Loading...
HomeMy WebLinkAboutSDP202200031 Correspondence 2022-10-18• see* . f 608 Preston Avenue p 434.295.5624 Suite 200 IF434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 www.timmons.com October 14, 2022 Cameron Langille Principal Planner County of Albemarle Community Development 401 McIntire Rd Charlottesville, VA 22902-4579 RE: SDP-2022-00031 Rio Point — Final Site Plan - Comment Response Letter Dear Ms. Langille: We have reviewed all of your comments from June 22, 2022 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Albemarle County Planning Division — Cameron Langille 1. [32.5.2 (a) and ZMA201900008] Per Note 4 on Sheet 2 of the Application Plan, the developer is required to design and construct the amenities within the 1.1-acre trailhead park. The initial site plan does not show any proposed improvements within the park area. Note 1 states that "the developer will coordinate with the County Park Authorities to design the amenities and landscaping within the trailhead park. The developers shall construct all improvements within the trailhead park." This is reiterated in the proffer statement in Proffer 2. Please address the following: a. Per staff discussion with applicant, the park design will be incorporated into the final site plan submission. First submittal: The park is now shown with a travel way connecting into the development. However, other amenities within the park area are not yet shown. Per Note 3 on Sheet C4.2, the design of amenities and other elements within the park will be coordinated with County parks & Recreation staff. At this time, Parks & Recreation staff have not issued any comments, but Planning staff expect comments to be issued shortly and these will be forwarded to the applicant. Per the note on the ZMA Application Plan, the park must incorporate features such as benches, public art, landscaping, and a gazebo. Prior to final site plan approval, these features must be shown on the plan. Please reach out to Parks & Recreation staff for further guidance on the design of elements within the park. ENGINEERING I DESIGN I TECHNOLOGY Acknowledged. A gazebo is shown on the plans. Landscaping for the park can be found on sheet LP1.00. We will continue to work with Parks and Recreation staff to ensure that all elements of the proffer are met. The site plan will be updated accordingly. b. Please be aware that Proffer 2a requires the developer to dedicate the land by special warranty deed of fee simple title or grant perpetual easement upon written request by the County for the 1.1-acre trailhead park. First submittal: Comment acknowledged by applicant. Pending completion of Parks & Recreation staff review, additional comments on timing for the dedication may be forthcoming. Acknowledged. 2.[32.5.2 (a) and ZMA201900008] The bioretention pond shown in the landscaping buffer behind buildings 8and 9 must be moved so that 30' of land is available for planting landscaping/screening as required by the Application Plan. First submittal: Comment addressed. 3.[32.5.2 (n)] Per staff discussion with applicant, a Special Exception application forthe requested parking reduction will be submitted with the final site plan and will run concurrently with the final site plan review. Should the Board of Supervisors not approve the special exception, the area noted as a future building will be revised to includethe min imumrequired parking spaces. First submittal: Comment addressed, units proposed have been reduced to295 and the plan shows the minimum required parking. 4. [General Comment] Please be aware that in orderto construct an additional building and provide the 28 remaining units, a separate site plan application will need to be submitted, reviewed, and approved by the County. This site plan is only proposing299 total units. First submittal: Comment acknowledge by applicant. Future building is no shown on this final site elan. 5. [General Comment ] Please remove the unapproved proffer statement exhibit on sheet C0.1 and replace with the approved proffer statement onf ZMA201900008. First submittal: comment addressed. 6. [32.5.2 (a)] Please revisethe property owner information to match County records. See Engineering Division comment#3f forfurther information. First submittal: Comment addressed. 7. [32.5.2 (a)] On the Cover Sheet and Sheet C.01, please revise the note that states "Proposed Zoning" to" Existing Zoning." Remove the existing zoning note that states the property is zoned R4. It is zoned PRD per ZMA201900008. First submittal: Comment addressed. a. State all applicable Overlay Zoning Districtsthat applytothe properties. First submittal: Comment addressed. 8. [32.5.2 (a)] On all applicable drawings, please revise the labelsfor Preserved Steep Slopes sothat it identifies these features as "Preserved Steep Slopes Overlay District." Currently, they are labeled as "Critical Slopes" or "Steep Slopes" on several drawings. See Engineering Division comment#4aforfurther information.Firstsubmittal: Comment addressed. 