Loading...
HomeMy WebLinkAboutSDP202100026 Review Comments Final Site Plan and Comps. 2022-10-130 County of Albemarle Department of Community Development Memorandum To: David Anhold (david@anholdla.com) From: Kevin McCollum — Senior Planner Division: Planning Services Date: October 13, 2022 Subject: SDP202100026 BROOK HILL RIVER PARK BOAT LAUNCH - FINAL - DIGITAL The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Applicable Comments from Initial Site Plan Action Letter (January 31, 2020) 1. [Z.O. Section 32.5.2(a)]: Note 5 in the "General Information" notes on the Cover Sheet (Sheet C-1) correctly identified the zoning as "RA Rural Areas." However, please revise this note to include reference to the following zoning overlays: "FH Flood Hazard," "EC Entrance Corridor," and "AIA Airport Impact Area." This comment has been addressed. 2. [Z.O. Section 32.5.2(d)]: Note 6 in the "General Information" notes on the Cover Sheet (Sheet C-1) includes multiple references to "Steep Slopes." Because this property is in the Rural Area, please revise those references to "Critical Slopes." (Note: "Steep Slopes" are a zoning overlay located only within the Development Areas.) This comment has been addressed. 3. [Z.O. Section 32.5.2(r)]: Please add a legend with necessary symbols, abbreviations, and explanations to the Cover Sheet (Sheet C-1) or the Initial Site Plan (Sheet C-4). This comment has been addressed. 4. [Z.O. Section 32.5.2(1), (h), (s)]: Show and label the Water Protection Ordinance Stream Buffer on the Base Map (Sheet C-2). This comment has been addressed. 5. [Z.O. Section 32.5.2(t)]: Show and label the Dam Break Inundation Zones on the Base Map (Sheet C-2). This comment has been addressed. 6. [Z.O. Sections 32.5.2(i), 0), (k), (1)1: Please ensure all existing and all proposed public and private easements are shown and labeled. This comment has been addressed. 7. [Z.O. Sections 32.5.2(i), 0), (k), (1)1: Please ensure Deed Book/Page references are included for existing easements. This comment has been addressed. 8. [Z.O. Sections 32.5.2(a), (n), (s)]: Staff acknowledges that DHR-identified historic resources are located outside of the Phase 1 project limits. 9. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of waste and/or recycling containers, if any are proposed. This comment has been addressed. 10. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of outdoor lighting and provide a photometric plan and luminaire details, if any outdoor lighting is proposed; or add a note indicating that no outdoor lighting is proposed. Comment addressed. Applicant has indicated that no outdoor lighting is proposed. Please note that a Lighting Plan that demonstrates compliance with Z.O. Sections 32.6.2.k and 4.17 is required with the Final Site Plan application, if any outdoor lighting involving luminaires emitting 3,000 or more lumens is proposed. Additionally, because the subject property is within the Entrance Corridor Overlay District, this proposed project (including the Lighting Plan, as may be applicable) is subject to review by the Architectural Review Board (ARB) and ARB staff, and approval/issuance of a Certificate of Appropriateness by the ARB is required. Applicant has indicated an ARB application will be submitted. Comment addressed. 11. [Z.O. Section 32.5.2(p)]: Please revise the Landscape Plan (Sheet 6) to provide more details for the proposed landscaping next to the proposed slide boat launch ("riverbank area to be revegetated with trees and shrubs"). Please note that County staff have been notified about a potential partnership opportunity that could help support a more robust landscape plan for this riverside planting area. Please contact Parks & Recreation staff to discuss this riparian landscaping opportunity. Additionally, because the subject property is within the Entrance Corridor Overlay District, this proposed project (including the Landscape Plan) is subject to review by the Architectural Review Board (ARB) and ARB staff, and approval/issuance of a Certificate of Appropriateness by the ARB is required. Applicant has indicated an ARB application will be submitted. ARB may have additional comments on the Landscaping Plan. Comment addressed. 12. [Advisory / For Future Reference]: Please note that the following approvals will be required prior to County approval (as may be applicable) of a final site plan for this proposed project: A. [Z.O. Sections 32.4.2.2 and 32.4.3.3]: Architectural Review Board Certificate of Appropriateness. B. [Z.O. Section 32.7.4. 1 (a)]: Water Protection Ordinance Plan (and corresponding legal documents). C. [Z.O. Sections 32.7.4.2 and 32.7.5.3]: Easement Plat(s) (and corresponding legal documents) D. [Z.O. Section 32.4.3.6(a) and 32.4.3.6(c)]: Tentative approvals (review status of "No Objection") from all applicable SRC members for final site plan; please see below for the review status of each applicable SRC member. Comments still apply. New Comments Final Site Plan 13. [32.5.2(a)] Please update the site plan application number in the title to SDP202100026. If you would like to include a reference to the initial site plan (SDP201900080) please do so in the revisions box on the bottom right side of the sheets. Comment addressed. 14. 132.6.20) and 32.7.91 The following issues were identified during review of the Landscape Plan, and must be addressed and resolved prior to final site plan approval. A. [32.7.9.5] Please provide street trees within the project area along Rio Mills Rd. Z.O. 32.7.9.5(d) states One large street tree shall be required for every 50 feet of street frontage, or portion thereof, if 25 feet or more. Where permitted, one medium shade tree shall be required for every 40 feet of road frontage, or portion thereof, if 20 feet or more. Comment addressed. B. [32.7.9.9(c)] Please include the following note on Sheet 1,101: All landscaping and screening shall be maintained in a healthy condition by the current owner or a property owners' association, and replaced when necessary. Replacement material shall comply with the approved landscape plan (Z.O. 32.7.9.9(c)). Comment addressed. C. [32.7.9.6] Please specify the "Parking Area Landscaping" calculation. It is currently listed as "1000+ SF." Comment addressed. D. Please provide additional information in regard to the "Perimeter trees required" on Sheet L-110. Albemarle County does not have perimeter tree requirements, are these supposed to be screening trees? Comment addressed. E. [32.7.9.61 Specify the total trees provided on Sheet L-110. Comment addressed. F. Please update the Planting Schedule on Sheet L-110 to include a column for tree canopy and the total provided tree canopy. Please see the Plant Canopy Calculation resource below. https://www.albemarle.ory/Home/ShowDocument?id=1020 Comment addressed. 15. [4.12.19 and 32.7.91 Please provide a construction detail in plan and profile view for the trash receptacle and enclosure around it. Provide dimensions, construction materials, etc. ARB may have more comments regarding the design of the screening proposed for the dumpster. Comment addressed. 16. [4.2.3 and 4.2.51 Disturbance of critical slopes is shown on the plan. Per Section 4.2.3 (b), "no structure, improvement, land disturbing activity to establish a structure or improvement, or placement of clean earth fill or inert waste fill shall be located on critical or preserved slopes except as otherwise permitted under sections 4.2.5, 4.2.6, 4.3.1 and 30.7.4." Unless this disturbance is permitted in accordance with Section 4.3.1, disturbance of critical slopes requires a Special Exception application to be approved by the Board of Supervisors prior to final site plan approval. See Section 4.2.5 (a)(3) for the specific findings that must be met in order for staff to recommend approval of critical slopes waivers. Comment no longer applies. 17. [32.7.8 and 4.151 It appears there is a sign in the VDOT right of way on Sheet C-300. All signs shall comply with the requirements of, and shall be subject to approval as provided in, section 4.15. Is this a new sign or an existing sign? Comment addressed. 18. The "Limits of Project" callout points to a boundary that does not match the actual TMP parcel boundaries. Is this intended to indicate that land is being dedicated to right-of-way? Please also clarify if any off -site construction easements are needed. Off -site construction easements must be platted prior to final site plan approval. Further comments on this matter may be forthcoming pending applicant response. Comment addressed. Please contact Kevin McCollum at the Department of Community Development at kmceollum&albemarle.org or (434) 296-5832 ext. 3141 for further information. Albemarle County Engineering Services (Engineer): Contact: Emily Cox / ecox2&albemarle.org Review Status: Requested changes, see attached (9/30/2022). Albemarle County Department of Fire & Rescue (Fire -Rescue): Contact: Howard Lagomarsino / hlaeomarsino@albemarle.org Review Status: No Objection (4/27/2021) Albemarle County Building Inspections (Inspections): Contact: Betty Slough / bslough@albemarle.org Review Status: No Objection (4/28/2021) Albemarle County Information Services (E911): Contact: Elise Kiewra / ekiewra@albemarle.org Review Status: No Objection (4/13/2021) Virginia Department of Transportation (VDOT): Contact: John Wilson / john.e.wilson@vdot.vir ig nia.gov Review Status: No objections, see attached comments (9/26/2022). Albemarle County Architectural Review Board (ARB): Contact: Khristopher Taggart / ktaQeart@albemarle.org Review Status: Requested changes, see below. The screening of a portion of the proposed parking area and travelway elements is reliant on the existing vegetation along Rt. 29 which is largely located in the right-of-way. Additionally, this vegetation will allow for increased visibility into the site during the months when leaves are not on the trees. Revise the plan to provide shrubs to screen the three parking spaces near the portable toilet and an additional grouping of trees in the planting area east of the opening to the turning loop. Historic Preservation: Contact: Margaret Maliszewski / MMaliszewski@albemarle.org Review Status: No objection (10/4/2022). � A kh 4�hC1N� County of Albemarle Department of Community Development Memorandum To: Kevin McCollum From: Emily Cox Date: 22 April 2021 Rev. 1: 30 Sept 2022 Subject: Brook Hill River Park Boat Launch — Final Site Plan (SDP201900080) The Brook Hill River Park Boat Launch — Final Site Plan has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan satisfying VSMP requirements must be submitted and approved before final site plan approval. It appears this plan set includes items that are applicable to the VSMP Plan. They must be separated. You can read the final site plan requirements here: https://library.municode.com/va/albemarle county/codes/code of ordinances?nodeI d=CH18ZO ARTIVPR S32SIPL 532.6FISIPLFOCO 532.6.2COFISIPL and WPO Plan requirements here: https:Hmcclibrary.blob.core.usgovcloudspi.nettcodecontent/l2230/382454/Chapter %2017%20W ater%20Protection.pdf WPO application can be found here: https://www.albemarle.org/home/showdocument?id=170 Please let us know if you have any questions about this process. Rev. 1: Comment not addressed. WPO202100026 must be approved before final site plan can be approved. 2. Floodplain Development Permit (FDP) must be submitted and approved before final site plan approval. Application can be found here: https://www.albemarle.org/home/showdocutnent?id=176 Rev. 1: Comment not addressed. FDP202100006 must be approved before final site plan can be approved. 3. Critical slopes waiver will be required. Rev. 1: Comment addressed. 4. The ADA parking spaces must be paved. Rev. 1: Comment addressed. 5. Cars cannot be parked overnight. Rev. 1: Comment not addressed. 6. Topography should be at least field verified within the last year. Date on cover sheet is 9/26/19. Rev. 1: Comment addressed. 7. Professional seal should be signed and dated. Rev. 1: Comment addressed. 8. Rev. 1: Please remove WPO Plan sheets from site plan (E&S and SWM). Contents of final site plan: https://Iibrary.municode.com/va/albemarle county/codes/code of ordinances?nodeI d=CH18ZO ARTIVPR S32SIPL 532.6FISIPLFOCO 532.6.2COFISIPL Contents of WPO Plan: https://library.municode.com/va/albemarlehttps: /albemarle coup /codes/code of ordinances?nodeI/codes/code of ordinances?nodeI d=CH17WAPR ARTIVPRSUREACAPPOPRRIOB DIVIAPRE 517- (Z) COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 September 26, 2022 Kevin McCallum County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP-2021-00026 — Brook Hill River Park Boat Launch - FSP Dear Mr. McCallum: (804) 786-2701 Fax: (804) 786,2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced Brook Hill River Park Boat Launch - FSP, as submitted by David Anhold, Anhold Assoc. Landscape Architects, dated September 12, 2022 and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. If you have further questions please contact Max Greene at (434) 422-9894. Sincerely, John C. Wilson, P.E. Assistant Resident Engineer Area Land Use Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING