mite to Point C Hyd. No. 20 -- 100 Year Friday, 09 / 1612022 = 1287.62 cfs = 726 min = 4,229,597 cuft = 67* = 0 ft = 21.90 min = Type II = 484 Q (cfs) 1288.00 1104.00 � f w, 736.00 552.00 184.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Time (min) 154 Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 21 Ex To Point C Hydrograph type = Combine Peak discharge = 1532.53 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 4,941,102 cuft Inflow hyds. = 18, 20 Contrib. drain. area = 234.090 ac Q (cfs 1533.00 1314.00 1095.00 876.00 657.00 438.00 219.00 Q (cfs) 1533.00 1314.00 1095.00 876.00 657.00 438.00 219.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 — Hyd No. 18 — Hyd No. 20 Time (min) 1M Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 22 Prot To Point C Hydrograph type = Combine Peak discharge = 1438.93 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 4,762,633 cuft Inflow hyds. = 19, 20 Contrib. drain. area = 234.090 ac Q (cfs) 1442.00 1236.00 1030.00 824.00 618.00 412.00 206.00 Prot To Point C Hyd. No. 22 -- 100 Year Q (cfs) 1442.00 1236.00 1030.00 824.00 618.00 412.00 206.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 —Hyd No. 19 —Hyd No. 20 Time (min) 156 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 24 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs 24.00 20.00 16.00 12.00 M 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 24 -- 100 Year Friday, 09 / 1612022 = 21.09 cfs = 719 min = 48,883 cult = 76* = 0 ft = 8.80 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 24 Time (min) IMA Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 25 Pro Site to EB 2 Hydrograph type = SCS Runoff Peak discharge = 3.137 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 6,300 cuft Drainage area = 0.470 ac Curve number = 56* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) = [(0.470 x 56)] 10.470 Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 25 Pro Site to EB 2 Hyd. No. 25 -- 100 Year 360 480 600 720 840 960 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) ibY:: Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 09 / 1612022 Hyd. No. 27 Additional Area to to Culverts Hydrograph type = SCS Runoff Peak discharge = 15.61 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 32,553 cult Drainage area = 1.470 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •M . M 3.00 Additional Area to to Culverts Hyd. No. 27 -- 100 Year 0.00 0 120 240 360 480 600 720 Hyd No. 27 840 Q (cfs) 18.00 15.00 12.00 M . e1 3.00 0.00 960 1080 1200 1320 Time (min) Hydrograph Report Hydraflm Hydrographs Extension for Autodesk® CMI 3D@ by Autodesk, Inc. J2022 Friday, 09 / 16 / 2022 Hyd. No. 28 Total to Culverts Hydrograph type = Combine Peak discharge = 40.31 cfs Storm frequency = 100 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 201,100 cuft Inflow hyds. = 7,27 Contrib. drain. area = 1.470 