9. [32.5.2(a)] Please provide a note on Sheet C.01 stating the required setbacks for this project. Setbacks are found in Section 18-4.19oftheZoningOrdinance.Firstsubmittal: Comment partiallyaddressed. The note onSheet C.01should also state the minimum required rear setback of 20'. Please revise. a. Please show all required setback lines on the drawings. Revise setback lines so they meet the requirements of Section 18-4.19. For example, the minimum front setback requirement in this district is 5' from the edge of the right-of-way, but the setback is shown as 15' from the edge of ROW on the layout drawings. First submittal: Comment partially addressed. Please show the minimum 20' rear setback on the drawings. 20' min rear setback and label is shown on sheet C4.1, 4.2 and 4.5. The 5' front setback and label is shown on sheet C4.4 and C4.6. The side setback is shown on Sheet 4.6. 10. [32.5.2 (a)] Please revise the open space required note on Sheet C.01. The required open space forthis project is established by the calculations on the Application Plan of ZMA201900008. First submittal: The note on Sheet C.01 statesthe correct minimum required open space as approved with ZMA201900008. However, the areas that are proposed to counttowardthe 8.10-acretotal open space provided are unclearon the drawings. Staff requests an open space exhibitthatidentifies areasthatwilIcounttowardthe overa118.10acres ofopenspace proposed, and also clarifywhich amenityareas internal tothe site are counting toward the required 1.0-acre active recreation areas. The plan identifies a 5,762 sq.ft amenity area, 6,128 open space (between buildings 10 and 11), 5,030sq.ft. dog park, and a 5,488 sq.ft. amenity area, but these donot add uptothe required total 1.0 acres of required recreation area. Please clarifywhatfeatures are proposed to count toward meeting the 1.0 acre minimum, and label them on the plans with sq.ft. Sheet C4.9 has been added to the plan to show the overall open space provided. A table has been added to this sheet to show what is required and what is provided with this plan. The active recreational area has been indicated with a hatch pattern and includes the small park, dog park, swimming pool area, and clubhouse which includes the workout facilities. 11. [32.5.2 (a)] Please revise the building height note on Sheet C.01 so that it is clearthat the nine (9) townhomes at the south end of the project are permitted to be a maximum of two stories, per the Application Plan of ZMA201900008. Add a label to the layout drawings that states the maximum height permitted for those units is two stories, per the Application Plan of ZMA201900008. First submittal: Comment addressed. 12. [32.5.2 (b)] Please identify the following: b. Provide a table identifying the total floorareaofeach building proposed. First submittal: Comment addressed. c. Identify how many units are proposed within each residential building. Specifically, identify how many multifamily units measuring lessthan 500 sq.ft, 1-bedroom units, 2-bedroom units, and 3-bedroom units are proposed within each multifamily structure. First submittal: Comment addressed. 13.[32.5.2(b)] Add a note to Sheet C.01 identifying the sizes of all proposed amenities (for example, the surface area of the pool, size of the clubhouse, etc.) . Add a note stating "all project amenities must be completed prior to 50% of the units receiving certificates of occupancy." First submittal: Comment addressed. 14.[32.5.2(f)] Please show all existing topography on existing conditions and label contour lines. See attached Engineering comments for further information. First submittal: Comment addressed. 15. [32.5.2 (j)] Please show all existing water, sewer and drainage facilities and easements within the property. Label easements by type, state dimensions, and state the recorded instrument number that created the easement. First submittal: Comment addressed. 16. [32.5.2 (k)] Please show all proposed water, sewer, drainage, and stormwater ease mentsonthefinaI site plan and state the ease menttypeand width. First submittal: Please see Engineering Division and ACSAcomments regarding proposed utility easements and adjust the easements as necessary. Acknowledged. Plat will be submitted under separate cover. For the sake of making the plan set as legible as possible, Sheet C7.10 shows all easements. Easements are also shown on the Utility Plan sheets (C4.10 — C4.17). 17.[32.5.2(m)] Please provide pedestrian crossing accommodations at both site entrances fortheshared use path. See attached VDOT comments for further information. First submittal: Comment addressed. 18. [32.5.2 (m)] Please see Engineering comment #15a. Provide note to contractor to coordinate with the developer of the adjacent Rio Commons project to ensure that the travelway connection to that project is correctly graded and aligned. First submittal: Comment addressed. 