Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201900039 Plan - Submittal (First) 2019-11-02
Doti :�►,r , COUNTY OF ALBEMARLE • i� !a Department of Community Development �' ® , , 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 ' Tel.(434)296-5832 • Fax(434)972-4126 Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Hillcrest Vineyard and Winery Tasting &Venue VSMP WPO 2019-0039 Address: 8585 Dick Woods Road Afton, Va 22920 38.020000 N, -78.860510 W Prepared by: Name: Monteverde Engineering and Design Studio Prepared for: Name: Hillcrest Vineyard and Winery, LLC WPO 2019-00039 SWPPP Preparation Date: 11-2-2019 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) ' TH OF I Uo SETH I ',I DERICK Lic. No. 041454 W•• O�` 11/6/2019 � ASS JONAL -��~ Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County DRAFT VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM FOR OFFICE USE ONLY CONSTRUCTION ACTIVITIES ID Number: (VAR10) REGISTRATION STATEMENT Technical Criteria: IIB IIC NEW ISSUANCE• RE-ISSUANCE MODIFICATION WITH ACREAGE INCREASE MODIFICATION WITHOUT ACREAGE INCREASE LT Existing Permit Coverage Number (if applicable): Section I. Operator/Permittee Information. A. Construction Activity Operator(Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: Innovative Refrigeration Systems, Inc. Contact person: Michael McGinnis, Jr. Address: 373 Mt. Torrey Rd. City, State Zip code: Lyndhurst, VA 22952 Phone number: 540-836-1383 Primary email: mmcginnis@r717.net CC Email: esummey@monteverdedesigns.com B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Name: Contact person: Address: City, State Zip code: Phone number: Primary email: CC Email: C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by credit card and to receive your permit coverage approval letter via email: YES • NO DEQ 199-DRAFT PAGE 1 18 CONSTRUCTION GENERAL PERMIT(VAR10) REGISTRATION STATEMENT Section II. Construction Activity Location Information. Project site information. A. Include a site map showing the location of the existing or proposed land-disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site. B. Construction Activity Name: Hillcrest Vineyard and Winery, LLC WPO-2019-00039 Address: 8525 Dick Woods Road City and/or County and Zip code: Afton VA, 22920 Latitude and Longitude (6-digit decimal degrees): 38.019432, -78.808252 C. Construction Activity Entrance Location (description, street address and/or 8540 Dick Woods Rd Afton VA, 22920 latitude/longitude in decimal degrees): 38.01333, -78.809930 Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit. A. Offsite Activity Name: Address: City and/or County and Zip code: Latitude and Longitude (6-digit decimal degrees): B. Offsite Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Section IV. Site Information. A. Acreage totals for all land-disturbing activities to be included under this permit coverage. B. Estimated Project Dates (to the nearest one-hundredth of an acre) (MM/DD/YYYY) Total land area of development (include the entire area to be disturbed under the approved Stormwater 166.72 ac Start date: 08/01/2019 Management Plan): Estimated area to be disturbed (portions with Erosion 16.45 ac and Sediment Control Plan approval only): Completion date: 08/30/2020 Offsite estimated area to be disturbed (if applicable): none C. Property owner status: FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE • D. Nature of the construction activity description (i.e. commercial, industrial, residential,agricultural, environmental): Commercial E. Municipal Separate Storm Sewer System(MS4) name (if discharging to a MS4): Albemarle County DEQ 199-DRAFT PAGE 2 18 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT F. This construction activity is part of a common plan of development or sale: YES NO G. 6`h Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Include additional HUCs and receiving waters on a separate page. HUC I RECEIVING WATERBODY(S) 0208020330901 Andersons Creek - North Fork Rockfish River Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the registration statement. By signing the registration statement,the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been approved for the disturbance in Section IV. A.? YES ❑ NO• If yes, provide the date of Erosion and Sediment Control Plan approval: C. Land disturbance has commenced: YES NO• D. Stormwater management maintenance agreement included (if applicable): YES• Not Applicable E. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section II.A.): SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS AND INFORMATION DEQ 199-DRAFT i'AGi 3 j 8 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT Section VI. Certification. This Certification must be signed by a person representing the operator identified in Section II. A. and meeting the requirements of 9VAC25-880-70. Part III. K. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator"means the owner or operator of any facility or activity subject to the Act and this chapter.In the context of storm water associated with a large or small construction activity,operator means any person associated with a construction project that meets either of the following two criteria:(i)the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or(ii)the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a storm water pollution prevention plan for the site or other state permit or VSMP authority permit conditions(i.e., they are authorized to direct workers at a site to carry out activities required by the storm water pollution prevention plan or comply with other permit conditions). In the context of storm water discharges from Municipal Separate Storm Sewer Systems(MS4s),operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K Signatory Requirements: 1. Registration statement.All registration statements shall be signed as follows: a. For a corporation:by a responsible corporate officer. For the purpose of this chapter,a responsible corporate officer means:(i)a president,secretary,treasurer, or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy-making or decision-making functions for the corporation;or(ii)the manager of one or more manufacturing,production, or operating facilities,provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements;and where authority to sign documents hos been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship:by a general partner or the proprietor, respectively;or c. For a municipality,state,federal, or other public agency:by either a principal executive officer or ranking elected official. For purposes of this chapter,a principal executive officer of a public agency includes:(i)the chief executive officer of the agency or(ii)a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this registration statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: PAL�t,P��� Jf, Signature(signed in ink): — —Date: -a- 19 Submit this form to the VSMP Authority. If DEQ is the VSMP Authority, please send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deq.virginia.gov DEQ 199-DRAFT PAGE 4 18 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued— 10/2014 Stomiwater Pollution Prevention Plan (SWPPP)Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project consists of a tasting building (7560 sf), an event venue (9600 sf) and associated parking (8370 sf) for vineyard operations. •Site lies with in Hayesville loam complex 2-7 & 7-15%slopes. Hydrologic Soils Group: B. Site has recently been logged and cleared as part of a timber harvest opperation. •A copy of erosion & sediment control plans and permit must be kept can site at all times. •All pumping of sediment laden water from excavations shall be through a sediment filter bag over a stabilized surface. •Concrete wash water shall be handled in accordance with local ordinances. In no case shall it be allowed to enter any surface or ground water systems. 1.Contractor is to schedule pre-construction meeting with County of Albemarle and engineer of record. 2.Notify County of Albemarle at least 3 days prior to land disturbing activities. 3.The contractor is responsible for maintenance of all erosion and sediment control measures. 4.Install construction entrance, perimeter controls (e.g. silt fencing), sediment basin, construction road stabilization, and sediment control measures. 5.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular racking onto the paved surface. Where sediment is transported onto a paved surface or public road, the surface shall be cleaned thoroughly with dry methods (no washing) at the end of each day. 6.Strip and stockpile topsoil from site for reuse at close of project. 7.Commence rough grading, cut and fill. Place fill in lifts no greater than 8", compact to 95%max proctor density. Do not place fill if in situ soil or fill material is saturated or frozen. 8.Install storm drain system and inlet protection as each inlet is installed. 9.Install site utilities. 10.Bring building pad to grade. 11.Install building foundation. 12.Bring parking area to grade and stabilize. 13.Dewater sediment basin through sediment filter bag and remove collected sediment from erosion control measures and stabilize sediment on site. 14.Upon temporary cessation of an earth disturbing activity or any stage or phase of an activity where a cessation of earth disturbance will exceed 4 days the site shall be immediately seeded, mulched or otherwise protected from erosion and sedimentation pending future earth disturbing activities. 15.Immediately after earth disturbing activities cease, the contractor shall stabilize the disturbed areas. If weather does not permit vegetal:ion, mulch must be applied (VESH - 3.35). 16.In areas to be topsoiled and planted scarify subsoil 6 to 12 inches prior to placement of topsoil. All areas to be vegetated shall have 4 inches minimum topsoil. Topsoil shall not be placed when frozen or excessively wet. 17. Stabilize site and remove erosion control measures with county inspector approval. Issued— 10/2014 Stonnwater Pollution Prevention Plan (SWPPP)Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 1 1 x 17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County 1 1 � , • % A410 ONE !}. . f 1 /1 iy,///::_—__----- 1 / — 1 THE IdV.LC>. p 4MLCG I .ID ERM YEC�tl MDREOlRT DCII ROL'�� / , \ �\ tt : &ittt KNOR Et�tRE01tTOr GQ�IRIDIION / II,` 10111.111N1/4 I 1 \ 11 I // / h- Bf11.E0 91a-D1000 ` \ \ 0910"HO SEONBYCWIIgOL NFa1ni1oeE PIACED PPMiTO[F n3T1E FR4F LW ER,IP TOLL _�w _:mYr ir''''Eov 'AtT'C'''' ra' µ e "paDeson S.'.ft �1 ,/ 1 1 j ��/ APPROVING AuTHORIT, __ �4 ~ � �-�3.5 •'rr.) \`\ ° wu sne Tonas To�uveE«r ewnos.on.xuars o�rer�,rnTnxnsoero ADDITIONAL iwlme"rr<n w • %,,�/ / J / /�- .�\ -�_ , ✓' ri,...A °•,.-�'-? � ;il. \\alws Y ammer,c ncrmr�Es.noawc SITE aEVELocreir umLwuL T CONTROL WWI.mTiairw°`rwuls - / ! I>Br�__, - • I"`tF±tFr pE5RE5. ER _Au _ .wE.oa�NANDOUR SITEDEVELO ( //i a°ALL Ru U:SEN a ^n mac„*, La'!. � J III�S., `e i„1, 1 \\ .\ DURING TERNOe«.,ATENiu T.TER AIL N cBEwa L.�WTOAN"wYaau°FLE NGi.r6. (/// I ' 49 ,4 �J���� s/ 1j• `\\. =40%.rwoDurMON..nuErENr.wr NEa=r*Sr.• CLEu.�ro•w VIT I / ' . �, ; 5 ,\ E EPEEciN.. nIE ERO.ON DON.CEwcES SHALL BE..LE RLIEOATBY ,r�(l!1 I 1/T S �� T �.. 't/,' a`�==r it � \\ 11L Ru ALL SwrewnILSS ALLBETwrAKEN TONI APPROVED V WASTEo SORROW TE AREA EAR.EL L SHALL BE INERT / i \ v y mil`` e$-' ;f \ t NnTERMSOW,FREE OF ROW SW YAW.RUBBISN.NO OTHER DEBRIS r5. �5 £ J �r e•.. _ R' i \(, `_-- S ) 51 t'f( 777) 1 I '` '"`, ; =zn1E \ j ..__i 1 - R, _ __ . js_-', - I-��—�.�� ,R w~ L Y;, N;R' ,IIw.•ECDFoaCTEoN. EN...ERtN,wNw,rn.,,LnTER,L T GR WEN DNRIw�.ERIGHT�,GYTLL AS YYREmovELR ONvER TO .Na j I I t I ; \ / / -^;�-� ti t ,,Y /j - u. LmFR"sw'iLNEI,E;Lar"Ya.eT.u`:Nm m aEuorEonW"�0N4R.ECal.i.ac. 1 1 \ - /�� f�--W L r. 1 "� --� -j I ```�.. REQUIEOOTTHIS PLAN REGARDLESS OF 1.SALE OF N,T LOT.IUNIT,BULLS.MM. 1 MOTHER 1 yam' «GF i� r i 1 Z I j�� %� �_= !� ruts,: //.,F'� ,�-- '`\\'1�, �'\ , B LiwoRE AND a ELw mwieE TEIEvw+v�ETx«t AHD wllLc.aw sEEaNGBroa•ns \'Al ; , _. //X / _� cY� Y. tworoa / •� ___-'- =- corn,./ l h R TEE moRTHei or ammo.To FEBnuMtv To coNsisT A we 7ALK or Amu. ,NRmr.XMlOUsri Ntl6T 6K µYMblAga r Aro.'"LT�[CN eS YE 010 ', \� -' //:fA/X'/. ___-rE � _ /,(�\X�///�,r—_�' i -- i \\ ' - \`` , Igv+. ..... nDN BIwEBELnEuoFrmuzER--...s... . m� \ \ _ -!� �` a ` .-.._-�J/"// ----- t�_ \ \ AGRICULTURAL WOE WEBTDNE SHALL BE APPLIED AT SOLLWOOYMC ED THE TOP AK \ S.',�_-- �/j %//�V, —� ��� —` � \\� KE: ":NORo,T sc ,175,.ETENN.T,YF....3oisKrTD.WR...Ass sTRAW o,EDRY THE Ww -�•- j/' / ^�� i `,. ` / i , EROSION CONTROL WECTOR SEEb \ - y ``�_ f // ` `�) \�� , `� OR CI00(410 TOLE s N.MEASURES o BE REPPAIRRWEDIinm"p EsaTTRA"TRAPS OBE DAMAGE \ \`----. / 11W \ ;�..�_t -.. /I `_ l �-\ I \\ s-%7L-, wBE.-='OFTTEwErsrO"n =1.E FE.EOwtT,,,- ' .yy sEEWn rREis NE \,, \�-�. _��/ '�1% j/ m"° • 1�1'E j/ r- 1\1 _ _�) 1 \\ �____\�t WE ILL o »i A.W"'OL.ECTYYG`Es.YwroENA MK..THEP 710"T°Nr°f.Dec.T BEE.NCLEW0` AND O 1 .r- --� /•(S SL ALL TEww.Nr fR09ON NO.Fr.E EL AEASU.S ARE TO BE MOW MTH.x arsa i _ aBSW-ao-ao-twJW��_ "+___.�� . I _._. ` V �T>FLL DIND �\ f11Vl XLF 3rMEQAtON WH�E1E.t71•ES LONGER NEEDED.SWEET TO MPROVN By THE ��`� /� / \ �' ^` / nuw GO s ca:aoo- \Z\t C1s, L.DunTV EwovLM conrRw c,oL �___�\\ �% J l (/ ty \_-- �// / PaaaAa G"N ._1 - / tz 0 O c ` , 1 :� 1` 11i '�, 1 ,.. �,q' /,�` I ! \ BbsIa,N01®RIEST CORTI.SIG z o(V � — ]{ -am. -- I I / I LWMD01ESTERLOA.I n w•K sons o. PROPOSED EROSION AND ] W O --_-_�\� °� ENRvw- 1 I 1 \ .eoE ARE.ols,wREGAREABWTNP SEDIMENT CONTROL LEGEND I_ Y l \ NTcoNTRGLwwSW IRE..MUST BEKE r \�_. �� � ',,,,,a �, J - It 0SR00-00o-oa0zmf� ,� \1 'D INAWDRaw wiTHLOCAL O srteTr MICE(am) I - I CX O O 4- pp ,/ tl \/� ® \ • 1GLIRE Y 1Y Fc PRO EGGGS5900Nn1 ` \ \\. OG[uLowr:D EN,F)t,YRT SREACE oft ® CONSTRUCRCN WRAP.(502) I II.OPEUP•CARE..IPLL OE MACE TO AVOID SECONEKT rums..To J Z Q. Ln¢ \ 4�" \ Ltc HER.°TO THE SEE...BELOW IS �� _-- \- - _ Y`' iwr1R • icams.To oils REGARD ® mismuctlw R°.D siABUZARaI(am)® (/) N 3 �:l'. °'OY1 � (\ \\` / rr.0,Trnuw r-,;�Go DE " ----, -wNo ® SILT FENCE faasl I R I TILL Q - _ ._ - /. RICO RFr•. 1 \ ---1� ORSTOSSC1EDuLE PRE•GONSTRUCRM I.EETINOWTN COLM'Y O STgiM DR.1111 INLET PRGECMM(10J) I ® I / _ ss, -Litreor1215TNIMIC[ yam. \ T PEENN4E Cg1Hrv.T LFA91l DAY9/ / __ - " "' q, 41�,�\J \ `_ NEs FROR TOLANDDuruanc a600-W-DO-omrw ( ,'L Y/l�� \ \ sEEowccM m�aCwis slRLcrm NA.mNANLzvALL EnouoN.RD ® (a l I J I PRAOSOSTA WESSIONAL \\ � 6f� {.Y _ \ WLNRT INLET FPOTECTN111 ae OMRRn1ME ENTRANCE.PWIETER CONTROLS SILT FENCING. LLC -�PAN — �y�S `.7',e��(.,^;3 `�- \ `-`� BEMENT MET cwBTRUCrIaN ROAD TELbw.nT OYuaw D.laal ® E. O....s. .r /\\ �.{Ay, h$ YTa MIC L� \\\ `\` `---_____ ON ONS SHALL..NE TO wb a THE T AYEr1NAYMrO ® WIT S RAY WWI.(511) r: t 1 _ T""o°R°NOA°NAYEv'�`"ie�ir'an.nncE mErE "�y // ,.> \c/� ` X TED C.0 TYIOROUYEITNr.ROAD ,,,FIFACEIODS THE K NT TRAP(aTs) �Ly� - i � ` % EACH rro sallwa(3.30)\ l \ -� ' .1 END Or T� �' �,avarn LTRAG�NWc Sd*.N"D r�uLst uz oLLGTEAa © TEMPORARY SEEM.anEgEI osE _ ▪ 3 W�THIN,owACT TO W EDWFRD�N � �p ‘\ ./ / -� 't' r/ N/_ '-'' ./,f ' •I �R1 % � DRAIN Sre.AND MET PROTECTIONA or NLI"TA e RRNANa,T NEEDING(1]xl 1�i-I 11.0111.1.1.1.0 PAD TO GRADE AND NW.BuLonos E064.1.748 -� i G��� . / • 1. /� / �/) !�\ trisTALLED oTArA cowl... Ra i OUST COMM(s.$) Tay PRELIMINARY ISSUE ! j P 60°r�� i/ I� \ WRING MAKING AIEwrowRAUNo 9rABLIxE. NOT FOR CONSTRUCTION ' °//p f r li / ) ��--� AEOLUS..SrceuxwrwN OF FIRAN IER OF Sr,vRERE FEASIBLE ® sne.Nr LASS<.T.tq �' . / di`P 1,1 1 I I \ 'r.GNrRncraavlNL DEwAER SmREr?Tww WOO.SEOITETTr FLIER ROCK atE % c��?* :/ / /� i I � ..gY�ENr.WGECa GaDN.s,,,, ® WI am) v e ti OVERALL ESC a `a. 1x tY / \ r \ `� Ys PLANPHASE 1 - L- -� - - ,� / \ 1 \-- ANY ....A.E. 19004C / / \ \ \ -_� az.AC DlsnnaD AREA ... B 21 2619 ��/ / / �' \ \ \\ '\ _ NOING FUTUREa EEIE�TlwrsDISTURBING iErA�TSE TEs G Ts • \ - 1 , \\ \;` /yLIEE RE 00rUFeED weA T WEATHER DOES SCAM �d FOE AT 4 NU M.Rw BEMPLE01 ES H]]BT / . ___ \\ tT ST4LL6113SNDABFTVLTPAWS. OBNERNSS C-3.00 MIN AREAS T P.NIW SWIFT SuBS0E,TGISWES PRIOR TO PLACEIRENT OF TOPLIOL.L AREAS TO BE VEGETATED SHALL \ \ ,`\ 1 / \\\ �C� FAWNOR EMRprv6Y WET a sJ CORM CONSTNROTON NOTESPal scow AND MOSENT CONTROL_BANE 1. Ile ,DTHORrr TBENOTIFIED R�ORTO a E«T,.NT..COMMENCE.OM WEER PRIORTO THECOMMENCEMENT OF LAND DISTURRING A011,11,AND CM HEM KKR TO THE,ITAAL INSPECTION_ _� V# ltK urrtr at 1 ALL EROSION NO REINERT CONTROL MEASURES WILL BE CONSTRUCTED ND MAMAIEO ACCORDED TOMMMD STANONpSNp - ,PEP,DADCWSOE„EMONAE ION AND SEDIMENTO.I,.O,M,®DO.ANDAROMAREDULA»ONSRN 2mFROMMNV `--WA RSHkt� \ �-- - O ALL DROWN AIM SLOEN.CONTROL MASUESAPE TO RE RAMC MON TO OR As TIE FwT STET N CLEANING - _ �\ __ __ .. AwP,'OF,HF ARWOYFO EROMo•AAM SEDIEM rams PUN El•WLE rVNTAPEDMTHE SITE MNL TIMES --�`_` / i '-��` �� _ ` x PRIM TO OMAR .1 AND TRS,INMN.A`TtvnES N*REM aniFf TlwwrwITO m DEAF PANS MtDOM.So,NOT LMTN,To, / IL CIF ME BORROW CR WA BY STE ASI.TIE C AD iCTIIDRNrrMAL SLAW A SVRBLNTAM'EROSION CO1POl PUN TONE OWNER FOR --�� // �1� a TIE CONIMCTOt IS RESPOSAE FOR APPROVING Of PREY ADORIOXK EAMON CONTROL MEASURES NECESSMO To NW.?DEMON ------ i _`.. • MMEMITAT THE PLAN ION AS WAD.. onteverde onMOURNED AREAS TO ORAN AT ALL -_-- nETS OFVELmRENT UNTIL MAL TAEOnMNISAPaVED. �� --�JaT 1f�i4 JF- E onsermo a Dawn Stud. S. OwN WWATPMw PENA..WATER WaL SE PUMPED MOM APPROVED WORM OEVIO. __ -�` -' MERE SURE4 - ,I.•....... ........... E THE CONTRACTOR SHALL REECT NI EROSION CONTROL MEASURES PERIODICALLY ND PATEN EACH RUNOFF PINTO"a•r RM.M.L EVENT __- we DOWN SLOPE ��- ..•It•Sam I...............IH, ANY IECESBMY REPAIRS OR CLEMILF TO WREN THE ElROTRBELtl OF DIE EROSION CONT..DEVICES SHALL BE MADE MEDIATE, - ' WET PAWING TIP 3E -^�-SLOE-�/\ `'-� e.ALL FEL REMO&TOMEI/YEN PROM AN APPROVED,DEMENTED SORROW MEN _- \\� N, ALL WASTE MATERWS4v4 BE TNBE TONI APPROVED WASTE AMA MONru MALL DE RERT RATER...ONLY E PEE OF ROOTS. - MEEE TAEi�LOS-LOS= -LOS "OE \L\ ,� \" -� Wow.IDYStm.we OT MANS '" wuMOENEA ..l/ -- \ �-- �� �\\\ \` \'� i TS mPR•u FERMSINSNIALL ARE TRANSPORNIVOI To liF IN COMPLIANCE WIT HWITTH OF SECTION,/MPER OF THE GGUDEE OF uAELURLE st>9 \ aT Ae _REDS / /`°p/% \\`\\\ \ll\ \`��\\��\\��=- M. ,F.OR WASTE ACRvm EVOLVING EowTM.L.TYPE POWER EGUPMNT SHALL RE LAM TEO TO DE HOL OF T MN TO A:Nw rAeFEMIIL ., /// \\ \\\ \ \ ���� _- 19 CONCOCTED N A REF MANNER TM wINTAINS U.TERN SOERnItT,co GIRDER TO AMOK if MT---�. SET Lam' / / // �` \\ .PuaONS,PHYS.,DM:DE TO ADLreMT UND PM MNPAAENTS.NO OAKS,A O AR,ISIxIc SHUNT LRCM!.o SLIDES. wOPE LW p // /// i _\ \\\\ \\ \I:1 \\\\\ \� - IS.IDEVELPER RESERVE NTOwiiET r w,Es EEkOvnatcwsENT TO PErwwEEW STawDVATER MNuauEMT M yw_�_ -- //// / / / i �- \ \ \\\��� '`N ar nan c-MEO.c w CO-ER�noN v nE MYER,r t Br RECNDIESS aF THE SNEOANv tO LAPr /Los=iDsrt ii= = /////% ///�� - \\\ \ \\..., „„� WEEaPreNw.EM ��,-ENLL EE TEMPORARY SEEOw AND MLPNNG RENO IS TO BE AT TS M .p NTNE MONTHSo- /_ - \ \ �EarwEEe =`\TRsw•N,LnNu,oEN+LEOAT AMm; :L:iw` TtvEe \\\\�_''�/� i�S= _=_- - // / ` \\.\\\\ \ -\1 \\ \\� �\SEnEMER,O FEM:wRv To OPEMSTA coca NM o-AM.HL NYErNAm ND a,EN MMTEN N.E.URN.FRAN RTE.o-VA.TH ROUGH ALDUST TOCP"ST o-GERMAN MLLE,.SXNeCT TO NTROWD OT TtN CONTY EROSION CONTROL MSEOTOR / `M PE MT STABLUATrON:HAILRELIEMDTsmRFRREwwEARSEEon.MOM.oI.AORnETURNGRA.IAETONESIwLBEN \��// ii 0 I / -\_ \ \ \\\ \ \ \ \_- APPLEDATSPDNIONF INCORPORATED RTC THE TCP•R NCIES OF SOIL.FERniux S•ALL BE MIRED AT Tm0L0wAcE ANDCONnT of ��///i/ - �`��'\ \ \ \ /r- \ \ \::: \ \\ L \• \`\\ _ To-WE tEN,UCNr.I OR TALL FEMuE AID \\ i / -\ \ / 'x .\ \ \ \ \ \ \ _.. OWN PERENNIAL RTEGRASS OR MIL.IS TOE APPLIED AT RSaN,WSF.E,EmMTNESAPEMEECT TO ,✓///-\\\\ \\\ \ ib \ OM \ \ \- / i//mil - \ A`\ \/ 1 1 / / �' \'\. \, - \ \_�\\\ ‘..DR oTAP ETMEC AFTER EDWHENM.N I..DMNwp`EVVO°UEMTDFE"DAIMl i/i/�_—/ \ I', \ \ \/' I I I \"I \ �\ y \ N. -- DnNE HEREFORD WHEN NIFE SIANV T WHEN M.WOO HERO OF THE WET o-OTROS MT PF,IV VIED OMEMIPN -i...... _-.\'` \ \ \ / / I '\ 1/ J// 1 1 \ \ \ ORENT DFDTER EMTr MM.MEWED AANCGM MEOMTE, / � \\ \ I I \ ._,I FOYERS TOME TER rAaFES FIE TOW REMOVED WRHR.0080E MEL ME STRsaATTON.SIRE s\m.=i i! /"\ \\\\�\\1 { \ - J // / /• I /// //////// �A �_ \ - VSAwH[s AHt NO LC.(A3i NEEDED.SUBJECT TO APPROVAL er RE COLYITY EROSION CONTROL FNeEcraR \ \ / / / / `` ^' ETC\\, ON \\\\\\\\\\\\-_////, 3\ ///J //////// / N.WHEN SILT 1 \ •SOFT SPICER TEE `\ \ \ \\ / -- ' / / �iL\ \ \ \ -i / A I \\\\\ \\ \ — SOIL \\ \ �� ; — // / ///// ;_\\\• \ \ \ 1\/ll ,!* AO\\\\\\� \v�s, E �® \\,\ tc.::::::::":„ . .tiltipit-. /.tee=__ � /////// / /- \\\\\\ >>- {1\1` v \,�\\\\\\\\\\ \ \ \- j / ) • 1/ • �/Ir =EM_�/////� J ///�\ \\ �)NL\\�= uiwa \\\\\\�\\ T I ) / //r/ � �' / /J//i/////�\\\ \\�=ice, EPP =__ \\ / \ \ 1\\\•\\\\\ I1 1 r 1111111 J.,S/J f J) a .... /ice//d /--\.\� \_--�% CC V) • /IF CUM OR LOCATIOR_-- -. )► -R\. \ '1 \ \ 1\ \\\ 1 ,I I I I I I I /j/ ///�` "'" w i/.�� \\ \\\\ '%'-- Q j / EnLmEa Nm - \ \\ \ \ \\ 1\\\1 1=1 AIR) I//�/ // i i =��Z� S2=T"��� \\-' %i ›- M CC ,OE.Tl1 \ ��\\ I \\ \ 010{11 I 1'I 1 I 1 I // ,.. / ' E.aN,.N -_ =_=_'•••• • =—— \\_ // W w 0p (n N`n /'/ - _ C- ,.��;i =\\\\\\\\`\\ ./)'r/1 J/I I r 1 1/J/,. !/ , SRGNON_ EED.E aaIGEN, > z o) Q SERLELOAM AND PESTER Low COMMA.Pa.w PROPOSED EROSION AND I.-- __ ; 3 �� I- - \ _ �' \ \ - `AID SELP•A COPY OF EROSION.1 SEDRENT wNTRn RAMP AND NEE..T KNIT E�NE.Pr z \ \ ��\\\\\\ i /'. IN SOW OFT URI.MEWS SEDIMENT CONTROL LEGEND ` _ \ .��`,\�©\\N�3\\\\ /� 10 UDEN WATER ExcAEDvwwN�E OSOME MICE I - I W 0 6 L'--- -^''' ` `���\,�'S�\�:\\ �\\��\\�== /'-//\/%, •• O.RONANCES IN NO CASE SHALL IT;iL LEENNp°UD ACCORDANCE ANT L OR ® WNS,RU[,IORI ENTRAIKE(101) I II 0 Z 0- �¢ \+:et: \\ \\\\\\\\\`\ �i ,�, PLOPRN_ APNERR E TO �°TO TTHE EaI ':E BBEELTOW IS = F= \ \\\\\\\ \ .,, RA REGARD ® w"sRDr,NFN ROAD T.M MAIMI 0.w1® CO \ \\ \\\ , SEDIMENT CONTROL MEASNRES SHALL RE /'/ ;�. CA\\ ��\��\�������\\��1 - y i,/ • BEOEENT AMLNSRATGa an oENTEenRsE TIE Do-,.T;,i,EVi,norNNa O SILT FEND aDi) I - ---- - wHENE WENS\ \ C' \\ ���\ • >C:- -_'t t - FwwlwLrMMNrNsw IRNM•NaUNE I Co"mAcr0R iS TO SCHEME PE.00*01*M ON MEETING MTN COUNTY FENCE '` ���\ \ M RNO\\\ \ \ \\ \`\\�\\ • NN.M,rM m'M J E A. HRH c..T 0 6PNINTO N,LHDPBTMENG ® TOBI OP.FLEi PROTECTION(S.Oi) I-®-I ��:\ ,,.