Loading...
HomeMy WebLinkAboutSP200600016 Action Letter t C- COUNTYOFALBE~E Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 November 1, 2006 Glenda P. Atkins 303 Dogwood Lake Road GordonsviUe, VA22942 RE: SP-2006-016 Mountain View Full Gospel Church Amendment (Sign #76) Tax Map 39, Parcel 38 Dear Ms. Atkins: On October 4,2006, the Albemarle County Board of Supervisors took action on SP 2006-016, Mountain View Full Gospel Church Amendment, to allow amendment of application SP 1981-13 to allow for church expansion on Tax Map 69, Parcel 37 in the White Hall Magisterial District. This special use permit was approved based on the following conditions: 1. The site plan amendment shall be developed in general accord with the concept plan received August 24, 2006, prepared by Glenda Atkins, and titled "Mountain View Full Gospel Church Concept Plan" (Attachment A.1 and 2); and 2. The sanctuary area shall be limited to one hundred ninety two (192) fixed seats; 3. A tree conservation plan in accord with Section 32.7.9.4b is required to be submitted, reviewed and approved prior to approval of a building permit for any structure shown on this concept plan; 4. Tree removal shall be limited to five (5) feet beyond all parking areas; 5. A twenty (20) foot (minimum) width of existing woodland along the southern property boundary shall remain undisturbed; 6. Five (5) large oak trees located off of the northwest comer of the existing church building shall be included on the tree conservation plan; 7. VDOT approval of the entrance including the sight distance requirements is required to be granted prior to building permit issuance; 8. This use shall commence within five (5) years of the date of approval rather than the twenty-four (24) months stated in Section 31.2.4.4.; and 9. There shall be no day care center or private school on site without the approval of a separate Special Use Permit. , Atkins SP-2006-016 Mtn View Full Gospel Church Page 2 of2 November 1, 2006 Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: . compliance with conditions of the SPECIAL USE PERMIT; . approval of and compliance with a SITE PLAN amendment; and . approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within sixty (60) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, VWC/aer cc: Mountain View Full Gospel Church Etal C/O Louise Puckett 1005 Smith Road, Afton VA 22920 Amelia McCulley Chuck Proctor Tex Weaver Sherri Proctor