19.[32.5.2(n)] Perthe Application Plan, amenities required include a pool, clubhouse, fitness area, and recreation field. Please clarify where the following amenities are proposed: fitness area and recreation field. First submittal: Comment addressed. 20. [32.5.2 (n)] ADA accessible ramps must be provided at all locations where sidewalks intersect vehiculartravelways. PleaseshowtheseonthefinaIsite plan. Firstsubmittal: Commentnotfullyaddressed,seeVDOTcomment#1. Acknowledged. Plan has been revised per the VDOT comments. 21. [32.5.2 (n)] The 10' shared use path must extend for the entirety of the property frontage along Rio Road E., and connect to the existing path at the intersection of John Warner Parkway and Rio Road E. Please show this on the final site plan. See attached VDOTcomments forfurtherinformation. Firstsubmittal: Comment addressed. 22.[32.5.2(n)] Please provide a construction detail in both plan and profile view of the dumpster pad enclosure and recycling enclosure in order to meet the screening requirements specified by Section 18-4.12.19 (c). First submittal: Comment addressed. 23.[32.5.2(n)] Please provide dimensions for a I I buildings, parkingspaces, sidewalks, wa I kways,walls, etc. First submittal: Comment addressed. 24.[32.5.2(o)] Prior to final site plan approval, the following areas must be dedicated to the County through approval and recordation of a Special Lot application: a. 0.12-acre greenway area. First submittal: Comment acknowledged by applicant. Submittal,approval,and recordation of the Special Lot platwill be required priorto final site plan approval. Acknowledged. Special Lot plat will be submitted under separate cover. b. 0.82 acres of land along the frontage of Rio Road E. for required road improvements. First submittal: Comment acknowledged by applicant. Submittal, approval, and recordation of the Special Lot platwill be required priorto final site plan approval. Acknowledged. Special Lot plat will be submitted under separate cover. 25. [32.5.2 (r)] Please provide a legend on each drawing. First submittal: Comment addressed. 26.[32.5.2(u)] Please see attached ARB comments. Prior to final site plan approval, a Certificate of Appropriateness is needed. This will require building elevations for all proposed structures to address the architectural notes as indicated onSheet2ofthe Application Plan. First submittal: Comment stands pending review byARBstaff. Acknowledged. 27. [32.6] Priorto approval, the final site plan must address all applicable requirements of Section 32.6, 32.7, and 32.8 of the Zoning Ordinance. First submittal: See comments under "Final Site Plan Comments" below. 28. [32.7.4] Prior to final site plan approval, a Water Protection Ordinance Plan (WPO) must be submitted, reviewed, and approved. See Engineering comments for further information. First submittal: Comment stands, WPO application not yet approved. See Engineering Division comments for further direction on the WPO application. Acknowledged. WPO submitted under separate cover. 29. [32.7] Priorto final site plan approval, an easement plat application must be submitted, reviewed, approved, and recorded for all proposed easements. a. [32.7.4.1] The easement plat must show all proposed stormwater and drainage easements. Prior to approval of the final site plan, all stormwater and drainage easements created by the easement plat will need to be shown, labeled, and identified as public/private, state the width/size of the easement, and state the recorded instrument number of the plat that created the easements. First submittal: Comment acknowledged by applicant. Submittal, approval, and recordation of the Easement Plat application will be required priortofinal site plan approval. Oncethe plat is recorded, all new easements shown on the site plan will need to state the instrument number (deed book/page) in the easement labels on the site plan prior to final site plan approval. Acknowledged. Plat submitted under separate cover. Once plat is approved, the DB & PG will be added to the plan set. b. [32.7.5] The easement plat must show all proposed water and sewer easements. Prior to approval of the final site plan, all water and sewer easements created by the easement plat will need to be shown, labeled, and identified as public/private, state the width/size of the easement, and state the recorded instrument numberoftheplatthatcreatedthe easements. First submittal: Comment acknowledged by applicant. Submittal, approval, and recordation of the Easement Plat application will be required priorto final site plan approval. Oncetheplat isrecorded, all new easements shown onthe site plan will needtostatethe instrument number (deed book/page) in the easement labels on thesite plan priortofinal site