HomeMy WebLinkAboutARB201400129 Application 2014-10-21 ei 1/Albemarle Court �+� Community Development Department
4{ 1 401 McIntire Road Charlottesville,VA 22902-4596
13 Planning Application Voice:(434)296-5832 Fax:(434)972-4126
PARCEL/ OWNER INFORMATION
TMP 06100-00-00-13100 Owner(s): SHOPPING CENTER ASSOCIATES C/O SIMON
Application # ARB201400129 DEBARTOLLO GROUP
'PROPERTY INFORMATION
Legal Description ACREAGE PARCEL C FASHION SQUARE MALL
Magisterial Dist. Rio Land Use Primary Commercial
Current AFD Not in A/F District Current Zoning Primary Planned Development Shopping Center
APPLICATION INFORMATION
Street Address 1555 RIO RD E CHARLOTTESVILLE, 22901 Entered By
Danielle Roth
Application Type Architectural Review Board 10/21/2014
Project Red Robin
Received Date 10/16/14 Received Date Final Submittal Date 10/20/14 Total Fees
Closing File Date Submittal Date Final Total Paid
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub A•plicati Comment
County-wide Building Permit I W/2O/14
'APPLICANT/ CONTACT INFORMATION
ContactType j Name Address CityState Zip Phone I PhoneCell
owner/Applicant (SHOPPING CENTER ASSOCIATES C/O Si `P 0 BOX 7019 INDIANAPOLIS T =4620 t7 70
Primary Contact JASON ARCHBOLD 135 S LASALLE STREET, SUIT CHICAGO IL 60603 3122622293
Signature of Contractor or Authorized Agent Date
Architectural Review Board Application
Part A: Applicant,Contact and Parcel Information
Project Name: Red Robin
Tax map and parcel(s): / — 3/ Physical Street Address: 1535 Rio Road E
Contact Person: Jason Archbold
Business Name: Stantec Architecture, Inc.
Address 135 S. LaSalle Street, Suite 3100 City Chicago State IL zip 60603
Daytime Phone(312) 262-2293 Fax 11(312) 262-2301 _E-mail jason.archbold @stantec.com
Owner of Record: Joe Peres-Simon Properties
Address 225 West Washington St City Indianapolis State IN zip 46204
Daytime Phone( ) Fax#( j E-mail
Part B:Review Type and Fee
Select review type
. Review by the Architectural Review Board
• Conceptual Plan/Advisory Review(for a Special Use Permit or a Rezoning) No Fee
• Preliminary Review of a Site Development Plan No Fee
• Final Review of a Site Development Plan $1000.00
• Amendment to an approved Certificate of Appropriateness $225.00
• Building Permit Review $590.00
O County-wide Certificate of Appropriateness
• Structures 750'or more from the EC,no taller than 5 stories No Fee
• Structures located behind a structure that fronts the EC No Fee
• Personal wireless service facilities No Fee
• Fencing or Equipment or Lighting No Fee
• Additions to ARB-approved buildings No Fee
• Minor amendments to site or architectural plans No Fee
■!�t Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# ARB#
Fee Amount S Date Paid By who Receipt# Check# By
County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voicc:(434)296-5832 Fax:(434)972-4126
I I/201 U Page I or:.
OVER--*
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
Red Robin Gourmet Burgers,would like to complete a tenant improvement of their existing restaurant at
1535 E. Rio Road in Charlottesville, VA.The exterior modification will include, new exterior build-out over the
existing entry. Build-out to align with top of existing mall coping line. Exterior of building to be painted.
New signage by others. Building exterior to be painted,to be completed with signage.
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted. Only
(I)set of building material samples is required. All submittal items, including building material samples,
become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all
submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompany information is accurate,true,and correct to the best of my knowledge, and that the attached
plan ontain al nformation required by the appropriate checklist.
i10/16/2014
Sign,lureof o -r, owner's representative Date
or col tract purchaser
Jason Archbold, Project Manager 312-262-2293
Printed name,Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency.Attach the owner's written consent.
11/2010 Page 2of2
OVER—*
I °1 4 Architectural Review Board
Building Permit Review (Preliminary/Final)
,..44#
Submittal Requirements Checklist
LL.
Project name Red Robin Gourmet Burgers
Tax map and parcel#:
Physical street address(if assigned): 1535 Rio Road E.
Location of property(landmarks, intersections, or other):
Contact person: Jason Archbold
Business name: Stantec Architecture,Inc
Address: 135 S.LaSalle Street,Suite 3100 City: Chicago State: IL Zip: 60603
Daytime phone: 312-262-2293 Fax: 312-262-2301 Email: jason.archbold @stantec.com
r m _ -
I s. t1 _$
Important Note Submittal packages must contain (8)collated copies of all information unless otherwise
indicated.
A. Written description of the proposal
❑ Provide a general description of all proposed work.
❑ Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1"=20', clearly legible and folded):
❑ Location of all proposed changes.
❑ Sheet number,total number of sheets,date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings.
❑ If mechanical equipment or accessory structures are altered or added, then identify those features,
their locations, and screening that will eliminate visibility from the Entrance Corridor.
C. Landscape plan showing the following (drawn to the scale of 1"=20;clearly legible and folded):
El Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
❑ Existing landscaping to be removed. Include the location, size, and species.
❑ Landscape key including all landscape symbols and a description of what they represent.
❑ Location of existing and proposed tree lines.
❑ Location of existing natural features.
El Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
❑ Location and height of above-ground utilities and associated easements, and location of below-
ground utilities and associated easements.
El Stormwater facilities.
❑ Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
1
Revised 7/28/10