ac Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 28 Total to Culverts Hyd. No. 28 -- 100 Year 360 480 600 — Hyd No. 7 720 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 — Hyd No. 27 Time (min) 106% Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Sep 16 2022 Ditch Culverts- 10 Year Storm Event Invert Elev Dn (ft) = 100.00 Calculations Pipe Length (ft) = 20.00 Qmin (cfs) = 12.82 Slope (%) = 8.00 Qmax (cfs) = 12.82 Invert Elev Up (ft) = 101.60 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 12.82 No. Barrels = 1 Qpipe (cfs) = 12.82 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.64 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.00 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 101.64 HGL Up (ft) = 102.89 Embankment Hw Elev (ft) = 103.53 Top Elevation (ft) = 110.00 Hw/D (ft) = 0.96 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 0. M M" Culver 10 Year Storm Event n. ore�n m, ,ow SC'�® IClllllllllll�llllllllll� � MEN C-ME;M1 �■I llllllllll=�llllllllll�®■��■�®�■■ � Gimar vW 161 In 0 C a In :. Outlet from Ponds 1 1 1 1 '.1 ' i';�iP!��'8� ,, �1xIgI�'IIIIryx�Ill�l �xx�lryx� xUry I`� .�:.-r.�.�_ INS ,,I�11t IiNINII��N1i�M11 •./�/ii�W. ' I1I�!,�� ���l'Ii •�,�q�pq,I��p 'III I111 �'• IIIMIIHIIIH��Ip—■ � ..� II I . ► ! �� � I NO III li INN11lIIII 1 ,ail?!I a.�W.ifi1 N 1 -�m`II I . • .'l�I ■nd t 1 11ij1+j II I III I I'mompip'lillp gN�l,l I '-..•:"...•'• I" pI'NtIII :, ,Oill;plxl,nlall.l.11xtl gills IixlllllllIll����I�I�I��■{{y�,■■ " II I MiIIllllllyy I I a�, 1!I '�PlU ,�'il'I RIIIIII I►K11�,111 I' I ryr �g1• mil !]57 ..•;,•-I' 1 1 n x mIII nunnm w xnn-��o'►a�1p�16ii i�I� ju�i��mi 111111111111111111�111111111IIIIInn1{fnila1a�N■■IiiI��I�I1N11�� � p1 ,Irlv'�p,I�%.• fll��llllll�l 111111111111111111 �IIIIIMilllllinp� I x xx NN 1111111111xxlnm: Alllu..inlllllllllll �■■1■■■■■NINIII■IN■xlx■INNII"Mimlx Ixxllllll mom a , iNlll; IIX` ' !m M.ih'i�P IIIIIII'!:iiI11111111111111111111111 II u�� n® i w 11111111111111 III IIII IIIIIIIIIII II ge �����uiii uuu{������uuuu�� ®NN��IIi��i��i��iaai�� I. �� 11111111111111�I11�I1'1'IIIII'I'I'��li na j,'.�ij �� � `. � 'iI�NH1M j�+j1�y�1�''■1:11p/ nm� -• � l 111111111111111111I1'11 11 IIII I I I II NIHt111N1I��111pINll • � , i lil IIII , II' i IflN I IIIIIIIIIIIIII'i �11i'ill' Illil'�I �I �p- FAF; . nmm�n1° IINNNII 1 1 I r IIIIIIP 191.I li!"I I' II �yjylrjxlil'1,1• ;11'ilClil 1 / r�11 1' I I nnuliili oiliu9iililihihil�i� e���rIril!, H.oll,x� �. ► m — °�6N�b�1lIIiN 111�11"i�II�N11111■���11111, ® 1 1 1 11 11 11 111 1_ 9 Outlet from Ditch DESIGN OF OUTLET PROTECTION FROM A ROUND PIPE FLOWING FULL MINIMUM TAILWATER CONDITION (Tw < 0.5 DIAMETER) 30 Outlet W = Do + La Pipe 2 min. I Diameter, Da 1 Il La top, 'lwater < 0.5Da Q 11 P �v�ve 5 II i �4 u N W 00 00 W 4ee- 500 4 M DEQ Viryln la FunojfFMuttbn MttMeFe-MNnpmenr fnmpYanre Sp eatlsdett - Verslan 3.0 - P,dle .Pa xwa. .a nPa.wa me, 9 Hnl LIrea. Qeuebpmenr Praline, No ands I Site Information Post -Development Pmjea (Treatment Wome and Loads) RmEr Tmal Disturbed Area (acres) i a 51 Check: .. n b:fist. xa11A a Q !idea, praise(?, Xo ®' ania—areuenxereronMlP? y j� mmreewmmaea edre,am y ]Ptoao FmurnCtNWT EW3REo Pre-ReOevab ment land roust Pandi r. 