plan approval. Acknowledged. Plat submitted under separate cover. Once plat is approved, the DB & PG will be added to the plan set. c. [32.7.5] All internal access easements as required bythe ZMA must be included on the easement plat, and shown on the final site plan once the easement plat is recorded. An access easement is required from the right -in only entrance into the site, and then south to connect with Tax Map Parcel 61-167A. See Engineeringcommentsforfurtherinformation.Firstsubmittal: Commentacknowledgedbyapplicant. Submittal, approval, and recordation of the Easement Plat application will be required priorto final site planapproval. Once the platis recorded, all neweasements shown onthesite plan will needtostatethe instrumentnumber(deed book/page) in the easement labels on the site plan prior tofinal site plan approval. Acknowledged. Plat submitted under separate cover. Once plat is approved, the DB & PG will be added to the plan set. 30. [4.12.16 (c)(6)] Prior to final site plan approval, all proposed parking must meet minimum County design requirements. Parking space dimensions (length and width) must be labeled on the layout drawings. It appears that parking spaces meet the minimum 9' x 18' requirements, but length dimensions are currently not labeled. First submittal: Comment addressed. 31. [32.7.9] The final site plan will need to include a landscaping plan that meets the following requirements: a.[32.7.9.5] Street trees a long a I I streets. Sizesand spacing requirements must be met. First submittal: Please add a note, either in the street tree callouts or the plant schedule on Sheet LP2.00, stating that street trees are to be planted 50' on center. A note has been added to LP2.00 in the street landscaping requirements summary and calcs.I has been added. b.[32.7.9.7] Screening for parking spaces and dumpster areas and elsewhere as required byARB. First submittal: See comment #4 under "Final Site Plan Comments" below. Acknowledged. c. [32.7.9.7] One tree per ten parking spaces proposed, and 5% of the overall area used for parking and internal travel ways must be landscaped. First submittal: Comment notaddressed.The y%parkingarea canopyrequirementis not stated intheIan dscapingcalculationsonSheet LP1.00. Pleaseadda calculation stating the total area of parking and travel ways, and statethe proposed canopyarea based onthetrees and shrubsthatwill be planted inside of the project. Streettree canopies cannot be counted toward meetingthe 5%parking area canopy requirement. This additional calculation is shown on LP1.00 and LP2.00. d.[32.7.9.8] Minimum tree canopy of 10% must be provided within the site. Provide a calculation of the tree canopy area provided, and state the tree canopy area proposed. First submittal: Comment may be addressed pendingapplicantresponse tocomment#2 in "FinalSite Plan Comments" section below. The canopy area calculations are now shown on LP2.00. e. Landscaping within the required buffers at the west/north side of the development. See the buffer note on Sheet 2 of the Application Plan for types, sizes, and spacing of landscaping within these buffers. First submittal: Comment maybe addressed pending completion ofARB review. Acknowledged. ARB comments have been received and addressed with this submission. f. Provide a landscape schedule identifying the following information for proposed landscaping: state the species name, common name, quantity, size/height at time of installation, canopy area per species, and total canopyareaforeachspeciesoflandscaping material provided. Firstsubmittal: Commentaddressed. g. All proposed landscaping must be tree and shrub species specified on the Albemarle County Recommended Plants List. First submittal: Comment addressed. h. Canopy figures for all species can be obtained from the PlantCanopy Calculations list. First submittal: Comment addressed. 32. [32.5.2 (n)] Any proposed outdoor lighting must be shown on the final site plan. A photometric plan and lighting cut sheets must be provided with the final site plan. Proposed lighting must comply with requirements of Sections 32.7.8 & Section 4.17 of the Zoning Ordinance. In addition to meeting all lighting requirements a standard lighting note will be required. First review: See comment #1 under Final Site Plan comments below. Final Site Plan Comments: 1. [32.7.8] Please address the following on the lighting plan: a. [4.17] The luminaire schedule on Sheet E1.01P does not match the legend on Sheet LP3.00. Please verify how many types of outdoor luminaires are proposed. Sheet LP3.00 identifies "Forrey" post lights, but the schedule only identifies three types of Hubbell lights and the bollard lamps. Either revise the schedule to include the Forrey lights, or revise Sheet LP3.00 so that it identifies each type of Hubbell light. Ensure that all outdoor luminaires emitting 3,000 lumens or greater are shown on Sheets LP3.00 and E1.01P. Fixture specs have been updated on sheets E1.0213-E1.41) b. [4.17] Please update the photometric data table on Sheet E1.01P sot hat it statesthe Light Loss Factor (LLF) used to calculate the footcandle measurements. for each luminaire type. Albemarle County requires photometric plans to use a Light Loss Factor (LLF) of 1.0 to calculate footcandle measurements on site plans. LLF of 1 has been added to table on sheet E1.01P c.