��\\ NH,c\\\ rr•EVEINY �io�R.n A ACTIVITIES - I / Fi k.v\\\ ` \ZI \\\\\\\\\\\\ \�`\�.. Rm.., mNTR,._ paw mot MvMANN S. FOR M.«ICNN.ao-NL EROSION MO -WI, PILwIT E.'....OE 0 OF) I.. I \\\\\\ \\\\ \``\` n¢Daf •Owe AM SYD.,M ¢,BcrnMTERCN NTROLcniwao D i --\ - 2 _ \\�\\M.-._: Z N...E -, MM. ® ,EMPR.RY PVERGa.Dla)0*) ® E. -o.•.M•- D.. �`ll'E 1��� - l�L `lit s""•"� '° r._mN NEwaA 5 WHERE r..NNZE Rttfu ROUTES MERSECT RAVED OR _�. sr \\��-•',.\ ������ \\\=� PYSM•� nBlRNw N.M NOws move.. E MwE TO was THE mwsDR,GF ® NPR,a RAY o-LErmoN(vI) ® - ___ +.. \ .t}` \\ \\\•\\\\"\_^_- _ _• _ V TRANSPORTED rwaNrc Are.FAERE CE_ HIE \\ '� \\-\\\\\\�` __ _ - • PA•P•re PrNw N.AaN MMN MSEDIMENT CEAED MOMOLMEY HRH OW arsaosMLa, (SST SEd[M1T TRAP(113) \\ PO f .��- -- _ _ p�M. C••I PP• MN1!• \DO EN]TOYMVmwralC TOP SWAPO(Sb) HIE r - C .ErOEYEWY TOIM./WBME�S_---_�-� - ..-.r^ ♦• `\\\ \EOf OF morl Pen --_- -_-- .. ft Sinn IIRISw SOIL FOR REUSE AT OLEEO PROJECT .F IeIISINEPREEIE `\= ==� _. 'T^. FROM COT NO FILL PLACE HAL N1 TR NO UNEVEN EIiONn WANG(SS/)-`�� --•\\`� - .� :wRmCTOR DEM,DO NOT RACE Fat E NR LEErsE �r E _`�c--- t s.T•n•.m. S`ON ----asRMSINCE /TN, \\ r A. Lyu,.A.•x.•n a TWAIN s-RTFM ND WEFT PROTECTION AS EACH re PTM \ \\ O..A.- oMNN TMMTEDwFinaR. ® Pw"aT Nome p.m) IFI \\\ \ 1Q 'E TfFS \\\\ =�. \\\\\ ROMS BROM EEO TO GERM MO• ,OUP IER SAL .TTOOi,0awes(SD( _- `\\\\_\��-\\\ \\\ ;AMERSO y DUST CON,RO Sb PRELIMINARY ISSUE �\ \\�\\\\ - • - ) NOT CONSTRUCTION I AQ=\\\\\\\STA \\\\ =-� ' aft HORN.HWANG MRS TO GRACE NC MOM. MDANN DEWAACTOR ERNE ® USSR CE DAM(SSG) r I PESO/HASE PP \ \ \\\\ \\•-�_- `� _ - O'k DIRECT PNONSa AM --- WTS O TT,-...." A 1 — o. \„\.::,� � _ F �WIT2r. END REMOVE MC STABLIZE SEDIMENT AND Esc...kap:pm SEDIMENT sm ENT a.:. N.Acl AA WEMOONS •IR ELT I �.\\\\\�_�` 3' f - EAVTTv DR J �N•N+AIEEr NOW Fe1CeEM \\ �� `` .ro• �I p SEN AC OSTOQED AREA AIM 21,MIS DDIOEIAE .\\\\_ !Dam lreN �WTtEW w., E'S DM EFEEE 8 \\\ _�/ �- - cCABE Tee Tw - - --}E}ZQ I, CONTRACTOR NULL STAWU.2 TINE Ps THEN DOSS L""'a" . ILCH ®la.__ '0' \��/ - _- - N 10 is f•!70 HAVEIR.NPLACEMIENO To-aoa TALL AR AS TO NOT LE VEGETATED WHEN • ALLPAEBADA.NM TMYNG C-3.01-A WS 9LIMI MO . I �� ;:N�AE�mR�R,mE�mTwANr TO IEREPEn .D . p L RIMER OR EISlYYOY WET. J \ \\ \ / •/r/ //// T .. \ � ,_ `\��\ \\\\\wm`w , ��-z�"z_�% %4.:, �/,,/— �° " / /// /////� BE STEar,NE.a.aosEneNosoN.+oseo.ENrcom� e,s,..s.ERE.EN..N.�E,.a>,oNW,.r��sr'�INo,,..reo,a PWOR \ \\\\\\\ \�—� i jCdA w,u,:,w.E.�c�..o,.s-,o,ww:.r,,,w,Es w..L..xo,Nw,ww Euw n<sE COMES \\\\\ — a,E.�awaNw �.,��,�a.aN� awEa oftteverde MOPE • � `�— — — - : ;\\\\\\ ___ MFWX MC RED .:µam.,. r�xar�wFROWNaa .ES SSARYTOTM,. N �\ =`�\\\`���`____�='=— 4 P ALL DIST...ME ARE TOO.. wo PLAN Ma.IXRna AEM14/E9.r All TINESWain.M3[(WORSM.CIM,ES AND En�� _` \\ / girNeN.nng a Poston ShRAo �' .1NIREQ / ��� • \ r\ \������= = s,TE DEvELoP Ewr UNTIL rw..STABA ATION w WIENERii:a,.vu,..........•....i,...,.. A `— ..7146 MllCf / ,.wErorw. ���— =—� -rs��f oEwATEmio°ramp..WATER WILL BE P.a..MOAN APPROVED FILTERING 06.6 'I` /•,' \\.���=___`�� vy.. . p f l M(brm...RwNLL N.srEcr.LLI EROSION CEN,ROL WARMED PEMODIONIT MD AMER EACH MINOT PROMO.RAVE.EVENT ,P-r :°t _ \\\�\---�_? Am NEcEssART CONTROL DEVCES..l.BE TAME MIEDIATELY / / ....-.----7/-- ����\\\\\��_� j� �r ":Iura;WWOmMOM.MMCOTERDEBRsPrRnmwEUEEwu.aNSLER. ,ER.soE,.'�anaan \=4. \\ E ASTENEAy.,E,0BERE,..,NEDWHn,a,STOFCOMPIEIIONENEo.NNo......moll..S / / — \ = ��\\\',�� r .� L» R SRNs N E, roR EDN a.. �w NSECTION,s>o,aE E aaEa BEN L.ROAM.FILL OR WASTE ACTIvIrr ervOL.......TRIAL POE POWER EOLIMENT S.M.SE LOVED To T......OF_ / / • \ I-/Q`��\\\\\\\\\��=_� v' /�/J / le ,�vEK,m,Im WASTE".s.�,.r;.w oAINAGE o.xo u�ME oau '.o�`.NrNP.M STRFE;LEGUSEmama AN-. RE �\ \\\\ `` � / I.11c¢1KOE«RMwL RESERVE TMRIGNI TO INSTALL.MANTAS TEAOVECR CONVERT TO FERENC.STOMM'APFRMWNGEIENT / /,_-1.00LL__--\ SILT FENCE I 'I =�\� \\\\ - % - 'rooms w.E,E APPLICABLE.L.Enm.a.coNTR«.4E.PM9RE«.REDVPMPLAN REGARDLESS OF TV SALE OF Ami.OT.P.T. / 1SEiOpSE19 \ = \\\\���-=' '�(�, / a.TEN'RONGMPORfmsr"'OSa.vA..ssw MINTON d'v.dBE iAVOWA.MEEonoaou..ww MEEER.IS roSE AT..s.MAE.HO N nE MONTN.OF / rvicE CH .\\\\Jj // / IETnFMDiro FENDMVTO CONM9LA WLD MUOAMLML R,EO«ssArC CEREAL WINTER RK.,Stn MARCH ANC APraL.o CaIMsrO \\ VENAL RYE OR W.r RRO..R,AUGUST TO COTM9T OF GOWAN MILLET STRAW MULE.E TO BE APPLIED AT FOLSS ODEF..TERNArM1ES ARE /� �" �°OR"" 4 $ \�— / MERGE TO APPROVED a.TE COUNT.EROSION CONTROL INSPECTOR -_ / !! L �\\�`�� / r IS PERAMMETsr.eu:T,GNSHALL BE TM AND romuaR.PEWAVENT SEEDING.A.MEM waaTLwL GRAD u.ESTOEawL s_ _ .../ 19$ \ �� �� ® ©\�—_� � ji.::::. _ ____ // / s�i�',�w'"'wr"`rEmSE"is.OR ��v'a,:c�R..9ee�R«o�n�,nm��.�in v,�.s`uERNaA:,'vis°Ai.n""MaE�ro/ � // mMw aEN�iN¢kl Niww rsraE io RE wsPENciEO W�cF�iavAro urEa EAa.R,vEru.rNr oAA,.�E a+2 .wroaTTaeTwL�/ \ \ ``� _ ` --_ i r / LEAM.Es is ro SEPEswR.EEn.TElr SILT TRAPSH+E TD e.dF...oW1vNlalt ac T.E WET srwANE vauEE E,4P oalE.m%a. . :/, \ \ ��` i // TEAM.ESARE roloncER rEEOEo.soerecr rotrmovn RrT.Ec«mrr ERosaN coN,vo�iNSP«Ec�an ORE arP.urwl,v.Ao. N a.ALL.PIODRwSEaoMc«AND SEo.EETr coNT„«,EAs,UESAPE.o,E.ERo.Eo \ I '-- w \ \ - Fy / / ---- `\ — j EROSION MO SEMEN,CONTROL SECRET.. } M p / �� i" /.MTEsW.TNIN�.xvalE Low Aro dEs,ENLaM.cornE%awsn. PROPOSED EROSION AND W W O STEEP Ng Sam MEM um.EE0 ARM CORN / `\ wRruSE • \OO ' - // STEEP MOMS STONY BE MM..aO. Nn PUMMEL Pt,..,..n„E SEDIMENT CONTROL LEGEND z o O N // // \ RT��GTP NV. Leo — / MOMENT•ALL MAPS.OF SEMEN,LAD.WATER FACE ESCAvATIONS SHAU.�R�, O9FE,TNT(>n) I I , W rn 3> ( / \ \\`_ \ \\ _ i /. /.dm:.ANws pia AccoRDANcE O Y 2 M -- _ , d.«M Mr.SYSTEMS ® C'OMaTRUCRON FNTRAIDE(a03) I] N V I 1 ., `-- i / . a R `SW..Av.AdE, roow'E> TRANSFER TO R 1 W (�((��f o 0 / / // .., /r RT..TO THIS REGARD ® COISTMADMn ROAD STMLI/ATION Sal)® fr V O Lt)� •ILO TEMPORARY CROSIER MO SFllEENT CMR«AUM.RES MALL BE w I 1 _ / THE PRIOR APPROVAL OF.E COON.M.SC.MCI I U h "_ __,COMP_1J4O._ / •I s®ET.r AorNarRAsdEL%AEPPE PRE-CONSTRUCTION MEOW COTE COUN'Y sT rm. = CONTFIACTOR IS TO I ' / ,�—��'-�� ® `\ \ \\ ® �' /l No .M ENGINEER aE COENr0AT LEA8TS DAYS m,O7 TOLMDOST,AMINO ® S1OIN 0RNN E.E,RRO,[CTI01(1.01) I ] I / ` ENTRAP.,PERIMETER CONTROLS.SILT FENCE., ` \ // IS0s7OE®2 FOR MNNRMNCE Of ALL FROG.MC I / / E I \ „��'� �l / MTROLRMEAwEa ® [MEW M.ET PRORCiDN PAO Hp i .POT.CONSTRUCT... STA.LdM,ON ARO ® ...PORN.d ded ONE(>a.) / / .WEREG�DRODN veto. DES. Rad,P EDd / -- / nLHuc RdAde woxeorL avuLE Mra rO Mrn�T,E TTMwEmrar R,ara ardwaa(>R) =, 1 \ 92&-— _ i / MOMENT WINNOWS r wrs„NPMR.oR wawa wrrin'�ORPArLa w°w:O�LMMSWISPS T 9/ I / I 1 \' �\ �// / wR'A�w:a)AiT,Mimi E Rio o'EPP DM ww,Rsa.wTN OTaLERDoso.o © a•mwc(vo) ® -__..`"•`w.�. v,r / 1 / I ' _ _ /�� / //i AND a TDPxE FOR REUSE AT aos:OF PROJECT —.. _ / LCC,IEEDLNOLPL..OMRIR MHO FLL NACfFLLnIInaNOLRN91 ® 1FEPdNM,SQbD(>l1) / b ./' / fM r COMPACT TO m W%PROCTOR OENRTv mNOS PUCE SUS IN S OR PILL MATERIAL IS swuRATED cm FROEBE `,/ 1 I.. / i 1 \ SEOLENT T,>�_ I Eamam srtE UT.,nEs A•Ov,INLET IS ® xwANENT 9FE0n0 fall) � � /`\ /, I ' ©1 Rk: '.- ,avccN„LOrNE- ' 1l:ENS,UE d+NN_ P MSS sOFer. .PEE FEAS.eLE. - /\ E i NCON _ ® sD.ENT M.(>Ip • 1 E REVN•.M.r 'REAR..HDNdiO WHERE FENCE / DEWATERIN MALI DE MED NOc.EON,TER MEN d4a LDM OWS lSEmw' �.�� PRELIMINARY 18811E wm.NO RANG PREDICTED. OPERATORS IN oDECT,RONNry NOT FOR CONSTRUCTION / lu FTm oryv .� `!. - %/. S,iLwA..,ls SOMENr BA. ,. Dwr F o ' i� � —— �_ — µ `>:.AG daRIN�D AREA ESC/PPP CHECK A RECI wp /1 _ ;i/ , `aNGOR PROTECTED PHASE 1-B /' AT ING EMvE END.. TTOM IP / / _-- - �/% ��y S..WPM.=RE 00TusEO AREAS Fvu HER DOES _ //////��' A SINE PERMIT NRzrAA�,ML MULCH P VN['HO9DEWNlIl scR TSI n.�P iLC01C Otw.IR �//ice j..% TU ,.msT..uR.s ArD Jule 21.1'01L 'ftEwhi Of +'%I .016 .r 1.IN*WAS TO RE TorsolEO Ho PLASM SCAM,SASS A TO It PO S ��/� PRIOR To rRA.RMEi.r,x TOPsan.DAP L.�MLr rSE.m�eEDErAnA�an SHALL WT. / Cuomo.•�F ,, I .,, �NL '• ��i� i. ''. y/%//�//� F.oawaN E,�ss..L.WET. h " _— i / /`\ rrjs' I :'i%%/47 _ • /�/ /i/ii ////G ,.rscabj �- «....C-3.01—B J — / / w—r..=E:MTNiO r i N/ �r. - '/_ -Iri AL.E.AA.E CW1r.BEN..GOEBTNCMN .FO...■0...MIME 00...L R.F. 1 F.I..ONE ED ON of /�— i 1 THE PUN APPROVE.ALITIONITY NUST BE NOTIFIED aEnEe rnaa° E mEcaa wComsE axx.ONE wHa PRIOR° E • EROSION IHENT CONIAE.CHAT OF LAND oisTIMBNO NCTIvITY ANO ONE WEER PRIOR/-0 TH FM.INSPECT./ ! �\ % , A J Z /•////�:� I� jj ij/ / / / A �pr °E; DcoNTrucTONawlEl.1.rE.E.rr,ENTAn.ENoaaleaNENanAN To,IE owEa w,aa41V/ �.i / //Fi -.•'� / /// //��i � B TIE CCNTRACTOR IS rEa.E FE' FoFoR warwun AN..mlo°Iwalo.0B CONTROL IEAawE]N ESSANV TORE..EROSION /�//�/�'rnaP. •"a: ENE AU all 1AMER.TO BE TANEN MON• •\ l / ,'i;V ///' Jll// ///// j///l l / HN.EHrRASS,NaEN,WEND APSTOINDENes ,./E \ �� ////— Ear////// // r / f wTE ]]HALL E TRAR.v�mc�nusT�`wlT`vrE IN...wisOF 11 METED. 'Nouw aF,ouw rc umnl d 1/7: ///i / �// I I / sOwow.uWASTE\ I. 141/A Al I l l ilI/ III , 1 1 ��` E.n o,NNAGE TO NYACENT LA E rE SuOONNMMc£TOM/MIBUO STREET MEWS o.E1ES. ' E4.E �7'7// //// ///// Il I \ \.8 a E.EIOEE a •...E THE RIG.70INSTAL NNN-AN EN a AN441.1MMAEeE3o SA ////// / // /I/ 1 \ \ FAGL°.11WHE APP...NsEROSIONCONTR.NEARUNE]«EODED° HISNAN`FIEGA.LLESOFTM SALE OF ANY LOT UHT 1'Q°°L0ID°'""` A.t 1 I x Ip/an l/llll l l/ I I \\\\ WRONG S F.N PORTION.,BFT TIC TENPOILA AMs LB .,MO IN THE NON.OF — WR NGOR TA.Lw°ONNOTL.TE..ORPROMRTY SEED. YNTENTER TO FE.RA9Y TO CONSIST A Sw.NN OF AM RYE OR w MAR.AND ARM TOCOMSTCV /''/ \ //////1////////////���/J \ \ \ RYE,ORN.v TN..NIND9r TO CONSIST OF R MREB AT 01.,OaE NTERNTIVEH AM ' \\ ' Nil r►►I hrlll l ll� \ \ yv w^" °UN :° N AiIDATRwORA.MEMO.HN.6E - ___ / n \ / / // r /r \ \ \ \ T�E91101.NC.P EDITOTNEIOP..114•E, D.,ER:.NERSHAL-AEPEEDAT,w.�A�AMOCHE Cr —————— / //h/h1�\�\\\\\\\11 a lour►/u//ulll/!f I 1 Y\ \ \ \ " >;°�T�» �«x.� w Ea. �.MO D� q�D�AL .iNIF ec T ////JJ))1\\\,,\•1,N POND r� l////l/!l/1111//I I 1 \ \ \/ B E wNT.ERDHo nNRD NaF OR 4 ///ii{/i/i/JJ Ii `� lllllllll�llhllI \ \ ESECIPAEHT Au SHOE 0 AM.AWE TO BE NEMEC..L]IS BEE/SPEC/DJ NNEC :'« �`T0W°F C A.DIVERS. e6e m\� -<�/i�/1//iii�/j/I ///////!I/I1111 I \\ \ / iMIGHTRE o.H.O ALE E�.TAEEI:AT,ON.,NE,. Tj /////4/�/J/ /l1jj1i11;111111;\1� \ ,� NEHREHRE EDDaaE TO APPROVAL R N�Uw maD«I CONTROL INSPECTOR. . _ NNIMICC .- 3 MO IMT06wEN'A,..EF�EOE]n I I I I I I I I I I 1 \ \ \ ro-,,,,,N4WMIl `11 �i%//4,//�,/�\•� 11I 1 1//I I I I\\ 1 \—�� ` --— i ����\����0\ \ ......\.\q I I I\\\\- ` / III\ 1 — i c, 01 ` \ \\ iNtk\ ..E0u0ro..E.Frw1.1 1 jI _ _��\\�\\\ 1 , \\off\ / E.b�F]�. I 15 / cc ch 0,2 \'�' \���\\\\\\\\\\ s\i\\\ //( /1r,=q(ryH/yiJI�Il ll/l/J -_. NHS..LOON ANC CESTERL°w cowLER SOILS ON HEAS PATH PROPOSED EROSION AND W j Q Q i4C)--\ \N4i���\\\\\\v \\\\.\ `// /,-, i1llrill////-�� TM 6 '/•�co�Rv BITE ARE RRoe n�Y STONY�SEo.Ew"`aOr.r�wOORRDL MANS�AFO FEn.rC wnffIERT SEDIMENT CONTROL LEGEND z \\\. \\\\\lam// /1P777 //l/ �/ oN HE AT ALL„ES Cr) q.\s,4A),\�\k\�\'\ \\\\\�\° /////�/ /, ZONE• CJRAL •AUEaEROo SEnEENTL.N:].w EREEOFFEi.r.Ar«,.a.a.N.°E Os.Ec,rr.Rxa.) I I j •- 3> \'.\h\ \\ \_,;-_-:-......:-_-------, /// /// .m '"No.AwA'�]N wA'�iE`iN...NE NAMED A�..a,N".zAc`niTT.LorwL O (\O° l\\\ \O---iiii/ii j///9 .sA�H««Do4HNA oENL DTON,RMYa,EAUDR Pei (V O (, � 1\\\ \�/ /ice/ // ` _ - IMO=•.o. OFO.00]®EE RA«,ERTD ® ONENEEUc>o)NM RFOUFNCEMS Ow 15 I 11 w c) O G E�"i/`') \ \ 1'��/ i/�..//— i.. / j / ....° TOMSRE_TENPORARY n NO H ae TO °NTRn Ew9UEs swL BE ® CONSIENcm:ROAD STAOuzAna(EAU® 0 Z a m S• -.../ '/ / _� —_ / / / SEDER«TAONw BTR,.TORO/APPROVAL OF THE C EENOSON,NM NJ N m _— / ' / / 1•�CMIRMTOmmR IS Rro9WEpaE aRF<weimICTIM wEiwO WW1 COUNTY O Ss/FENCE II°!) I 1 --I l^ W�)/ �I///1i11�T)/ �_—/ �/E's / ENGINEER 6 RECORD. ® 5T«M MN.NIET...GT..?°T) I- H •'AcHTFEs �/////IIII/// , _// / \J ].NOTIFY NBFW4E COUNTY AT LEAST]MY9 PRIOR TOLNOOIHMIBINo ��, ____ _ rII!111� — / CONTRACTOR L E Of ALL E�NDNMu ® CAN,..uPROIED.a,(].a., 1 ) I CONTROLS: .AD RHO I - /1 =__ —' /4E/ \'\ _—\ J '� / "T e� Ric,R ED w ® .«M.a waDN ORE L>Oo, 11 f ; \\ 1 \ 1 / — / .Y/j /� W / �// 'PUP.ROADSSEDINENT la.NrohaONS Nwl BE WOE TO owl.TIE TRMsrart OF ® MOLT or wv„„,,„„,,,,) ORAR TRAM.ONTO THE FAMED S.N.E WHERE 11 \ ,\ \\\MI 1 1 1\\\ /.------ � �' —� / —/ //\ CIS E°v ICIE.veTH DR.RETRO.TIC �eEIG(s]D)a) IDEI I .1. _- o.....E:: SR \\\\1\\\\\ \\\\\\\1 \ \ I m /�/// —_—/� OT PLACE ®,\ VEAYMFHr BIDNo �t�1 _/ / )+SERFNno F1LL RATER.le CATIARATED.1 FROZEN ".`iiA�`u`r:orDR DRAW 9YSiE,.AEU NEi PROTECTION Ae EACH HET IS ® tsnl — \f \ \ 1 \ 1 \ 1 --- d WATER r;°�T�N:1 o OOR.ANDNSTALLw.nIN°HFOUo.110.. ® NUn«OI , mr,+m — x \\ ANGER , T.E«N.E°RAMAGETOSEDEE,IT TR.A.N NSW TIWO,IQ.All PNNES. • / y 1 � 1 I I I I / _ I PROTECTION c"' I ..:/ // / // C13EEI� t ORDINANCE /''� TTIMR," EATEN ® c , L �ARLg � PRELIMINARY ISSUE / / / —� -WATER ED /i ON.DECCEEH;TAB„°;BE NODE OUR. OR/ ® EON«E«ON n.ro, ).► .'! NOT FOR CONSTRUCTION '/'/// / ' ' -—— BUFFER J OAS° NA°DEF OPERATNE..IN DNEOT PROF., —--— LARS O,os 0.D.,:F // / N"°R ———— HE MINT B.:««...-:.9 / / /7 / /__ S / / i IEU T NR RM.7, N>«O'S�DNTU.wDA ORM, mE / / I. . / \ / a nNE.�<"EN�Exan.0 Y14 ESC/PPP are cOlNTRucr COIONACT.TO A:'o,ro / / + /I/ /,Ea' -/ / 4 \ ' , A.EEnEG Nua.m°R DTEERNaERRCT Las.Ni Osnr�C APES PHASE 1 -C aN , /', __ga, TER . rNa.MOLIEOow.CWNY E. N///� / i �I"'��^s;e-:Il .\_ {�.�, �..'.�i /// / / / AND ASPN4.1 PAVING ANC NOE.. 17 INSTALL ff'T�snEU MO PLANTED xwnF.s.e.9CE HrD„wnEs -/ ,,Lx'^O<\ ,jq.- `Q /// / /—-s / I SMOR Torsos.ALLARE.TOSS VEGETTi TE°Wel,N l ".E SCPR 'irk -_ .,......,...�a. _. ..w. . - - ,,,A. ` oteverde__ - _— _ � �- - :n°°.x U—w�a.,.-r %=.ow.a o.a...,..o..e... - - F CDMOO St.._-.� rworn gas Mm. .,r NWT WAWA w...MAGMA ..n . ` .,•ate -- -_- _a�euw( weTm\ a= �e \ _ DONIS ,., ...,.,....,-» .a,.....w-.,o,.,,..rw,w,o,». rnwo.o°Rm ..� - xI - 1 - ~.��� `�(2.c' '4 \ �� - --(m . >s—' s ' / - I�l►7 • (i�`�';arras0..--- _ • w.,m....o......�...,.a..i. lam+ — _- -.r13�1t@® RE,.�.r�-y% , I� ., q ww1.0P4 w `� -- ......are.. om;r Owe a,a.a� \ li '11M1 ' Y . _ .�":r""..: - ,.1�` o.,.,. ,........,,..o....,. ��\��\\//i ,.ec//r i Irk, 111 �l j ! mi- .:.Pair\ \ _` \�_ - _.._ - ...e....d .,.. »w.,.THE I. ��� \.. N.���\ o 42:© ��1 \i S S its y r .. 1) /�' '� 1, �\ �N\ . - raEirFet¢w' Ns\ \\� \\\\\\ ''' 0#1R _ �i1 / / ' • P/ / ' - `-- \ / .Q'•1 rnsuP.PTYr �v 1 :3'S ,\oormauwe \ ��/��_ A,wN� .F � �� /X/(7 // /�- \\\\\\// / II `\/ 0."C9 �. \\ �`�, 11; �� c, \ % I /. i... i / iry �0// ,/i▪ ce �-. NN \�-%< el�\`- Imo/ /�i� i �'e 1���� 1/J/.� •' I. / %��j jr. ,i ...rea• r /////!, , //-.� \\\ -_�_/i 61 \ _ �NNN� ! 1'l,,a.�����.AAA�� y`,. `1 (I �yl//�i•=T/ �►F. i�� - , _! ///// ////�\\\\\\\r�i!/! -�_< ,... �vrl \ \+\ `� ),'III I!� /� '� ice....:....-_ a::r /%//D \�� ���rn i. - YA1 e. art / / • \\ CSe.``�_� \ 1\ . I I fir//�!L'�.. �/f _ iii i----=_-�///-- /'P�/ \\ \\ �i i i /� reErr STUCCO. ...s EM ON ION- = .--a's' Ems �'�,�•����'w ,,{{If rl I I �'a .Nnl�//,. Q"�� y� i' �.....n ` --%ii/ /\\• \\\\\`— —� i .sTEn -, N - �X /i — Ng 9eePxM(bN1.InL EE0.l.f.11D' - — c N 1 \\Jl //l//,,,/, / i ,i- .,E.E°o'� ,,..dam .o„ .n Z ) 0 acb h - ♦ .. -/ / /i / //i////a /'%//i " PROPOSED EROSION AND CS o. _ �4 \ ,n•s / J( /' ///%j ///// // . a�ao�x"�T M.0,...,Eanws..ce...r..,...e>, SEDIMENT CONTROL LEGEND Z O tv '� ICh :i— _ac, Qv. \\\\Y� ��J( �/� //////�%%/ /�/�/ %/iiii�- ,..w.u.mo.c,u..°as vw.ec > W 3 _ . \\ _ \ - ! '',�/f/1,� ( /-/i i/ iri//o/i// //ems _ 03.,,..CEur) I - I 1— > WNi — � . iti � ( / NO CAN MALI,LL SE—- TEMPi '' '7 J N Y\ -� \\�-��\��\\---///, / -, //��//�/////%//�//%/ /�//�ii%%ii_%= s. TO.rnDEsow.TEDRE`wESENTAT NT MCC J war s 4.4.\\ ���� �\��'�--\:\\\��� %j▪ /% y///%/%/%%///�%/�/%%�%//�%%///„�%%./////% =i`-° aT�. M.POD oEwow ® smw MD.ar.r.o,cr (aa» I ® I Z Q M SLC.Ss\\TM �\\���\\��\�`������� �ii// / /////// ////// ///p// _ FW.eueTENN.OF SFROS1D.WO \�\ 01.\\������ �\� �� -�=j%% %/////4//'/%////j%///// NOMA(cow-Fax o�..n.,O. ® aa.nE.a�T vwo Lcna(aa> I� ����\\�\\\��77... ����--2 �i/ ///%//////////// ////////,/ �f w";.c.NTaRatwurtn t.rE.xrrr...noe o€ nr.wa+Y a....s,m w¢aa) II — �_7�7_ �` --\\\z--- ur — _ ▪% '//// �//////// i�%/'� 'NNE ROACODSTRUCT.M, 'Ewe.uuff WOE ro.twaeT TRANSPORT OF . 'Y \' \ \ \� Z. iii ,.✓i//ffl-7,// //O / T.w.,owaaOMEPASEO SURF AEw 7\� \� /�/ / / _ BE TRAMACAND w®.'n sQ :n..AM.(a.n ® I... Prier kb \\• Jr ��\\\\��.�\�\����7_.�__- ._ ��/�j�d / / "�1 7 sr MOVE A.STOCKPILE TOP su.wrtuoE ® .w suns(aw) j �� ��\\\�'�� - „,.d� / / / /�' ow xnr Tcn DEW,DUT NO F.PLACE o ra.RAi�MM°Fas P w ® mev.urc SEEDS.(an) EiEJ • ��_�_` j , / .wrsr SYSTEM MO ran PROTECTION AS eo. ® rcwaatn xmeTte(aaz) / �' - ��\\��', d• / / / / ii.�cawxcr o,o cwaE ewo roTnL01.1.4.9Faaano.s �a'L lau) I--®-- - �\��\ \ — / / / / i'�`r:F.CoDRAIN..rra.ro.ONONtSET..E.TT.N.MOa.s..n.OD.r..T.w ES OF /' �� ▪ �� - .-, .� / / / / e� OUST coma.tarn) / ���'''A'------.....'"'\�\\\\� - N- / / / / / • ..Tcarn�iTn s«u S.M. zEn.ntT ens.W. \\\\\=�i_ -' /' / / / ` PRELIMINARY ISSUE �` \ \\\\\\\ \ // / / �� a DOINT c m°twa)nDRY Pax ONO(DM(a°o) t \ ® NOT FOR CONSTRUCTION _� \\\\\\�\\ s fi /� 1 \/ / // // , vrwww.1ra ran vT.aa.n tsarsa°n- \ -. ``\\\\\\\����$ i // / / /,..-..MUNNTrey..awYuu,Tta.OFANE;aT..aoT..awo,<,Twna..nY ---.TRAP SRNS IIF AMR;AO — sem.,., ..:_ ESC/PPP - \\ = -/ / / n,.eORF..MEDFANKOLA,.WHERE.DE..NA.S NA SIN MALL.OE;R. �\\\\��\\�=3 j -, / // ,/ j / LANLY / .wBAWE BALLEX...ME PROMOTED o Win"° u.0 AC mnwm wEa PHASE 2 A • S. `\\\\\� '`¢ ` /, // / / / j /� ME�ETSEMBENELTw TIONT."D.EEAR1nasTi.rnc par cEME.ME FRAM.. t I \ / / / / // / , / „t.o` r °M N.VE n.TION."ta,.a1..00Ta.FnanAREA.1 APC �ow T.1.II,MAMMA°r' \sue / /_� / / // / .A TO SOIL MO=NVFLAa FLAMED SC TMI.ILAro rs..aca » °' • —/ ` / / / r.ar-d / r+o.FU MEM T°r.a.rnTED suu ,,�, , 'uvE.wvwi,awoa MALL NOT � � , __-- / / -c / a P/ , "® C-3.02—A MORON NMI.CONTROL '- __� �v�`.' \\�\\�\.\\.\��\\�,� ".\y`�\��=.- RM/MON.A MUST BE NOTIFIED PIE WEB(FwIrn TOT...CONSTRUCTION CONFERENCE,ONE WE.Favors TOT. /- i96 _ ---- z�,✓ \ , \\`\\\\-; �z,..,���1\\ j� ,,, mrF.eee.r OF LA.wcrURSING MOON MO OM Met PRIOR ro D.NM NSPEcrNx / L --- SEP. Will.SE CONSTRUCTED MO occompec FM., \ \��Z�l-���\ \2-\�-;L`�-•/y. :MIENTC Mora REwuWnn. //� \�`..'---''' �� \\\\��\�\\\\�`\ ��==_S.-= M- - • x .uansaFMo sEO.FIIT CONTROL RAF..a.ia.ONE TO eEFuaOFwwrowWS TWEE.STEP naF.w.Fc. ® \\\ \\\S. C.'' ���\� \��\\\�a� ,� q UN...ALOE MANTANED OR NE STE AT A11 TIRES IR F1wa�MOOvn`.. SUM r.NMEM, ermaN mrrNOLION wI NO1L.,LI TO. "' '_ _____ onteverde /'�^`"49 _� _�� s�\\\����\� ��� .'>�� y; NT C.TRAROW CONTO EAsuES MEM.TO PREVENT � ___�_ ti` \\ \\\\\��\\\\\S..�� / o BY R. ar�µcMHO..r�N Err aDes� Stud F .-- ,�\ �\\ .� ..11 SEDIMENT AT ION Kr DT PTO APPROVED SEDIMENT CONTRIX.EASUIES AT M1 TIMES CORNS LAM CORM..ACME.AND pr,eer�np pn. _-1 �ImR ratlF �,wmoralam \ ���. =�� �..r py:.. [ARM NTF.VELOPMEM UNTIL FINK STA L ,..LAIN;u ..................... / - {��r'_���_— \\\\\\ —_�� \ Y- /l i`[I7 MAVMC 77.R Vin Rleltti.lpd.JON0 R(S0ML[VOIT / r '•"``_ • \\\�\ \-•—_��\\ , �S ML OY Nun CCMRfL CEMCE69r4ll BF MMIF YIEOMTFlY p..4!,1„4.*., \\\ \\_\ r;..-...,,,,---,-*.....--- -________/ ps FROAM AVNmYm sWM-17 EARTH FIR.: / \\ == \\\S. \\\.. // ' Mw VILE S.AND Cf=OrRIS INN,.,,,,OF COR[1v.FU 2aNNOaOawrE 9ECIla.a,.SM.EE NERT AMEN.MET Ff.6RJOra. �� -\=\\\\\\\�\_= =_., - # izn....TENww nMalBm .aw COMM.WITH err b THE ALBERVALL. HE / / - \ .-\\\\\\\\\\�\ �ff P.N.E.E.A.n.o..aNr,Mm ATox.aoa.emwo o.M.cf TO M+rnarerFE�T arrJffO �/ / IS°�oWmLL OR AS.A SHALL BE MM..Pi A SALE AM.ER Twn rw.O.LATER.SUPPE rw To MwE • OR COLLAPSE / -�\\\\\ \—i j •... _—_ / __ , DEVELOPER ER Swu RESERVE TIE NOR,TO NNALL MAINTAIN RENON OR CONYEwT TO PEFNA..STO AWNER wrrt.ENT �w00__ _� \\\ \\\`� -/ TES M.E AMT.. .EROSIONAL CM..MEMMIES NO.Er Ts.sus WEeMOLESS OF THE we OF MAT WT.., ORTIONb Rc PROPERTY // NM..NNOS. =\\\���S.= 6/ /' / , Mvrnwv SIRS ATONEw.BET.)P01.17 SEEDING MU NEON.SEEDING II TON.Al 76 MSAOE.MM N RE Mmm.e of R.MCE RWS EPTEMEER TO FEMURS/rooaMsrA SOO NIX O ANNUAL MORASS ARC AREµ VnnifN RYE.OR n MAROI AND M%To COO.OF / __-.�_ ` \\\\� w5/ �' / RYE OR Mir TINCOMAMEUST TO CONSIST OF GERM.MILLET STRAW MM.M TO BE A.R.O ATN M..WENN..ME /' / SOFT '- \\\� r" / ' '/EOEr,K COUNTY EROSION CONTROL INSPECTOR _ \TYR \`� ; 1020 / EWH.E MEMO FERTILIBR.PEN... MOM...AawcuTURK M.UES.E SMALL LIE / // coranss OF // �� \� ` ® ` ,�\�/ \ - /e/ N.M.INE:91FACM Mo CONym Of WADANE rNTUM II OR NO A. / \ :�` , / .ROME...0.....N.M.STRAW a TOES AI,E�ATFN.1017.ALTN.WT,YEaMASUIJEOTTO / ev TEE COUNTY Eao9aN commaNNEcroR / TO E NSPECTED METRE NO AFTER EACH RANA..INT MIME OR DOOM.TO MORON ' \ \ \ _� _� / ET TRAPS ARE TO E CLEAED WREN SOK OF THE WET STORAGE YDLUM IS FEED WITH \ 1 `NNW _ ------ .� MR/0EE m'MM.Vi.E`ti.,r Mauer toNAILVL ANALOitNO u MIMS MI MRS Mo ulaM. // \ �� /' / EOM.MINNr E CLEANED AIO REPAIRED PNECN \ \ // ' / MEASURES MP TO.ONGER MO..S IIECIroN.M.ST ME CC EROEON[M..f e x.....TEENOROR EROSION ME TO OF 1� S \ \ _NE MOM ___ \ S. oO.rN yppE�T+E RUNS / __,....... . Q. , cr 0) , , ........ ....._ / \/` -, R\/_ :�= /EROSRO.AM EDNENT CONTROL POMPOM r .. I� w 00 RNA ��\ rAE/�`TJ:`i N•SLOPE_ -a \✓ --- /, / • msTal�AI;`,:tr°:w NUMU OA,.z.Li°1WI�°N PROPOSED EROSION AND co Z p °N I / / .T N >o f,E°;�rO,rP - - ��— // PEROS w`.S.I CONTR.PLAYS MAENAD WMSE SEDIMENT CONTROL LEGEND z N / (' �\ r / // /. PN+ri.woF .ENTvneL WATER RTOAEu..vATRue>w.E a F— '— 3 �/ '� \�_----- " �� / / RNA MHRAII.. E ®AawTM A an Os.E,r FENS(SON) p UZ •COMPETE D °a CV O / :Ns.", \ _ tee• y \ /'/' // TE ORMANCES R SYSTEMS s ® CONSTRUCT.MM.UM) I I I 6 / / / !! ` ,- / _ SHALL E MACE TOMO CORER TANNER TOP. Q M) / / PROPERTIES ATNEMNC TO RE EO..M ISELOW O /, a LO Q / ' � - //. \\ `� / / DCRIT TO THIS CO INUCT N ROM STABILIZATION(103) ' V7 / 2 —__ 0. WI. _/..3._94D_� /�_ l_..NO TFM oRMm TFRmo»RS Pn"'�DRA :LmOFf"REO'EwrANTE�Ea sRM. ® ® /�n m t ) // ` • MM.IDrRWlNNTONOi SNORTED REPIEEENTAnviRnON ® 9Ll fc1N£(SM) ! v/ 1 lr-^� ® ` \ \\ ��� ��� �' I CONTRACTOR IS EONO.PRE.C.RTRCTONWET...CONTV Z Q / - MOENbEER O RECO.O. ET..oNAN / /' —/�� I �' /// s WNW FEEBEMMLECOHnTY.TIFA JOEYE MN TO M.DIM.. 0 MET FMR[<Ig1 BOB I�}'ADITTNS. F- / ' / i �-�- /7 / E TIE CONTRACTOR IS RESPONSIBLE FOR M.....E M.ERO.ORMO / 1 / "/ / /�-Z \ / SEC..c CONSTRUCTION EEwwaa ® RuwIT PRET P.R..