HomeMy WebLinkAboutZMA199000008 Staff Report 1990-08-01 • STAFF PERSON: RICHARD E. TARBELL PLANNING COMMISSION: JULY 24, 1990 BOARD OF SUPERVISORS: AUGUST 1, 1990 ZMA-90-08 - WOODBRIAR ASSOCIATES Petition: Woodbriar Associates petitions the Board of Supervisors to AMEND ZMA-79-32 for the deferral of the bonding requirement for construction of Briarwood Drive from Austin Drive to Route 29 (Section 33 . 2 . 1) . The Briarwood Subdivision consists of all parcels on Tax Map 32G totalling 173 acres located on the west side or Route 29, just south of GE Fanuc. Zoned PRD, Planned Residential Development in the Rivanna Magisterial District. This is located within the designated growth area. APPLICANT'S PROPOSAL: To defer the bonding requirement for construction of Briarwood Drive as required by the conditions of approval for ZMA-79-32. The applicant is proposing to complete the construction of Briarwood Drive with the platting of lots in Phase I . Phase I will be pursued after the lots in Phase III and VII , which can be served by the existing gravity sewer, are completed. In addition, the applicant has clarified the phasing schedule for the recreation areas (See Attachment B) . SUMMARY AND RECOMMENDATION: Staff has reviewed this petition and recommends approval with conditions. PLANNING AND ZONING HISTORY: The Board of Supervisors approved the Briarwood RPN rezoning ( ZMA-79-32 ) on January 23 , 1980 for a total of 661 dwelling units over 173 . 4 acres. The first subdivision plat for this development was approved by the Planning Commission June 24, 1980. This plat represented 96 lots for single family attached housing units (phase II of the RPN phasing sequence) . A subdivision plat for Phase I development of 64 lots was indefinitely deferred from Planning Commission consideration. The Planning Commission approved a subdivision plat for 26 lots (portions of Phases III & VII ) on April 5, 1983 . The Planning Commission approved a plat for 80, lots in Phases III and VII on August 23 , 1988 . In 11,;}+ July 1989, the applicant proposed a subphasing plan for 28 of the 80 lots approved in 1988 and then a relief of conditions 1 regarding bonding of Briarwood Drive. The proposal was presented to the Planning Commission and no action was required as consent was granted. The final plat for the 28 lots was signed August 31, 1989 . On March 27, 498-0 e 1990 Planning Commission approved a preliminary plat for 28 lots in Phase IV (actually within Phases III and VII of the RPN phasing plan) . The total number of lots which have been recorded to date is 150. COMPREHENSIVE PLAN: The development is located within the Piney Mountain Village and is designated for medium density residential ( 5-10 dwelling units per acre) . STAFF COMMENTS: The conditions of approval of the Briarwood RPN rezoning (ZMA-79-32) are included in Attachment C. Condition # 14 states: "No final site plan or subdivision plat shall be approved as to any lot or dwelling unit served by either road X or road Y prior to dedication to public g,,;ww°'di use and construction or bonding for acceptance into the 9r1 Airtme, Virginia State Secondary Highway System of roads X and Y. " (To clarify, of the roads cited in condition 14, "road x" is now Briarwood Drive and "road Y" is now Austin Drive. ) Staff has determined that this condition must be met before any additional plats are signed unless the Board of Supervisors chooses to amend ZMA-79-32 to allow the deferral of this requirement. Originally a bond was posted for the construction of Briarwood Drive. However, it was allowed to expire in 1987 (See Attachment D) . It should be noted that the right-of-way for Briarwood Drive was dedicated in Deed Book 714 , Page 48. In accordance with Section 32. 7. 2. 4, two points of vehicular access to external public roads are required for developments of 50 lots or more. This requirement will be satisfied with the signing of the final plat of Phase IV which was approved by the Planning Commission on March 27, 1990 with the following condition: "Construction or bonding of the entire length of Austin Drive to include the relocation and improvements to Route 606. " 2 • This access to Route 606 along with the existing entrance at G E. Fanuc and Route 29 provides the two points of vehicular access sufficient for the current level of development and as required by the Zoning Ordinance. As more development occurs in Briarwood another access point will be necessary, therefore, staff recommends approval of this request to amend ZMA-79-32 with conditions requiring the construction of Briarwood Drive with the completion of Phase I . It should be noted that conditions as outlined below could allow approximately 250 lots before the development proceeds with Phase I. Presently 178 lots have been approved by the Planning Commission. Should the Planning Commission and Board of Supervisors choose to approve this petition staff recommends the following conditions of approval drafted in accordance with the applicant' s letter included herein as Attachment B: 1. Upon completion of Phase III and that part of Phase VII which can be served by the existing gravity sewer, the applicant shall proceed with Phase I as shown on the original phasing plan. 2. Briarwood Drive shall built or bonded for construction for its entire length from Austin Drive to Route 29 prior to any final plat approval for Phase I . Briarwood Drive shall be completed with completion of Phase I . 