[4.17] Adjust the footcandle measurements on Sheet E1.0113 (if necessary) to address comment #1b and ensure that footcandle spillover onto adjacent residentially zoned property and public rights -of -way do not exceed 0.5 footcandles. Footcandles have been updated on sheet E1.01P d. [4.17] Footcandle measurements along the southern property line exceed the maximum 0.5 spillover permitted where the travelway will connect to the abutting parcel. Please adjust the lighting plan so that the spillover does not exceed 0.5 footcandles at the property boundary. Either the luminaire types proposed in that area need to be changed to reduce the spillover, or the lights need to be moved further into the site so that the footcandle measurement is reduced. Footcandles have been updated on sheet E1.01P, see updated light selections e.[4.17.4(a)] Pending applicant responsetocomment #la above, please ensure that manufacturer cut-sheetsfor all outdoor luminaires are provided on Sheet LP3.20. If the Forrey post lights will not be installed, remove the cut sheet from Sheet 3.20. Fixture specs have been updated on sheets E1.02P-E1.4P f. [4.17.4 (a)] The manufacturer cut -sheets on Sheet 3.20 do not show the light distribution of the luminaries that will emit more than 3,000 lumens (Forrey and Hubbell lights). Please provide additional information demonstrating that these lights will be equipped with full -cutoff fixtures. See cut sheets on sheets E1.02P-E1.04P 2. [32.7.9.4(c)] On Sheet LP1.00, please state the area of the existing tree canopy that is proposed to be retained, and identify (generally) the types and sizes of vegetation within those canopy areas. See sheet L1.04 for additional information about the trees to be retained. 3. [32.7.9.7] In the labels for the 50' and 30' screening buffers on Sheet LP1.00, please state the sheet number that shows the typical buffer plantings (Sheet LP1.10). Sheet number references have been added as requested. Buffer details are on LP1.01. 4.[32.7.9.7 [a)(2)] The parking spaces located south of the clubhouse building must be screened from the adjacent parcel. Currently, no screening is shown. Please address the following: a. Show screening on Sheet LP1.00 that meets the requirements of Section 32.7.9.7 (d). The planting strip area must be a minimum of 20' wide, and the plant materials must consist of a double staggered row of evergreen trees planted 15 feet on center, or a double staggered row of evergreen shrubs planted ten feet on center. The additional evergreen shrubs have been added as requested and the plant schedule has been updated. b. Update the planting schedule as necessary to include the new trees/shrubs that will be installed to meet the screening requirement. The additional evergreen shrubs have been added as requested and the plant schedule has been updated. 5. [32.7.9.6(b)] The parking lot tree calculation on Sheet LP1.00states that 500 parking spaces are proposed. However, 528 spaces are shown on the site plan. The calculation needs to be revised to state that 53 trees are required within the parking area, and two additional trees must be provided within the site. The parking count and calculations have been updated on LP1.00. We now show 53 parking area trees. 6. [ZMA201900008] The site plan does not showthetransit stop and associated improvements (shelter, rest bench, signage) that is required by proffer #3a. The proffer requires the transit stop to be installed and completed at the same time as the other proffered road improvements (proffer#1c), unless County transportation planning staff opt to initiate proffer #3b (cash in lieu of transit stop). Pending applicant response to this comment, the site plan will be sent to County transportation planning staff on all future submittals. a. If the developer plans to address this comment by building the transit stop, revise the site plan to show its location and all associated improvements. In coordination with CAT, the transit stop and details have been added to the plan. See Sheet C4.4 for transit stop location and sheet C1.3 for transit detail. Albemarle County Engineering Division —John Anderson 1. General: (FSP) Item 1. Persists. Applicant Acknowledged. a. WPO202200011 approval is required prior to FSP approval. Acknowledged. b. An easement plat must be recorded prior to WPO plan approval. (Also, item 5.c., below) Acknowledged, plat submitted under separate cover. c. A SWM facility maintenance agreement must be recorded prior to easement plat recordation. Acknowledged. 