(10R) I� / /! i , // // I \ \\© �920- -� '' i7 ////WrnEREw lRconos•NviTeKT,EO.YE EDNENT rr vRwTEa INTERSECT vWvm OR ® TONanMr mEnsOR ERE(SE) '' i I / / �I __ / NMIR:ROM.SEDIMENEST V HI CULAR iR E ARMO 1D .RE/'R T°` ® moo D ..r OM..an7 I I / 9 O I _ / / a srw.EERieMEOnt"NmwRirwmOm•IN.ROM nH.�OFo SUMO mw(S,J) ®.MERE R. o....MY.� r / I 1 1, � __.___- - --- // I AT THE ENO OF PM OM T� TON SPINS(l.w) // / I NA POIRPS.. �' A MEA NA PLACE FILL .PROJECT aMLIER 1 SEMEN TOM CMSITFTYO NOT PM.FILL EN 110.0.Y SEFEO(ST) / ©/� 7 \�_ -ii IS Cr STWfE WET / E.INSTALL STORM OMEN SMMA MO ME,PROTECTION AS EMNNET. / i / h/ \Q WEEK EO. ® PONMERT SF..(xu) E�c� / \ / / ) / / ` �-• / WET SRO.ELEV.JS�,M.MT AREA•NORLITIES '- O10 APIN PAO TO INIE AIO o...anion TM�E RUMINGS MNRwo.w RATIO S ® N.C..(].Ja) =+R 1 \, /l - I( l ♦. / STORAGE ELEv.NL.r /NOMINTIINT BEY CRAW.BRNO IMO0.1r rn L AWL.. i' OUST CONR1(3i) Q�J+- _ - O TVA k •{ R MET N'�Q 6.EWFO6L OF fIR w,IE FFA9QE. ® SEDIEEMT RANI(1T1) SIL/ 9NOptS RCCNEAOK SHALL OEWATER EDEE.N,RM TNOIOH SEDIMENT M. Pam. Y1 \� . .WAY u s NOT FOR CONSTRUCTION / WE r//� � ./� eR ERNOMO 0.0.1MRON�MWL I MNO A MIA OI MERE _ •J'"'-- `___ / ,ss,.DewNLaEOFa�w•rNrrbiweaeAaaanTwNai RCMP ewm mom amEERrE / ROOT oEa Oa fs.xO) tf�� RROR. / E O \ FILL_ A.M. —___ .TUREANa SERA �/ACI.1 /L / / I.\...... / -. y _--- :_~•EANAa AB,. E�ES�C/PPP / EL 1 \ �� / / Io.NS NO OODERNISE ORCI®1ROYEROS.I O ,1Z1 AC OS PINED M. PHASE 2-B TOV MLR CAM OTSTURMO MIMES CEA.RR OM P.. CONTRACTOR.ALL STN..IME INSTURNO AREAS.IF W.TMEN 00ES N. 1..ne 2 1.2019 ORME. UPSTREAM OF ' _/ E- cif - .E" NOT LeOETATION.MULCH MET E AIRED MM.Lssr EMON �y ' / i /M 11 -__. % �/�!i /.' /�d+ 17« BE TOPSOIL. NAMEDP ARM....E TO T.ONCE. _OMMT. spit \., !/' /i-i /A \ 8(Ylb '4 / NMFN...P E MN.PRP.TO MACE..OfMOOR TOSS.M/REMALL MSC ON n YANN -- / �,��, • -,,...„..,.../..-....- !F /// /,i/%ice. /A.:�,,-/ 4'' " / , .=`.."="=; ;l ii— 'r v�i- ALMON COUNTY GOER.GONEFI.wTw..m.ronuowluo®.INNTCA EL PEA. w A.aE Wii0F1 Os' 1 �%=-� �"%%/i�/ , TIE RN,APPROVING.THORITr MUST SE ROMEO ME PEEN. lTO THE P ELONSTNETION 00MF9FlIQ 011E..AMOR TO 11E "'wrfg'aAP„Eui a"ri l "` ••:, r%/ �i� i ri - _- CONTROLN CCMENCENIENT OF tr.DISDRENG M....eEw ARO OW `NeTRIXIMNOPM"`v1r,INSPECTION OCRDI OTOWEN.a,.lu.OSMO i� CUE r' T wMILM•E��� �!i i%%/- ROROr1Wo�RooTRm.NIN,000cAro WRGNA REouuTF..w o.mo.cRmEE1ANo /Pk /z t / (/y f j j/'' —/> SEMEN r `rRT CONTR(..xEASEES ME TO NE PLACED PRIOR TO ORM TM FIRST SEM N CLEWING. �./ ` f \ 1 /// �iG /i�ii // � LAND w>TI 9EpI`u.T..111 MEAS WPMTH.ru.reDW,�." DPW,AW."`w°.BUT NOT LASTED DI. I \ ,!. „o' `) / -*IA.-. —iii' /i, ////J' Off. `wraoTEMEM,DEOOMw.cTwaw:MN.A..nEEENEARPEROSIONCONTRaTUNTODECN.I.FN i "O"R N N 1 , ../ ./ ,r ;v4/ -=-// ;/* /I,//�;,�\ , 'RE DER °wN OF AN„ BONONCONRGEIE.NN/ESTECESS.RYTOPRE,..ERONEN o/Lteve/ �// • ,i1.'cPn `' T ✓././ %/% -• /�//' /// /, /..,�i15k jr%/% DmT°`x`O1 ""'" 01'1.•'T1C1O �.Roµ T11''11NEwNEEM.0 T.EST•m.O T.No ae,,,eNO EOEWES.wD ,^nTmD..e a•oOsa,sew.o A+m+s ! /.• // %� / �/ /' / ///////i//// ', DURING SWF DEWAT MGOPER C..W ERWIi.PUMPEDIMOANAMMON.P.,ERNOOENOE ------- -E.ar .'�' /i /i�•�--/ _ — ' !/ / i//i '/ //// • . DunEloOm1°EmuIN".; S:“-"g- -TotON�, ...,-o AN .u.Ere- c 'oxTROuw oi---:NOR,wr..E-nE`,E`."rE -tom /i i� �;� i/ // F.ENA.ETS OAP"'MR o`""E :.WENESSaF �SS1W..eE.Woc / - ��Fdu.`,'"f "OA�� /// //� / // /, / , AU AMIE w n O R1 APPRO..WASTE N.A.EARN W..lu.s PERT NATE..s O1Er FREE OF ROOT. --_ Ill// , ,/ /// { 1 , //' /����—�IN.-I//I/I ///// ,!• „I / l/ .E D UMCE S T PER C ,wN>,z. ........... lI/ l/l 1/ 1 I 1 I t l A AWLNEI'::A' :'PRS,POWER E. UNITED TO RR TO Esc.. w //// l 11 O. I I I 1 I N.R0 REnSONSPMSN..OM..TOP LNERrwoun.E«OW Tw..aTOrWwMK.TRE.BEGx,>E0SLIDES. ///// / { 1 11/ \ & THE Wer.TO INST.EEA...RE MAY a°o-N.,RSN N. R ESA STORM or. s, RmES WERE PPOPER eEAr mSONOo RO EMT. ."` /ljj//ll�l//llt Itl/11I11 I \ \\\\� x .>ER / �NGatoN.C.,.�0 NE..IS,ORF.,,,/MAC E Ann w RFE,ONTM.a l/ l//N 11 I!!lI! l ti 1/I\ \ \ �� SEPrENE.TOT...R.TO CONSIST A>EEO NIA.AMIwER.EGRASSNND.RE.WNTERR.E.DRNN.RON.ND,RILT000HSE. ,,.NDER.E.OR ANY THROUGH MEUSE TO DDNE TaF..MA DUEY STRAW MAaIS TO.APPLIED AT SOLEMNSF.M.TEM/AT..APE uaueamselEa I I 1 1 Ill //I \ su.EO TOAN.DEDS. E ate. ERovONDONRaNSPEDO 11 \\\\1 \\I 111111(1/111/•Ill III II \ \\ \�� ..PER....T R NDNN .E.EANDFENRGaRP a .MS EwD.AOMA..AORN.ONA NNE R.aiDENw BE ------- MD CONSIST Or / ////111�\I\\\\\�\Ili a llI/lI/f11j11 Nit ! 1\I\ \ - REFE NUL R.. SHALLWSP WPMCH2,.O P I AMON MT.NR,ME l//,i)»\\\\\\I11H POND 111/ll/1111111111I \ \ ,.ESARETOBENSPEO..N .AND AP,EREAaRAREAEE ANT DANAOEOREL...TO.TN,D„NNE ® ▪��� /�/i//��/�l%�,! �" III/Il/llljl Nil/ill/it/11(111 I i I\ l \ \ REPAIR M":OBE1�..P.M E;`R.m NVDG�nA� S>:."a A°a SON p OM.PEEN ME COLLECTING M.P.TO HALF NNHERNT MSS ar,mo A.REAMEO.�E T41 — � — V ` I f -//IP///i/l/ Ilt/I111111111j1I I 1 1\I�\ e..ITAWO ENO LOW.PEED. R,eEOT.OAPPROOA.S.TECONTYEROSw1CO1 . SPEO;ORNAL ST..�TRNWa 'i .i ORe.�.�ILL IIII►IIII I1 I I \ ,t n , . / ' I II 1 \ r,,,, , \ > �; Q�� \w.\ _�\- ����� \\�\/O ( a..c.cmNe,we.RMEiw 1 'J W j O li TM 6 — !`° �""` ° PROPOSED EROON AND•'"• EDPESSN. ''""Ez. SEDIMENT CONTROL LEGEND (A > \ \ / //t ZONE: RCIRAL ADO..OFNER.P1ASEDNENTOONTRElP.MASEM.. NUSTSEPDT I— > \ I , \ // 'Off MEAT.TRES. C. -\\O \ 1 ��' _ /j.////� .Aunrwvam.EN,.oaEN WATdr«w EAuvATve>wuee ©zMErr FENS I I I 41 CG4 0 0 ``Cj \ \' "/ // , A ESTER B.o„ERA nreuaD auEF�.TML W 0I- OCAL \ \ � -/// /y. / / ORIGNMc �vue�srsT[FE.s w�Nr nETmwENO~OFMRMH AIFAf£W ® CONSIIN1CTpM Emu.(Sm) I I I V Q ,LJ-, C _ ..',).. / /'' /O ��/ •00.9..spEam.OAK r i TADEwN.TT SWAM. DEaud TO J m A ' — / \ /-/ CRITE.TO/WS REGARD.•110 TENDON..DI..NO...ENT comma...LURE.MALE SE OT1 AND ® GONSNDDROX ROM STMUaAMIN(].w)I �I = 0") ' �� 1 •1// �1,/j \\/=-'i.- •\ / sEaxEN..nwNISTTL.TOROR WE.m.TROOT,OTIFE.TwcvA,NOVN,. ® a1 F.OE(aw) I-•--1 .T'' - ENS , - / { 1 CONTRACT.IS TO S.M. awn PRIOR ro NNE a..Tvs10 © sTaM1 MAN N.cr NrorzOTHN(a.oz) I O I / / / i�t -- _\ , ,¢ ...ES T OF W T F TN A.., ® aavolr MST MOW..co.)a I� I I I k\\\\ \ \ Iv" — / y//,- /l .�/� •STEO DADO DNER=«N,N�,PRo,EO,,ON`OON„R D o ROADET " \ / •.�,.. / ® TEaraEARr u.uaal mu(aa) I \ \ \ \\ \ I \ \ I / // -- / Eon• '.iEMBY`PEAL VEHICULAR Ta P VEDS.FACEr'AWITE.or Rw1T aF.A.mdsw ca,p ® - «.RrE. wr I \ \ \ \\ ( • L/ / — REAM w"wSAwo1Wi,ED ONTO ao,n SURFACE.THE ® T� I \ \\ \ \ Y // `� BE CLEANED THOROUGHLY mmarclETrImSINo '��xr TRAP(zn) \\\\I \\\\\\\\\ \�� I e'i // // /——�/ / REM A TIET SEND,EOF EAP1a. ,® TOP SOEEIO(a.201 r \ \ co 7 MONA. SMOG.TOP.OEPOR RE.BE AT Ci0fE OF PROJECTII _ I \ \ \\ \ \ \\\l 1 i _-/ / / MIN W.CEearw7TOM EwPr1CTOR DEW.DO NNOTT PLAFrACE FEL If w TEalloeAR.SEEMS(aa,l �I \ \ 1 1 . WATER /.:,Tm:m'�"M"°o=`�MEAONE.E,�a \\ \ / I AMBER / ..' ,.DEW. ® PERVA1,1T SEEDING(1..0 I ® I - --. �' I I 1 I I 1/ I /_1—_CREE ' PROTECTION ' ,,..1NMEMLE NUM. ONmN 4�oxOSFo.o.R.R ® MEO.c(a�a) ' /.//; �I ORDINANCE ./F.Mo N E.ERAP.roSASNTHROu...N,ASESOF • OESFO�N4(a,) I LV,4TER ED 'K�pq PRELIMINARY ISSUE /// ,/ / /� ——— BUFFER f w""KT°"a'"1L pENM1F1.11.018.121122WON Cr RTMN'Of N�"FiO1°" O"."FR'E" ® Rr eA91(x,A) NOT FOR CONSTRUCTION !k L / o.,... ...uNYR'`�`O"�F'�FO.mal&GEMENT MO CEcaNN WOMB NNE. ® Roo.aE«DAN(gaol V 1. 1I ,� ,/// / ✓ '�/— I // PERN,OW,RINORANPREDICTED.FEL MO Er 'A W5 DIRcnPROM.. A.R.--_ wTS OP CM.PH,w. ESC/PPP / /j //rya' -/ 1 MADE UST is OFMONNMAPSALLHALL BEAFENEAR.NOS.uRNNCNcrmrroRANr st°"ENre"s",A PHASE2-C eoxnwc„v1ExmArIrE WTrR / = / ' , SIAEE ORNwEOF AN ACRVR.wK1EA¢VurAN UFEMM 1W,AWu,PA1 rorM,craxmr / / AER::tf r///// �9 I ...e®w" .M.m"`LaTmlEmm"w�r�TFerEoMnaAeERoN`s 'N n� Tax AC orsTUNro AREA 'M1.1.0. 7 AI.EYYlL OOIMY /.E i.:f.; //// / , ATONPEc.q FUTLE EARTH COS,LFNEIO AWVITES .Ir \ I =ARam C % /// / / / / NNOT PPEaeRr VE. nar MAa1`IE FEST BE AS..TUFEED NES.•Ss1. i or.F.F MOR �.."" -'+' // / / /7 / " rNs'•m o / DPN MD NNNEMTO.E.0.0 12MLAMTEDBUN. EB °1ENOE. / /--, PRIOR,DPLA<NeRDFTOP,D..AARMS...VEGETATE... / _ /A ,:, ES � /� TOPO.SNI NOT BE FEI®NEI C-3.02-C �.R� / wo FRO ORE YWET MOaM AND 4/M NT 00NTRn NARRATIVE WTMRN EROSIVE NO SfM05T CIMtRX NOTS. MS-IT ANGULO SONLNT TRAOdL MERE CONSTRUCTION MOLE ACCESS ROUTES MRR0CT PAVED 1 PEWEE OSMIPTIM MS PROJECT WILL CON95E O A TA51NG ROW FOR RC ME0NO,M EVENT ES-I UNLESS 011ERMY NOCATED.NJ.54GE1A0\£MO SJRUCOIR0 EROSION MD SLO1EHT 00N1RO OR PECK IONS: VENUE,NO ASSOCIATED PARRNC.THE EXISTING FIRM POPO MIL E MWWED FM S10NWA1FA PRACTICES NIL BE CONSTRUCTED MO MANINNEO ACOMPTIC TO AWAMIM STANDARDS MCI SITOIICAIONS A.AROM9CNS SUU.BE MOE TO MANZI RE TRANSPORT O SEDROIT BY MA CO TRACKING ONTO QUANTITY MANAGEMENT.THE 06IURBER AREA FOR THIS PRCLECI RILL E 13.24 AC O THE KRONA EROSES ANO SEDIMENT ORERO HANDBOOK MID MROINA REGULATORS 9VAC23-1140 ME PAVED SURFACE EROSION MO%DOME CONTROL REOAATNNS B.MERE SEDNEl11 IS TRANSPORTED ONTO A PAVED OR PUEIC ROAO SURFACE.ME ROAD SRN ACEilifft 2 MIRK SR 4M000 31 IPS SIR IS LOCATED AT G565 DOR WOOS ROAD AO PROJECT ME E5 ME Rµ APPROVING AUTHORITY MUSE E NOTIFIED ONE WEER NBGR TO GTE RE-CONSIWCTIW MALL E CLEANED TH0 P...ET AT ME 00 O EVEN DAY CONSISTS O M EASING TAM ACCESS ROAD.0EAEO VIE AND AN EXP..FAM POOL RE CON£REIO,CM SEER PROP TO M WMENCOE11T OF u1t0 OSI UBNG ACETATE AND C E WEED C.SLIME*!WALL E REMOVED FRO/ME ROADS BY SHOEING OR STEFPNG AND TRANSPIRED 10 A PRAILCI MMMZE5...ACTS TO STEEP SLOPES NO ROOD PLANS ARE Co,SR. PEON TO 1E FNAL INSPECTION. 9DMEM11 CONTROL DIWOSN AREA-START RAHMIG WALL E ALLOWED PLY MIEN MOMENT IS � * ES-):ALL EROSION AO SEDMENT CONTROL MEASURES AM TO BE RACED RACED PR011 TO AS TE MACAW FIRST O N THIS MANNER. ,LEE/ V(Pe (te 3. EAIA1NT AREAS MI5 PARCEL NO ALL AOJONNC PARCELS ARE TERN ACRKOLMRAL OR MOSs-N PLANK. MS-111 REl01VN OF TEMPonµr MEASURES AU.TEMPORARY EAMON AND SO MER.CONTROL MEASURES En91T1eertro B.Deport Studio TESONDM. ME ACC.PARCEL TO TEE REST IS WRRENRY ALSO USED AS A.NEYNO ES-A A COPY Cc M APRRO(D EROSION MD YOMIFNT CONTROL PLAN SHALL E UNWEANED M ME MALL E REMOLD VAN N 30 DAYS A1ER MAL SITE STAEUZAOM OR NRR TIE TEMPORARY MEASURES SR AT ALL RMS. ME NO LONGER NEEDED.UNLESS ON01MY AUTHORIZE°BY ME LOCAL PROGRAM AUTHORITY.(RAPPED N.M 11P AN I....A.......N.N..Two,... ES-5:PRIOR TO COMYEHONG LAO-TSTURBNG ORATES N AREAS OP ER MAN IMOANO ON THEY SEOYEN0 AND DE OIOIMEO SOL ALAS RESULT.FROM ME 19P09nON OF IATIJITEMPORARY REARMS A. DF-SIR NNAS THE SR SHOULD NOT 11010E 00 CR WASTE TOE WPOILIED/EIwORRO FROM OFF PLANS ORSUONG.BUT HOT TINTED TO.OFT-SR BARROW OP MASK ALAS),ME CONDUCTOR SHALL SNAIL E ERMAEN ILO STAUUEED TO PREVENT FURTHER EROSION NC SEDIMENTATION SITE.MY OF-SITE LNO-01STA BOG ACTIN1Y ASSOOATED MTH THE PROJECT MAST E PERMITTED 5'JB.A SUPPLEMENTARY EROSION CONTROL PLAN t0 THE OMIER FOR RENEW AMID APPROVAL BY ME MS-TO SIOMWARR MANAGfMENI PROPERTIES AND WATERWAYS MAINSTREAM FRNI°MLOAENT SEES TROUGH IRO APPROBATE ANOSOCTION PLAN APROMN1 ARMORIIr WLL E PROTECTED FROM SEDIMENT DEPOSITOR.EROSION REND DAMAGE DUE TO µGREASES N VOWOE. ES-6:ME CONTRACTOR IS RERONSINE FOR IPSTILLAIMN O MY AAItIONAL EROSIVE COMM DURATION AO PEAK MOW RAIL CCSTOMWARR RUNOFF FOR THE STATED FREQUENCY STORM OFZA-HOUR 5. SOUS:REFER TO C202 E C2.03 FOR SOTS MOWAIION UFASPES NECESSARY TO PREVENT DROWN NO SEDI*I310ION AS DEMEANED Br IRE PLAN APROMN 0(1501 N ACCORDANCE WIVE THE RATE NATURAL STANDARDS 010* M01 O01FRN STSAY ES T MAN- It AV1HOOir RELOGIN PRIOECIS THAT INCORPORATE MANRAL CHANNEL OE9d CONCEPTS ARE NOT MAN-SPIN CHANNELS NO WALL E EXEMPT FRCS Mt ROW RATE CAP.,AND GOOEY REOUREENR FOR G OR ME,OCAS HERE ARE NO SPRINGS.ERAIOS,ES ROW PLANS IN M PROJECTS URNS. ES T.ALL DISTURBED AREAS E TO DPW TO APPROVED SEDIMENT 0.TRW NCAI MANUA MCASWES AT ALL TANS MANA CAI ENAMELS. TURBAN.OF SEEP SUES(a.02)ON Mt wu MPMNIm ALL OAT AND TO SLOES IN M DON. MTNBHG ORATES AND OURNG SIR E'ELQNENT UNTIL FAIN STABILIZATION IS A PREENIMRD 3101*0RR RUNOFF LEAN.A OEVR0M0NT SIR SHALL BE DISCHARGED ORCRY IUOJEti AREA MAIL E M'IV W LESS.UTUN EC2 BLANKET MATING M ALL 11 SLOPES CS-B:DUP.IMATERHG OPERATIONS,WATER AO BE PUMPED Wro AN APPROVED RIERONC ENO INTO AR ADMAN HALM.OR 11AN-YAOE RELE0NG CHAMEL.PPE OR STMM SOMA SWAMI FOR NOSE SEES WERE ROOT.15 DISCHARGED INTO A PM G PPE SY'S101,001IN510M STABILITY ES-S.ME COVERAGE.WALL RESPECT ALL EROSION CONTROL MEASURES PENCOONLY AND,AFTER EACH ANALYYS AT ME MENU O 1K PPE OR PPE SYSTEM WALL E PERFORMED T ER.00N AIO�nRSNI CONS.NEASMES;UNLESS OTHERWISE AC!ATED.ALL VEGETATIVE AM RUNOFF-P.0U.°RAINFALL EVENT ANY NECESSARY REPAIRS OR CLEAR.TO RANT.THE El ADEQUACY OE All CHARNELS AND PIPES VES WALL PM°IN ME FOLLOWING MANNER AL EROSIVE ARO NMI CONTROL PRACTICES WALE CONSTRICTED AND YNNTMIED FRTCTIMNESS OF THE FRUSM CONTROL ON05 MALL BE MADE MNEOAT 1 10 THE M610.14 M STUAR ANU IPCOFICAIO OF 1 AROMA MORON AIO SEDIMENT 1 T APPUCANI L DEMONSTRATE MAI THE TOTAL ORNMA.AREA TO ME PONE OFANALY95 AM IIOUxL' WOG IIANU .011MO UNIIM.135991 AS AEU.AS ANY ADDITIONAL MEASURES REWIRED BY EMMET STANDARDS DST' WTI.ME CHANNEL IS ONE HUNDRED TES GREATER THAN THECONTRIBUTING OMRACE AREA OFA OPPUCATAL LUCK,SIA:L MU ILAN.REGULATIONS ALL LANC-DISIUIDISTM0N.ACETATES ON1EAIMEN ON PRIVATE NO PUMP,LANDS N ME COMONKALM O DE PROJECT IN QUESTION OR STRUCMRAL PRAC TEES NNUMA MUM MEET THE 19 INN MU4 SIMDADS FOR E.M SECTION PO50-30-AD O ME KRONA II.MANRAL CHNOELS MALL E ANALYZED BY ICE OE ITIORM STONY TO VERIFY IN. SiTN TRSTAPLINGIM 302-CMCR.MCE-A STING STONE PAD IN ROM PORN OINR SC REWLATIONS.THE APPLICANT WHO SUBMITS ME ESC PAN 1O ME PROGRAM AUTHORITY FOR STOMNATM MU.NOT OVERTOP CHANNEL BANNS NOR CAUSE M09ON O MANTLE BED M LOCATED AT PORTS 0 VEIMOEAR MMESS APO EGRESS M A CONSTRUCTION SITE. C F S RESP015!BLE. M MIEN.iCOMPLIANCEMN RE MNMUS STANDARDS MAT AIRY TO MANS. 50.E-CONSTRUCTION ROAD STABILIZATION-THE RIAPMµY STAEIZAl10N O ACCESS PGDS, NIS A/IER ACTNIES. 1.2.ALL PRENOUSLT CMSIRUCIED MAN-MADE CHANNELS WALL BE ANALYZED BY ME USE OF A SUMMON ROADS,PA URO AREA AO OLDER O/-SR SROEAR MANSPMTA0M ROUTES 145-1 SO E g1/ZAT r50SM ONEY PERMANENT 1PONARY STABILIZATION SHALL BE APPLIED TO NUOD AREAS 10-YEAR SION 0 VERIFY THAT SEOMWAIER TILL NOT ONDIOP ITS MMRS µD BY ME USE OF WM STONE IMMDIARLY AFTER CRAWE. A DAM BIER FOAL GRAM IS REACIEO M ANY ACRE.O DIE STE.TEMPORARY SOL A TWO-RAN STOVE 10 DZMONSTRATE THAT STORE/WATER BILL NOT GUY(ROSES O CHANNEL STAEIZAIIM WALL E APPLIED WIND 2 DAYS TO O0001O AREAS THAT MY 1401 E At RNAL WADE BCD OR BANNS 105-SLR(MOE BARRIER-A RM MPARY SEDIMENT BOOR CM56Sw OrS G A NTEM FE DORMANT TER MIT WILL RECAP FOR GE MA N AN 30 OAK.PERMANENT STAE E 1ANDVE ALL BE MALL ROOTED TO 1 APES A STOP/SLIER SYSTEMS SHALL ANALYZED D BY/TIC UY A 10-YE SION/10 FABRIC STRETCHED AMISS NCO ATTACHED TO SUPPORTS.HOSES AW ENTRENCHED. AREAS T ARE 10 E LEFT DORMANT FOR MOLE MAN ONE VEAR ERE THAT SIMYMARR SILL E CHINNED EMT THE PE M SYSTEM. 107-STORY DRAIN GREET PROTECTION-A SEDIMENT REM OR AN❑GGVAIM MOUNDING AEA M5-2 SCA S10TOPME STAIUM..DUNG CP.511UCII.,SOIL 510CRMIL5 ANT BORROW ALAS MALL E..IF EASING NAIRA.REOUVMO FUNNELS ON PRENOUSLY CONSTRUCTED MM-MACE CHMNFLS ON AROUND A STORM MAIN DROP IN171 M CURB WEER E SIABEIZEO ON PROTECTED AIM SEDMOIT IRAPPNC MEASURES.TEMPORARY PROTECTION AND PIPES RN NOT ADEQUTE THE MFLCAO SHALL 3.00-MARI PEET PROTECTOR-A SEDIMENT ERA LOCATED AT THE µLL1 M STORM CULVERTS PERMANENT ST.UZARM SHALL E APRED TO KS SOIL STOCKPILES M ME SR AND BORROW AREAS I SPROW ME CHARNELS TO A CONDITION MERE A 10-VENT STORM MS NO OVERTOP ME BANS 311-TEMP.ART RIME O WAY ONN9M-A ROE O COMPACTED SOIL M LW1 ROM ON M SEAL INIENRMALLY TRANSPORTED FRCS THE PROJECT SR. AR0 A TWO-YEAR STORMPLC NOT CONY EROSION TO DC CHANNEL,THE BED.M 1E BANS ES -... GRAVEL CONSTRUCTED ACROSS PS URBED RMIS-O-WAY APO SUE.SASS.AREAS YS-3 PERMANENT STAP EI U.DON.PMANBNT METAM E E COVER MALL 010. M MEO OENP EO 2.MPROM *ME PPE OR PPE SYSTEM TO A DIADEM MERE THE 10-KAR STOVE IS CMEMNED 112-TEMPORARY SEDIMENT TRAP-A TEMPORARY BARRIER CON AREAS AM ER D WM A TROLLED AAS NOT OMERY PEP/ARENDT SIOZED.PERMANENT SHALL NOT E ENT VEGETATION OT CONSIDERED N THE AAPURTENCE SIMM IL AN E COMPACTED OT NATER EA.STRUCTURE FINED BT CONSTRUCTING EINIPP NT O PACTED CSTASHEL UNTIL A WORD COVER IS ACHIM°MAT IS UNIFORM.WARE ENO MIRK TO S ,NO NM MS SOIL ACROSS A MNNAO5AY MM.. 1 DEELR A SIR OWN MAT WILL NOT GUY M MI[-DCNYOMdT PLAN RUNOFF RAZE Mom A w05. i BASINS•TRAPS.9DIMEZNi BASIN£91 T TRAPS,PWMEIFR ONES,SEDIMENT 10010 STORM TO NOEASF SPAR RUNOFF MTFALS NI A NATAA CHANNEL M SLR NOT 3.14-TEMPORARY YOQNT BASIN-A IELPMARY PON..AREA FOEML BY CONSTRUCTING AND - SEDIMENT LOSE NE PRE-DEVEMEHT PEN,ROOT TEAR FROM A 10-WAR STEM TO INCREASE WM EARTHEN EBA9EIENT NTH A RISER 10 DEIAN SEDIMENT LADEN RUNOFF FROM OSTMBED BARTERS.APO OTHER KASNES NTEPEEO TO TRAM SEDIMENT SM..E COMPACTED O A PST STEP RUNOFF OUTFALLS INTO A MA.-MAC CHANNEL:M AREAS LOW ENOUGH FOR ME 490511Y O MOMENT TO SETTLE OUT n ANT NAND-OSMTAEIC ACRNTY NO SHALL E MALL FUNCTON.EFOE CP9ZPE LAD OSRWNIE TAWS RAC. 4 PROVIDE A CO MPATIOR O CHARNEL I PROKMENT STOMMTER°CIENTO.OR OMER MEASURES /1l 315-1F3PUNMSOREY 01E MAN-A REWBLE PPE EXTMb FROMTI O FROM TIE P PAST THE TOE OF 1MGR IS SATSOIOO I0 TIE MSCP OMOOry TO PRENT VE OOM/SREM EROSION. � CUT OR FILL F SO TO CONEY WATER WM PE FAO O.THET SLOE SPROUT CTPI NG MS-5 STNAUZAIUN CCSTRUCTURESEMTEN STRUCTURES STAEIUR MEASURES AIMEDURT M ASURES WALL RFD TO EIENN Q E DON. STRUCTURES SUM AS DAIS,ONE'S AND OVIDSONS M iUNAM.Y ALTER NSiAURM 0.RE APPLICANT MALL PRP.OE EMOECE O EIMSSON TO MAKE THE IMPROVEMENTS. 3.20 O ROM OEM RMI ARMS-MALL TEMPORARY STONE ONK CMSIRUCRD ACROSS A SWALE OR M5-6%MMEO BASED At SED DIE ENT10 A MS°RA NOEAGE AEIA TRAPS TO E S 0 BASINS SNAU.BE BY MIN M BA90 ANO L 41 II1 OLIC ANALYSES£1OKX1 COMMIT*01 EE 6 BASED(IN M 10510 WATERSIEO MMKRPSIH;MO RE Cr Cl') ROEM 3.M-*WAlOtlNG STRUCTURE- A TEMPORARY gTRIMG AND FILTER*VIBE FOR WATER WEN IS FOLLOWS F IF THE APRUCMI CODES AN MOON MAT MIMES SI0MWA1FA DEIEHTIM,ME WALL OBTAIN FROM OMAN.°DIMS A.SEI MF T TRAMS APPROVAL FROM ENE ESW OFA RAN FM MANTENANO CC THE E1ENiON FAMES ME PLAN 1 r I O a N I ONLY CONTROL URANME AREAS LESS THAN CRIME ACRES WALL SET FMIH MEMA1IFMANO REQAROENTS OF ME FACET,AND RC PERSON RESPONSIBLE W VECETATVE PROTCEs FOR PERFORMS.THE MMNTEMNN£. Z (2) Q 7 Oi 2 MWMIM STORAGE CAPACITY O 134 ODIC YNDS PER AC E O MANAGE MEAL C OFTEN,.MCS A DETENTIONFAARY 91ALL E DISCHARGED TO A RECEIVING MANTEL MO MERCY Z O O N 3.30-TOPSOIL(SIDWILE)-MEDICOS O ME9ANNc NO.SING THE SWAGE LATER CI B.SDMMNT TAW.: 059PAT1R5 WALL E RAID AT THE Mir..O ALL DETENTION FORUTES AS RMS..'TO M061.003 SOL OFTEN BOOED IN ORGAAC MATTER,IN WEER TO WEAN A MOLE I CARTED-MANAGE AREAS DEDE RI MAN CR EOAN TO RIM AIR E S PROM.A SIMUZED MANSTIOX FROM ENE MCOY 10 TE REM..MAN. W 09HNAE PLANTING nB GROWTH IIEOIM. r 3.3E-1EYPONµY SEEDING-TIE ESTABUWEMi O A iEYPfRARY EETATVE COVER ON 2 WIMP'=RACE CJPAOTY OF 134 PEE YARDS PER ACE I ORMAC MCA n NL ON-SITE WANELS MUST E VERIFIED t0 E AEWAIE °IMMO AREAS BY SEEDING NP G MIN .R ATE RABIDLY ORRO NM.PLANTS. 1 TIEEL W METALL SY51ALL.AT A WNW MAW.MEINTEGRITYOr THE RN UCIURAL INTEGRITY E BA U IXCREAYO MUMS 0 WFET ROWS(HUT MAY CAUSE EWOSIOR OR YOMpNTAION ON APMOTIT /At CD OUMRG A 1MEMM1-nVE YEAR STORM Or 21-µOw WRAnM PROPERTY WILL BE(ALERTED i0 A SOME OUTLET MEQUR O.NWEL PPE M PIPE SYSTEM M v, EV 11 Q 132-PERMARENI SEEP.- E ESTANA RENT Or ECEIATM COVER ON O IUMEO TO A DETENTION FAWN L� AREAS BY PLANTING SEED. MS-2 OJT AND FILL SLOPES ESKER R CONSTRUCTION.CUT AND FILL SLOPES VIAL E DESIGNED NO .IN AMOR.METE STORSTORE/WATERNN WAT YAGFYp/T CATERA.NONWAL 103 OR PARCELS N A CONSTRICTED TNMANNERNY A MANNER THAT SILL ME EROSION.SLOPES ro ES FOU TO OE ERODING EXCESSIVELYCr 3.35-MULCHING-APPICATON OF RANT RESIDUES DEARER RATABLE MATEPALS D TE SCA A MN ONC YEM Or PEMINVIT SiARUTATION WALL BE PROCEED MM AD 111010.SLOPE STAMM RESOOITAL JULMEFIAL CR MOSEMN DEVELOPENE WNI NOTE CONSIDERED TO E YPARAR r; Z Q SURF AI MEASURES UNIL THE PROBLEM IS CORRECTED. DEVELOPMENT PROECTS MSTEM.ME DEVELOPMENT,AS A MOIL.WU.E CONSBEED TO E A V 3.36-DUST COITRO-REDSKIN°SURFACE MD MR MOVEMENT C DUST CROW LAMB DSTALRNG. Y5-O CONCENTRATED RUNOFF WMl SLOES CONCENTRATED RUNOFF SNAL NOT SAIL OE\II.BE 95EDPRO IN YMOOOC PMMERRS THAT R:FLECI ME ULTIMATE DEVELOPMENT J .3 CO DEMWTION,AND CONSTRUCTION ACINTES ROW ODIUM O S PE CQM110N 9/ALL E'JS:O W ALL MONEERNO CALOMnONs Co SAWS UYi F55 CONTAINED WIRIm M ADEQUATE TEMPORARY OR PCIMNENI CHANNEL.FLAAIf,OR MOVE KILL MEASURES VYO TO PROTECT PROPERTIES 011 WATERWAYS WALL E EYRORD N♦MANNER 0A DRAM SigUC1URF M40 5INMZES MPAC15 ON ENE PNY9CAL.CHENWN AND*0.000AR.PM.,O R1RS,STREWS B. NRYNIDU SIA9uZABD7 AO DIVORCED AREAS SHALL E 5TA95IZED MM PERM/NENE SEFDNG 1,1S-9 SLOE MAINTENANCE.WIFNENIR WATER SEEPS FROM A SLOPE CAE,IDE0UR ORIMAC M OTHER AND 0MER WATERS O NNE STATE. MIN.SEVEN WORKING DAYS O FN.MAP MANER NO SOIL LIPPRONS PEMRIIMG,AS PROTECTOR WALL E PROVIDED MAT SWOTTED IN 111E PROJECT SPECIFIC STARONES MO SPECBC.10M FOR MANNA. MS-ID STOW EVER MEET PROTECTION.ALL STORM EVER MLLES MADE OPERABLE DURING CONBIRUCIOH µY PAN APPROVED PRIOR CA AE.T,(VEAL.MAT PRONDES FOR SFOR NARK M R NAME(0 _ L CHAMSYS AL ROW PAR ROC RATE AELOpry A. WELOEMR 4*xMENTS OC RADRAO S. S _ _ 10*5 9CEt FLOW WENT STOMYW W. ELL FLOW Oft!PLOW BIEDING WALL E P IT FIR W MAT TIERED/-LADM WATER 2000CANNOE2 ENTER TINE SEOMIIMIM CONEYAEE CHARELS WILE SAT9Y HE RICT S 0150 ANO ELOOry REIAALIEn15 fON nANPAL M AND OF THE PA RATTER TEA AS 101 FWM ME R0ENT TELL E NI.ONO TOMsSYSTEM UTHOUT FAST LNY FILTERED/TREATED 10/E111(SLOMMI -VEAL MNNRER E T PRACTICES ARE ESWED TT x PATTERS TO TR STOMWARR 8-VAC2-1 POND0-81 INC POLO RYA WILL E TEN CONErMO ORATION.WORE HEM.CVOTRECTEO ARO NT R tUWEYNHW M ETA.Mf RELEA E CAER wIWE UR TORE TEE :E DER D N TOMS ENPRMALE TO IS SITE 10 1004E OCC01.01 NR TO EDV 15 RP-RAP !1 LOCATION WCJM A MAIM MMIIER NE MALE OPERATION.UM., ALL EC I WREi PROTECT.ANO AN.EQWIED 2 TARN AND RELAY OVER A N-TROUT TRW ENE EIMCIET RAINFALL RESULTING PROM ME OE SANE*50001 E STEEPER THAN IS MLL E ARMORED MM 0 010E 1.0C-2 MATTING.ATE TEMPORARY A TEI/ANEMi CH/MU WING WALL E INSTALLED M BOAR THE CON(YANCE CHANNEL ANO 9.1 ME PROECI PACE SIOM WATER QUNJIT REQUIREMENTS 1HROUM 2R.00 O DEDICATED FOREST 1KLMINMG MANTEL TEAR, DE AL SW/RE NO AND Q9H SPACE FA93EHTS 3 STORMS TO ALLOW/RE THAT PM ROW TEAR R FOuN THE THE 1,I.AND N FROM 24-HOUR MSALL a.41ITA N UN wARZE OCR LIAR YARN w A SE RENT TRANSPORT IS PERFORMED&ME W R A IL.MI TART IS USE MAN ON O., TO ME PLAN RANI TEAR FROG THE SIR IIIV 0..