3 . Phases IV, V, VI , and the rest of Phase VII shall proceed in that order in accordance with the original phasing plan. 4. The recreational areas shall be constructed in accordance with the letter from Wendell W. Wood dated June 29, 1990. 3 ATTAGHN ENT A • - ALBEMAILE COUNTY --"-,.,■ lIllIll .lIl SECTION 32G llowlit 11 ti- '.\'' BRIARWOOD AUs11M PHASE 1 (Future Develot.1•tet) 0 PHASE 2 D6.714 Pp.23-47 ®PHASE 3 D6.775 Pg.546 0 ��1��1. .. *� O PHASE 4 (Future Dewlolmem) Q `- ��+� t� OvHASE 7 (False Oevelepmte4) �4 r 4 °PHASE 6 (Future DevNopmeet) JJJ����T ' U b�r* ,++'+' w °PHASE 7 06,775 Pg.566 o M � i► o' : 744.'+r TA, -- ua V iiE 9T 'o K r 111111 0 E.O® �d N 1*�. . as, N*44 0 0 0-- , t; . azir itirftialwarAwk . ,::. . a kralt• vro , i te fte:41,......agav,. -.!--...-„, kirkv:kaavas 41.p.4 Lfr c.'"- / Rita fts.,,,„,,,„ vivill, --"4 a� vti' o�s. 3' o r' \ 'P' 4. ee, 140 \ . ,, SECTION 32E I _. ZMA 90-09 WOODBRIAR ASSOCIATES _ ��• \ �' WY L_ flAIt IN Pet1 eoe . :oa eoo eoe eoo - -�� R I VANNA DISTRICT SECTION 32 E, 32G N.CIZIENT B UNITED LAND CORPORATION OF AMERICA P.O. BOX 5548 CHARLOTTESVILLE, VIRGINIA 22903 TELEPHONE 804-979-3334 June 29 , 1990 `,; y 11• Mr. Richard E. Tarbell , Planner ,jlj;_ n 1990 Department of Planning & Community Development 401 McIntire Rd. Charlottesville , VA 22901PL =`' N`;,j ' �`✓`�''�'►'� Re: Briarwood Dear Rich: Tom Muncaster met with Ron Keeler and yourself on June 25 , 1990 to discuss the phasing of Briarwood. Phase 2 was built first because the GE entrance was required. Phase I was indefinitely deferred. As Tom told you, the sanitary sewer has dictated subsequent phasing. We are currently working on Phase 3 and part of Phase 7 which can be served by the existing gravity sewer. The Phase IV Preliminary Plat approved by the Planning Commission on March 27 , 1990 is actually part of the original Phase 3 and Phase 7 . Upon completion of Phase 3 and that part of Phase 7 which can be served by the existing gravity sewer, we intend to go back and build Phase 1, which will be served by the existing sewer. Also , Briarwood Drive shall be constructed from Austin Drive to Route 29 at that time. Briarwood Drive has already been dedicated to Route 29 . The next logical progression is to bring the sewer up the river and do Phases 4, 5 , 6 and the rest of 7 in that order in accordance with the original phasing plan. The rezoning requires two playgrounds , two primary recreation areas and one tot lot. One playground exists and the second is to be built with the 24 lots approved on March 27 , 1990 and is to be located behind lots 9 and 10 of Phase 7 . The tot lot was built in conjunction with the existing playground. The first primary recreation area consisting of passive recreation areas shall be done at completion of Phase 5 and the final primary recreation area located South of Camelot shall be built with the final phase of development of Briarwood. Mr. Richard Tarbell June 29 , 1990 Page two Austin Drive shall be built to Route 606 as a condition of the March 27 , , 1990 approval . That connection will provide two accesses in accordance with County policy. Considering that and the above information, we request deferral from the rezoning requirement that Briarwood Drive be built to Route 29 . That construction will be done when Phase I of Briarwood is completed. Please let me know if you need any additional information. Sincerely, WOODBRIAR ASSOCIATES LIMITED PARTNERSHIP By: S-V Associates Limited Partnership , General Partner By . �/ ,z,, Wendell t Wood, -eneral Partner ATTACHMENT 11[]CHll'1L'N 1 C • — • M7�T� lam Department of Planning ROBERT W.TUCKER. JR. 804/206-5823 RONALD S. KEELER DIRECTOR OF PLANNING 414 FAST MARKET STREET ASSISTANT DIRECTOR OF PLANNING CHARLOTTESVILLE.VIRGINIA 22001 DOUGLAS W. ECKEL SENIOR PLANNER • • January 29, 1980 NANCY MASON CAPERTON PLANNER • IDETTE CHARLIE KIMSEY PLANNER Mr. Wendell W. Wood S-V Associates Post Office Box 5548 Charlottesville, Virginia 22901 Re: Board of Supervisors Action ZMA-79-32 (Briarwood RPN) Dear Mr. Wcod: This is to inform you that the Albemarle County Board of Supervisors at its meeting on January 23, 1980 approved ZMA-79-32 with the following sixteen conditions: • 1. Approval is for a maximum of 661 dwellings subject to conditions contained herein. Locations and acreages of various land uses shall comply with the approved plan. In the final site plan and subdivision