2. C2.1: Please provide a more explicit reference to 'VDOT plan.' A note has been added to sheet C2.0. The VDOT Plan Referenced is 0631-002-128, C502. FSP May persist. As follow-up: Note does not appear (possible .PDF flattening issue?). If .PDF is not flattened then saved prior to digital submittal, text may be stripped from the plan. Please confirm Note appears on sheet C2.0 and comment will be withdrawn. Acknowledged. Note has been confirmed to appear on sheet C2.0 under the scale bar. 3. C2.0-C2.6: a. Revise to show Ex. paved walk along J. Warner Pkwy C2.1 . If easement exists over this walk, please label easement and provide deed bk.-pg. ref. to (public) sidewalk easement. This falls under the deed to the City of Charlottesville DB 4622 PG 523-537. The deed book and page number has been added to the plan. The trail lays within the Permanent park easement with same DB & PG. The width of the trail easement was not explicitly stated in the document. Towards the north (near the intersection) the trail easement is covered by the Permanent Drainage, Trail and Slope Easement. FSP Addressed. b. Provide existing contour labels. No elevation is provided across existing conditions sheets. Additional comments possible. Labels have been added. FSP Addressed. c. Revise steep slopes label/s to read 'preserved steep slopes.' C2.3 Labels have been revised. FSP Addressed. d. Revise typo at WB. 173 to read DB. 173 C2.4 . Typo has been corrected. FSP Addressed. e. Label preserved steep slopes C2.5 . Label has been added. FSP Addressed. f. Revise parcel label ref to Helena Ottillia Wetsel et als, consistent with county real estate records (and C0.0) which identify TMPs 06100-00-00-16700 and 06100- 00-00-167CO as owned by Rio Point LLC. Label has been revised. FSP Addressed. 4. C4.0: Revise 'GIS Critical slopes — preserved' label to read 'GIS Preserved steep slopes.' Critical slopes exist in rural districts, steep slopes in development districts, and different review and construction requirements apply to each category (steep v. critical). Label has been corrected. FSP Addressed. 5. C4.1-4.6: a. Label internal travelways'private access.' Label has been added. FSP Addressed. b. Provide private access easement consistent with Sheet 1, ZMA2019-0008 Application Plan. Private access is more clearly visible on the Easement plan sheet (C7.10). FSP Addressed. c. Label ACSA utility easements. Label ACSA easement width. A separate easement plat application is required for ACSA utility, SWM, and public drainage easements. Please see all easements on sheet C7.10. FSP Partially addressed. As follow-up: Please submit easement plat with easement plat application and review fee at earliest convenience. Easement plat submitted under separate cover. Plans will be updated with DB & PG once plat is approved. 6. C4.2: a. Recommend Open Space 1.1 ac. Label be revised as needed to reflect <1.1 Ac. If future Rio Rd. E./J. Warner Parkway roundabout consumes a portion of Open Space. Paved roadway/public RW likely do not qualify as Open Space. Label has been revised per Parks Department comments. Portion of frontage will be dedicated to right-of-way. Open space calculation matches approved Application Plan with the rezoning. FSP Withdrawn. b. Recommend C4.2 include line-type/label that depict future Rio W./J. Warner Pkwy. Roundabout, consistent with approved Timmons Group ZMA Application plan, Sheet 1. The roundabout layout was conceptual and not designed or approved. It was included for reference on the Application plan as requested by the County. This plan reflects the existing conditions per date of plan submission. FSP Withdrawn. 7. C4.4: a. Provide (internal development) roundabout inscribed circle linework, consistent with Min. radius, Figure 2 (table) at VDOT Roundabout Design Guidance, Version 1.1, March 2014. Label inscribed circle R and check to ensure R attains Min. inscribed circle value (45' — 90' R). Plan has been revised. FSP Addressed. b. Provide, show, label CG-3 Modified Truck Apron curb detail (for internal roundabout); ref. VDOT Roundabout Design Guidance, Figure 7. Label has been added to layout sheet and construction detail has been added to sheet C1.3. FSP Addressed. 8. C4.5 (Also, C4.0): a. Separate Rio Commons townhouse development is shown. Please include ref. to SDP202100045 on C0.0, C4.0, C4.5 to avoid any misunderstanding that Rio Commons is separate and apart from Rio Point Development. Reference has been made on C4.0, C4.5, but not C0.0 since the cover sheet addressed Rio Point. FSP Addressed. 9. C4.7: a. Revise sheet index (key map) consistent with C4.8 sheet index, which is correct. Correction has been made. FSP Addressed. 10. C5.0: a. needed when any 2:1 slope exceeds 20' (vertical interval), any 3:1 slope exceeds 30', or any 4:1 slope exceeds 40'. Reverse slope bench has been added. FSP Addressed. 