^Vµ^!_- 91 THE NNECE MEETS CHANNEL POOUGH E ERGAEMMT B-SEE ATTACHD B.3.a 00EN51REM SHAG!O TAKEN EC/AT STMZE T POSMNMDi.CONTROL EgTENI DANSUHI NO MATERIAL SE IL EMUS SEEMS TO Om CHANNEL PRORCiId IS ET THROUGH ENERGY BALANCE(SEE ATEACRED S1d01WARP AEA 10 ME GREATEST EXTENT POSSUM DURING CONSTRUCTOR NESMWIEE MA1gIAL WALL E USED ASSUME 13 Fay N A GOON FORESTED CONOTM,ACHIEVED THROUGH MDIE RUNOFF 0 DC CALCULATIONS) FOR ME CONSRUCIIM O CAUSEWAY,ANC COPEROAMS EAR..rILL NM E USED TON TEE FORESTED PEAR ROTE TEAR BY A tFORES1E°FACtM MAT R EQUAL C UN FFNOT VOLUMEFROM FROM E 9.2 09M EC15 R.000 POTECTON EOIFCRONT 9.Ori6To-66 C.I THE PROJECT RELEASES SMUG...5 R NMO1ED BY SORER..GOER MMA0ALi ME SIR MEN IT WIN IN A * FOESIFD CONgTON MEW BY DC RUNOFF VOW[FROG ME POST-*(CONSENT PEAS MOW RATE FOR TIC 10-EAR 24-..OUR STONY EVENT THAT IS LESS SR M ITS PROPOSED CONDE..AND SHALL E EMMPT FROM FLOW RATE CAPAOTY AND - MAN ON EQUAL TO ME-DEVELOPMENT FLOW RATE 5-13 CROSS.I.1MRR000RY AMEN A LIVE WATERCOURSE MUST E CRUSSIO MY CMSIRUCNIN ELOOIT RE FOR NATURAL M MM-MAIL CHANNELS UNLESS SUCH LAND-pSTURP. ENO M LS MOM THAN 1GE N ON µr SY-AWN PERI00,A RMPORr HA S£HWJLAR STREAM CROSSING ACETATES ARE E*4 N ACCORDANCE MM 9VAC23-117O-A11 OF ENE VIRGNIA STORMIER MANAGEMENT 10.CONTROLS. TIE CONTRACTOR IS RF10114 F FM YN/IENFINCE OF EROSION AND 9D/YENT CONSTRUCTED OON NDROOpL MATERIAL SHALL BE PROMO. PROMO(POW)RECO0TION ON ARE 10 KRONA M COUCE N THE WATER QUANTITY RLP ES ORAR0 MO MORON MO SEDIMENT CORM.BONS WALL E 4NNTIN01 M-IA REWLARON OF MATER000RSE U 01.5E .NI APRUCANE FEERN STATE AND LOON REGULATMM ND GEE OUT OUT N 0VO23-B E IG- O THE STOMWA0ER MANAGEMENT PROGRAM M Of• REPAIRED AS NEEDED TO ASSURE CTNUED PERFORMANCE NEn RANCHO. PM MEOWED RANCHO. TNNMG TO WOwPG IN M OOSSNG L.WATERCOURSES WALL E ET (VS P)REGULAR.WALL E OEM.TO SATISFY ME REQMMENIS O MS SUMMNS ON 19 - ▪ANTMMCE APO IMAM 9TN1 E CMWCRO IN ACCORD T WM THE APPROVED PROJECT 11S-15 SEAEJZNG O WATEIRCOURSE.THE BED AO BAPS O A MIER...SAL E SIATAUZD SPECIFIC 5 01 LEASE EA T AND ONCE 10110E 00 cOOK NO MEDIATES.ATM UT M me MARNCIURSE IS WPAREIEO. SAM M MA SA..0 TSEPMICVENT ROAR OF AL WETTECIE IDIPMARY ESC MEASURES SHALL GOON B.SC.DAYS.MO MEW PE HOW FCELOSING A MS-M PCIE001*10M OF LL G 11MSEAWARDS /ACCOMI I0D UR1TY MIC 0 E INSTALLED N MN 2A WARS O RRINGNM,M AS SOAR AS CONDOM.ALLOW E COMMENCE WITH MS 1M ALLDOAMCE MN THE rOLOM/G SIANOAR05 n IDDIIIOH TO OMFA APRICABIE CRITERIA. ORME PRBJMNM ISSUE RESULT IN GREATERGREATERWM R MNRarA s mPMAR M RE PS Mu RuREMOVEDIPd THAN SPEARA.No WIDE Sao SPEAR FEET BE I MAT OPE1Nm AT OE Tl/E NOT FOR CONSTRUCTION ACHIFANG VEGETATIVE SUMMATION.DISNRED AREAS NOT ATTANWL AN ACCEPTABLE EOTATE B.EXCAVATED MATERIAL WALL E RADIO ON ME UPHILL SOS O TRMOES ALIE 0 ONCE RE-SEEDED AS 1EE0 STA ACHIEVED. N/IAMN IS HIE T FSC BONS C.EEFFLUENTDENATURING NT FRCS OPERATIONS WALL BE FILTERED THEE➢ PASSED MOAN AN APPROVED -- OU• RO I K(O D MAIN b DAYS AFTER PIRA SITE STAE!1AnON IS AMIEVEO ON KRR THESMIENT MAPPING ONCE,OR BOTH,MU DIS0!M0D IN A 4AMAN MAT DOES NOT ADVERSELY ARE NO LINGER EEOFD MOPED MOMENT SHALL OE REMOVED OR STABILIZED M N.SEEMS ON OF-SR PROFIMry W1EE.P611 B WW SOL RESUL.G FROM TI M RENCOL OF PS ON VEGETATION BE PEFN R NENY AFFECT RO ESC/PPP NOTES SIARUZEO D.MATERIAL USED FOR BONPARIG TREND ES WALL E PROPERLY MAP..IN MEER TO MIME EROSION NO PROMOTE STABLI.TION. E ES1µ5ZA0l1 WILL E ACCIMPUMED N ACCORDANCE NM TEA REPEA1RK5 MMMIrM 1WM F GORY wTH APPLICABLE SAFry REGULATORS. Me 21.2B1R ENNN Ell 171101110111. POR C-3.03 Section 5. Stormwater Management Plan (Provide a reduced 11x17 copy of the latest stormwater management plan. Do not reference only.) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County I I)i (�I II 1 I \ \ I , 1 ''r i (f`\\ // -\\ ` ( 1 / } QUALITY REQUIREMENTS FOREST/OPEN SPACE FASBIENT TO MEfT tI011/WATER "IPIIN,,, //I/ / (.2! \ /' '� i`II!I �'��� �~\� �w�l.�� -- \\ � / ARE DEVE OP EMIT ADRESS UANTITY ACOFNPE LPROARE.N "`..✓/J FUTURE ATER POND A TO ADDRESS FORITY SC E RIPERV PROTECTION. /..3• STORMWATER MADE),REouIREMENTS FOR FUTURE DEYELOPMEME ARE NOT/ , / , , ��/ --'~' :r."t "�...� AGGRESSED IN THIS PROJECTIi\ 1� /�/ �\\ �`\����" -I - .'Y " I \ µpERSONSCREEKiiOCIGISHftlVERME1gT COLD WATCR TROUT STREMIS.' ( / / \ �/— \ - WNW. • K-, ��\ \�-/ EXISTING POND WATERSHED:OS75AConteve�dPX \)1 Ir /// ,-�\ \ �✓ ^ ''.- _ --. _ I�t i \ \ PROPOSED POND WATERSHED:BA.M AC .......... ..........,.nStu,.. /){ Enpn onpBDve51 e 1 / L �.-`_ W y ;wetumwce ,t�YL t t\ \�, / ��'=- \ ,.�.� �. " .a` 1T I : ?NE!! OR 9TORMYATER 1MNAOEMENT PLFR1 TO BE WITHN 95X OF MAXIMU�� MOISTURE CONTHiT.ALL FLLL MATE_ IBE CTON OF pNAg.Y. EOTECHMC.Y ENG__ BE WATERTIGNf WRHN STORMYATER // / D!9 / s ) \\ \JIt'. :S " E/1 � ;— - -- I IS I' • +�y C!/ +/I/ `(/ J 1 NOTES: fIl / I 1j • WORN ucxeDs sulrJtr urwts.CONTRACTOR TO ENSURE REASONABLE rvx�a OF 'c•rfY t Y� I I \I ,I'----:_,,'' I'- ,,''///rt _ `2;TO NAW �1f Y �� —�, � � ..__'. // /.�_'..\ 1'\ 1_ %/ % _wTulLra< NAYJMYY.411E1.13T ,.E ia BUIRFACES TO BE RELEASED AS �/� \ \ \ 3 ��/ // -��__.. ...SLOP:: .wm�...En OVER r�.GFA -i iri- \\ /• __.55." waM //� taonMFNI umD +FwE 1-./// -2 1.:\\3, '')) N\N ,..___ ) / '..---77:R..\\.._ 4.. � % �../ i / ? ooN II o \� —�_---- �/ Irilth, ;A _ D.NwMta` % % F"r"'"' "`..."�Nr\ J / ( ^i1--- _ e- 3 1' ' --_..------- ------.-./ it .* %/ 1 � � / I� I V >0,5 oY f----'�"\` \-_^ eAr,�r y, L. .ash?, ''�I I �-_ _=__- J •�`, `� J �S a' /J \\\ , t/ t t` -"aKYs�i- z r �+1 k - "/ / / ��- J c // ' I: -// Ste. ` ( ' rnryE TOfr) 1 / _._-��_ -,.„....___: ____,,, '''.\.,\,, ','...,./T-:',,:,117);:. \‘‘...---': _..._,./..'- 1,...Th • ‘A-'" 1 f\-:\ , PRIIIMINARY ISSUE P / I / / r\,___� I :i_ NOT FOR CONSTRUCTION j� w // _~, l -- 1 1 \ N. STORMWATER = —= -- 1‘ � \� "� % 1 > > MANAGEMENT PLAN l\'. , / / xxe1.0,,p —� - , \� \ \,!\•;\ ��...-- �X J \%�D b BBB C-6.03 -r W r 1]Mi MEIND \ -- RivAnox AND MARIFMANIW nyL \ \ \ \ -~ _f __-_ �-7. ---LAP LMOOIIEM CONTENT MID FUME)O TnLLOEsI WREN.LOCATED AT 5565 LT.IROOS ID. \\ \ \\ \\ ` __ Loa i _U. L. E�y-'.. - `\`= LOCATED VA a DESIGNATED AGENT SHALL OE FESFaIsu FOR THE wAnvINICE OF TIE MAP /I� os i .-- \\\ � \ LOOTED ON TER \ \ \ \1 \\` _LO6 /�/ ., -\\• ` TIE stpMWA,G MANAGEMENT PLAN CDx95R a DEDICATED FOREST MD wet SPnt£CASEMENT -^'"-ti,` \o_s�/ /// / V ...........\T� No w ono.FOAM eow NUT ENT Ylnwna rEaMbLN»Fa T.eRo.Lc,.E"fr // / // // .1.00IN» TIROL.26 ACHES DEDICATED OPEN SPAS.CHANNEL PROTECTION AID FLOW.WOTECTION \ _�\• �',I� S / Pm... PEOIAEApIis ARC Mti frWWOI YUIWOAMINS TO RE POND sfurAY lU.VLMJ TELL DETAIN • /''� y"�"-��p�Jp(�r�yJ� _ \\\- ,, L��!' ---'- _'.J /__,�I/4., / aurae `\P; R `A 4�1 AmnaA RUT EROM ME rsxwa»smACES wwN rE wTEn 0, COL ru+o nu O/L E.VYG/VLI� \ \ TDB �/ �- `�"�= {_�'\ aI 1 % \\\\ RRan A,IiN'Ai MEET Mu r eN 3.'"iFa1RRENTS ATHE SP L.,STm STRUCTURE wr9i PIPES ARE E-,G-Mer nv 6 Des pn Swaa \�` `` /L�' •i- -� �'_' 1 \ N,•. `,,,t, •\\\ 91ED i0 ACWWOOAR 3.5 ACRs MIIYTgxN IYPERNatS MCA FOR N1WE«K,OF`YfNT T..:i..i.; ...........r...TTr..... i _ �yr\J�\/ / X \\\\ _ — r — 1Ye 1 • ,0'V. ,� ,•w�i i \ THE MONA siPWWATER YwAQYENT REGULATIONS(.VAC sO-00)SPECIFY THE ORgMSTANCES � � \ /I ���- .Tts� / .,5 ,\ LINER YrUIN A YNNTENNKE AOEEaNT MUST IC EXECUTED BUTS.M OWED AND THE V.. \\ \)� //�9 E f�-��6 FP1 • �,�pg►_.. �, ��// I. ♦ rwMOY,.AND SAYS Pam INSPECTION rsaArmENTs mruNEE PROCEDURES s uNNlLxwa 1 n Vr�, 11rRV N KOFCRD.D SETS FORM or M TOLN-OUIRI UPON MINS.MPUMXE R CEDUOMCR S F A ND \k \\\\\ \\\ ,�I//i N CL 957-14, NW4f. / D,ar RIGHT-OF-ENTRY FOR LOCAL PROOIAY PERSONNEI. / �'/� S. _,y fa. ��,OLIENNINI �.rFI� -t 1 6I r' \ : ,�..I.,/E� 6 . N s,MCnK COMENwrS OR OTHER MEOI .EKMCEwIE RT THE K"P AJTNDgrr WSl BE \ �\ •I► // �C \' ` HG'r91.P""I► \ ; : � 7 1 » r PEACE TO,ALP FxsWE THAT STOII RP MANAOIIfHT STRUER ES ME YAINTARED.AS �\ \\�` �/7 ,� ` - 1 -R'<A ' -I ��\�, Yk\ �S. • \ VELE As to PASS'NE MOWED% s sRGiNt PROPERTY ORATES. �\\\\\\�``\\\\\`\\\ /. �� - - f / � \ -.,� / hwraaF • rn:c¢ss�e"vrts:."s�"w "ilrwRaTV To caoucTinsrtrnoWirsNHo vwraalTwH¢ \\\\\\ . ��.\\\ �w-ry` ED9F.E� �/ D mr \'11� ` �.F J-- En NECESSARY ,4' 1 \\\\\`\\\\ \\\\ -- ,� �YA • 1 + / /♦ _, ALL EMNYYACO "DINT TIRE STRUCTURES MUST IINF NSW A IOIC TERM YA MT MST I \ \ \\ \\ .`\` s�I' �' - r.r 1 / / •� 4 ••.•I �/ /y roTRNnvanelwE-\ 1 NCONMENCEED YAANTEMAMNa T..AND A COPY a AN•rmum..."yfcmN CHECHUST /I I: I \\\ \\\\yy c. S i, � . nr MrNRHANCE MYEmHT SHOAT Mso rrHa Hnf coxrAcr ntOn.AnON Fa awes ro TY��"" � ^�E � \ , 'f. P '/ //i/ PST LOCAL a sIVEv•ss6T/Ml:To SACK CWwa MRSANO.PRO&EYs.ST1OH AS MOSOxro 1 I I I L./ . \ T A^'0"N ire \ t � �� ✓ 1. ca RDE GEEE nvAGK tANrs KE AnK NANAOMEHI w0 Kx xENovA / . //, `� \\ `y �' ire...,It►�'u` �, L 1 ._ ... r., �I� //�t` 4`,..',1‘,.//---- _�. n, MNxRNwanvTEE/ � /�/�f�/ � SIC 4 • � � Ir,�r � / �♦ „oOrr./.- 1, �- EUENOFS,aW/.ER"{NA4VIENT SIRNL LS s LvnM der Nwvu nrsPEcnaxs THAT \ vA-1}/1T1r ; 'd'joII .0 �/^ i /// -� EVALUATE NNE mHq,xN w0 xTrw74Z Of COL STRUCTURE auomc THE ECU... / �lr � ' \ / I!♦,ti";I 11, 11 Om r T I �/ /� � //� ///l% i . "EWN'O �NNM Kn�"fNls EPCL.. rR`r.ANTED RECORD TIE 9rEas NID Ili; j fi jjE)T / ' / // MATE COKRNS N1O oTE n Rr POT-OI ANr NVASK PLANT SPECIE i .. c. . / ,I 'yy \ INI W��l�. iii''��,��I)))III/P l �/%/ /% ••�'` .'`••/// // /^. nx P:.M COndMn 6 sTawrvATfA m FT`,rC Mf STRUCTOE Ea YARFN O.WAGf. I I�+1 \\ \ E\ -\ ��-, �"^A• p I ,, 1 // /`/�.- _ ./'� / evew...... / • ERo9 OP cER c,T 15. - ��JL *���• '�•11Ati '�, Rea Wt/'4 , /I i.��� /` _ _ t�e s a vsTaw wo Dow„EATT aHwrns ra ErmN:e s awanw. ��.iY�E ♦ In , . .r� I I 1 1 Y,(SIT 1' i %i i/ i///uwrEz A , \ Ns,Toccr ONE..WOO.WORM.a GAL.EROS.MAT NAr I NTE,NwS I• 'P\ ��OLT r ilp .r HPEOOILOfOERrri 171 w� / � ji j� E n--NYF- -- =_= //�%�i//\ • CROWN.E cRNE RNL FOR ER0401N uNOERUIrTWG RP RAP PSPLALEMENi MOOT _- ( \ r.1I, rrWirEla..... LIT'r) t 1 // //j j//%_ `TFLow Ove �ssOE _- -- -i �.ae\ • MSPECt COroRTION Of PRn�N S.W.AND mg.n.EWIENCE a WAu1Ne.JOINT A ��.. -� I- �1 1yl'Y� ////// // �N//iy i�' Hr T....LEVEL STMEACER _�i�.i� i i _ • "XOri LEANAQ OF A'Ll a.ETc. ((� 11" /// . i - N4C T COORIION Of NL iRASN RNSR PEKRY SLOPED PrES a nA56dPD RISCRS fa I-_-_e�� . 1 . I I. ��)�i /'�!� / /'i;I'///� //%/%� -� i i - - ETNWNCE OF CLOOCMC.LEMALE DEN.•COMAATIN ETC - er r\�r l \\ I I 1 .„,,,,1 //„ /%//�/%/ �j - - - • RFSEDANVI=:CC Ts LAro EIT,Cw RE OF.0077 o n�OAMO CEOLro mow -'-. 414 \ J/ / I P1 / '' �f ///////% i// -� - -- �qn- • n4i:.T INRRNK AND EXTERNAL 9DE SLOPES OF ME STRUCTURE FOR EMU.OF SPARSE `=p! Z.\ l V / / % /�/ / 7%�/f�// '/./ %// /�/7///f i� _ = —— — KCA An iE coKE ER�O,1 a suNww uD Y.HE NEEOn REFITS Wr.EOANIY 1/10 �!/ ////� •�///////// - - --_— BAenMARIiLN°NNTLc"sFi4HvRECna"�`oE'oc.1545°FaR"srn'Er.:,"TEnP STRUCTURES C.EX EXMaLt \, _ `\� 1IY�' 1 41//h///// //�////��I//////// ==_\` =-H6Y\.\ A TICT- M IPFfNDIX C Cr ChM TA 9 OF TINE NNOIdA STO1YrARR MANAGEMENT MIMIBOOK P.\\� \\ Pik'�1� w- i /$//7/1g///j////%//%%///,i/�iii - -=t\\����� FAME/HANNAncEACTIVTEs �Ll O ��.` \;T \\\ � ,i;R�'Oa O/Yw'wm=� //%%///////�/�7„ /////,,,,,/i/i//�/ - - - �_ s,ONALWATER MANAMENY STmrnxra �Ll (7 YT \\ •..••`:-.,•; •'�•� � /: /%/ %�/� //�////%////%ii��^.� -- LO6 LOS Los-� • ' INSPECT Ns CE SPOT E STOR.ER IIMI.CESIGNATED AOHT a WnmACRO MAINTENANCE SYSTEM EM Z O OM \ SIMET�n AT OOMPPIEiTXME`�P�\Ina wEEmL , ' /// ///%/�/////�////%//�///% /i/�/�- Los" LOS -�s ON RCANT CERTIFY vMaERh miTrXTE"IF TNT fAUNO"rTuw AS f[STRUCTURES DID An�rsTaTAEO INSPECT.rz" O Q V�,RUT[OTBNIEwvRE.mE'`���\\'t}�4'//// //% �ft/�///%//%// %/�//�///� FNONGS wNA BE OOM.MITT M NOTNL UIN NOTES LA PHOD.ME n ME PW.ECT FILE.THE ,- 3 lBa1NSTR:� �\ \ // _ IRERISPECTONAIM SHALL PRONOE D FNN NOTIFICATION R OE LNDOFKRs AND ALL BE RED MINI M � `` '\\� \ii I/,77/�j-//% %o' ////2/////%//j//%%/////-o`''L j THE RING I,DENCIE AND EwINcs.IRE owERsroEs,aARn AGENT NN.0 BE RE�GNs®E FOR Go O V O RETCHING wv DEEIOExoEs FOUND MAI _ \� �_ �� �� `�`��i///i %////%//�////�j�////////// /i/gym -- 6m%G OVE PERATION Of AH I INFLOW STRICT., STRUCTURE /a ANY FORMAT.ALL OR DEBRIS BE REMO DD.n ADDITION. CD O O U ;\\\\` \\P. \rNP......:,....-�``�`=i/// //%/////////// //////// // - LANDSCAPE IRWiNGS SHALL BE PROM.DISPOSED OF TO PREVENT.00.0 BY M VE ETA'IK co Q �\� \\ \ 1---�--' / ////////,,,, ii// ///7,<0/ -\.----.... oE>sus.LaoaLAas nA.E TEE.aulr Iu xNu INe cesG.WATUI LEVEL Rn TIE TAcwlr eE (� Z LPL \��\\\�\����1 �_%% ///j///////�//�///,//�/gi/s --� _ --- - _ RianM'Ri°r9""cAiAerim00 I"�Nsa mF:ILLICIT EPi+si ai Mt DENNIS cua THE BLOCKAGE 3 ra ,��ZC\Z 1TO`'`C\\ % >%//� *////////l/r//Nos /� �. REaNL"LNTs :��\ \\\\\� _ ___-47-i / //�// /A/ ' ��.. 1EMOVE DLO..5 FROM aTnOW S,NIKIUES ANT TRASH a CERN,OM.NANRA a �.\ \��� _1^��-_�._ Ys x.44 E� �/ / vw YADL.•MAT IS aOIXNO a MEW.OPERANT O NI WTTIOR SINUCILPE SN.BE L\ ..,......''''\\\\\'\\ �\"�`�_4-�_ =%i- I/ .L -7-- --"'-- _-`-1�� REWKU DESIGN MIEN LE.TELOWM TM.0I nc UItT,LC ON.ARL BLOCKAGES M ILUO10 1� _ UNQS MINN INE DEBRIS.F TIE BLOO.01- ENDS MTO THE OUTLET STRUCTURE MONANO _ r( ��./A, 1T� . ny. AHFCAL ENTRY INSIDE RE SIMUCTUE.PLEASE OBSERVE ANY CaONm SEAS aDTnR"ENR .- "'' C- \\\\\\\ \ U / \\ \\\ \ 1/llI`I)\,\`sP IFwr...OF�HA. 1E.TTOK A.F.rNP ARO SEDIMENT 5 s- ALL FAaItr SETS 0...SUMPS PIPES ANO �\\\ -1\ \, f I \1 \ /J' STGRHWA:LR STORAGE.CAS SHAL BE CLEANED OF 6CDWLNI TO WWI.THE AREA TO OM.. \�``����� \\� y \/ I E\\'.- ,>� A/ I I /I REWIRED LEVEL SPREADER lf"OM,]FT/OS \ \ \\��ti^\\\\ 4 •Jq- apt, ,,i'..li I I i 1 I DESIGN QIADES AM)ENSK FUNCnaAUrr SEDIMENT sNNi LE DISPOSED a IN AxOIOANQ PYRE Eaf \ =\\\\\ \ \``L\\ /O ,r OPawOmwewrtRwTa 1 / LEVEL SPREADER is NOT USED OR CREWED FOR LOCAL.STATE AND FEDEPN PCO16E11fxR .NE SHALL S TAKEN To MHYYIE THE EXTENT Of ANT _, �\ �� \\`\\\� \`��\�\ @NTIEMOCOIXa I I 1 1 / STOMTATER 00.TV MANATEMENT LAM DISTURBANCE AND TO LEAK THE Srz n NI ENON•2 PRE-MAINTENANS UNC T. _ \\\\ \ d9RATIOS SHALL FO LOW ANT STAR AM/OI CITY ESC STANDARD ANO NUTRIENT MNHAMMENT "A. 00.110. NM ✓ \`=-�\\\\4\\ \.\ \\S'\\ / ///I'/ ///////�//////i� LEVEL SPREADER I-SA FT PLAN To PREVENT RINK SaENTA»n.ME SWRCES MUST BE«m..DID REMELTED. //` -\ \ Cg\`�\\\\\\\\\\\..\\ \ \ `/�J,JV�'J• ��+/ // /////y/� ,o»-swR STORM nowAR wls6 CR SEEDDMENT OR MOWN.l RFosGEOHS CAN CwlaR./7F O sDIANAIS MiNTATION IN TIT BE CEONFle.L AND NM.,11,SOURCES OF \\ \\\ \\\\\ \\\\\\N_ZiI/ ." //l////A /'' LEVEL SPREADER x-MSS Er WEN(fN IRE STRUCTURE,IIEPETNIw6 a i15 SEVERITY MO L«ATIOL FIIOSM 41AL IV CORRECTED ,\\I\\\Q\\ \\T\\\\` //////i s! �/�/ am-awR STORM nawArz n rJ as BY sfEGnG GRADING.AND/OR M,TAiAna«SOIL sTAaa na MA we To cow ccr E \�� \\ \I \\•.11 \ ; \ \�\\\\\`� . j//✓/�, TRANSPORT SWALE io LS2 DEFICIENCY C,� \\\\\ \ \'\. / // //// BOTTOM NOTE TES 1RO,Alm OPEN mAri \\ 0�C \ \\\\ 1 TM/�I / //i//� NO MA.Os1a6ANCE MAT CCcn EmmN THE MISER.OPEN SP•cl INxRnc OR AFTER --- E TROSTMEA"Mcn wFe T_`�\, F�{•ai`•,I /i \ SIDE sa+Es r.I xI AssOan cna(E.no fi UT a caADMc Is ALRENi EXCEPT RuroRAN,I.S.R4N4A es EEE� r 's/ i� TOT.DEPM. I.a CONSTRUCTOR tCO NTH INCIDENTAL.OP CasMUCna PEED EX EP.R-MPO MMs IS YNTA CES 6 �� - A ,� CC � '�/=i// /\ YOPE ,.n NUISANCE KOEIA0Cti) THE OCR/SERVED tO OPEN SPAN AREA URis NOT eE STRIPPED OF TOPSOIL PRELIMINARY ISSUE ti 1 1 /I�, / MA♦I+43 N OIT THE LIMBS O'NE CONSERVED MEN STAB WMAD BE PROTECTED OANO COISTRUCTO"9r )I I / / <O♦ 10m-24m TOR I SS OS NCEPTABIE 9QAE MV`FROWN O TROL WASHES. NOT FOR CONSTRUCTION 1 GRASSED AREAS MAY BE MOPED A MAMWM OF A TIMES A TEAR FR1 WATER SPIN ate n -i \ -it'rtl U /,1 ......../ / / \CI' VELOCITP 2.Rn A OPEN LC TERMS N AGETATION cQ K'COX"N MUST U TaEX PRALLY REPARE TT50BRM.O.OPEN THESPACE COI SE"K0 ENLARGED SWM AT aA'E 7,-,H rrT lA sr..NOTE HE ®Diz-..• \\\ 'F .':.. ,I.i i�/�-——/ / l MANAGEMENT NAN DO NOT ENCOURAGE a ORF MEOW ANSI ACTIVE MANASEMENT HOWEVER.A r.A N '•"{�.;? � - �R�UTAIS T_// / , /• ,IaX011.014"OEJIGEFDS SUNSET LRAM.CaRActa i0 SPECIFIC RAN SMGAD E 0EMq'ED TO MANAGE ITC UHMTEID t Ca-NTNNI S OF PASSIVE PLAN&NOTES i v L \\ \ T/4NIMYBEf- / / ETIS/E EASN•4E rnMc M OARS -- Jr CONTROL INV..SPECIES.PROVIDE FOR TREE MO UEER-STD.MAINTENANCE,ETC I \ .! YANAOm TURF IS NOT CONSIDEPED AN AcasTwL[EGAN O KDFfANK MANAGEMENT,AND CET PTE+•R♦W 190MG / --\ / THE PA35W RECRFAIKN AREAS O DEDICATED PARKLAND IAA EUOEF FOR THE PRACTICE, y ,Pry 21 2019 .MW(N CONSERV..AREAS CAN BE IE.TREAT..PRACTICES Al THE EDGE O ., \ „ ///mil / HO nW INNN9K LATH USES. O.. EIS \ - / / CONSERVED OPEN SPACE VEST E PROTECTED BY A PViENA EASEMENT a DEFT RESTRICTION aIM♦.A� eDR (/ _`� / /,(/ /\ WALE T-�•0 MAT ASW YNS TIE RESPONSIBLE PARTY To ENSURE THAT No FUTURE DEMON..OSTIR6MOE E/�� �/�EQ� 1 4\\\\\ I\1\1\1\.\T\ (\ a /�I// A/ \ ,,,, 03 a CLEARING MAY OCCUR MINN TIE AREA C—V.VT Vr\\ \\ I. \ \ 1\� \ 1 DIE/J.' \ - Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced 11x17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County AUIMANLE EawmmcaL COtl,«MnO.NOM POREA L ON MN xALENT COND.PLANS I. hE PUN APPROVING.THOTr MUST OE NOTIFIED 00E WEER PRwN TO THE PRE-CONSTRUCTER CONFERENCE.OPE MEMO1TO'PE , - ccuEEEEVErraUVOISTNB.GACTVTTr NO ONE VEEKE.OR.TO TE FNN INSPECT ION. •s,,... -� IA ILK JU1-1''L{`�T/i6C '�� �\ T. ILL EROSION AND SEDIMENT CONTROL IEABLRES WILL BE CCNSTXICTEO AND MANTALEDMCORORG TO MwgS SIMONE.MID RSIIKV /-- -_ MrEOEuaroNa Or TIE PROB.EROSION AND SEDIMENT IM.OLOOI MO•AROINA.DLL,0ia6W.0l0L0«O.aIMO y- /� \� `\,� I CU TMANEGLLA.am ----- .LLEND.wMMgCE..r CONTROL SEM ESM.TDEMOOEDWNDRTOMASTE.R.STEPWCUARS. Y. Acrovg rlE M.WorEO EIOMOIIMa aEo.ENrc«IRON NAN.w1M MALWArEDw THE COTE AT NA TAWS - -- -- - ...:?__---- SEMEN .. OurnTE ORROW TNG TAROCRWASE asTm«E CONTRACTOR WO TWNEmaLrEo.«EROSION CONTROE.WATIS L M«DOTHE NOT OWNER FOR TO, �--`.` � .-.\ `` =ice... OFF-SITE RaB.dwrnwA•Re AREA4I THE corNRMraR MNML.eSrn.EwnemrMrcnmvN mNIRa PLANroT,<wAERFrn --- ------ er.IE PLAN APPROVING WIRMwrT RAin R CON WGTA OOISVRESPOISIBLE TOR Ys'MUTON Of ANY AMMOL.MOON CONTROL MEASURES NECESSARY TO PREVENT EROSION '`-.�� i'. -�� . .O7 All STE. wSaI ODRAflNT. � --ram o verde PUN a�E _ _ _ — W6.SET�14 DURING MENU TO °E T , E:APPROVED TL"E E DDFW�: ND DISTURBING Dr W E, o ---- �� .,Eon �,a_ .rp,LLEerN,a p, E TER EA«RUNOFF PROD..m RAZE.EVENT � __— I.MDOWNIOPE �LfF— �� _ ••• Mr NECESSARY MANTA.THE ETTECTYENESS O DE EROSON CONTROL Ounces SHALL BE NAM MIED.TELT - MET®M10M © i 10 ALL FILL EATER.TO DE-.IAEA FROM.APPRO.:0 DESIGMTED E. STUMPS WITCO.mABWHAIiuDLIE OTTER TO ANAPPROVED Wnb[Mew EARTH a SHALL OE VERf ANTENNA ONLY,FREE OF ROOTS. .. �lOIWAWAS MA LOLj---LOS\LEE\ .---LOB \`L� ��\ ��\=`\`` -i�� .,LAC ` \- \�\ — i NE 17 BORROW Ell OR WASTE urns OH.ILE.NW Tru i":TE WITH EarPSENT SHALL OE ONI 301 OF THE CODE DTOM...ORSar,COIN To STOP. ....,:WASTE AFEAS AR TO BF FP i3 ukii n woo.7 RATS.Co.,F TON PPR..............SECTION S 1 XI , ,i //�� / / �� \\\ \�\ \\ _— Is.BORROW.EL.DR WASTE...TY awl CONDUCTED N AWE MANNER TAN MANTANS LATERAL SUPPORT, ORDER TO MLNIEE NO -� ST FENCE • �L / / // C'• •\ \ \\ \ ___ HAWS)TO PERSON.PHTSIUL D.M.rx Iow,NxnT , o ALOE LOS // /// i ` •J\\\\ \\\\��,R.R. \\\ ..T TEA MAINTAIN, uT TO rEwr,ENTSTORMrATERR...E.Er.T�S.LINO.OR COLLAPSE ' ym _ _ __ /// / �� \ \\\\� \ -_ CONTROLFACILITES WHE.APPLICABLE ALL E.T.A BY RE THE MN m tun BMW.OR OPER PORTON OF PTE PROPERTY LOS i = -_ _-!N°� // / /7. .- \ \ \-- RR i IOMAO.,PAD N T.MONT.OF _ ' AND IS TO AT .SEARCH NOWT.TO rmsST OF �` r ice_- _- -- ////// /// — \`, \\\\\\ \\ � ErMiTDrn — �\- TSERLE IV EMFORARY OPER MUTATION0 STTOCOHO TEMPORARY SEEDY.OiC:A:WLET \ r ��— _ __ / / \ \ \ \\ \ -mil \\ ��— SUBJECT 70 APPROPED Or THE MN,N RrE OP VAT TwA _ r..� m�R..PNRM»ar gED..D.ANOSUN.AaNAanRN GRADE LwEMTarE sRN1 BE \\\\ i O — ( / / \ \\\\\\\\\ \ \ \\\\\IL PERIAMENT ARRANT AT f0.0sA��aOSfwirN `aMRA�IMO T.E TOP A. LN'CIESO S0..FERTLIZFA SIMIIE nrraEn AT TeORRVAaE MDCONNSfO \� %�� - - -RR 'RR- -� - \J \ ` - \. -_ ,16t0WTWENT NIX PEON/ENT SEEDING MINA BE MPL.DAT,MaBWw.AND COSSET a EEa RENru«v SI OR T.FESCUE AND \\\\` / i ����' - Y { 'yam_ \\\ \\\\ �\ �' \ \-,_— —\ _ STRAW Mg«.TO BE APPLIED AT00.111,MM ALTERNATIVES APE BLEJECT TO - ' �Y///—�_ \\\ \Ri, ' \/ • i I / /.\ \� •�'L mpro =RDA - \\ \\-.\ \ \ �M�.EO•rNCE ALLLCT +FS.KNOUT..P r HENSCIOR AFTER EACH DNA..OR SOIREE TO Emuc,wN j/i r� R �\ \ I \ \VS\\ V ' A \,r WARS. le TO ALL AR ONEDumrAur TRAPS A.TOE wLLEMmmDAIEN 5 0ATI.WET STORAGE VOLUME If RUM Willi // — \ \. \ \J l/ I I \� S -- TO GomSTANOOgWES.sETN.IgAI.d.ER«g1 _ ����_ \�' \ \ \ ; / / / I �\ lx, I l/, 1 \ \ \ \ DYKES WHICH WHICH ARE COOLLIECTING S�KM TT3NN M I WHEN EgM MAST NE MEM.Mt WE W1.NEWRY y * - DI NLTIAPOARY EROSION NO*MEO CONTROL MEASURES ME TO x RENOVETW1MIn S0 WA OF MAL ERE STMEITATON.MEN S\ A� ;K.:i _ \� \ % 1 1 \.P I / I I \��/ / ////// Om�ElDei 1 e -_- MEASLIRERARENDLONG.NUM,SUBJECT TO APPROVAL M THE COUNTY EROY«CCNTR INSPECTOR \ \\\C'`\\\\ .\r\ -% - \\\\\\\\\\\ 1 \\J/ /// //I ///I /////j/// -��'�� - v\\ \\\ V \i' \\\ \ \\\�_../ / / / / / / // / \\ \N ERE SAT FEM.RN. - oOWTxoPE '\ - N \\'\ \\\\\\\--////�1 ������l j// %//// / j%_% �����\\\i/ • mROAv.O TTF • �1 / I \ \\ \ 2 �/ // / /��--�\ \\ • 'S°1'1 \\\\\\\\\\\\ \ \ST PU \\ \ ��(I �� /aP ....... ////////// \\\\\\\ 1 1` .Erc' \\ \\\\\\\ \\\\\ \ ), i �l l�� ,( i/// / /l // \ \\\`' -- ; _,T / L )•LCGATION \ L\ \\ I III / / tpj o✓♦ /// / /// \\ \\\__�% QCI- WE.EB: OWNSLOE_-= s / 1 \\\,N \ \ 1 1 Il // 1. 1/0 �TA�M'o __ / //// Ij/ •-. \\\ \\-�% re« STLla MXVON STOWL.% ♦ Cr CO -E"' . \ \ \\ 1 1 I I I 1 i /% / /r '.E.ML.:::A = i i i/\�\\\\ --�; Q/ ND Sun.;.,,,.,TE,Ee— \! i \\ \ \ \\11\\\111$111,811)// / / .N ,\\\--- >-- co c, ( _ DY•fa-� \ •\_+ \� \ I \\ \ 11111 11 III 1 ) /// /. i ' _- ---=\\ W W o Tn '— f ,�\ \\\\\\\ \\�1,� ��l� i!i!i/l/I�l//// �s- - �RRancacr \\\'��ii z z 3N \\\ \\\\ -•.rE .uaLowwoaE LOW COHI . PROPOSER EROSION AND j j —I___= _ _ - �\ \ \\ = _ y�" _ RI »:LMEo.SaE MEAA asTJImLUM.As SEDIMENT CONTROL LEGEND O Y . ' \\\ \\\\\\\\ / �n A OProfEROS.0 DEENT CONTROL PL.NENOPEI.AT MUST ffIrPT Cl) 00 N P -o • •ALL MAMBO. \. 1—� ������ • �\\\ — �\ \\\\` _ /, BE IINOLE0\ \ \\\\ I � \ / IT BE cwE,EOnnxmTRM¢E(Sox)�. -. I - \\ \\\ \\ \ �- _ I 0EEPI ES REG T)rNE 9EalEMCE SELON. OM STMMRAR«(W)® ' (/) \ \\ -.\ \. `\\ - CONTROLW WA.4YiLE� • , •LED..ENr AwMs-w.ia«aeMaNA,m Nen.mrATrvc. ® su PENS p Ds)� R' � \\ w .IWN. M.WN \ \ \\\\\`�\\ • " E M$$- \\\`\\\\\\\`\\`\\ _f \-����\\\\�\��� W.,sAP.,L. +o.Lww p.,,..,I..� nM�N iinLEv ovr aiEr.+ s ® aawTr RIFT TwmECIO)'^ '\ \\\\\\\\�\\\ \```- % r'.rW'L M� 19D.0,0ry WON ry e EE PROTECTION, RUCTILONEMUT FENCE. - \\\ \\\\\MRIMLE. ` _ 1 CHECK CA. PT. TEa�SAP: © MAPCO..OPER...O I OR ® N. P..a.Yr som "-- L�.�'�A\. - ,l _���.t l�L' ��\ ,.Ewa OSENp _ b1.?' CONSTRUCTION TURTLE.CESa ROUTES INTERSECT PAVED OR '_�'� 0 \\\ \ �\\\�\�\\\��`�=_� - DrSIPRL' � N'� 1 PIT Phil T,ROADS PROVISIONS SHAD.w iN M BE IN TO EPAI®.an 11.E TOi ® NW OF WAY OVENS.(1T) ® V \ a{�\\ \�\\\\\\\`\"�.-_-mac_ _ i «wA•r onM..N. Nrp.n rM«waRTED aNTo.rAvenaRrwDla�. NSTIE Q sua.r mrP(a u1 \\Sb i' _\ '�\\\\\\�-_���'�_ _ I MAW.arc 6TNO a ACO END OT OFANEOTIORPIWrrWM OW IL,.ImERO iOP O OO lb _ a � \ \ \non o o ITMOIEY eN YM I ..:OD OT P SOS.FOR T Er PROTECT ' r� ( )`_ TYn 'VY°F .EOEPLiMg�1f rq OEA.MXegf� ANK © ,O/ORmAT m.o.<am)• -- \ r�W-� "+. "E" - R w WO .Nl..o- I'T,1W ORFRO.TO WO M.PROCTOR DENNTY onor rLAQFu s«/�=`= �\���� ��` =- �'�`N..-Maw I P OR ASEAwnErw ® PDEIun.(suae(Ara) ® - __ / to sea =-- \\\\`��=-- — _ n...a-.'I E u P.T By /(((\ J C7 `��\\�- —�\\� fi.- • p R ��«w.,0000 00M TO AE TO flO MO«nAUB NRraNOATIVE, ® INNING<a8) '-"�""}-- ' ``\\\�-- _��� f4R'WaLW..u.Ma..a TON CKEATO GR T.NM STMA TRAP AIS>R.S.. ALL«ONE ® Dusr COIRTOL(asl PRBIMlWSTRURY E \\_ ��\\\\ _ I EML� _ 10:“.FOR CONSTRUCTION —��-'\\\\\\\����-— Mn, DER OF SRE WIEE FEASIBLE. MAW.r BASF(a,q \ --•\ �\\ \\\\- - MOWN MAP THROUGH SEDIENT FILTER I-,O..�\\\\\\\\\\\ • -1 j AND DEODAPmSSaNSEDBENT RaN a«DN<aED, ESCIPP OON \ \\\\\\ ,TOLD NGSTx NI O'Y y.V OTx Mv.IMOEW*EwrM s'.wcW anNA BE WLEJuwM ADM' _-- Wi5 6 6:'LLDwC: PERIOD WITH NO RAN PREC.C.D FEL \\\ \�\_ /m R::v'..A. AR N�e�MEW D W• -- �D EN,B..M.N.« F. PHASE 1 PA .ALTIJI,oDNE I 1\\\\\\ �\� v'LW -�-- _. I PE Atf&ur OF EARTH ,BDDLC eNC2�w�eT - \\\\\\= / ; Rlt.M aSTMSD MEn . .FILL 1,.M,B ' �\ \��s6 , 0.HP 'TOM% n RADON OOOE "EAi RTH EXV ROONGACI ITE> NETS nDWNMeLTR' SION AND s \\\\=� �- _ - CONTRACTOR SHALLs is n' ws N AUTO.DOES 9oN s' `��� RMn VEGETATON..F.MUST OE APPLIED D'ESCH•LM) "\ © \-� � MOM.IMIrPAVND ANDCARIFY U ��C-3.01-A 111;', :s O 100 to EE,TPMHIAtOTs.wIEOsrNb ..BDELTO,BNaEa NA� OF TOPSOIL WE RTDE..ATRDWW1 HAVE•NCH.E MAM.OL«TOPSOIL PUTT NOT Of PLACED WHEN EAMON CR[EQEEVdr WET i '" ak.v�\,\ \`\ \\\\\\-- \\\\\\\ =�\`=_- j/�j/%i9/�//%%j Kaws seaK�r c raxsnmc,wn RDAs FM e.oHox AND a�aar rw '496Q- \\` \\� .,:�\_ _�� '�./., ////•�/1' ' m...�NENTOFwodmv u'.,ova'.`oQt.TREK TOTHE..wawernwFM PRIOR TO THE PRE-CONSTRUCTION ONE EExrwd,roTE //� ---- -_--^`mil' -. `w.�,�e \,\����\\rumfuf ����\��% //%///4///,//, T ALLCROWNKo MOMENTCoNTsaFonsuXEs»,LL�EonsmucTeomoo.Ammo.AMOK..70..arre0.1.3. O \ �/ f/ �/ - SEEor.TwraoLR OLATIO,E.oaa...o aEa.EX,rb.,Xaw.000X..o waw,.coa.,miawEao�anm...o i� i� \ \`\\\\\\\\\\���c_�'-�_ ��i/ ///�///� EauSEDIMENT c a°`o SE011ia CONTROL MEASURES ARE ro a:Recur reaarow wa nc Ewn sm.n at/wwo. \\ ♦\\ \\�\\\\\\�\`—\�—`� — -^% ///// ME ER0310.MDOE°.Enr caoRavw,awL eE WANT NNW w T1E YE.AT ALL MIEl. �— - —- \\ \\\ _-=___— „-�„� E X� � . � ;� °! : E..,�E o u�°�,X LwLE°,° o�tteverde /'- --t9 _ - �� \����`,N.,\ -��_%— i% ` �- Km*Aoes�.K Br ow PLAN APPRO,Xs rurw,s n lAnON Ls .Kn,n.K camma...v.erc�v.�Ym r.�ima. /A, �_-_ -� \�� \\\\�\\\\_"s.= /-''.DA a AM ScauExrn,an.s sETEmEEo�er TlrtEwn usmOvwcwrn°mr��En°x rise /E^9enrgfi0es,9n 5tvdw /•t \\\\\\lir���..\\`— _=—= d, ' NLDUI DISTURBED IS URBEDTE EVEAiAS NO ErTODRAINTo UNTIL FINN_sr DAAMINENTiEYECONTROLREARM.AT AAA TANS dFw LAM DaRltlMi ACTIVITIES IND / �"---'----°" ^"ICE /� /. `�\\,. a.�. ���_�=--- _ /` G. DUMB(*WATERING OPERATIONS.WATER wu BE PURRED INTO AN APPEASED ruews°ENCE L........................�..,... \\\\\�7_ 1_Z\\ c� c a ,IE wX,wc,ORHwElravcC,.0 otmc«D.IiRO�EEwsIT.K�a wa°D�E..urK�Fw EioETwarv.mlCND wviKLEa9.r // � - ��\ \\\���� \\\\��-- �' /` . wi wwartWi+w�a sluli eE raEE,µ;":::c.................n,osPRovE:...:or'wri w.awEeE rEmwEEwaaaY ETE.Evroonr/ ��_�.� \ =s- �' Mmu.a wom.EDHSIHI.Hc or.EB ce/ �`=\\\\�`-`�\\\\\\_\���'-".- �C' i BWBW DI wAVLE u.E�vv NE iU EE REX,da.90E YC1Bn 11]e�,DI TXI CO°Ea1plW4F�'rlLa.s...]e/ �`�- I- __��Z\s\\�\\\\\\ = d �' / , "sn;,cDwrr H�inl .l:Wv.eE:::leT.waEUT�mK'O. T' anam'Ew TD:.�,rw\\\�� \�- wa..ao ERRHn em dEEO�roeB Uaos a Ee uE oe nEa// 1nocL,_.— © \\\ /� ��' / D.,°Eu DREIREa REDIYrXa aD XEa�� ;: TROs / / TERROR.RYITALvATAN*AL.BE,..R°R,DrSEED.lBHaH ff.T,ll,l,�EmooNTEWRNSOT OF E RLM' \\\\\\ / / / ' SEP,EuaER TO FEI.uHry TO DONS,A S°»NM a1H O Mom*R,EGFLE,CANC C WLNiRoTswETOFADLETT....S3 'ERRYE.at.AM*AP 0/arm TO.COINOS OF --'---._ OOISTIAOPE iliiii i `\ \\\�so Er ARAM. ` / aUSJECT MAMAS.B TO c'DOM I I NOS.TONI...NV 10R • K !EE/ T' _ \--ld' /, ,a REMANENT Apnea*201.N Aa RAGRti E0.1NE ESEEDING SEoNTRoL f innn*.csso VER.PERMANENT o*FE AND T!tuna . M T puLSACRE ADOFE CONSISTNINA OF ......--._� ANO ,� r1g \ \ ® ©\ / \ ���-- // / .ELIH LE BE ApPLED AT ISTTOO IE H=aBL 0 .rotrnrreES ME aue,ECT.ma,II al FALL eDEOPECTal _ ,.ETERE,�IRAwFALLYRaDOO.B4OI \ iil `�� / // / oE✓EO waEHs.tOE SroLInE ISrViFD SETI.W` MIAS WHICH ME COLLEGE.SEDIMENT TO Il.r THEIR EDO.MUST OE GL.MED MO REPAIRED NW..r :i / \\ \\ \ \ i'/ WARMER ARE no LONGER NEEDED.auerEcr TO MaLw, KCasonBY ca EEOHDE caI,BOL.H>Ecrw 'E sr.ElL.rwrlDl.MAN ---MEM*LT FENCE s ----' /1 \ OOWMAg / \ SO so T� ,\ - \J a. cc co / 9a7" \----A `�`� \ ��--_ EPOHDXnBSEO.EXicD.TRDLSEaEEIwB >/ , / 7^" - DEISRHIINHAYSEwELow.AND CESTERLowco..EA..R°asa PROPOSED EROSION AND W W y,n -��\ NACRE a._ Q �` ' an/aos�wsaE AREAS dm�. vwr. Co CO 7 / s,EEP aorea SNAIL IS NINOIDO.CONTROL PLHaeXo.aXW ANSI ETaar SEDIMENT CONTROL LEGEND Z O O N / / / / OE Tw - ��J6@----��/l // // LADEN WATER nE r�nuIE z N / / `` N pO N / EXCAVATION.WALL E e se at Eva(1D) I I 1l.l 3 / / \\ \ \ ,.conc.-re lX.0 RH.1ED.AMOK..**MOM f•- / _�- -- ------- /' uwE 'i'�w°eroRYDo aeaRRXrS B.Bo CASE SIMI.rr Be AIMED o ENTER ANTMY SURFACE ',a O Y A \ \ / / •sm.. IEEE i OAv0 roDOKNT INE IErcEEE.o.I I! ® C'DTlBVIIC,.Oa ENTRANCE(1Da I�II CO cv O(s is / / / F� a•�• /' /' DORMODAL TO MS REDMD- ® cD.vU.cnan ROAD STMUELTION(1 ) ( UE O LI,(. / / �_ I 1 1 `- // /..o TEMPORARY EROSIONAND SELMIHT CONTROL aEo ALL. O] I ) / _ _- /� \ >I.�°.aT_�L-soa--- IT ME ISTR:TOR°RDEH(w...RE„ERENTATOR APPROVAL OF THE CCUNTV ® gr.EXa(1OS) I I w \ � / wml COWRY _1 / /, J ® - \ \ 'L/ % ; /-. ,;nNo ENGINEERo_ �cE:EAST 3OATSPRIOR OLANDaenUa.o o ....F..,.....0.0 1 ® .1 = Q = W.RRM�D ALL e� / /'� \ \�_ -- — //' RESPONSIBLE URES ® a1�,aEETwBE<EBn(1D., I� I F— I / I \ — NTRIBCE,KRI ETEREDXTRaI.ILTEMOM / / / ( / / \ NA O �, //a sreex DATort Aso sETaRENT EA-AN/TRAP ® TL.E°EMY EMS..o.E OM)/ t / "-A- PLd.0 ROADS.M MARE CONHOXa 9YELBE MEOETOIEINIITXE TRANSPORT OE I� Iq. 6 mMY daf.BM(111) l l ! i / ) \ \ _ _�- �� I REORIENT BY LVEaLM,EHawo arto ME PAVED SLweLE..a6E / / r / \ ,� '' aLwLnI n IXMHaE,ILO LINT OAK..oR filmic NU.sl.R.RCE M(s.,al / 9 0 ( / ' I \ \ ` / /M V4.141.)A EiIO B SDREME MALL EE.01 CEAT EL md.ounLr v.TTX ORE.rtTXDoeo.o © Tw scums(aw) ® r ..... ... r II \' / )BEHOVE AND ST OMR TOOCPILE TOP SOIL FOR TEuSE AT CLOSE OmOEDT \ SITE / /� ' Ir I. \\ n.� -- -- ��-/ // ETXµ.,COWVC,TO w'rew rrBeP WIoi ersmama o manemr serum(11.) ® \r l/ 1• II I \\ L�M�, I /. .I. o •SITU SEW 0,R `INSIST.S1E PD• X'e '�Kloirac';Or o�E '.ME.cX INLET. ® PEwIMnl;SEEDING(lu) ..s� "(( ®/ (' O -'f: T26 SLeT M'wE, ILL TO GRACE Na.lT.A euLDKSEaEO.,O.! ® a ,1Y)MED �i / • \ / I I / \ SAW WET STORAGE ELEV-ea ' • iiEX.sal .nncE,o ADLEHL TRAP AND BAK.ORM.ALL PRAISES Or , dSr CaLB0. ,. -- \/ I ( (I. �� 161 V MORA.OPT .ee �/ STE MEREMA MZE, Ts ® so.ol,AWN(1Ey /V / • /..BOBS �I*OS - -;, �. oeH:aIaTTEuv .n / DEcu.eomE«r ® Bur aE ow;v u ,-- PRH..WIRN ISSUE HIHLEIN mumeow :A +'PEy.- D, D....E..r"�"' - .Ewm f.mT.a..TT ---- 1.1 sT- - NOT FOR CONSTRUCTION T FENCE RUNS x\ � 4DXEMT En ah/ n m ET/Rdnow.D Os j/��� - a� CESSATION OR MIT ———— ESC/PPP / aEcFEADocr all.Hc MIN EETIONC /s ' _ '/�/i ` IE ""M°'EL"'� 11x.AC MORN.AKA NAT..DEIL,EIaB.r f���� sac.olucoNED ON 0-r.'E" rM �`w"E EE PHASE 1-B / .INABOVE BOTTOM OF I / •-/�-/% - M1EaG.a.sl. DOES .;.)...r. 11001C so'OTAL Lswn `/OFOE / • 417 //% /f. / '' RBA SAD TcvsatEo.nowwrm sown fuewE eto ls.IaE! Juno f.mfY \. — .i/ ' Ii/') ,o NOT WREN I A.N. ,r- .D, L�RT i��% //\�\ /i/�' rlloa,I co,t.�lHrEL.rIEI ,oRloL SHALL �Ia...l., saE scam / / I I /.;,w _ ��.., iii / G a 1 C-3.01-B ,/ / �: ( ; ////,"' ,..�� /is// /,/i/ �ii� I /o-,. 4+m m ]i /r r -—_— j�-- , W,OOW.00.1.N111.....IR.01 NOM FOR OM.NOER.RR Canna PASS I / �� I. DS oc.ff roe.e.c. 001.1.0TY rr,re,N cfsle MI c NEmrorI.....riC..Tn..Exm.aE WSERPWmTo I,! / ....M..LOOM ,' , • '.'( /�% i�i�� ] EROSION biro�IrBrt awnmiMFAMEe•Ow,uEcons,MMI®mrco wNr.NEo�i�c�amnaro w.w ar.aonaMo TO'1n.WAVER1 /, �/ .. i� �� �E1� e.aF UTaM OP nE.nRm..ERONa.Mw mcrrt mN.rRNM..,m.Ma]nwrARCOAATww Nllxa.a.mOERI.rO /WAN ' / /// L - MAro LeE, / ,i i/ \ SEDIMENT CONTROL ReaEARaW / a ..1 EROS.MO....CONTROL 1.....ME TO le PE.EO Nagt m ORM TEWtlT STEP.WAR. _- /u< i�%i �y /-G/i�i // ACES/OF Re APR..SWAM MO SEAR..COND.RAMS. .ware.On nE STE...KaS. llm]rrtom / ! / \ / ��:-.- // arr'v011gaTeT m.we%M.°LwrTrErrE COMA.. ea r'.T""a ae'a®rMwir,'weiw.RIMS FUR ro.,<owe.ra. ^ / \ ^� .:Cr / i/-- -.5- /i/ /// i/ /. Ra nwMo...l0VM.r I.wMw.ro.+.o.. V `Y / // ', l / •r- /� / //ice//i\ /� // Cerro am•sor O,rn oo t i.wUEn mEaouarro waTxanEa.am M.mmTEE a� Enq neer.n Design StvWo �' / weals N i /%--�_ /i // / �//�ii//////// . loowoe°rErL,e Lopmorrool�a::,I "E"1,REE"o•:1.yr:M..oEo.eTr•.1a aE] ...,,. .. ................1,-... I _---�- -N21 !/ / ////////��i / // / ,/�//// / //// ' a ooromcT.i>W1.9RLT.LLHYWR.I CONTR.MU.1E.ADINCOGILr NOM.E,41.11.PR..OMN.MST • ! _ i//i i/ i �/// / / lcawm • Rrot., a.Mnr.o.wr 7,11:FE CS..OF INEaoao.Co...CamasawLEE MACE rEnlvnv ffi(T� , 1 ' ''/ / �// / / r M1iY]wrERul.o eE rMEn 4AO1MM.M114O,OEaOINTOIePawn ME• A./. `Oe' AL (// //,a/ / / 1 ALE MM.MATERIALS sous TAKEN TO MM.nE0 WASTE MEn..Re al.M].E eaa..NATERwe MY,MEs OF noon. /' �r .a GRADE TO i/i /ll// /j// •////l l , aw°N"'.oR"�°rn.�..a 'ro`.E rR,1«,T,..a�Tn..•,.a...n:owwolu.M.x.c.�a..,m �� • / ;4 ��//// •w l/1/ // ' / / ( M.te 1..TE.a.L.aeMLRE,RM...e.R®.m1.1M...n,gro„a.If.OF„E coos o.M�.MaE // 111/ l ll /(/Y// 1 I 1 , 1 \ L ;:.STOW Ems. a a i .M..w.w w MALT. . EMT...a M.E1e®m E a..a aaMm.w.. s..w...ME m WI.TF ACT.wort FP caRR.rm N A RME YMalR num MA.rMX.unow.x.rRT mOQR m MAso.MN .; //// / 11/ \ \� NArAroTOFwearla.CrFxoM.CE.oMvrRrwoMo.maEneRSMwnwlroE.oM.rn.re STREET Eu..EOsnEs /// // /I / I 1 I MEDO PI M.ROM..1.RwR.ro.s..u. ..R.OvEoRCOWEmroPER..ma.w.TEnM.MS ENT —mil ii x TR.o //%/%/1�l//ll�/ l/l/llII! i 1\\\/ aM.u..M ............»...RE.MEa.. E.MEaFMWrm . TEMPORARY .RawTN.swlEETv.ORMrT.a0N.141AOWw SEW...O.OECAT7.11...Maw TS1•02.1OF //;/ �� l , /ry 1 \rk 11 1MEI.1211.0 PaanUAlr TO COMM As.aa..a NNw.RT.A.MO CEREAL MITER Ma OR IN kW.MO ARM.TO CON.OF umaeu®wws i "' I I 111/lllllllll ll//ll/ � 1 \ \ Ma.Rya OR WeDIRO ITMRMT TO COM.O0.M.N,AOET STRAW NIRO1 O TOE M.Ea AT R.O,a.F MTO.NTNES ME i- •, /, \\\I 1 I /11 11/l/ / l \ \ \/ M.PERMA 0S 1-0.RIO.TO APPRO..M M.E..E.FERI..PER ANENT ek.110.NO SW./41..I.11.OR..IAA..R,M..: --- I1 \ \\, ci //Il 1 ll /l r // \ \ \ \a. A1O.,:.a.'O'MFWO..PO.wE W .....11.APPuEDAT ; E` CORSET F'.11:14 011/Sii OR TALL Ma . ------- -- / ' '/!/loll 11\\\\\\\I a lillll/d!,ll/I 11 I 1 Y\ \ \ as.. aNFR.a.11.a.M1 STR„WSUE .0MaEMT.En,RR.a1a..ATT.T.....ARF1.. 1.0 ////1»)\\\\\\11I# POND ti ///////!/11 //I I \ \ \/ M.T...n.r,NEeo.S..AR TO N,R.rN�w nM.E All WAS...ERMENEE.VECOOCTOR MO MTERF..W 1WEML M.ro.MAae ata m.Na ro.l.ICr1.K alt �� �//////////Il W� �' ill,!l!lll//ll/1/III 1\ \ \ Al.%'w EWSME I IE..E.EDE.MERN�` To...AGO E OF T. f ORA.S E'CEMOCIED .a... • l •i-////�////////ll //�1I 11 111 ill I \ \ AAA TESOS R"TF 1. r . "AEroRE A..� rilem.o..mot �%` • — ,J///,////1, ,,,j l,l„I,II„I, 11� \ ,�/ YEASUE.NW NO.01.111...0.NI.ECT NMRRO..Sr RE CM.ER011011 CONTROL NSECOR 4' ��- !_•11,-...qar:./../.�Ro1.o.aa.R i Will I I I I I I 1 I I'1 I j 1\ .e7\\ 7 -- ... :."rovrisran cnix\_1— /�%//// *—Zr w� 11111 I I 1 j II a 4 i , —\0\\ • .rr i I\\\\\\ \� 1111 1 sa O 0) Ct \\ 47.4,4 ` 1.11.10.1.111...11111.ro 3 Q M EOp ��\�'`Alit\\ a\ \\\� 1 Eon.nna.rM� I11IA / .w..NNw.m.e.....SFa.a..r�w / cc \\\�\\ \ •\�\\�Q ///••, // / /1 V .a1E... .R1.N.rsra].........E.............. LULU O vJ.o '\\\\ /� /1° /ll 1 /l 1 /� WE„RV,TmO,,,.,i1Ot�.eaENE.mo.UM.MENM. PROPOSED EROSION AND O rn -- �r \\\ \ \\\ '/ i�/A({r/I7 /I l / `� _ ETesaareaaw. 1..MeC SEDIMENT CONTROL LEGEND Z O N °q \�\�y� l FR' l l// /-/H TM 6 COW aERosoN�emwvrmN.1R.Me Mw.Rw.uFaE.Evr Z ] N \ \If\\�\\\\\\\�\ \\\\\\\\'ii////1'�il�//�//� �/ .°ir"E:u.F.m.oTAWIWATERFRCSEXC..a.SS.eE aF IIat1.) I a LV Of $> \\ \� /// /i / ZONE. URAL r I C\ \I \1' \\\\ /ii //// /// .a.R.,".usi NT,Tnr�w.:alram.�.aEM Rn,...aa a,. O cYi -\\ \\\\\\ \�\\\�// /i i�///%i/� i 'EN"° ,E'NM`R:MLOWEaT.E.k.Mra..R cot ® o.R... ERR.R�<an) I II °/S N Z- (1) °'\ \\\\,\ - //i��' ./` / -.m�°wr,�..some im 1ta E..TORSO R'®'s,.ioi.' oNW. ® I � Cr (7 (Op 1 ///// f / / C.C.TOMS REC.. COADOCROI RO.O.0.1.1.(IOU U Z_ IX U1 l/1/ / /4 'IREMOVEDWITHOUT TK PRIMA...OF Tt. E - iO \ / I(Y^/(/ -- .-..../ \ /- /// e.ONOnww«an.Tm m mNak.TFORIMIESEMAME ® SAT FENCE(].OS) I I = ~ ���MD/1/ 1I///I(e( _ // / / ,CANOWARACTOWS TO FMM@ROf RECORD......CONSTRUCTION YHE.NO WM CO.TY P S.OaI OIIM,NIE,PRO.EC1101(101) �'I Q� •• _ — ///II III/ // / \ / :. M.BIMlEO1M .r LFA.9T]TMrs MpRro]MO daTMw O I Z 14 1 ,gym-- ___ _ /1///i t'l _/// /1 > / .............ROT . 1... Fd.E P.R.COMMA w ® Cu.Q,Ral..,.ECOM U.wl I= I I /spa\ /( __ /6/ \\ / / EE'T.w T ,w wn"velRne.area R.Ra.NmRamP,.amw ® IFw•a,MY over.aE WO 1¢I \\ \ \ 1 / — .Y//////jy / ,(F// I RIVARROWS. v.�.yam.PROVISIONS To'EP SA ME Of ® RMT or WAY menu1(111) Qt `/l \ \ 11 y / / J .pYOR a TUMSPORTEO.Mo.P..EO ORINO.FRO.Da KMLTIE s r _%\A \\\\\\\11 ll\ \ ` (/ /d — I /i 44-/ �/ a• �•ea�iE a'c EAo,onrTxv.aiaE.WTNORr.E.1.ma.10 roP sa.w(Sao)al = r .s+yr_�_ I. /\ TOP SOILFORREWE.CLOSE OF PROJECT \\ \\ \ ( iri /J/� WRIT CCM. RACE ILL.n @a CM..Rol.cf..on ma Po.Pw.Fla OA WM NO GREATER M.slabl.(Sal) r�\\\\ \ \\\ \ \ \: / VYI.aF001.EOM1a �' / E MT.SI ROL O..mix ar.TEaI OC�•TED ira rP OTE/R.1.AA EA.Heri. ® PEsiMEN,SEED.c>a.) � \ \ \ \ \ 1 / / NTN1E0. rg \\\\\ \ \ \ 1 1 , g •�:—-—— WATER / .2.: ..mR.EMa...M.NN.N.aF..wR N.a ® a.m) =IN , 1.ROw ORA .e ro... ..TRAP MO e...1C.O.O.A.RASES OF ) � I I I I I \/ ��'I'']�� ' PROTECTION a11114.0.012014.1.1014.N...w aEMa.MIL. i• a CONRawan l / . / I l 1 \ llR�r f��IRYICT RI A a't if;,NR« OOE.EIIf FI,Ot ® smNR..eAsi wl.) g • / //Ji/ // . —1 \, ORDINANCE `10...MOVEMOwaM.,o mczawswemarr ® .oa.OILS.MASTwm) 12 ► !� PrtERCONS issue ,a4/4TfR ED ////// / / ——— BUFFER I MKS0.1...1 P'E91.FRL ..'..Ear.R... —--— 1...or D0,R..11 NOT FOR CONSTRUCTION i / // / / / S 011.11. v o.mr TRAo E •E a'M"FMR M WN.w N,MRr m M, ———— g.RR,..; N ESC/PPP \ /// / r'_' / ® ccommo.a N"wFo NERwcE�wEC ECFRCReo�RaEMn az.. asR.ffC AREA ,...q PHASE 1 -C // /// —g a.AREAS 7 0 ita TOM.°moll...SOAR.SARSOIESTO ISM. WMN RIM OOIN ..• * / • �1//j// / / / • T.TONPTA1 &SUN.E 1RRME.M6.li -A16A DOES !.r. 1Y2019 / CETATIOLMAO.wM.F APR... 00. A.W 11..O,. coNcermL Oa __t �LOCA..A �// Q /// / /—�Z. / / 1r PRIOR TO RACO.Mr OF TOPSOI.ALL MF STOIN MOAT.M M. cw....q S,M- lour" / „a..sm..TOnaIL.TOPSOIL M.NOT SE RAC... /'/ //T / /\ R�m R COR ELr WETC-3.01-C II 114.°11.1111killik . ,n...,�,.. .D.e.__RA.., -- - a,.. —`�_t, oftteverde ,.mw.n...:.....EY.Q..o.m. An — - --- �� RUMS OMR� usrn YYUAe�uNa t05 — r.= E(J m9 a°OWN Sa d.o ,.vrPP.w.o wnrt Ren vwTx.i wue¢.em...enwawar,aae..mrILenrIL _- __ - �. ltos ^t.`tm=•`—EDS �\.� =`= �� •••r��•�w�••••••••••••••�•••,•• .Van D . ..v.>ao... aoc Eas e��_/ I // //./......'' i ce— \�\j \. _=., /� \\\ PE _.� --c - _--�1 7/ ice �,-*� �Z • ' q,� =. ,, ,'arwa.otwoaiw n ooENwN .....A..,,,...m.o........... s �\\\�\\\\^/i s// 1s�' ( !�� i I Ili\ it��~' �;'" �/ \\\ \ \_ ....Y.YY.ou.,,.. ...Accra vm.r,M c.r..,t.�rYt ..Y.a,,.a � \�\\\�/ii ,�//1���.y[C� i `a i r, r► `.YY.Y\» N.���__ -. 11 , damisl'Air. ....... .....,-,-433 1001\O.:,1 eittil\-41. \ , „ /I ,\.<*':,,,,•••:,9,1,ruiRks2 :::-....•-•:::•••••,,' -'"\— '4"117C1,111011/141 /,./ ' •.; ,,,, ..., , i ; ."-- —. — --- — --- alliilll • '�I / h� � \\ \ N �Tarly-_1 , t.einlif Kg lit ft, _ . ,, //;-...gym_--.., ,\`-- — / \ --..-.' / \ v9l b L �� _ ss. '. - •7 °' PP- -�\\ \ \_- ,- . '` i� ter.. / //// / /^ \\\\ �- .- b I ,\\S'— /u 5/f 111 a - e � ' 1�II/i % _� ��' // ¢ /// \ \\" ..--.i�� 'fi e,4 eVi�I �lre-,,„1.4.... I • III �1�1.'}S� `la I'. 1 i)✓ 'i -- - r../..z /////�\\ \\\`.wadi i MIR sT as aRVENT ST•nan. -!rr@ ,...1'r UQN., Wpwitij,1( 0--_ ... mT®7 "yE . '"lt-1 �!�i �/i/ \\ `\�i <� �- '� ' j�\ti -.�'! I�Mr7 l� p i/G/.••G��'j/ ii . �'". w T --__"�� i---�,\��ii��i" Q ] Cr) O Lij -- - ��i \J l l' /I I J� /fi ///! �.. _ tE°ETww sANODAe�'n`oc�, .r*,�SOL».rflo" PROPOSED EROSION AND W O p rn Wit. _ ���©a,• \ // / / I // / ///� -' _ = v e` \ R)< ' / ' / / //////%//%/%////j//%/i i SEDIMENT CONTROL LEGEND Z z O O N -__ _-_� � \ \- t �f//Iii /it,yi/i/ii /�/ .„may" -.: � SEDIMENT S�PE..Ya, �� j W 0) o¢ \\..\\\A\\_'C\\, �1. \ \ \�`. �1,...i}//j/��j/�j////////,///%/j iiii��' Eu o° �" Q (xm) I I F- ] •- 3 �/ ///%/////////// /'i s.P sour FREE -1 \\�C \\\'\ .�- A,I`i //fp //%/%/%/%//%y///,...,-iii�' TILE OE ANNE.oro'MEE TURF wENCE WITH LOC. 00 O V p , - i. �\\ \\�\ \e - fY' /%�//////////H//////��/iii-i wE.r, ® wa,Yurnm am.wa(xm) I I CC N _ \\ \ �a i ` //// / /////////// H//�i ii _. EDNICIToOTIESEQUENCE.nm w.e �� \\ \\\\\\\\ - y . /�/�//%%////j/////////�ii - _ ® casrrarna xow STAMEN.(xw)® fJ Z Fn J \ S\\\� \��` \� �.\%= // /�'' ////%/%%%j//7 /�/. /%//%/////jj%�,/� = s�.r SAYSSTRATORoAOEVEIMOVE THE PRIOR S9N0 SEDIMENT EDREP1tYewATIVAL OF Om COUNTY Es K.ma ® xr PAIL cam) I I J1 I� w " . GOWN CREW \ \ `�� �� \\ \�_����!i%/%/ /%/////j/%///////j�%%/%%,j%///jj%%/%%j/� . o".ABET AIN E C�P .r A4T t DAo suNoTAF PRE YS PRIOR o LAND rr.rra 141. ® Rrw mw PAST.n OOR.N.(AIM I-! - = \\'\ s \�����\����� -A.-A. `>```_j/�%j/-SNif /�///j/////%/•�j/�j H• Nr% SEDIMENT CONTROL 1....1 Iva 1 0. LOP Y.P E. r OF E a. o ® aa p.PROEM..cxm) I� C \\��\\\�wnat %;/�/%/%/�//�///%/j/�/%/�//// Q E ACCESS ROUTES INTERSECT PAYED o« ® ,Er ma cam) & � �' / //////�%//�//%/d S>' /� ,Ao EPA rswN MAU.eE NAM TOYw�Tnc rnwvcara Sort or uT 0,0,..(ar.) ;1 — iy /�i,/ ////////,// .AR TWO..°ONMINE PAVED SOAYAC:WHERE �. _ _`—=--_ -4//W////ss ,� /� OR RELIC ROPE w.mm.PRY YeTr,o�w IRE o.o ® amrEYT mw laia) ® Y. ar.r. or ,_ ,CONNENCE RC..OWING,OUT NOMA PLACE FEL INLETS NO GREATER / vI \ \\\\\\\\\\`= _— y/ / / / //1 aw,..sTs.Ex.A�o wn�E.orecnoY.s DENSITY DO TeAa..a. s © 1bPOPMT SEFp1E(1]tI IiNew���Y� \\_`� _a PLACE FILL IF PI GIAN rLU wO MAX eA�nau.n OR FROZEN MON/` ._� "/ 0Pa 1 Eon ® PEXYNEM SEEMED WE) IEI /LwOYIEE / /" _ � • --=��=\ — /} NMGIBOLLowG PMtOCPME �r /� \\\\`=z==\\\\ %-2 � �/ %/ �/ %/ ,�ll/"j_ tREASUE DRAINAGE TO SEDIMENT NO MaNONO x.ALL NMtSO ® OA(xa,aael t�EiEl - _ • =``\\\\`�_\\\\\\\\\-`lam /' i / / / / '- siM GE SITE.l!¢' E�EEneIIE ® 5f0Y[l1r BASIN(x.e) _\\ \\•\\��'\ ‘� �� / / / // / CONTRACTOR �M 199/1 NT MCA OEM_ PRELIMINARY ISSUE \, _ ` —� \\\\\\•���_--¢-.fi / \ \// // / / / „// "�TED i LE FOLLOWING SIAOSCATION Or D .orsw` RO,AOREin ® n(v on , T , NOT FOR CONSTRUCTION 1 - \\\\\\\ / i NI m 0910.99 cmmmun ----el sm.ewr M>« = S THE SITE...OBE AMIEDIATID, \��\\\\�_=s% /�/ // / / / PTY .REACESSATO„PENNA. ESC/PPP \\\\\=`�\%y / / / , % ,/ / r°A"ROTT`E�o`"OYEROSION O 1124 AD uaewam AKA PHASE 2-A\\\ /� / / / E,wm�mOerwsrO nnA.r'4a.ana>A. ,....r. _ t I \\``\_` _ / / 1 NOT rERAM ACE(1e .a,.raa.wasr�AA.wa YwMneroaea 91PE MIMEO NES.SEAL Noe it S `/ 1820 /Y i /,,N A. ' /�/ // e AREAS ro BETENSOR.NO inrtE,SCAMP S.eaneTO As woes u`•••w �s ... \` RFC PRIOR FICHES DE,OOF TOPSOIL A MEAN TO BE VEGETATED Nall NA i�� ... NM,,,,, —__— --- / a R OR EXCESSIVELY TawLLROTEWOEON.EN �C-3.02—A __ v�)%. 1 \,��\\��\\\\\��� �-�`-�_--=::,.::;;I: /%/ +° rLA,w �41LwoaarrF�ara MOWN.mcF wr� caN1,wc rum ion carecc.dtE rffxwarone /`__' �__..� -f'''' \ It \`\\\,,\\\\1woFui .. ... �` % %// // COMMENOMEm,:LEODISTws.cN 9.OIE WEEK.Fr.TO OWYSTRUCTED ERNA INSPECTICE ,o w...FmNn.,pwo / -.� � - ' - \\ \\\\ i' AG',//.fi/ // vM..EROrnaa.No SEEKER w.uod,MO AR..LEauma VR VHS.M K.NO /Wk. / `..�_�_�-�� ' sl` \\ \ \ \--=��= _ // "' %/%� cMA. DSEDISMEASURE°IPEmIE RAMISNOACED ORroaa AS AWED MINF.SRP AT ALLW0.\ ®. \\\ \��\�•\�\\�.��` �� P.- .i, //, NosEmE,as».r°M�isn°oM"iLeLr°°°11Lw.EM" ",,.,:�L.owLEsEw9REva°TtwLvw'ia.wnFOEFrrenro, \\ �\\'..'1.\\\�..��\`�� pis f!�/�\\ _____ ,, �, d. �.F..�.E a„,.„.EA� �d �ra xa�� onteve� e RCRN �`'` tea I' �� \\\\\\\\�` _ � 71 RMTNAa"'°aa.aatowEaow".Donnoaf.°,..°FEaMANITO OS.' mdF _�- 1 �� �\\\\\\\\\ "1�- NE PLAN APPIM MCAUTION. ErW rq EL Oesvn Sn.dw r . ,4`����7� � =� — =� FOR APPROVED SEDIMENT COEMMEAME.AT EL TIES PUMP LAND CORM.MANES MO i"-^ r / �Ir\\__��=�--�-- wag.SITD DEVELOPMENT UNTIL F..STABILE.. ACHIEVES , r.Fuu,...................... t "�- MTNB.NCE / / \rWra.BEE f�-r_-= �-''--" '. l� IEWFTOR cr.WATER NE BE IM OINTOA APPROVEDF vTaMP DEN. \���\ - _ `\�\ ti� No.FlER EON RAPE.REMAN°RAMALL LENT —,�� '_ - \\\��=_�� \ NECESSARY REFwodL aL.rw roawru.r.EEEsrcTnTaEsaTIE EROSION CONTROL PE�..s.°vwLmL.wE.�EnI.,FLr //,/ --- •r, \\�``��\\��\" � • `�/ // mres.woanERRAJ m OW1S. oi.011 sOr AN u ARIAL TO BE TAI04 FROM IN...ROVED DWMTEE Ma.IGNATED° ENTINEORROW .swLE.ERr......taa.FREE OF LOOTS, \ _ ME COMMERCE PER OEIRMEE aT.M. // / �' --�--- \ .