HomeMy WebLinkAboutSP200600016 Action Letter
t
C-
COUNTYOFALBE~E
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832
Fax (434) 972-4012
November 1, 2006
Glenda P. Atkins
303 Dogwood Lake Road
GordonsviUe, VA22942
RE: SP-2006-016 Mountain View Full Gospel Church Amendment (Sign #76)
Tax Map 39, Parcel 38
Dear Ms. Atkins:
On October 4,2006, the Albemarle County Board of Supervisors took action on SP 2006-016,
Mountain View Full Gospel Church Amendment, to allow amendment of application SP 1981-13
to allow for church expansion on Tax Map 69, Parcel 37 in the White Hall Magisterial District.
This special use permit was approved based on the following conditions:
1. The site plan amendment shall be developed in general accord with the concept
plan received August 24, 2006, prepared by Glenda Atkins, and titled "Mountain View
Full Gospel Church Concept Plan" (Attachment A.1 and 2); and
2. The sanctuary area shall be limited to one hundred ninety two (192) fixed seats;
3. A tree conservation plan in accord with Section 32.7.9.4b is required to be submitted,
reviewed and approved prior to approval of a building permit for any structure shown on
this concept plan;
4. Tree removal shall be limited to five (5) feet beyond all parking areas;
5. A twenty (20) foot (minimum) width of existing woodland along the southern property
boundary shall remain undisturbed;
6. Five (5) large oak trees located off of the northwest comer of the existing church building
shall be included on the tree conservation plan;
7. VDOT approval of the entrance including the sight distance requirements is required
to be granted prior to building permit issuance;
8. This use shall commence within five (5) years of the date of approval rather than the
twenty-four (24) months stated in Section 31.2.4.4.; and
9. There shall be no day care center or private school on site without the approval of a
separate Special Use Permit.
,
Atkins
SP-2006-016 Mtn View Full Gospel Church
Page 2 of2
November 1, 2006
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
. compliance with conditions of the SPECIAL USE PERMIT;
. approval of and compliance with a SITE PLAN amendment; and
. approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within sixty (60) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit."
If you have questions or comments regarding the above-noted action, please do not hesitate to
contact Sherri Proctor at 296-5832.
Sincerely,
VWC/aer
cc: Mountain View Full Gospel Church Etal C/O Louise Puckett
1005 Smith Road, Afton VA 22920
Amelia McCulley
Chuck Proctor
Tex Weaver
Sherri Proctor