process, open space shall be dedicated in proportion to the number of lots approved. Primary recreation areas to be owned and maintained through a homeowners association approved by the County Attorney. Off street parking and access shall be limited to the recreational area designated on "Plan A" and the means to limit such access shall be part of the site plan review; 2. No grading permit or building permit shall be issued •in any area until final site plan and subdivision approval for that area has been obtained; 3. Special use permit approval of sewer capacity adequate to serve the entire development shall be obtained prior to any final site plan or subdivision approval; 4. All road plan and entrance plan approvals shall be obtained prior to any final site plan or subdivision approval. All roads shall be designed and contructed to Virginia Department of Highways and Transportation specifications and dedicated for acceptance into the State Secondary Road System. In review of road plans, the County Engineer, guided by Virginia Department of Highways and Transportation's letter of September 6, 1979, and such further consultation with Virginia Department of Highways and Transportation as he deems desirable, shall discourage alignment and design which would result in excessive grading. Virginia Department of Highways and Transportation approval of access to Route 29 North and Route 606. In review of such entrance plans, Virginia Department of highways and Transportation is requested to be mindful of its letter of September 6, 1979; -46 Board of Supervisors Acti ZMA-79-32 Page 2 5. No grading or construction on slopes of 25% or greater except as is necessary for road construction as approved by the County Engineer. Any lot which is unbuildable due to slope shall be combined with a buildable lot and/or added to common open space subject to Planning Commission approval; 6. Fire Official approval of fire protection system including but not limited to: fire flow rates, hydrant locations, and emergency access provisions. Such system shall be provided prior to issuance of any certificate of occupancy in the area to be served; 7. Albemarle -County Service Authority approval of plans for water lines, sewer- lines, pumping station, and manholes and appurtenances which are to be constructed at the expense of the developer; 8. Staff approval of recreational facilities; 9. Sidewalks shall be provided along roads serving 60 lots or more and major collector streets to Route 29; 10. County Attorney approval of Homeowners' Association agreements prior to final approvals; 11. Only those areas where a structure, utilities, pedestrian ways, recreation areas, roads, and other improvements are to be located shall be disturbed; all other land shall remain in its natural state; 12. No more than two phases shall be under simultaneous development "Plan B" phasing; 13. Lots along Camelot Drive and St. Ives Road are -Co be developed with single- family detached dwellings and shall have a minimum lot width of 65 feet. All other lots shall be developed with single-family attached units unless other- wise specified in condition #15; 14. No final site plan or subdivision plat shall be approved as to any lot or dwelling unit served by either road X or road Y prior to dedication to public use and construction or bonding for acceptance into the Virginia State Secondary Highway System of roads X and Y; . 15. Letter from United Land Corporation of America dated January 23, 1980, signed Wendell W. Wood, written to the Albemarle County Board of Supervisors; 16. Site plan approvals for phases four and beyond shall be contingent upon evidence that dwelling units in the earlier phases have substantially met the County's goals and the developers' assurances that moderate income housing has been provided. • . Sincerely, Julie Cushing Planning Department jc/ Iratyril 4;;;i% , MAY 30 1990 PLANNING DIVISION COUNTY OF ALBEMARLE Department of Zoning 401 McIntire Road Charlottesville, Virginia 22901-4596 (804) 296-5875 MEMORANDUM TO: Richard Tarbell Planner FROM: Kathy B. Dodson )61,10 Zoning Assistant RE: Briarwood Road and Sewer Force Main Facilities DATE: May 30, 1990 In response to your memo regarding the above, I offer the following information: (1) The bond in the amount of $196, 233 . 00 was increased to $269, 233 . 00 in March of 1983 . The bond was renewed over the years until 1987 . At that time a new cost estimate in the amount of $308, 400. 00 was prepared. The developer did not care' to post the bond in the increased amount. Mike Armm and John Horne discussed the project and came to the conclusion that the bond was no longer a require- ment. On June 25, 1987 , at 3 : 07 p.m. , I was informed by John Horne that the plat was never signed nor recorded and therefore, the plat was null and void. Both John and Mike determined that there was no need for this bond. Therefore, we let it lapse. kbd