11. C5.1+: Multiple SWM facilities shown on C5.0 series will be reviewed with WPO202200011. Please ensure any revisions to the WPO plan translate to FSP proposed contours. Acknowledged. FSP May persist. Acknowledged, at Timmons the same parent file is used for printing FSP and WPO. Any revisions will be reflected on both plans. b. With FSP, please limit proposed retaining wall ht. to 10' Max (18-4.3.3.A.). Retaining wall height has been revised. FSP Addressed. c. Provide PE -sealed retaining wall plans (required for Engineering to recommend FSP approval). Acknowledged, plans will be provided by others, under separate cover, to the county for review. FSP Persists. Acknowledged, plans will be provided by others, under separate cover, to the county for review. d. Wherever grade concentrates storm runoff against curb, provide/label CG-6, as opposed to CG-2. CG-6 is provided (and labeled) where applicable. FSP Partially addressed. As follow-up: A few locations requiring CG-6 persists; for example: grade concentrates runoff against curb fronting building 1, and against curb at the Rio Road East north right in -only entrance (C5.3). CG-6 has been provided and labeled for runoff against curb fronting building 1 and against curb at the right in -only entrance, as well as other required locations. e. For all parking spaces fronting 2:1 or 3:1 graded slopes, provide / label VDOT guardrail (GR-2). Guardrail has been added. FSP Partially addressed. As follow-up: 13 parking spaces opposite building 2 face 2:1 Slope at wet pond; location merits GR-2. Please provide, show, label GR- 2 (C5.5). Guardrail (GR-2) has been added in front of the parking spaces opposite of building 2. f. Provide drainage at base of proposed fill slope to convey increased volume of sheet flow away from Rio Road East and to protect existing / future sidewalk at this location from wash, or erosion. Sheet Runoff may not release uncontrolled across this slope without capture / conveyance. A drainage ditch has been added next to the proposed trail at the base of the slope. FSP Addressed. 12. C5.2: a. Several extraneous TC labels with leader lines appear to float, without pointing to top of curb. Labels have been deleted. FSP Addressed. b. Provide label to identify heavy line -type rectangles that may be garage or storage units; these features front 3:1 SWM facility slope. Label has been added to sheet C4.3, C4.6, C5.2, and C5.5. FSP Addressed. 13. C5.3: a. Note railing requirements, VDOT Road Design Manual Appendix A(1), pg. A(1)-76 for sidewalks when separation from the back edge of a sidewalk to the top of a 2:1 slope (or drop-off >_ 4ft.) is <5-ft., as is the case with several proposed sidewalks adjacent to SWM facilities. Provide required railing, or at least 5' separation. SWM facilities have been removed with this submission. FSP NA. Note: SWM facilities have been removed with this submission. b. Inlets 602 and 504 appear to collect runoff from Rio Road East. Provide public drainage easement beyond public RW to downstream SWM treatment or detention facilities. Plan has been revised, please see C7.10. FSP Addressed. c. Provide public SWM easement for proposed SWM facilities. Plan has been revised, please see C7.10. FSP Addressed. d. Provide public drainage easements for SWM facility outfalls. Plan has been revised, please see C7.10. FSP Addressed. 14. C5.4: It appears the large SWM facility does not have an emergency spillway. SWM facility design will be evaluated with WPC202200011, including presence or absence of emergency spillway. Special design criteria apply to emergency spillways on fill slopes. Acknowledged. FSP NA. SWM design evaluated with WP0202200011. 15. C5.5: a. Provide note to contractor to coordinate grading with Rio Commons contractor/developer. Coordination is required to avoid misalignment (or dispute), especially give Rio Commons reliance on retaining walls in vicinity of travelway proposed to connect the two developments. Note has been added to sheet C5.5. FSP Addressed. b. Label large SWM facility, which appears to be a wet pond. If this facility has a permanent pool, provide fixed barrier landscaping or fencing to prevent trespass, and provide signs that warn of drowning hazard. Fencing has been provided around the wet pond. FSP Addressed. 16. C8.0-C8.2: a. Recommend 95% compaction note/label, leader lines for storm MH str. Or pipes substantially or entirely in fill. Pipes 215, 241, 243, 245, and 221, for example. Also, MH structures 242, 244, 214, 216, 208, 206, 222. Label has been added. FSP Addressed. b. Provide note/label and leader line requiring %:" steel plate floor for "step down" manholes where difference between invert of inlet pipe and invert of outlet pipe is 4' or greater. Ref. VDOT Drainage Manual, 9.4.8.7, Max. Grades. SL-1 is specified on profiles. FSP Persists. As follow-up: Certain 'step down' structures with difference between INV IN — INV OUT>4-ft require %" steel plate in the bottom of the manhole; for example, Str. 224. Additional labels have been added to structures where''/=" steel plate is required. Label has been added to "step down" manholes where required by the VDOT Drainage Manual. 