-�-_�S\\\\��\\\\\�--� ,` / ROM MB, u�O ME COM OF ALBEMARLE. EOM.?MALL BE.FLE,.,P.F�oa.MELBmEn,o®'REa.PRr"a.i°O�F,L:o:..H AM / Q —\\\\\\\\\\\�`_— s� rsrw..c L M/MEM c STREET WOMB.SLOES, / wD4._ _\ 1 —��\\\\\\����- �/ -- --- WARMSREd,REPB.TMa RBONdEB°o N Of MA`m . / `\\• \\\\`_ sE ERR 031.CONTROL RN REM OReABP. TR GAROLEm / ��\\\��\`�-- / / / NIM E f WORM,.EERINOAOOM .„O SEEDING IS TO BE AT,BL°.,OE MDINPE MOM.OF / COM SLOPE `\\\`= � /-�' ANINJAL RYE OR NM 10-1 SETO O.MSTG. OFWMANMILTROL ET A OK NM Of AMOK ST STRAPMHWIS TO EAPPLIME OR M NOERBLiE, ME . S...TO APPROVED BY OE COLINTA 77/' //i SOFT BPATUILP ` \\`\=, / 1020 -- • °�PPs�LEr STABILIZATION SHALL BE SPE AND x oMEm`M`�N mEPDIuzER ERMNENr sEEDac,ANR MOWS.AORCLRrLwL ORNE UMEmO.EE„NLE / \ 15 .... .."" / APPROVED BV ME COUNTY EROSION CIMR.INSPECTOR LEBtrMM.RrML.EwsuESMETOE MSPPCTED WERLr AnD NTveFAol wuENL.ANr DMMR dt 4000N0 Ta sm..nLruL� `-� -/� // / TEAMI."." OEIEPNR MADDIATE T'31L TRMSNiETO°EdEMED.%"0v.OFT„EN£TSTO.NEVOLOE IBFBLEDRM t.NYALL BF MIMED AT ISMEMACE NO COMET.KR INFICTUOCV 31 OR TALL FEE.AND \ ' --- 8.311.1.1 I.NE COLLECTING STAMM.0 RALF TM.HEIGHT MU..ORAN.AND REPAIRED MEOW.T N /�/ / // 10 AEAMUES Me NO LMPER NEED....co-TO.M.,.By TE COMP EROsq„CONTROL WBPEROL D SEDNI04.0.01,01.MEASURES ATE ME.140.0 ARM X NNW Of FN.SITE arMlluArE..w1o. 1 \ �`�EEw. E.HOME 7 / --.MIME 9.-1.MC*RIM \ I OW.E BorE / / a d \\ I Ct / �`�_ - \ \��-� ..,..---- _ j \� __ W j 0° LOOrn / • ... ..•... / /ERRMU'Na 9FDI.BR CON.IIR MU)OIEI OEB.ER LO.W N.EtEx.6OLS O. Z O N �/ ^y�\ WE.E xr1211 • \OL,o �/ ,/ • EEEMBO.E NE.�B.Oar,P.Eu.wE-.s..,„ PROPOSED EROSION AND / / / \ \ SO ET SPEW., - ��`�' __� �/ sAE�a Mo�t°ROER'M"R E°ffds ram.Rlw.B..o MP.m M,.RE.E>r SEDIMENT CONTROL LEGEND z p I // // - _ ` Z::o , ' \ \\\_--- I\_ /// /. Rn saeR. °E'r niER`wENse gym`ieE . OsMen FERCE tia) - U• 2 / L P_..._ E` `` \ i / /�/ SLRaR EONRFrrR.NeF.P.TM.EAg SLR ® co.ara.craR dEMNE(am) �� Cr UT O• O I / / �� ' • RMwL° ro.v OF TIE / -'_ �. 1 / ORERC TTIE PPROV.T.E EOIENO BE MOa ® [1 R)Q \ w �� _ Rosv,„..n EaenranRR MrwsuEexwLE ca10.C. R, IL,EnM(n �i J 2 w'+) 1 l /''f ® \ _940-- ITI°rr rTRAroaa D.O.TT.REPIE ATVE. nMo / „R .�� ® sET R..R(ass) _Ky. , I AIa=.rasERRroBo.FmPFREcuaTTnx:no.FEPncrvr„cwRry 'Q/�_ \ J V .cd.rruc.RR Tema. w srPRF ItRNN M,Er WOrtc11p1 ao l rI / / - ////x vALSOM.E mMry AT LFA.Rr 3 OAPs MARTO LEO OMUR..o ( ') -� j ! 1 / 1 -- % /. • IB 1ESPpa9E FOR MNNTENNIR OF ML EN...NID ® m`Em WI£r I1.OrLC11M(10B) /� // / / //� _ \ \\ C — /' /, PE..E,a,mFROLMML,FM.O. ' ` 1 \ --92�—.. "/\\\ S.weERE CONSTRUCT.,ANKLE.c w RaRES.R REa PA r m ® rmaLENT mrnsM Le:E Ivr) l .{ J I l 1 \ \ .eo MMIE IME WERE EwT a WAN dw.soR(III) y f ( \ - ^ / N BE OE � MTMEO YdMENT RW(ST)) ® .la OWLMa .W S OEM GR.SITE ' 1 e'""'01. --/ � r.OJTMO MOM- FILLOi E.SOIL FOR MUSE AT CLOSE uOSNupeATm 13.8 \�I / 1I - r �°s R u L IS SATURATED RTv PO NOT RACE FILL IF N © iMMY YEOMC(aa) \ // / / j ®1 ' M LEMEn ..... / TOM ALL SIG.W TMEN SM.NO°V°.ET PROOtfp AS MR BEET IS I / I`/ i O B: E MOM.WET O ® FELNME r EEDMP(3.32) FEE fei\ W.ORM.•E°iL. 10 KL D GrE,TEs /� _ .ro°1 0.3.w.M.` a.E. ® Muala OM) DiEl \C ()I . i w.srw aE,EFiEM,T F.., i - o...M.c°"B""K' �R.P°.w `. y Iwsr ca.ma case) } �S•L / \ / _ EA�e xr E1EV•asi T` ABILI.1014Cr R'iwE.OFIEESETT.WERE WASIE ® SCOENT e.EI(a") sILT Kw.E.aoNa / t / PRELIMINARYCONS RUC \ ! WE.e * -` / t rN OF SPB"�+ ,ss _ REMOVE Mo ST.SEDBE9FDAENN.MECEECO. ".s°,o°E..WINEI.F"r TER ® _ NOT FOR CONSTRUCTION / ROCK/ NI FT G., - = — `.__. / ISSUE CONTo`"`^FrMixi rt®r®.ML^Rnr`ILrE+sN "�'.NM.aA,d"`rrr = =«Lnlrs(Ed I� / v(� SPmom.ACING., ` �ji/ Mo T .00.R.BAnMOPNEHR Rr PEEaN R TdNR 3aMa,B.v DRAMA. F ESC/PPP .MnKN.. �l� y /�// _ 9' ORP LENC EAT AMTIOR SEBMTB / °AN EC.EI� n �i /-� Mt..OR OTIERWE Mg2EED 4 DNA THE CT®DFRO`F MRNI MO .a.:.BC PRIMED.... PHASE 2-B Il , '/. - ✓/ij, / ADAENTAT'°vTc PENDING OI FURORE.. Br COSTUMES OM,TIE F.B...W ISOMc / ,w 1 ` L.L • %/%/ SRAM STA..TFE DISTURBED NEAR.M MATTE.oafs I�or Latt.tote aon0.. ` /�// !�� COMM..SRAM wt.Mum.APPLIED NEW.Sat oar El0 m/n. / �� �' /� 5 \ �' 17 d EOPsoEAND ER NO M.vrtO fGNEr �.NFn 9wL°�J �E'°° pR _ i / / " �% /i/ii, /%\� Grua � o///^ o:BOEBNNLRmEMAPmWe /► q / : T 'i% /// _ice/iii ,/i/ / /G B II VWJ.OZWB /' A / ,�:1 i.;/ii/ v,,,/if%i, ////,,-, kI //11/1q./ !o so tao FROZEN DR...SAE. �- / I r.ME.n.MwrN.NM.T I / i/ii i'M', ALiMECa.MT.EEtMMICE..rwcTTRt.ETUEERaw.O.MS mart CONTROL ALMS CS rNE mesmoc.TO PE PREP.:INSTRUCT.CONFERENCE.ONE WEOWIVOR TO ME — ,; /� aF AMO�a M�a aE.HEEwaN,awE.0.vE RM. // // Mu.E.mT�AL R/ ` ' % MATCH LB,./% i/j'%%%` \FED �vo F arALlE aumnucF®100Imo.wo. CuLATnrw Von snow MO . /' EFOEENTCOMNOC w.me.TMEEr.RE Nnuoacuo.n��".EE II - / i iy''� i/ ��_ \ S. Au eRae.Or.NVOSEOPPENT T0ATROT WARR.Ain TO BE PLACED PRIOR 70 ORM I/.MRS,STERN CLEARING. // t�7 ///�� - /%�% /�//fa : ABORT THE APPROVED EROSION AND SEDIMENT Co,Frn«a,""F; ,.E..En,.n,Enn�«n« .;"", uFoa' l PLAN / .`T /' �i .�- / i ////r//%� %// . FFwNO NE RAN n0 �tea»o>a. i�.�F Qn'teverde y � //j i//// _ �� /�i // ///i/ i // ��"..". .ono E eoEs sw� / _ _TAT CAI Ems,..0 ONES w�owaamM.o n Ea.ro olosai cow.. E.. fir' ' i,!i / �/ :jam///,j /, , i n�mISSARro`REPAISSITE DE OR nar ANUPTOION om s i'pw;ED tiro a;nastorao F ALMS.ooAcEa posoucwo a�w OE ..En ATM3 vart ' %j\7 // / .+un"iW "KTOOkTANENF �vNAPPROVEooESONATOSOFRO.,EW _ - owtRTm.t..T>si //i // / // ..uwwre�.ass.��°FiA.aroAn,w+m.mw°mere..F.mnFuaw�.F.eFi...°AL.Fao.rF�aF.00n /. w�CE in�rr�c rx ///// / // //// / mura woao,w.ma,.AM OTHER Draws _ _ / '.��� 11111/ ///9%// /// / ( /¢ K A R MM aS A '""10 `°.I�a LIAO E:o r N . i MARTLE aF„°w oE,... - ----- \ �/' III//// / 111III//I I I I Ill I 1 �/ "wi° q':OPERS�PERSONS DAMAGE TO .LAM 4, .morsrEn a.Ar"NDMI Fo&MART MILO°snsrmcrw1uF MODES. �& oa"w1° ////�///////llll//Il� I I \ \\\`d ItOnWvuanEn.w.NESESE THE wmrt.onmru.MANTN�.REMOVE wcoxw9nrowawErimmwuFarwwmENT TWA PLAN RE Emo Ile ME OF ANT LOT,MET, ///////1//////// ////Ill I \ \ \� wALOALOOR0ERFORTH.OrT.ETRORE`Mn° E.aOnESE«wEaOMAP0ERRT SEEDING IMO MOORING «Mawa.EA. Fs RTE.oR�Aac.oALK«ann.a OF urma�a®mrra /° J \' I I lll/1lflllI11/l/I//11LA/1\ \\\\ „ /AMT, ,wOa TTOCONa" GERMANNUAL TEUWMxa.CEREAL" .EAPPLIEOAi.RaRN.w..a,MARC.AND AMR A. \\\I I I/// nil/1(IlI l 11 \ PERMANENT e,.,..EA,a,E Los Aw.EnIIMaN.N~,a....NISLLO .MUN....A�R«,ORAL �..W*.MLI. ------ _ PROVED.THE COLATT EROSION CONTROL INIPECTOR r. l�iihl�11\\�\\\\\il h/i1i111h1/ll�li Y�l� \� ATOM,:w,R�NTMOPE;° :SE.aG .;BE oAT1 REAM OF �.M�, .ALORVALOLISMAGFIR ° ////JJ)II\\\\\\\Ilp POND l!l/lI/ll/IIIl11I I 1 \ \ ARROWOemTTNECONT`.EROS "g4m�"RE`CT STRAW MA N,On rO.i.Ra.mA E.aMrE.A...EO 0 MY WARM M CADOO..a TO ETRaenwE ///iip/r/sill VA `' lilNlllli 1111/1 I I I \ l \ 'w,�"DM.Mk°To BE "WHE�NECE;SA a" WET STORAGE GRASS SILT E� ON \ -eeo-—- ---- `k, < <—%//)//////l l////llll III II I I I I r \ �� v a Ea APE COLLECTING EO, OMM TO,� EiM,TMUST O �NEaAOwy ra E.EM r:,i.a °.�ON.wNM / ��=, . % /,/...//�/,h /I I I I I I I I I 11111 I 1 \l\i\ \s . E A E Nn. a�r �r SKEW Arm N�En �"�a INSPECTOR �, �,, . .. , IIIIII 11I II1II i \ y \ 3 >row�aE.,oNwwEw...�.EF.a.E ,� .. T .' "'.''.r'R.''-' �- ,� " = Z.,/ /-�'t� 1 IjI1IIiI11j��1�:`/�� CIL ��� • \\\��` ,��r a {,)\\\•- - rllrl( 111(` if - ��. 'Tvi, \ \1 ,, ///)E ///�/////////� /'aoaa NosEO.ENc«TRasEaw�a o ` \ \ \. , \ /T l STEEP ac;ow. E�m t°odw.moM z N a�+\,. .�,I\�, \��.0- // /� SITE ARE VERY STONY MO�.E:EO PROPOSED EROSION AND 1 j w Cn O si .� l \ / SEDIMENT CONTROL LEGEND 3 \` \` /�ii //� ZONE: �RCJRAL O.ENTCONTw,MRS„O P.M M OSONM o Y Z. G-S\O `•,�;. �\ ice, ///�' ON SITE AT ALL LADEN WATER'RCM E...,vA„Ore..,Ea ORDANCE WITH LOOM sr sMET.'EKE>a w °�S N o ` TER.AOo AOR ME.OREAOE Q ( > I. I '� \ + ' /.'/ / Y.aNO�f/S S.W.iBF.MldvFO To ETER SHALL EIE HAPCILITO IN NTER 6U1F.I�U1 rL �O \ 5 %'��'\Ta / •/ SHALL.rain SEER To ® m.mwKnaN WRAP.r>ox) I I I 1 U Z_ a m. .).\______.--, ,� aL� - IS, / / -- ' RRmrn s ADHERING TO s"`EwE'; BELOW n J m I . _— \ SHALL BE ® CONSTRUCTION ROAD mAau:A aN(xw)® J �� �: 1 '/' r'/ SE«N.NTAOMNSTRAT°ROwFtnONATEORr TYE :NE°AO'OME"O 7. TO TION MEET".WON Mom I A _'� / - / / /`0 OF RECORD,T E.,aO�, of N O LAND r r / 7 i OTTO,ALEE - © STMY ERN°WTET notELTIM(>O) I�-1 / --- / / Aim,GORTRAa TT,RSRESP«.S.NFFMMANT,N.NnOFNIER..rC.ME, I /I \ / t ;: --• / / C CONTROL OMT ia.N TRANCE PEP/METER CONTROLS.T FENCING. ® O•EEi iN FT PROTECTION r>°I I� { I \\\1 1 1 I 1 o�:�/ / // 4/� w e E ONS. wGRECS OARS AL .ROO w Rx OR ART ODER. (xoa> I 1 1 \ \ \\ 1 I \ \�/ — /••`�1�% -- / .O..ORo Roost.e. MADE TOE.RE.�,METR.N.PoRTOE ® ® �•Y•—_ / / _ aFMENT Br MODULAR TRAawa MORO RAVED SuEAEE.WHERE wWI6.A,MNRaIM.(>�1) 43\\ \\ I 1 I \ \ ( !I ►•/ �'/ _ $/ OOAo NTi:T TEDONTOA;T THOROUGH/E""E`e oMAD METHODS,ACEao © aEM.ET.T o I (O.O/ ME6'� 1 — i �\\\ 1 \\\\\\\ \\ \ !41,- / ¢/ RE EACH 13.0 MVEEEARO ATOGSTOOOP.WAS,WC,AT THE END�TOP BO.ME REUSE AT GLOMOF...,EO TOP SOU.(ISO) � \ a EwnE.wn 11 1\\ \ \ \\ 1 ' 1 \ \ ____ - / r T`N COMCE PACT TOMMA'`�T,« 00T T,A.F�".AN ,�M.N.SHEEN.cxm I \I \ \ \ \ \ I \ V T d' TED OR FROZEN /E POTALLL STOMOR SITU O.OR MATERIAL .'mTEiBR AiO ALE PROTECPLOT.AS EACH g \\ 1 I I I1 WATER nl I-/ ) i1 / J/ / PROTECTION Rama aRAD oMMOEANDmoT.M.OR.OaFOMOA,TO. ® Mm(>AI /' �CREE f E ORRNACETOSEa.EN.TRAP MUEAeM TNRaOM.,u PRAMS. x '///�// ;SWAT-ER ED k ORDINANCE � '" M,an.,OOPA C COOKScx.> ~s PRELIMINARY• AM AREA RIO/ / / / —_ IA FOLLOATING aroAa¢wTaNaTww'nE'"'»�i.E®EWER ® s.wEt»T eAa.(aM) NOT FOR CONSTRUCTION 1 ¢rr�//j// l // �i— / BUFFER // :ML°° Ma..11.•R" __NOD` sxml ` V V ESC/PPP / P.®CTEll OFFRATTONS NOWT FROMM ® M'O"•LR-IAN, `--- •- / a1M.1 E.UOE uaT I___— Sm.rwr e.S..>AA..ACT A _ DO PRIMA,At/MOEDA DAYS F RE ,.AO PHASE 2-C EErTwrwuALMS« mier . \�/%�/� jg / SEDMI NIA NON RENDS.SALM Ulm�R�FTM.°�"owoNr'�io" aznEem AREA !IKON* ..,n.at.aME I\tom_ �' �A /// / / 4 / ACM..CEASE,TIO sTATEg THE TR®°R'm.T.nNS Ei.AiTERaare t �1OOMnE0.1\ / IC /// / / / ut• VEGETATION MO mi.A LoSTiOE ARMED ID EMAsN•ANN soR ^!' \ �CJMDT•m-O / Em Mn PLANTED xvsr SUMOErTO,..OE /'/ // 7 / TOPSOILAUAR6a,aE.NE�T„ED,M C-3.02—C --Lam"— MST., _'— , /p-1 / \:'I >re o -- 1 1=4.r. 1 Ta.011.1M.NOTOERACEDMEN II 1009 M FAIR MTE.RLT O9NTRO NARRATIVE gMT(/A FR04M ARO OTMMENT Rrt11RTE MOTES. MS-17 N]PCUAR SEDIMENT TRACKING.WHERE CONSTRUCTOR VERGE ACCESS ROUES NIERS.,PAVED 1 PROJECT OSCRIPnON Ms 1R0,C1 MILL CONSSI OF A TASTING R001 FM THE RETARD,AN EVENT Es-I UME55 01ERN.NEWATEO ALL\£1S1AIRE AND STRUCTURAL ER090M AND SEDIMENT CONTROL OR RJR'RCS' MORE,M.ASSOCIATED PARKING.111E.STING FA1BI POW RILL E u00.23 FOR SMOMWAIER PRACTICES RILL BE CONSTRUCTED AND MAINTAINED ACCORDNC TO MNIMMM STMDAWS NO SIEOFIGTONS /PROMOTERS SHALL BE MADE TO 1EIM.ME:SPORT G SEIM.BY EMU.TRACKING ONTO MN.,MAYAGEMENT THE DIST..,AEA FOR 1R5 PROJECT WILL E 13.24 AC O THE VIRGNIA EPSON AND SEDIMENT CONTROL HANDBOOK ANO MONO REGULATIONS MYERS-MO ME PARED SUFA2. EROSION A2O REDREW CONTRA REGULATIONS B.TREE SWEEINY IS TRANSPORTED ONTO A PAVED DR PVBUC RON)AAfAQ.THE ROAD SURFACE 2 ERDING SOF.S91011ONS-:MS STE TS LOCATE°AT B585 DER WOODS R0I0 AND PROF^_T AREA ES-2:ME PLAN APPROVING AUTHORITY MUST E NOTIFIED OK REEK PRIOR TO TUC RE-CONSTRUCTOR 91NL E CLEANED MOROJO.Y AL THE ENO G EACH DAY. COMM O AN EXISTING FARM ACCESS R.O.OFBv9 SITE,AND AN EMOTING EAR.POND.TE CONFERENCE,ONE MEEK PRIM TO OE COMNENOIENT OF LINO O5IUFBO ACTIVITY ARO OE'BEEK C.SDWON.MALL E RFNOYCD FROM THE ROA05 RI 5H0EUNG OR MEEP9IG TEND TRA POIRD 10 A PRIOR TO THE FAN Alt¶1 INSPECT. .Ede./er J- EMCEE MNEZES IMPACTS TO STEEP SLOPES HO FLOW...S ARE ON STE. 10 EN1 CONTROL DSPOS1 AREA STREET 9ASFWG MAIL E NL01D ONLY AFTER SEDIMENT 1 /VZ V Y//W(J ST. .ALL NNE. NO SEDIMENT CONTROL MEASURES ME 10 E RA®PRIOR 1p M AS RE fN51 REMOVED N TARS uANER. STEP N GLENNE. MS-AIR REMUvµ 0 TMPOHARY YEAS/RES.NJ.THIS 51 iv ER..MID 5E0E.CONTROL NEM., 3 FBLT RESIDENTIAL MS P TICK AID ALL EST IS CURRENTLY PARCELS NN750 RAN AEA M TRµ OR R20 EnplTYeerinp B OeSIpn Studio E9Dp1TIL ME AGG.PMQL D RE ESi S LURENTY N50 USED AS A METRO SITE1.A COT O M APPROND EROSION NW SEWFNT WNTRQ P SHALL E MANTAFED ON RE SMALL BL RLEOED 0*0M Y.!DAYS M.FINK 9H STATET ME LOCAL OR 0AFTER109 TIE 1EYPONART MEASJRES SITE Al ALL TINES ARE NO LOWER 1 E DIM UNLESS AREAS SUMOIL(R LIT ME LOCAL PROGRAM MONOf1T TRAPPED L�i.Fii I;i.I1....•.....•N•...II.,•.. ESAN.PEKOE TO.BUT NOT NITER T.OFFS WARMS N AREAS°TER MAN IN GIIOOC ON MESE %ORMALL BE PO E 11L'T STAB SOL ASPS 4(511(G FEN THEM AND SON O TEMPORARY EASUES l 9Of 15.NO M - ME ATE SIIOLLD NOT EONS S0 OR WASTE TO E YF1AIE UST BE TD.M OFF PLANS(INODUMHG,TUT NOT 1091E0 T0,OFF-SITE BORROW TIE OR WASTE NE AS).E.UHF f.M1MCTM SOUL A0_I E PE 90100 MY SMI400L TO PREEN FURTHER WIlSM AND SEAM FROM ON SINE M1 OF-A9E 91011 ISIMWIG ACTIVITY ASSOOAIFD TOlH ME RDJECi RUST E EMPTIED PLAN A AAING AUT1MY FROAM'.ANTE°PLAN TO THE DRIER fCR REVIEW AND APPROVAL BY ME MS-1. R001AIDR NFROM SEDIMENT NT IRPIES N, MA.ANO1 I OA.DUE FROM EASES IN 1 SITE TAODH DE APNROMATE.BNSOIC110N PLAN APPROVING ALITRGXn .ALL E RO PEAK .01 STE EXt OEPO0TON,E50411 WC SPAT OUE TO INCREASES STORM N VOLUME ES-.ME CMMACTOR IS RESPONSIBLE FOR INSTALLATION Cr ANT ADDISON.MS.CONTROL ELOOn NID PEAK FLOE RAH 6 STUMLORING T N AR FON IRE STARED FREQUENCY STOWB O 21-MODE 5 SOLO PETER TO C2.02 AI C2.03 FOR SOLES IEOIMATOI MEASURES NECESSARY TO PREVENT ERIZ9ON AND SE1xNFMTATON A5 DEIERN 110 BY 11E PLAN APPROVING DURATION N ACCORDANCE MM THE NNALO'MNG SIADIEIS ND CRITERIA.STREAM NESTMAl10N WD AUTHORITYRELOCATIONJE LOCATION PROJECTS MAT INCORPORATE NATURAL ON11CR0 DESIGN C.CC.C..AR NOT MAN-MODE MINN.,Min MAT-RE EXEMPT FRM AN FL OW OW RATE GROOM AND EDOTY REQUIREMENTS FOR IS ANO W G. OR^-^s'AEAc.TEE ARE NO SPRINGS ERNIDS OP fLOW RAMS N THE PROJECTS UNR ES-2 ALL OMER.°AREAS ARE TO M.TOAPPRO.WOMEN,CONTROL MEASIRE5 AT All TIMES NATURAL OE MAN-NA CHANNELS OVUM...Or SOD YGS(.02)M SIT TOIL litMAZED ALL OUT NO FILL SLOPES N INC EL LAW� pSTMYNG KTNMS DUMP SITE EELfPENT MTL ENN STABUZATbR A CRCENTRATED STORM..WEFT REAMING A OFEL.MENT SEE SMAL BE DISCHARGE)DNECET ATATILPROJECT AEA SHALL E 9TIS M LESS UTEUI EC2 UAMET MATTING OI ALL 3I SLOPES. INTO....IT NATURAL ON MAN-MADE RECLINE 00RTEl.PPE OR STOOP SEER SYSTEM.FOR ES-E DURING DEWAIETNG OPERATIONS,WATER WILT.BE PM.INTO AN APPROVED MIER.DEVICE THOSE SITES M E RUNOFF IS OSMARGED INTO A PPE OR PRE SYSTEM,DOMNSTEW STABILITY T EROSION AND YOENi N1R0 IS 0Fc1 UNLESS OMERWISE loll RED.ILL VEM.ATE NO ES-9.ME CONTRACTOR 51AIL MSIECT ALL EROSION CONTROL II 0.00S P[RCUICMLY MO MIER CKN ANALTSTS AT ME W1FNL OF THE IRE OR PPE SYSTEM MALL E PERFORMED STRUCTURAL w09w AND SEPEIII AIRFA.L NIX.PRACT OS SNAIL IIN IATEIMUCl50 NO MANIAWED RUNOT-PRODUONG RAINFALL EVENT WY NECESSARY REPAIRS M CLEANUP TO MANTAN THE B.AMQUKT G ALL CHAPELS AND PRES SNARL E VERFED N TE EOLOWNO MANNER: ACCORDS TO PIE SIOA5 MO S*. N5 CrOE MONA EROSM ND SEDIMENT K TIE EROSION CONTROL DEVICES 91ALL PE MAN YE1RAlELYPIE IN ANW 1 THE AIPPLKWT SNARL DEMONSTRATE TOT ME TOTAL M WE ANA AREA TO ME PONT OF ANALYSTS OMER.NANWWN.MIRD MOON,1092.AS ELL*5 AS ANY AOOIIONµ LEASUES EGGED BY MfMM SEAWARDS(Mil: MAW IRE MADEL ISONE HONORED.ES MEAIER MAN TIE CONNITN CRAE OF. G AM AREA VUCIITL LOC.SLAT.AO FEDERAL REGULATIONS O N M REGLATIONS A LAND-OSNBNG T IN N11E5 E AND RTMEN ON PRIVATE PUBTUC LANDS N IIRECOMOIEALM E OF I PROJECT N QUESTION. ON:OR 530CI1AAL PRACTICES ELT lE 19 110NU41 SINOAWY FOR CM IN SECTION 0AC50-30h10 O THE VIRGNA 1.1 NATURAL CHANNELS SNAIL ANALYZED BY THEUSE OfA TITO-EAR VERIFY TO RIFY MAT 302-CONSTROOTON ENTRANCE-A STABILIZED STONE PK TO M M RLEER EM H O OER ER ESE:ETHE A WLATIOXS.THE VINO MOWS ME ESC MAN TO ME PROGRAM AM W FOR W STO ..WILL NOl OVERTOP CHAIEEL BANS NOR CAUSE 01W0N O CHANNEL BED M LOCATED AM ROWS G RETICULAR W.F.MO EC ESS M A CONSTRUCMN SW APPROVAL IS 115. E FOR MIRING COMPLIANCE WITH ME IM..STADND'MAT APPLY MO RANKS 3.03-CMSIRUCTM ROM)STAEUAIIW-ME TERROR.,STAEIIATM OF AMENS ROADS. HIS/HER ACTIVITIES. 1.2 ALL PREVIOUSLY CONSTRUCTED YW�IAM MANNELO MAIL RE ANALYZED BY ME US OF A SUBPAROR ROAM,PARKING MCA ANT°TER ON-MT.111.1.0 TRANSPORTATION ROUTES SOIL STABU1 P54 PERMANENT OR TEMPORARY STANUZATR MAIL BESTORMAUEO TO DEEDED AREAS 10-YEAR STORM TO VERIFY THAT SIGRNWAIER TOLL ND NOT OVERTOP ITS BANDS MO BY ME USE O WM W ST.IMMEDIATELY AFTER GRADING E OARS AFTER M M.GRAM EE ON MT O IS ACD ANY P M ME SITE TEMPORARY S. A HMO-EAR SLOW 10 DOIONST ATE MAT STORM..TELL NOT CAUSE EROSION OF CHANNEL STABILIZATION SHALL E 11 VOl WHIN Z DAPS O DENUDED AREAS THAT MAY NOT E AT MOLE GRAM BED M BANKS 3.05-SLT TD10E BARRIER-A TEMPORARY QOMEWT BARREN CONNING O A 00010 SORE.INTER MI MU.REMAIN DOWNIE FOR EWER MAN.DAYS PE MANMT STA...ATM MALL E APPLIED N 1 3.TEES AND STORE SEWER SYSTEMS SHALL E ANALYZED BY ME USE OF A 10-YEAR STORY 10 FM .STETOIFD ACROSS'AND ATTACHE,TO SUPPORTING PHIS FIND FMIRENCHED. AREAS THAT ARE 10 E LEFT DONA.FO MORE MAN ONE YEAR. VERIFY IRO STORY..TOLL E CENTRED MORN THE NE M SYSTEM. 3.02-STORY ORNN INLET PROTECTION-A YOMMT nom M AN MARA.TED IMPOUNDING AEA MS-2 SOL STOMEEI SIABIUTATI.WRNS CONSTRICTION,SOL STOCKED.NO BORROW MEAS SNARL C If ENSTNG NATBµ ECU'MG MNNELS CR PREN0SLY COMP..MAN-MADE 01,WNELS CR ARONO A STORM MAIN MO INLET M CURB INLET E SMABUffD LP PROTECTED MN YOWENI MM5•NG MEASURES.THICRAST PROTEC M AND RPES NE NOT ADEQUATE NE APPLICANT SHALL 3.06-CALERT NET PROTEC1101-A SEOMMI FILTER LOCATED AT THE NLLT i0 SM.CULVERTS PERMANENT STABUZATION SMALL W A 10 ALL SOIL STOCKPILES ON AND 1 ME SITE A BORROW AEAS NORGE ME..ELS TO A CONOITM MERE NU A 10-EM STORM LL NOT OVERTOP ERE RAINS 3.11-TOMMARY WIONT O WAY TREASON-A POE OFM OR SOIL LOOSE ROTE CO OR SOL INIEMTDNALLY TRANS'MTCO FR 10101.NE PROTECT SITE. 1 MO A.TWO-TEAR.STOW ELL NOT CWE MOSM TO TIE CREME.THE BED.Oft 1E BANKS.M - (PAEL CONSTRUCTED ACROSS°SPIRED TAM R-O-WAY MO SMRM SLOPING ARMS MS-3 PERMANENT SIABL'ZAMw.ERI WONT EGETATE CORER MRL E EST.:MED ON DIMMED 2 IMPHOE ME RE OR PIPE SYSTEM TO A 001.101 MERE NE 10-EAR STORM IS COD.. -1D1ONARY SELL*.MAP-A TEMP.M.WK.ORE OM NM A CONTROLLED AAS NOT 0.....PERRAVn OI NY STAZED.PERMANENT EGET..MALL NOT E CONSIDERED NORM THE APPURTENANCES: SIOWRATR RELEASE SM1CRIRE FORMED BY COSTNUCTNG AN FAMARWD•T G COMPACTED ESTABLISHED UNTK A MGM CORER IS AGREED MATS MEOW,MALIK ENO..TO SURMA.ND SIT 10 1 MAT via NOT CAUSE 111E PRE-O[VELGWIMT PEAK.....7T9,Fa0t1 50L ACROSS A CRNNAENAY MILL PEAT FNOJM L 1W0-REM STOW TO NOME II MEN 1100 O TFALL5 NED A RATAN MOREL OR Mil NOT A 3.14-IEMPORART SEDIMENT BASH-A TEMPORARY PONONG AREA FORMED BY CONSTRICTING NO MS-1 OD..0,1*0 BASKS R TRAPS.SEDIMENT BA}FS,SEDIMENT TRAPS,PFRIEIEF ONES,SEDIMENT OAO0 ME PE M.N. 10 0ElN1 PFM RING.RAT FROM A 10-1E.STORM TO NOIEASE MIEN FILER CWAN9EN1 MN A RISER 10 DE1FN MD..LADEN RUNOFF FRG.DISTURBED BARRIERS AM OTHER MEASURES M1UOE0 TO TRAP SEDIMENT MALL E CONSTRUCT.AS A FIRST STEP RING. LS IN10 A ION-MADE 0... M AREAS LONG MM.FOR ME MAJWT O SEMEN!TO SETTLE OUT N ANT ENO-OSTUWXG KTMLY MD MALL E EWE NEW.EFOE 11SLOE END OISTNBACE TARES RAG. 4 PROW.A WIDNAT N G OA...MPROVEMMT STCNIWAVR DETION.CR OMEN ERASURES Gl 315-TEMPORARY SINE MAN-A FLEXIBLE PPE ERTEM NO FRO.RE TOP PAST ME TOE OF A MEIN S SATISFACTORY TO THE ESP MTIIGTT TO PRETEXT WWSIRM EROS..W OR EL I L 901E TO OCN1VEY WATER DOWN TIE FAG Of THE CAUSING SLOE MOUI CAUG M5-5 STAOIIZATIN OfEARMG STRUCTURES.STABLZATON EA9AES SHALL BE APPLIED TO EAR.. EROSION SRNCRIKS SUM AS ONES.ONE'S MU OER INS IMMEDIATELY K1EA NSTALL.. D.THE APPLICANT SOUL PRO.EVIDENCE OF PERRI..TO MATE THE MIAROEENIS 320-ROM OEM DAMS-SMALL TEMPORARY STONE DAMS CONISMUCTD ACROSS A SWINE M MS-e 9AMEMT TRAPS 11 MARL.BASINS SPENT MAPS MO BASKS STEAL E DEWED WO E ALL H\ORQ000 ANµ1E5 SNAIL E BASED ON IRE USSR.WATERS RD.ANACTERSi1C5 410 THE Cr CO MANAGE MM CONSTRUCTED BASED UPON RE TOT.DRANAG AREA TOE SERVED BY IRE MAP OR BAAN AS ULTIMATE EEL°#TUT COMMON O TIC 2IBALI FROJECT QCr) S.N-DCWAImnc S1RDl1ME- A TEMPONMY YTILMG NW fXlfR ENCE FOR WATER MTM S fOLOR4 F N IRE APPLICANT-CHOOSES AN ONION MAT NQWES SMOMWAIFR ETEN1gN,E 91ALL MMAN l En 0 OSMARGE0 RRCM ETOAIEIONG ACTNES A.9➢WENT TRAPS APPROVAL NOON M ESOP OF A RAN FOR MAMMA, G THE EIMIRN 11099* ME PLANT W 1 ' a I ONLY CONTRG DRAINAGE AREAS ER MAN 111EF ACRES, SHALL SET ECM,.DE MAINTENANCE REQUNOIENTS OF TIE MOLDY AND THE PIETISM ESP...E W FOR PERFORMING THE YMMTfNA1Q Z 0 Q N PR 11N VEGETATE PRACTICES 2B11111 STORAGE CAP...G CUE.YARDS PER ACRE OF MANAGE AREA G.OOUR.FFROMON A DETENTI MUTT 91ALL BE OSMARGED TO A RECEIVING MAEEL•AO ENERGY ' 0 N 130-TCRSOI(STOOTRLL)-MEMO.OFRIESEFVING AND USN.TE SURFACE LAYER G EL SEDIMENT BASKS ...ORS SNAIL BE PLAT. OF ALL OE PLAT.AM MC OJT DETENTION MOUES AS NESSNIY TO N UNDISRED SO,OFTEN 01.0 D N MGA.RATTER,IN ORDER TO OBTAIN A WE I CMTROE ORMAN MEIN GEAIER MAN OREC..r0 THREE FACIA.TOACRES PRON.A ZETA IUDD MANS.FRM ME FA .MO THE RECEIVING..... W Kc 0) 3 EOR.LL RANTING AND GROFM MEDIUM. 2.WARM STORAGE CROOK OF 134 CUBIC YARDS PER ACRE OF CRANAO AREA. H.AL ON-STE DINNNELS MUST BE TERMED 10 BE...OVATE 3.31-...PARR SEEDING-THE ESIA0U1ENI OF A TERROR.,EEIATE CORER ON I INCREASED VOLUMES OF SWEET ROWS MAT MAY CAUSE EROSION CR SEDIMENTATION ON JIAMCLNT '' 0 DC DISTURBED AREAS TO AS BY SEEDING M APPROPRIATE RAWLY GPO..ANNUAL PLANTS. 