'res• eirr__l-�.ei.mma, -sir,st•al.ary -m.�...e.em. ^+ea�mvMaol oas.- a, PwPowaopnwMlvae Cw.r lava.) A. c. drains Trial. .w..ml...nm e..aw..a.m a a.. ana4'sal'a..e.aa'sard -saa mw�r.,.lml amCd va ac z rre=./ma.a.re..e"...a...........—w."..rewarass amm. rumcrm RawNrnaOdenn llM N -.1 r.a Ir.wlWmspa. ussF n.lr.l[mclmw a.. unl rmc lmMl I as does Iffi1r. l Pmrlrld.X urm^rep+MPmr - 5sr-src V¢mmp¢a 5p. w=,lad, d c.N a<ueI -sh vvn•dl 01. ,m.vaear.a t -r-rro f ae-prrs-, I` xau--I Volume and Nutrient Load w..-uv.eem.m x..lmre�'mu: _ _ _ x . ••• 3os n o.�l "i--I ass uiw Lu cams (..Iza/oce. Sp..� w.anw nA�.l O% a.anaFwmvl�l 'a'ydeMwm oLl ..1.... anm�.rw e]v .m�.er.a . xa r-lare=l aza prX oia m c� 1 1 s. Mmm�W nss ow c cassia-.1 ass v. vv v3v Are.l�l ed, al Fisd Mar areala�Y Tratment Volume and Nutrient Load Treament upon oasaz o3M9 ..i.' alPorire aietx wn urre atl9] m oI' s k..enl u e.n.n W nl pyre xl s- ae°`w° va"" �1 qsn vets rre .e..m n.oa tre mre aSxt n. ... r- arse lae.V.d're lati..eel� er-Dua 6As P2Reen LeM Ix33 I11.96 aniel m IOe/nl LI.]I lrvlmm a]a /Mlm nehd• /v� lma - .'ena "m em aasr- .....�.`1ue:oer" s.aa irm- aa. m ..� •.a, c,s-S ­r T, said season, er Aides ..mae xMeww Ball a/Rvww�af.revmwuervmv. Netmrca A Sena/wl -5.38 InR,n'Iws rYeallY/ya 5'3d ,.�.,aa6 Post Development Requirement for Site Area m weF.eaman R.amea lro/wl -pax Nitrogen tads (Informational Parana Only) aaasart na..�.n,a.a„nl®elaa,.l uzz na=.a ,?Asset .a n ]a.ze awn 165 Site Results (Water Quality Compliance) Area Checks DA. A DA, B D.A. C D.A. D D.A. E AREA CHECK FOREST/OPEN SPACE Ia[) Dw O.m O.m O.m 0.D0 OIL IMPERMusccVER (a[) DOD DOD O.m DOD 0.00 OIL IMPERVIOUSCOVERTRFATED(a[) Dw 0.m O.m DOD O.C9 OK bNNAGEDTURFAREA(a[) MOD O.m 0.00 MOD GM OK MANAGEOTURFARULTREATEO(at) O.m OM am Om 0.00 OK AInAMECK DR. OR. OR. OK OR. Site Treatment Volume (fe) 17•0M Runoff Reduction Volume and TP By Drainage Area DA. A OA. B DA. C DA.O D.A. E TOTAL FFRION RUNOEOUCEVOLUMEACNIEVEDfl 0 0 0 0 0 0 TPLOAOAVAIWBIE MR REMOVM IIb/yr) Mw O.m O.m O.m 0.00 0.00 W 1P LOAO RECFON IACHIEVED IIb/yr) 0.00 O.W 0.00 0.m 0.00 0.00 W LOAD REMAINING IIb/yr) 0.00 0.00 0.00 0.00 0.00 0.00 MIIROGMU1ADREOUCTI6NMxIEvsD llb/yr) OW O.m 0.m DOD 0.00 0.00 Total Phosphorus RMMPOsr-DEVELCI MENTWIDAD(ro/yr) 10.71 TP LOAD REDUMON REQUIRED (tb/yr) -0.01 W LOAD REWCIION ACHIEVED Im/yr) 0OD W IDAD REMAINING pb/yr): 10.71 REMAINING W LOAD REDUCTION REQUIRED (lb/yr): 0.00 "TARGET TP REDULTION EXCEEDED BY 0.02 M/YEAR" Total Nitrogen (For Information Purposes) FOST EIOPMEM IOAO pb/yr) ]6.59 NITROGEN!LOAD REWCUON MMTEVED IN/yrl 0.00 RM EAINTNGPOST-0EVELOPMENT NOROGFNLOADIIb/y.l J .59