Loading...
HomeMy WebLinkAboutWPO202200029 Correspondence 2022-10-03John Anderson From: John Anderson Sent: Tuesday, October 11, 2022 10:31 AM To: Kim Roeser Cc: Bryan Cichocki Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] Very well, and thank you! From: Kim Roeser <Kim.Roeser@timmons.com> Sent: Monday, October 10, 2022 11:46 AM To: John Anderson <janderson2@albemarle.org> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] John, Thank you again for your help and willingness to work with us on this project. Yes, please withdraw our WPO application, and we will proceed with <10,000 SF disturbance at a time as discussed. Best, Kim Kim Roeser (Mellon), PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue I Suite 200 1 Charlottesville, VA 22903 Office: 434.295.5624 1 Direct: 434.327.1685 1 Fax: 434.295.1800 kim. roeser(rDtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: John Anderson <janderson2@albemarle.ors> Sent: Monday, October 3, 2022 5:54 PM To: Kim Roeser<Kim.Roeser@timmons.com> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE -VSMP -DIGITAL. [ Engineering review] Kim, This is very much in keeping with our discussion. It divides project into principal grading-Kafka path (phase 1), and distinct separate bench -landscape plantings with minor (negligible) grading to site contemplative benches. There is a distinction, which Engineering recognizes. We anticipate that existing gravel path or new Kafka path (either is fine) will provide access and whatever equipment -material staging may be needed to situate benches into the landscape, and that construction monitoring will help ensure that work proceeds per Exhibit LOD. I am glad TG opts for this approach, which we accept. We discussed that Monticello is not a common plan of development. With permission, I will update CV with review status 'Application withdrawn: Land disturbance (not part of a common plan of development) less than 10,000 square feet is not subject to the VESCP, or VSMP. A SWPPP is not required. Inspection by Albemarle is not required. Project does not require registration, or bond. We maintain record of LOD exhibit for reference in the project digital file, along with this correspondence. Thanks very much for clear, thoughtful coordination. Good luck with this project. Please let us know if you have any questions —thanks, again best, J. Anderson John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069 From: Kim Roeser <Kim.Roeser@timmons.com> Sent: Monday, October 3, 2022 5:16 PM To: John Anderson <0anderson2@albemarle.org> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] Good afternoon John, Thanks again for chatting with us on Friday. Following up, please find an exhibit attached, outlining how we plan to phase the project to remain under 10,000 SF of disturbance at any one time. Please let us know if you have any feedback on this approach. Best, Kim Kim Roeser (Mellon), PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue I Suite 200 1 Charlottesville, VA 22903 Office: 434.295.5624 1 Direct: 434.327.1685 1 Fax: 434.295.1800 kim. roeser(rDtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Kim Roeser Sent: Thursday, September 29, 2022 9:28 AM To: 'John Anderson' <janderson2@aIbemarle.org> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL Engineering review] Great, thanks John! I just sent a Teams invite for 2pm tomorrow. Best, Kim Kim Roeser (Mellon), PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue Suite 200 1 Charlottesville, VA 22903 Office: 434.295.5624 Direct: 434.327.1685 1 Fax: 434.295.1800 kim. roeserCa)timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: John Anderson <ianderson2@albemarle.ors> Sent: Wednesday, September 28, 2022 5:34 PM To: Kim Roeser<Kim.Roeser@timmons.com> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi, Kim, yes, Friday is best, only conflict is 11:30 — 12:30 —if MS Teams platform works for TG, please send invite and I will accept. Anytime that works for you is fine with me, excepting the one mid -day hour —thanks, best, J. Anderson Additional <10.000 sf vs. `common Dlan of development' l Dlease ref. Attached Monticello is a World Heritage Site; is listed on the National Register of Historic Places ( Oct. 15, 1966, NRHP Ref. Number 66000826); is a Virginia Historic Landmark (9/9/69, VLR 002-0050), and is residential estate of an 18t' century (-quote Wikipedia) "diplomat, lawyer, architect, philosopher, and Founding Father." I say this to counter any argument that this `site' is a `common plan of development' within context of state stormwater management regulations, especially given relatively recent DEQ guidance concerning lots in existence prior to 7/1/2004, which are not to be considered subject to `common plan of development' requirements. Land disturbance at Monticello (World Heritage — National Historic - State Landmark) site, f< 10,000 sf is not subject to the VESCP (17-300 ,and, since the contemplative site is likewise not within a `common plan of development' (within context of regulatory framework of VA state stormwater regulations), land disturbance associated with the contemplative site is exempt from the VSMP jfLOD <10,000 sf, 17-303.D. I look forward to speaking with you. take care, John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069 From: Kim Roeser <Kim.Roeser@timmons.com> Sent: Wednesday, September 28, 2022 3:53 PM To: John Anderson <0anderson2@albemarle.org> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] Hi John, Thanks for your thorough review and suggestions below. We'd like to have a call to talk through and make sure we are on the same page. Do you have any availability this Friday (9/30) after noon or next Monday/Tuesday (10/3 & 10/4)? Best, Kim Kim Roeser (Mellon), PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue Suite 200 1 Charlottesville, VA 22903 Office: 434.295.5624 Direct: 434.327.1685 1 Fax: 434.295.1800 kim. roeser(rDtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: John Anderson <]anderson2@albemarle.org> Sent: Friday, September 2, 2022 5:42 PM To: Kim Roeser<Kim.Roeser@timmons.com> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com>; Gardiner Hallock <ghaIlock@monticello.org>; Jessica Denko <Jessica.Denko @timmons.com>; Andy Reitelbach <mreitelbach@albemarle.org> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] All, Re -reading: Kafka paths, depending on specific material type, may be impervious, semi -pervious, or pervious. At any rate, thanks for thinking it through. If LOD <10,000 W, it could simplify matters. Thanks, everyone. Enjoy the weekend, best, J. Anderson From: John Anderson Sent: Thursday, September 1, 2022 2:57 PM To: Kim Roeser<Kim.Roeser@timmons.com> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com>; Gardiner Hallock <ghaIlock@monticello.org>; Jessica Denko <Jessica.Denko@timmons.com> Subject: RE: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] Kim, I hope to send MIA review comments (SDP202200050) to Andy Reitelbach a bit later today, and while reviewing MIA landscaping plan, want to circle back to thought that this seems perhaps more involved than it may need to be. I only suggest TG think it over, and see if smaller limit of disturbance is possible. And if so, whether WPO plan requirements might become more manageable. From SDP C5.0: TW s3010` + \ MAT GPAOE TRAN51110N i5. \ \ 101 \ V' LEVEL B \ 9EE PETAL 31EE G.1 ` MTON B + 10 \ 111 \ \ 100 +\ \ \ OBAOE TRANSMON \ + \ \ Sheet C3.3: LOD =.39 Ac., 17,000 ftZ , I \ P/D TROM, \ MEMOR OB.. \ / BEHCM C \ f \ OITONO \ 5 1 I 16BI�CH l / ��+..��+..11ll!!!! I I / / i; / / I HICKORY I l / ■ l MAPLE 1 d1 11 1 \ I II III I POPLAR I r it , \ I I I I 1 I II / I ; i BLA BLAC! r BIRCH, I I 11 I10. 