3.THE MMOWSYSTEM M M.ALL.AT A WM M.D.TIE STRUCTURAL INTEGRITY G ME BASH PROPERTY ROLL BECHEATED 10 A STABLE W.I.NEWAT CHARNEL ORTEM NEC P PPE SYS .ORv^l CV V Q DURING A MEAT-EVE YEAR STORA OF 24-HOP DURATION 3.32-PERMANENT SFWNG-THE ESTIHU9WENT G PEEMMAL EGETATE COVER ON CWT.. TO A QHNTON FADUITR. .CAS B,0.AN11.SEED. YS-Z CUT NO FLL SLOES E'SION E CONSTRUCTION CUT ONO FULL SLOES MALL E GE9(3E0 AND J.IN APPLYING TES[STORMY..RWAGEYEMT CRITERIA NOE]UAL LOTS OR PARCELS IN A Cc CONSTRUCTED N A MANNER THAT TILL MOMZE EROSM.SLOES FORD 10 E ERODING EXCESSELY 3.35-MBLONNG-APPLICATION OF KNIT RESIDUES OTHER SUITABLE MATERES TO 1E SOL IMAM OE YEAR OF POWMENT STAB/TZAR.al.E MOWED RIM ACM..SLOE STABILIZING RESOEEITAL.CCNWEADµ OR NOUSMAL[£ELOPMENT MALL NOTE CONSIDERED TO E SEPARATE j n oC WEAR MEASURES UNIE THE PROBLEM IS CMRECIED. ...OWE.PROECTS.INSTEAD,THE DEVELOPMENT,AS A MARE,SILL E CORNERED TO E A L_ 3.30-DUST CONTROL-REM.NG SURFACE AND NIT MOVEMENT Cr DLST DOTING LAND DSMRBNG. Y5-5 CONCENTRATED RUNOFF W'AN SLOES.CONQNTRATED RUNOFF MALL ROT FLOW 01ZNN CUT O TELL SHOE ON MM.BE PROJECT MY URUOOC PARAMETERS TUT REFLECT ME ULTIMATE DEVELOPER, J � 41 DEMGUTM N1D CONSTRUCTOR ACTNTES SLOPES UNLESS CONTAINED'AEON AN ADEQUATE TEMPO..CR ERURENI CHANEL.RUYF.O SLOPE CONDITION MM.E USED IN ALL MOMIFLWO CALCULATIONS --I Cl)ONION STRUCTURE. EAMES USED TO PROTECT PROPERTIES AO WAIEMEYS S1.AL1.E EMPLOYED N A MANNER vA M. 1 IMPACTS C.Mt MIMIC.CH...MD SMOCK.I.E..OF TIERS.STREAMS8. PERYAND BU II SIAZARON.ALL OSR IOE0 ARE.SH.L E STMO MM AN ZED PERMANENT SELLING MS-B SLOE MINTNANCE.RMCNEER WATER REPS FROM A SLOPE FACE. M Q OR,AATE NNA OTHER NO OTH14(9 ER WATERS O M ERS E STATE. lQl SEVENMON WORKING DAYS OEG E AND FAIN GRADING, A SOL LONOT1S FETE O.,AS PROTECTION SMALL BE PROVE. L.ANT PAN APPRO.PRIOR TO SLAY I.2011E ROT PROVDFS FOR STMYWATEP MANAGMENI THAT I-. PFOMD N ME PROTECT SEO11 STANDARDS.0 SPfCOCAT TO ECR UNGRA YS-10 STORM SEER INLET PROTECTION.ALL STOW SEER INLETS NIE OPERAFIL DARING COPTRUC11O1 ADDRESSES MY ROW RAT WOOER AND ELOOT REQUIREMENTS FGR NATURAL OR NAN-HIDE 9. RICANWAIFR WNW MINWERAMNCPOST 1 11.05 MINI 51ONWWATER WILL FLOW OF ME BODING MARL E PROTECTED 50 MAT SEDIENT-L1DEN WATER CANNOT ENTER MC STCRMWATEF CONEYANCE SANNELS SNAIL SATYR 10 FLOW RAT CAPACITY MO ELOOM REOURFMENIS FOR NATURAL CR AND OF THE P.KNGNRE AREA AS MEET FLOW ME RUNOFF TOLL E NLOED TO FOLLOW SYSTEM METH FAST IERIG FILTERED/TEAMED 10 EMCEE SFUMENI AN-MADE CHANNELS E THE PRACTICES ARE DESIRED N: NAIR.LRAM./PATTERNS TO THE STOFMWATER...ENT POND IME POLO RISER TOLL E 11 STMMRATER CONVEYANCE PROTECTION.BEFORE MET CONSTRUCTED STONRAHR CONE,FN¢ N OTW TE RATER 0.1NJ1Y RQWE ND r0 RELEASE T OAR M ROARS: MOWER.To FELLA. TOro10014 ACCON - 5-IJG-I6 ANY LOCAii.x MERE A MAINELS ON PPES ARE MADE OOARONN,ADEQUATE OUTLET PROTECTION MD ANY REDU® S TEEPOI 1 TEL E NCNMOED MM TIP-ROW O EC-2 MATING. TEMPORARY CR PERWNENT MOREL.11.SHALL E NSTALL.M BOAR THE CO EYNNCE CHANNEL AND 2.ERI. 4-HAND UR STOASEW; OVER A T1-NOTE PERIOD ME ERECTED RNNFµI RSLLTIIG FROM ME ON 9.1SWME PROECITMEETS STORM WATER QUN11T ECUREENTS D RQUM 20.00 AC DEDICATED FOREST RECEIVING ENAMEL VEAR,tF-HOUR SfOM'ND AND OPEN SPACE EASEMENTS. 3 REDUCE TE ALLOWABIE EAR ROW RAT RESULTING FROM M T.2,MD 10-YEAR.24-HOUR 9.1.ME PROIECf MEETS CHANNEL PROTECTION REQUIREMENT 9-VACTS-BTII-XIS 0.3.a D01NS1EM MS-12 WINK N LIE MATRCONY.TONFN NORM W A UE WAHNCIWRSE S PERFMMEO,PECAU1gN5 STORMS TO A LEVEL MAT S TESS MAN M EONµ TO TE PE.RNLI..FRM M ST NA M.o. ERI CHANNEL PROTECTON IS ET THROUGH ENERGY BµMO(SLE ATTACHED SIOMWTTR AREA TO ME G EA1i U POSSIBLE ONNG CMS1...04011ENT.CONTROL*Im1N1?RMEROMEE MATERIALTIANS,PORT AND ...if E USED A RTEDAN°P DS W A GOD°MEMO REDACTION TM.FACTOR DOT IS MROIM EILTAI NOFF M TE CAOAATMS)_ FM TE CONSTRUCTION OF CAUSEWAYS MO COFFE.,FARIERI FILL MATE USED FM TES: ORFSTED PFM FLOW RATE BY A 1FOREST Y.CC. [QUf TO UN RUNOFF VOLUME MF mow 9.2 ESOP EFTS ROW PROTECT.RM:RESENT MACES -TES CI THE PROJECT RELEASES SIRE..W ARMORED BY HONER...COVER ITATERAi TE}T MEN T WAS N A 0000 FOESIED CC..OVOID BY TIE RUNOFF VOLUME MOM ME MT-EELMENT PEAK ROW RAT FOR TIE 10-EAR 24-HOUR STORM[CRT THAT IS LESS SIT IN ITS PRO05E0 CONDITION,AM MALL E LEAPT FR.AN FLOW RATE CAPACITY N. MM CR EQUµ i0 PRE-MELOW(NT FLOW RAT EWOLSS MORE THAN ONCE IN NIT 51-MONTH PERIOD. 1EMPORM VE HICULAR HICU TEAM CROSSING E C TS FOR A AC111E5AREE Pi ACCORDANCE M 9VAC25-810TUR.OR -00 1 0 1E 1A05 ORMWAIER MANAGMENT _- 16 yAINiMAN6 TIE CONTRKTCR H5 RESPONSE.FOR MNn1FNANEF CIF EROSION AND SEDIMENT OFR(MERCRXEL YA1*00,91µL BE FRONDED. PROM.VS.)REPRARON OR IRE EXEMPT C011UANCE 1WM ME WATER QUANTITY M.. - :, � CONTROLS.TELPOI.Y AND PERAMFNT MOWN AND MOMENT COM.MPS SHALL E MNNTAN1 MS-11 REGULATION O WATERCOURSE MOSSO°ALL APPLICABLE FEDERAL STATE AND LOLL REGAAINRS SIAMARUS SE1 OUT IN 95KZ5-870-.OF..GNU Sta...MANAGEMENT PROM. _. AND REPAIRED AS NEEDED TO ASSURE CGNTNUED PERFORMANCE O TEN R OENEO FUNCTION. PERTNHNG TO RO VNO M C CROSSING LEE...OURS.MALL E ET (V511)REGULATION.ALL E CEDED TO SATISFY ME EONEFENS OF MIS 910ONSON I9. - f ANTENMCE AND REPAN.NE E CMDUCTT ION ACCORD..M TH M E APPROVED PROJECTMS-15 SIANUZNG OF IDARN OFST WATERCOURSE ME BED A BS A WATERCOURSE ALL BESTABUZE.D 1 SPECIFICSONDE.S DE.MD SPELJEcAIIM1 CONCOOT NMECTi.5 OF WAPORARY ESC CONTROLS ALO WMEOAELT AFTER WORK N TIE WATERCOURSE IS COMPLETED SHIM EPPS AT LEAST ONQ EERY FOUR BUST..OATS MD 400 SC HORS FOLDWNG A MS-U INDERMOU0 UTILITY LANE IM00081010N.UNDER...UTILITY INES..E NSTALL.ED N MEASURABLE STORM CEMr REPAIR OF ALL PEFFECDE TEMPORARY ESC MEASURES 9NML CCWN ACCORDANCE MICR TIE FOL..SINWAROS N ADDITION TO OMER/PETO..C.D. MITTEN 24 NOTES O W10NTPGMN,M AS SOON AS .LO W LOW 4- UIN INC COPCE WM MS PR ISSUE MTE A ROOD RESET IN.EATER FNNROEENTN MPI0K0S TS TIPMARY IMPS MIL BFROPED UPON A MORE M W LE MORE 5 LPEAR KM OF WWI MAY O I.AT OE ME NOT FOR CONSTRUCTION AORYNG VEGETATIVE STABLIZAIDN.BK..AREAS NOT ATTAINING AN ACCEPTABLE EGET.. B.EXCAVATED MATERIAL MALL E PLAQU CR ME UPI.WE G TEMOES COVER MALL E RE-SEEDED AS A"EGO URtt STANl1ATON 13 WATERED.1F)117012ARi FS[BPS C.f.-LORI MRM DEWATIPFIG OPERATIONS SHALL BE FILMED OR PASSED 0ND101 AN APP..)p1Rp BE ROAMED MR.]O OAK AitER R SU NA E STABLIIAR RE ORG115 AGED KT TER SCOPE.TRAPP.ONCE,M BOTH,MO OSOHARQO IN A MAKER MAT DOES NO!.ERALY TFMPCRART IMPS ARE NO L EFDED.TRAPPED SEGMENT SHALL BERFIMOEO CR STARLIT.M AFCCN TLOMIN:STREAM. SITE PROPERTY 9T - .DISTURDISTURBEDO 5TBED S RESULTING15)5 0 FROM%MORAL OF MPS OR E M BET GEIATION ALL PE... ESC/PPP NOTES SIABAZED O.MATERN owl:FOR BNSFFILNGFMEWILS MALL E PROPERLY COMPACTED N.ER TO NN:& FROWN AT.KOPEC 51NIMMEEN. E.REST...ANOR SHALL E ACWMIRUSIEO IN ACCORD..TOM NIESE REGULATIONS. ram* 11004C F GODLY NM ADDUCE E SAFE..EWLAIONS. MN BEB'N.2019 "MI NETS oFEFFq, 909E C-3.03 B. Sources of Pollutants,locations, and prevention practices Pollutant,or Pollutant Location on site Prevention Practices, Generating Activity Control Measures C. Sources of Pollutants, continued. Common activities and minimum control and prevention ractices Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures Follow Erosion and Sediment Control Clearing,grading,excavating,and un- Land disturbance area Plan.Dispose of clearing debris at stabilized areas acceptable disposal sites.Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip Paving operations Roads and driveways pans and absorbent/oil dry for all paving machines to limit leaks and spills Direct concrete wash water into a leak- Concrete washout Current location and detail shown proof container or leak-proof settling and cement waste on plan basin that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction,stucco, Structures in a flat unpaved area.Prevent the painting,and cleaning discharge of soaps,solvents,detergents and wash water,paint,form release oils and curing compounds. Water shall be filtered,settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan. Designated areas for material delivery Material delivery and storage Designated area shown on plan and storage.Placed near construction entrances,away from waterways and drainage paths Material use during building process Building areas Follow manufacturer's instructions .MSDS's attached. waste collection area will not receive a substantial amount of runoff from upland Solid waste disposal Current designated container areas areas and does not drain directly to a on plan waterway.Containers have lids covered before periods of rain,or are in a covered area.Scheduled collection to prevent Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures overfilling.MATERIALS NOT TO BE BURIED ON-SITE Convenient and well-maintained portable sanitary facilities will be Sanitary waste Current locations shown on plan provided,and located away from waterways or inlets.Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or Wash Waters Wash areas shown on plan better control as specified on plan. Minimize the discharge of pollutants from equipment and vehicle washing Designated areas and details shown on Provide containment and filtering for all Vehicle and equipment washing plan wash waters per the plan Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products, construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP,9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) Innovative Refrigeration Systems, Inc. 373 Mt. Torrey Rd. Lyndhurst, VA 22952 Phone: (540) 836-1383 Attn: Michael McGinnis, Jr. mmcginnis@r717.net F. Response and reporting practices Minimize discharges from spills and leaks.Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills,leaks and discharges as follows; Report all spills,leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70,Part II, section A.4.e.) G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document: waste management,wash waters, prevention measures, etc.) Contractor is responsible for disposing of all wastes and unsuitable materials legally. No burning, burial, discharge, or dumping is allowed on site. Wash waters shall be collected, settled, evaporated, or filtered and disposed of appropriately. In no case shall wash waters be discharged into surface waters or groundwater. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. (Provide detailed measures for any applicable TMDL) This project falls in the Anderson Creek - Rockfish River - Middle James River TMDL Exists for Rockfish River watershed in the Middle James River Basin for E. Coli. This project will address E. Coli. loading through properly designed and maintained septic systems. The property is not currently used for livestock. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) Michael McGinnis, Jr. - Owner Phone: (540) 836-1383 mmcginnis@r717.net Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Operator Name: Seth Roderick, PE (engineer) Company: Monteverde Engineering & Design Studio, PLC Title: Managing Partner Signature: Date: Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority I, (name),hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements,including the Construction General Permit, at the Hillcrest Vineyard &Winery construction site.The designee is authorized to sign any reports,stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city,state,zip) (phone) By signing this authorization,I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit(CGP),and that the designee above meets the definition of a"duly authorized representative". Operator Name: Company: Title: Signature: Date: Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County 4t4r1-' Hk' COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2019 Expiration Date: June 30, 2024 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with the registration statement filed with the Department of Environmental Quality, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth in this general permit. Construction General Permit Effective July 1, 2019 Page 2 of 26 PART I DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on-site or off-site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater.This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. Page 3 of 26 4. Impaired waters and total maximum daily load (TMDL) limitation. a. Nutrient and sediment impaired waters. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a stormwater pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations and implements an inspection frequency consistent with Part II G 2 a. b. Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for PCB are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations, and implements an inspection frequency consistent with Part II G 2 a. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit effective on July 1, 2014, to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Page 4 of 26 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings, managed in a manner to avoid an instream impact; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60, unless a registration statement was not required to be submitted in accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential structures, to the VSMP authority after one or more of the following conditions have been met: Page 5 of 26 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator has operational control. When applicable, long term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate notice of termination and the construction record drawing prepared; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For individual lots in residential construction only, final stabilization as defined in 9VAC25- 880-1 has been completed, including providing written notification to the homeowner and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. 2. The notice of termination shall be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. 3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first. 4. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless otherwise notified by the VSMP authority or department. 5. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator shall select, install, implement, and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II C to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or Page 6 of 26 c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter shall include a signed certification consistent with Part III K. PART II STORMWATER POLLUTION PREVENTION PLAN A. Stormwater pollution prevent plan. 1. A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. 2. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator shall develop the missing elements and include them in the SWPPP. 3. Any operator that was authorized to discharge under the general permit effective July 1, 2014, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. B. Contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: Page 7 of 26 (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of any support activities, including (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2). 2. Erosion and sediment control plan. a. An erosion and sediment control plan designed and approved in accordance with the Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications, implemented to: (1) Control the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Control stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; Page 8 of 26 (3) Minimize the amount of soil exposed during the construction activity; (4) Minimize the disturbance of steep slopes; (5) Minimize sediment discharges from the site in a manner that addresses(i)the amount, frequency, intensity, and duration of precipitation; (ii)the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration, unless infeasible; (7) Minimize soil compaction and, unless infeasible, preserve topsoil; (8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed areas immediately whenever any clearing, grading, excavating, or other land- disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. Except for those projects identified in Part II B 3 b, a stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an approved stormwater management plan is not required. In lieu of an approved stormwater management plan, the SWPPP shall include a description of, and all necessary calculations supporting, all post-construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant- generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; Page 9 of 26 b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part Ill G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape Page 10 of 26 materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, waste concrete, and sanitary wastes; (8) Address any other discharge from the potential pollutant-generating activities not addressed above; (9) Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to nutrient and sediment impaired waters. For discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for sediment for a sediment- related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or phosphorus), the operator shall: a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 6. SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For discharges from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii)with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for PCB, the operator shall: Page 11 of 26 a. Identify the impaired waters, approved TMDLs, and pollutant of concern in the SWPPP; b. Implement the approved erosion and sediment control plan in accordance with Part II B 2; c. Dispose of waste materials in compliance with applicable state, federal, and local requirements; and d. Implement a modified inspection schedule in accordance with Part II G 2 a. 7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall: a. Identify the exceptional surface waters in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 8. Identification of qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 9. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. C. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP shall be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures shall be accomplished as described in Part II H. Page 12 of 26 3. The SWPPP shall clearly identify the contractors that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP as soon as possible but no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and were modified; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part II G. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part Ill K. D. Public notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. E. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. Page 13 of 26 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II D. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. F. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures shall be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II G identifies a control measure that is not operating effectively, corrective actions shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II G identify an existing control measure that needs to be modified or if an additional or alternative control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then additional or alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. G. SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. For construction activities that discharge to a surface water identified in Part II B 5 and B 6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following inspection schedule requirements apply: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when Page 14 of 26 there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day. c. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the inspection report required by Part II G. e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. Any time inspections are delayed due to adverse weather conditions, evidence of the adverse weather conditions shall be included in the SWPPP with the dates of occurrence. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; Page 15 of 26 (2) Record the information and a description of any discharges occurring at the time of the inspection or evidence of discharges occurring prior to the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization and effective impoundment or flow control; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channels, flumes, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved or public roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days to ensure: (a) Initiation of stabilization activities have occurred immediately, as defined in 9VAC25-880-1; and (b) Stabilization activities have been completed within seven days of reaching grade or stopping work; (6) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications has not been properly implemented. This includes: Page 16 of 26 (a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed or is not effective on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance or sediment deposition outside of the approved area to be disturbed; (7) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance, and effectiveness of the procedures and practices; (8) Identify any pollutant generating activities not identified in the pollution prevention plan; and (9) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The locations of prohibited discharges; d. The locations of control measures that require maintenance; Page 17 of 26 e. The locations of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The locations where any evidence identified under Part II G 3 a (6) exists; g. The locations where any additional control measure is needed; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. 5. The inspection report shall be included into the SWPPP no later than four business days after the inspection is complete. 6. The inspection report and any actions taken in accordance with Part II shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. H. Corrective actions. 1. The operator shall implement the corrective actions identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Page 18 of 26 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator shall comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individuals who performed the sampling or measurements; c. The dates and times analyses were performed; d. The individuals who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. Page 19 of 26 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for terminating this general permit coverage or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or§62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; Page 20 of 26 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined in this general permit, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; Page 21 of 26 b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part Ill I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part Ill 11 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part Ill 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure,facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i)a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the Page 22 of 26 manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports and other information. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part Ill K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy shall be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: 5. "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant Page 23 of 26 penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit coverage, termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 60 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by§ 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under§§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. Page 24 of 26 S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. Page 25 of 26 V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology-based state permit effluent limitations if the requirements of Part Ill V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part Ill S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records shall be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that shall be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. Page 26 of 26 For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permit coverage may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permit coverage. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator,the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) NOTICE OF TERMINATION 2019 Permit Coverage Number(VAR10####): Section I. Operator/Permittee Information.The person or entity that has active permit coverage approval and operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VII (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: Contact Person: Address: City,State,Zip Code: Phone Number: Primary Email: CC Email: Section II. Construction Activity Location Information. Project site information. Construction Activity Name: Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Section III. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions (select one or more): ❑ A. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible.When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a Notice of Termination; ❑ B.Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; ❑ C.Coverage under an alternative VPDES or state permit has been obtained; or ❑ O. For residential construction only,temporary soil stabilization has been completed,the operator has provided written notification to the homeowner about the importance of final stabilization and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. Rev 04/2019 PAGE 1 6 CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019 Section IV.Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater management facility, provide information related to the regional stormwater management plan. Attach a separate list if discharging to multiple regional facilities. Regional Stormwater Management Facility Type: Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Total Acres Treated by Regional Facility (report to one-hundredth of an acre): Impervious Acres Treated by Regional Facility (report to one-hundredth of an acre): Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to the perpetual nutrient credits that were acquired in accordance with §62.1-44.15:35 of the Code of Virginia.Attach a separate list if needed. Nonpoint Nutrient Credit Generating Entity (Bank Name): Perpetual Nutrient Credits Acquired (pounds/acres/year): Include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? ❑YES El NO Section VI. Permanent Control Measures. If applicable, list the post-development stormwater management facilities or best management practices(BMPs)that were constructed and installed as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural, on-site and off-site).Attach a separate list if needed. If you have permanent control measures,the following items are required to be included with this form in order to complete your Notice of Termination submittal: ❑ A. Engineer's Certification Statement ❑ B. As-built plans(construction record drawings)—digital ❑ C. As-built plans(construction record drawings)—full-sized, paper ❑ D. Stormwater Management Plans—digital ❑ E. BMP Maintenance Agreement—notarized original,for public and private projects under DEQ's VSMP Authority Stormwater Management Facility Types(please choose from the followinq_bmp types): Bioretention 1 Extended detention-enhanced Other IIC(manufactured Soil Amendments Bioretention 2 Filtering Practice 1 treatment device,etc.) Urban Bioretention Bioretention basin Filtering Practice 2 Permeable Pavement 1 Vegetated filter strip Bioretention filter Grass Channel Permeable Pavement 2 Vegetated Roof 1 Constructed Wetland 1 Grassed swale Rainwater Harvesting Vegetated Roof 2 Constructed Wetland 2 Infiltration(1 x WQ Vol) Retention basin I(3 x WQ Vol) Wet Pond 1 Constructed wetlands Infiltration(2 x WQ Vol) Retention basin 11(4 x WQ Vol) Wet Pond 2 Dry Swale 1 Infiltration 1 Retention basin III(4 x WQ Vol Wet Swale 1 Dry Swale 2 Infiltration 2 with aquatic bench) Wet Swale 2 Extended detention(2 x WQ Vol) Other IIB(manufactured Sand filter Extended Detention Pond 1 treatment device,etc.) Sheetflow to Vegetated Filter or Extended Detention Pond 2 Conserved Open Space 2 Rev 04/2019 PAGE 2 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Stormwater Management Facility#1 BMP Type: Date BMP Became Functional: Address(if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one-hundredth of an acre): Impervious Acres Treated (report to one-hundredth of an acre): Stormwater Management Facility#2 BMP Type: Date BMP Became Functional: Address(if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one-hundredth of an acre): Impervious Acres Treated (report to one-hundredth of an acre): '. Stormwater Management Facility#3 BMP Type: Date BMP Became Functional: Address(if available): City and/or County and Zip Code: Latitude and Longitude (6-digit,decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one-hundredth of an acre): Impervious Acres Treated (report to one-hundredth of an acre): Rev 04/2019 PAGE 3 16 CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019 Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70 Part III K. Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true, accurate,and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature(signed in ink): Date: Section VIII.Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program (VSMP)Authority that has jurisdiction for your construction activity. If the locality is the VSMP Authority, please submit your form directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to: Department of Environmental Quality The Local VSMP Authority(insert address below) Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructionepPdeq.virginia.eov Permit terminations may be delayed if there are outstanding annual permit maintenance fee balances due. Rev 04/2019 PAGE 4 16 CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT A complete and accurate Notice of Termination is required for terminating coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. Termination shall become effective upon notification from the department that the provisions of termination have been met or 60 days after submittal of a complete and accurate Notice of Termination,whichever occurs first. Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted unless otherwise notified by the VSMP authority or the department. Permit Coverage Number. Include your existing, active permit coverage number. Example: VAR10####. Section I. Operator/Permittee Information. The construction activity operator(permittee). The permittee with active permit coverage and that has operational control over the construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project(the party with control of project plans and specifications),or general contractor(the party with day-to-day operational control of the activities at the project site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator,that person (or a representative of) must sign the certification in Section VII. Section II. Construction Activity Location Information. Project site information. Complete this section with the same information as listed on the current registration statement. A list of active permits and corresponding location information is available on our website. Section III. Reason for Terminating Coverage under the General Permit. The operator shall submit the Notice of Termination no later than 30 days after one or more of the termination conditions being met.Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted to the VSMP Authority, unless otherwise notified by the VSMP authority or the Department.Termination of authorizations to discharge for the conditions shall be effective upon notification from the Department that the provisions of termination have been met or 60 days after submittal of the Notice of Terminations,whichever occurs first. The operator of the construction activity shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions(you may select one or more of these conditions): • [A] Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible has operational control. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate Notice of Termination; • [B]Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; • [C] Coverage under an alternative VPDES or state permit has been obtained; or • [D] For individual lots in residential construction only,temporary soil final stabilization as defined in 9VAC25-880-1, has been completed and the residence has been transferred to the homeowner. Section IV. Participation in a Regional Stormwater Management Plan. Where applicable, include information for each regional stormwater management facility to which this site contributes. If your site is contributing to more than one regional facility, please include the information for each facility in a separate list. The following information shall be included for each regional stormwater management facility installed: • the type stormwater management facility(see the list of facility types on page 2 of the Notice of Termination); • the physical location of the facility, including city or county, and latitude and longitude in decimal degrees; • the receiving water to which the regional facility is discharging; and • the number of total and impervious acres treated by the regional stormwater management plan to the nearest one-hundredth of an acre. The total of the impervious acreage may equal but not exceed the total acreage. Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to all perpetual nutrient credits acquired in accordance with §62.1-44.15:35 of the Code of Virginia.Attach a separate list if needed. Attach the affidavit(s) of sale for the purchase of all nutrient credits acquired for this activity. Rev 04/2019 PAGE 5 16 CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT Section VI. Permanent Control Measures. If applicable, list all post-development stormwater management facilities or best management practices(BMPs)that were constructed and installed as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural,on-site and off-site). Choose the type from the list provided in the Notice of Termination form Section VI. If you have multiple BMPs, attach a separate list if needed. The following information shall be included for each permanent control measure installed: • the type of permanent control measure receiving the discharge(choose from list provided); • the date that it became functional as a permanent control measure(MM/DD/YYYY); • the location of the BMP, including city or county, and latitude and longitude in decimal degrees; • the receiving water(s)to which the permanent control measure discharges; and • the number of total and impervious acres treated by the permanent control measures to the nearest one-hundredth of an acre. The total of the impervious acreage may equal but not exceed the total acreage. The following items are required to be submitted with the Notice of Termination if you have permanent control measures: • Engineer's Certification Statement. Signed by a professional registered in the Commonwealth of Virginia,certifying that the stormwater management facilities were constructed in accordance with the approved plan. • Construction record drawing(s)(as-built plan) in a format as specified by the VSMP authority for permanent stormwater management facilities in accordance with 9VAC25-870-55 D appropriately sealed and signed. One digital and one full-sized paper copy. • Stormwater management plans(digital) • BMP Maintenance Agreemen;. Submit an original,signed and notarized BMP Maintenance Agreement for all public and private permits where DEQ is the VSMP Authority. Termination is not final until you submit the local court record of receipt to DEQ showing that the signed Stormwater Management Maintenance Agreement was recorded with the land deed. Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70. Part III. K. Section VIII.Submittal Instructions. Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQ or your locality depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for additional submittal instructions. A blank area is provided for the Local VSMP Authority to include their mailing address. Who is the VSMP Authority for my project? DEQ or the locality? • DEQ: DEQ is the VSMP Authority and administers permit coverage for land-disturbing activities that are: > within a locality that is not a VSMP Authority; • owned by the State or Federal government;or > utilizing approved Annual Standards and Specifications. • The Locality: The local government(locality)is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is available on DEQ's website here: Local VSMP Authority List. DEQ'S CONSTRUCTION GENERAL PERMIT WEBSITE http://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneralPermit.aspx Rev 04/2019 PAGE 6 16 Section 12. Inspection logs (Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part II, section B and F.) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County SWPPP INSPECTIONS 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: a. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day, and b. Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department- approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8)Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9)Identify any pollutant generating activities not identified in the pollution prevention plan; and (10)Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. VSMP INSPECTION REPORT Project: GCP Number: Notice of Coverage posted? ❑YES ❑ NO SWPPP available for review? ❑YES ❑ NO Inspection Inspection Conducted By Date/Time (must be the Qualified Personnel identified in the SWPPP) Date of Last Rainfall Measureable Amount ❑ Not applicable since inspection frequency is at least once every four business days Storm Event Record the information and a description of any discharges occurring at the time of the inspection Record any land-disturbing activities that have occurred outside the approved erosion and sediment control plan Have controls Are controls been installed in effectively Describe any maintenance needs or other deficiencies that were Inspection requirements: accordance with minimizing identified and the location of the deficiencies (e.g. have controls been the approved sediment inappropriately or incorrectly used?) ECP? discharges? All perimeter erosion and sediment El YES ❑NO ❑YES ❑NO controls (silt fence, etc.) Soil stockpiles and borrow areas (for stabilization or sediment trapping ❑YES ❑NO ❑YES ❑NO measures) i _ .. _ .aril., .• .,_. aril... •.1. .r,....,..••••.— — .....mm1. -.aril .r.r....,...•.•......_... • aril. . r. .aria .liar _ --12.1 1 t ,.lyv,aL: i t 1 • . I. . .. .,.— — — r.. - __ ..•..•�. :_,•••s, r . A.. ,.... .......... .•.r_ ...•_...•.. ....... -.............-.•J .ar it .. ... ..... ......,._ ..... _ .-.. 011•11•110,........_11•.,.. _ ._ .. . - ,arm..... *MP. ...... ••••••..r _.. .. . .....,.....� t' '1 l'•_•`•C . r •, u(•.fib 1'1t' • A +;', �_•.• r +r. ..,ar r.+. .war - v •a.._ .Y ..- w 71wr 011••a.rfiv• S i.r.1•1•.- •ri.rfr+__._.__r.. n ••••am=1.•••r-,'__r•••••n•r.rr•,-._..:v•ems S r•-a •. .... ..1 +. • •.s -.. w .v..• r .. .r ••._.aan+w wlr. -..war. s wsili•w•n r•n1r.1.•. •...�.•wr...nt war .• r•s�+ •s _-.•r..+r.....•�.�.� i .� .. . ♦ r-'1 . f 1 t- ` • I, t' I ,I f: t " •i t • ' _ war... .. ..... .� �.e..are. -. ....�.�.r .F_ +...•: ..._.....�....,.•,... aril. •.r..r. ....,+....... — F—�.•.� kr....t ,. t .1 _ • . , t-eal Ana rufhaas;►n Nclo.►.fa-‘:+,t, ,►rv_�-, I # 4 _ ''a,,tf.-L • -• ,I .,- '".- '.•:E 'iQf sot itnr tooth, •,•tl , i-el...l- ♦ tt :1• 4 tar W •' .at, 's ..r,,:t1 .r-':-. ..,C..! '•+lit..i39' } - / liar .'+-. ._are.. -. ... .r.. ...�...11.14...••••..110_....1•••.........11.-•••1.•••.r.•,11.0. W,• aril- _• ....a..•. .... . .r. ... f I _ � . • . 1. ��' _ f 1 t Completed earthen structures, such as dams, dikes, ditches, and diversions for ❑YES ❑NO ❑YES ❑NO stabilization Cut and fill slopes ❑YES ❑NO ❑YES ❑NO Sediment basins and traps, sediment barriers, and other measures (installed to YES ❑NO ❑YES ❑ NO control sediment discharges from stormwater) Temporary or permanent channels, flumes, or other slope drain structures (installed to YES ❑NO ❑YES ❑NO convey concentrated runoff down cut and fill slopes) Storm inlets (to ensure that sediment laden stormwater does not enter without first ❑YES ❑NO ❑YES ❑NO being filtered or similarly treated) Construction entrances and access routes ❑YES ❑NO ❑YES ❑NO (for minimizing mud/sediment tracking) Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days? ❑ YES ❑ NO Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached ❑ YES ❑ NO final grade or that will remain dormant for more than 14 days? Inspect for the presence of the following: Present? l Location Concentrated flows of stormwater in conveyances (such as rills, rivulets or channels) that have not been filtered, settled, or similarly treated prior ❑ YES ❑ NO to discharge, (or evidence thereof) Sediment laden runoff that has not been filtered or settled to remove ❑ YES ❑ NO sediments prior to discharge Sediment deposition in areas that drain to unprotected stormwater inlets ❑ YES ❑ NO or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper ❑ YES ❑ NO installation, lack of maintenance, or inadequate design Sediment deposition on any property (including public and private ❑ YES ❑ NO streets) outside of the construction activity covered by the general permit Required stabilization (initiated or completed on portions of the site?) ❑ YES ❑ NO Sediment basins/traps without adequate wet or dry storage volume ❑ YES ❑ NO Sediment basins where the riser appears to be leaking, water appears to be leaving the basin around the barrel pipe (rather than through it), or ❑ YES ❑ NO the dewatering device appears to be dewatering basin from below the water surface Sediment traps that allow stormwater to discharge from below the ❑ YES ❑ NO surface of the wet storage portion of the trap Land disturbance outside of the approved limits of disturbance ❑ YES ❑ NO Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan Have the controls Describe any maintenance needs or other Inspect the pollution prevention controls been properly Are controls deficiencies that were identified and the associated with the pollution generating activities implemented as effectively minimizing location of the deficiencies (e.g. have controls identified in Table 8.1 of the SWPPP outlined on the PPP pollutant discharges? been inappropriately or incorrectly used) sheet? Clearing, grading or excavating ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Paving operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Concrete washout and concrete waste ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO disposal Structure construction, stucco, painting ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO or cleaning Dewatering operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Material delivery and storage ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Material use during building process ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Solid waste disposal ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Sanitary waste disposal (ports johns) ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Landscaping operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Vehicle Fueling or Maintenance ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Other(describe) ❑ YES ❑ NO ❑ YES ❑ NO Other(describe) ❑ YES ❑ NO ❑ YES ❑ NO Other(describe) 0 YES ❑ NO 0 YES 0 NO i{ ';t n _• i ... __.. ... .._......_.. ,.. .............r. __vow*,,,.-_. ......•-asanamia __......._.....- -.......W. 111 I ,`OSinn.J'r.. '7 J' n(l , .f . .' ,'.•I' , ' Qt 7pin.ty. . .. f-.t',R.I ' . ft. . . .(...- 'Ia' - . , • •.t 1" 3:1-4. f ..........ate ) If fa.v 9. v .ti Or 21•.,ltnnt, ." tifi9 '1- 'I7n' 'ia'. ,.- t. c ..2 - • ,_ .'34i.'-Si'' •••1 it:.alultutY I °IC; d ./ i- 0 .',t I a.t 440E !C.. f.,1r1 . , • rtt 1 , ,,. y1 J y 4 e (1 r . . r • f �...:: _ .._. - r • - f • • . i - ' 1. ' r3 , _ • - - _ - - — ' - ..- - - I t ' 31. •. ' ' , I - ), :--. - - I ._ • _ . _ _ - _—_. _ _. -- - _ -- _ — • t .• , ,ii } • j 1 —.. . -- - - -- — ... i -- - - Other(describe) ❑ YES ❑ NO ❑ YES ❑ NO Other(describe) ❑ YES ❑ NO ❑ YES ❑ NO Identify the material(s) and document the location or presence of any evidence of pollutant discharges that are not authorized by the general permit Identify the location(s)where any additional control measures are needed that did not exist at the time of the inspection List the corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance Document any corrective action(s) required from a previous inspection that have not been implemented "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Signature: Date: Name: Title: (must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection)