Loading...
HomeMy WebLinkAboutSP200600022 Action Letter ~ e COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 November 1, 2006 Tracy Tucker 29 Mill Ridge Court Standardsville, VA 22973 RE: SP 2006-022 Northridge Community Church of the Nazarene; Northridge Preschool (Sign #79) - Tax Map 21, Parcel11A Dear Mr. Tucker: On October 4, 2006, the Albemarle County Board of Supervisors took action on SP 2006-022, Northridge Community Church of the Nazarene - Northridge Preschool, to allow establishment of a Day Care/Pre-school within an existing church, with no exterior building changes proposed, and SP amendment., on Tax Map 21, Parcel11A in the White Hall Magisterial District. This special use permit was approved based on the following conditions: 1. Special Use Permit 2006-22 shall be developed in general accord with the interior concept plan received May 30,2006, and titled "Northridge Preschool" (Attachment A); 2. Hours of operation shall be limited to 7:30 am to 1 :30 pm Monday through Friday; 3. Enrollment shall not exceed eighty (80) children; 4. The church building must be approved for day care use by the Building Official; 5. Licensure by the Virginia Department of Social Services is required; 6. Health Department approval is required before the commencement of the use; and 7. The existing woodland shall remain undisturbed with one exception: the woodland may be disturbed within ten (10) feet of the highest water level in the storm water facility. In no case shall the site be disturbed within thirty-five (35) feet of the western boundary of this parcel. (Reference Attachment E). Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: Tucker SP-2006-022 Northridge Preschool Page 2 of 2 November 1, 2006 . compliance with conditions of the SPECIAL USE PERMIT; and . approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, .. -- u. a v.w~ Director of Planning VWC/aer cc: Northridge Community Church of the Nazarene; David R Marsh Etal Trs 5100 Dickerson Rd, Charlottesville VA 22911 Virginia District Church of the Nazarene 3910 Manza Drive, Richmond, VA 23234 Amelia McCulley Chuck Proctor T ex Weaver Sherri Proctor