UNITED LAND CORPORATION OF AMERICA
P.O. BOX 5548 CHARLOTTESVILLE, VIRGINIA 22903
TELEPHONE 804-979-3334
June 29 , 1990 leSignly
1.1
Mr. Richard E. Tarbel l , Planner ,jai_ 2 1990
Department of Planning & Community Development
401 McIntire Rd. PLANNING fu DIVISION
Charlottesville, VA 22901
Re: Briarwood ,
Dear Rich:
Tom Muncaster met with Ron Keeler and yourself on June 25 , 1990
to discuss the phasing of Briarwood. Phase 2 was built first
because the GE entrance was required. Phase I was indefinitely
deferred.
As Tom told you, the sanitary sewer has dictated subsequent phasing.
We are currently working on Phase 3 and part of Phase 7 which can be
served by the existing gravity sewer. The Phase IV Preliminary Plat
approved by the Planning Commission on March 27 , 1990 is actually
part of the original Phase 3 and Phase 7 .
Upon completion of Phase 3 and that part of Phase 7 which can be
served by the existing gravity sewer, we intend to go back and build
Phase 1, which will be served by the existing sewer. Also , Briarwood
Drive shall be constructed from Austin Drive to Route 29 at that time.
Briarwood Drive has already been dedicated to Route 29 .
The next logical progression is to bring the sewer up the river and do
Phases 4, 5 , 6 and the rest of 7 in that order in accordance with the
original phasing plan.
The rezoning requires two playgrounds , two primary recreation areas
and one tot lot. One playground exists and the second is to be built
with the 24 lots approved on March 27 , 1990 and is to be located behind
lots 9 and 10 of Phase 7 . The tot lot was built in conjunction with
the existing playground. The first primary recreation area consisting
of passive recreation areas shall be done at completion of Phase 5
and the final primary recreation area located South of Camelot shall be
built with the final phase of development of Briarwood.
411/
Mr. Richard Tarbell
June 29 , 1990
Page two
Austin Drive shall be built to Route 606 as a condition of the
March 27„ 1990 approval . That connection will provide two accesses
in accordance with County policy. Considering that and the above
information, we request deferral from the rezoning requirement that
Briarwood Drive be built to Route 29 . That construction will be
done when Phase I of Briarwood is completed.
Please let me know if you need any additional information.
Sincerely,
WOODBRIAR ASSOCIATES LIMITED
PARTNERSHIP
By: S-V Associates Limited Partnership ,
General Partner
By: _
Wen el Wood, eneral Partner