1 1 I I\ RE IPAK '11 II I\ 1 j 1 I 837 LIMITS OF DISTURBANCE 0.3�ACRE§ I I 1 1 \ \ \ I 835 I\ I SF HICKORY •\ \ ` cL IP TP \\\ \ OP 834 \ PS MU TP \ \ \ W E I \ \\ \ \\ SAF ` IP CWD 1 \ 1 \ 1• ` \ B/M ` 6 If deduct lightly -graded interior of LOD (7,082ft2 ), revise linework /labels /set aside superficial landscape and bench area leveling (surface prep) with immediate landscaping + bench installation to follow, then county can consider LOD for path /storm pipes separately from far less intensive superficial grading required to prep bench areas. L6.00 (incl. with MIA but not WPO) shows landscaping in bench areas intercepts overland runoff in post-dev condition, similar to a filter strip, and that proposed grading affects not more than one, 2' contour over 50' in five or fewer locations to install contemplative benches. The level of disturbance proposed is minimum necessary to level pads for benches, with the remainder densely -landscaped. A portion of LOD estimated at 7,082 ft2 may, for this project in this instance, be reviewed distinct from typical grading that precedes land development, and is, to a large degree, landscape planting with mulch stabilization. What remains, if <10,000 112, is not subject or is exempt from VESCP NSW requirements. TG /Thomas Jefferson Foundation are encouraged to consider ESC-SWM practices /measures to protect downslope areas from erosion during and after construction, since addition of impervious Kafka path will increase runoff at several points, may concentrate runoff at several points, and may pose problematic maintenance issues for TJF, absent care in design, or temporary ESC measures and permanent storm conveyance (pipe /inlet /ELS) measures. Please discuss, and let us know if this approach appeals to Timmons (design standpoint), or to TJF (long-term operational performance ; site/construction scheduling standpoint). If we take this approach, it would not do for a site visit to reveal LOD> 10,000 ft2 at one time; limits can be managed with silt fence that separates Kafka path from bench /landscape areas. Note: Once Kafka path is installed /stabilized, a site visit would no longer consider areas beneath path disturbed, if in fact stabilized. So —design revision, reduced LOD, scheduling, care in construction, ESC-SWM measures recommended, whether required or not. This approach reflects effort to balance proposed development and ordinance requirements. Thank you, best, J. Anderson MAPLE I I I ► d \ / II III ► i POPLAIR I I I I I I / I I 14" 1 I I I I I ► i I BLACK OAK ► 1 I ► 12" I I 1 BIRCH I 1 I 1 I ► ' 1 I � I ► 1 I I I I I1 1 I I I I I 11 1 I 1 \ RFDIQAK 11 1 1\ I \ \ t_____1_____J�______I______1_____f \ \\ 1 1 837 1 \ \ \\ 1 I \ 836 N \\ LIAMTS OF DISTURBANCE = 0.39 ACRES\ \ \\ 1 1 \ \ 1 \ \ 836 SF F 1 \CWD a \ \ \\ \ \ V A AI A \ A HICRURY II \ V \ \ \ ` g g `\ u OP 834 TP \ PS MU ` \ \ \ \ \ \ \\ TPMAPJE ^M, 16• DEC , IP T SAF� CWD \ \ I B/M \ 8 L6.11 I � I � � l \ I101M ERRCLLAYA'BERRYPOPPRS.3 GAL. 6SO.C. B IBI CIFHRA ALNIFOLIA. 3 GAL. m! O.C. I 131 ILEX VERIICIIRATA'MR. POPPM. 3 GAL b 3 O.C. l I 131 IEUCDTHOE AXLLARIS. 3 GAL IR 3 O.C. 151 CALYCANIHUS FLORINS. 3 GAL • 5 O.C. I PI CALLICARPA AMERICANA. J GAL 0 (O.C. 161 MUCOYHOF AXLLARI , 3GAL 63 O.C. 39 II II LEX vER11CLIATA'BERRY POPPRIT, ] GAL • 30.C. + + + \ + +++ I SEWEMIX-5605F + + + +++ IPIGpCANMUS FLOFIWS3GALBSO.C. 1 + + I&CIEiHRAAWIFOW.3GAL. 94O.C. + + + 1311LEX WITTICILLATA'MR. POPPIN3, 3 GAL. 03 O.C. \ + + /V\) + + + + (BI UILICAFPA AMEMCANA.3 GAL 04'O.C. + + + (JI ILEX VENICILLAiA'BERRY POPPN3, 3 GAL 3- O.C. + + + +++ + \ (611FDCOMOEAXILIAR6.3GAL C3O.C. a + + + + IBI CALYCANMUS FLORIWS3GAL ISO.C. + + + + + + + { + + (51 CALLICARPA AMERICANA, 3 GAL. 0 E O.C. + + + + ++++ + \\ I51ILEX VERIICILLAtA'BEM POPPNS.3 GAL 03'O.C. + + + + + + \+F + i \ I i + ILEX VERIICIWu + + (6) CLwALNIFIX.3 GAL O\(O.0 }+X + + �. + N SSEEDFEXIUE BUR- + + \ AIR+ kA +�+ + yy Jor +++ + NE+ + + +++ ` / \ ++ + + \+ + + + + \ ` \ + + + } + } + + + + + + + + + + + + + + + + + + + + 1 \ + + + UNMBICUE + SEEDMO.vpp ++++ } + ONMOWN v p p 1 + + n0. vv vv + + W 00 v + + + + II6I OENNSIAEDM PUNCILOBULA - I GAL 3ISO.C.-- // } (151 CLEINRA AWLIXM'Fft. AINGBiRC 3GAL(3 v � - 14111Ex VERIN;IIIAIA'BERRY POPPNS'. JGAL • J O.C. - UI LEUCOMOE AXILIARB.3 GAL • 3O.C. - IBI ILLIL VENDIIIAIA'BERRY POPPHS'.3 GAL lSD.G. - 14111EX VERIDIIIAIA'MR. POPPNS, 3 GAL 0 S O.C. -IPI CALYCANMUS ROBINS.3GAL. ®5'O.C. \ -IBI CALIICARPA AMERICAIU.3 GAL 04'O.C. �\\ - 151 CLEIHRA AWIFOlM.3 GAL 04 O.C. IXI IEUCOINOE AXLLAR6. 3 GAL ® 3 O.C. - PI CALLM:ARPA AMERCAIU, 3 GAL 04O.C. 83(3 (6) ILEX VER➢CLLAiA'BERRY pl CALYCANMUS FLORDUS (31 LEUCOINOE AXLIARLB. 3 (51 ULLICARPA AMERICAN ILI....... LI LI... LI LI LI..am............................. .............................................a a SEE IS 12 FOR S„RUB 6 PERENNIAL PLANTING PLAN SOUTH Kafka ( pathway ) material 9 Decomposed Granite Pathway Materials Kafka Granite Pathway Materials are used where a firm pathway is affordable and aesthetically pleasing alternative to conc required for pedestrian or vehicular traffic, but a natural look, unlike pavers, and other hardscape surface materials. hardscape surfaces, is preferred. We offer decomposed granite pathways in three variations: Standard Pathway Mix, Stabilized Pathway Mix, and Wax Polymer Pathway. These products are an Kafka Granite's naturally occurring decomposed granite and crushed stone are screened to a 114" minus size, allowing for a Contact us today to learn more about our products or b sample. At Kafka Granite, we have the ability to pre -mix our Standard Pathway Mix with organic stabilizing binders to create an even more firm surface that compacts durable natural pathway. well, while retaining Compared to the traditional permeability. Our nearly pathway mix, the stabilized 40 colors of pathway mix better resists the materials make for beautiful and organic walkways, nature paths, bike trails, courtyards, patios, and more. Read more — erosive effects of weather and traffic, while retaining a natural look and feel. Read more — For an entirely waterless and dustless decomposed granite pathway solution, Kafka Granite combines their Standard Pathway Mix with an engineered wax polymer. For extremely high traffic areas or steep slopes, our Wax Polymer Pathway Mix trumps all other pathway solutions. Read more — If possible to utilize pathway as site access for far lighter grading proposed in bench area, and to eliminate off -site upslope runoff through the bench area, where it will be, for all intents and purposes, absorbed into earth densely landscaped in the bench area, then LOD may be reduced, and SWM requirements perhaps reduced. If, for example, areas to be disturbed but not placed in dense landscape are identified as areas to be disturbed, while others are essentially classified non -graded landscape areas, LOD reduces to: ( L6.00 ) 10 I (1( MAGNOLIA TRIPETALA, 2" CAL., B ( 1 ) PLATANUS OCCIDENTALIS, 2" CAL., B (1( MAGNOLIA VIRGINIANA, 8-10- 1 MULTI-STI 11 John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 eat. 3069 From: John Anderson Sent: Tuesday, August 16, 2022 5:57 PM To: Kim Roeser<Kim.Roeser@timmons.com> Cc: Bryan Cichocki <Bryan.Cichocki@timmons.com>; Gardiner Hallock <ghallock@monticello.org> Subject: Planning Application Review for WP0202200029 MONTICELLO CONTEMPLATIVE SITE - VSMP - DIGITAL. [ Engineering review] The Review for the following application has been completed: Application Number = WP0202200029 Reviewer = John Anderson Review Status = Requested Changes Completed Date = 08/16/2022 This email was sent from County View Production. Kim, Thanks for your patience; attached also in CV. best, J. Anderson John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069 12