17. C8.3: a. Increase pipe slope, pipe #501, to 0.5% Min. Pipe has been removed with removal of biofilter. FSP Withdrawn. b. Decrease pipe slope, pipe #223, to 16% Max. Pipe slope has been revised. FSP Addressed. c. Storm structure table reference to ht. is confusing in places; for example: 426.08', Str. #200. This height does not appear to be an elevation reference. Please check / revise structure heights for the four (4) structures listed with height >400'. Plan has been corrected. FSP Addressed. Albemarle County Department of Fire & Rescue — Howard Lagomarsino — 07-08-2022: 1. Provide the available fire flow for the hydrants proposed in the plan as a note on the plan to ensure they are able to provide the needed fire flow. Hydrant flow test report by ACSA provided on cover sheet. ISO fire flow calculations provided on sheet C1.3. Vireinia Department of Transportation (VDOT) — Doue McAvov— 06-24-2022 1. Provide details for the CG-12 ramps. Particularly, the truncated domes plates must span the part of the ramp that is flush with the roadway pavement, and the two ramps must point a pedestrian towards each other across the roadway. All VDOT details has been taken off the plan as requested and replaced with a table of VDOT details that references to the VDOT manual (sheet C1.3). The ramps are perpendicular to each other across the roadway along Rio Road. 2. Why are the stormwater volumes for structures 266 and 268 zero? These structures may not capture stormwater from the site, but they capture it from the road and carry it into the site's system, and must be included in the design of that system. Inlet calculation have been revised with this submission. Rivanna Water and Service Authority — Dyon Vega — 07-12-2022: 1. Please clarify what manhole you are connecting to. I believe you initially requested a connection from us, but now it appears to be a different manhole. It is difficult to tell. A new connection is being proposed since the ISP submission. Please see sheet C4.0 which provides an overall view of the sanitary layout. The existing manhole on the plan does exist and was provided by Richard Nelson at ACSA. The invert information used for our design has been updated with additional survey data. 2. Waterline 1 profile has a label for 18" x 8" TSV. I believe your pipe is 6". Please put the correct size. Per ACSA, we have updated our plans to reflect a 8" waterline for our development. Albemarle Service Authority — Justin Weiler — 06-28-2022: 1. All offsite easements must be recorded prior to plan approval and the recordation information should be shown on the plans. Acknowledged, easement plat submitted under separate cover. Once plat is approved, the Final Site Plan will be updated with DB & PG. 2. Manhole EX that you are proposing to connect to does not appear to exist. Is there a plan to extend the ACSA sewer to this location? This offsite plan would need to be approved before these plans can be approved. Please see sheet C4.0 which provides an overall view of the sanitary layout. The existing manhole on the plan does exist and was provided by Richard Nelson at ACSA. The invert information used for our design has been updated with additional survey data. 3. Coordinate the offsite sewer extension shown on these plans with the proposed Rio Commons development so a manhole is installed at their connection point to the offsite sewerline. Acknowledged. We are working with Rio Commons on the shared sewer. 4. ACSA will own the sanitary sewer lineup to and including manhole 8. All sewerlines and manholes upstream from manhole 8 will be privately owned. Clearly label the privately owned sewerlines and manholes on the plan and profile views. The ACSA easement for the offsite sewer should extend to the property line north of manhole 8. There should be a separate overlapping private sewer easement for the section of sewer between manhole 8 and the property line that will be privately owned and maintained. Profile titles have been updated to reflect ACSA/Privately owned sewer on sheet C9.2 — C9.3. On sheet C4.0, note 4 has been added. On sheet C4.14 a label has been added at the manhole to explain the stopping point of private/public sewer. Please see sheet C7.10, Easement Plan, for the updated ACSA and private easements for sanitary and water. The easements will be reflected on the easement plat which is being submitted under separate cover. Once the easement plat is approved, the DB&PG will be updated on the plan. 5. RWSA approval is required for the proposed waterline connection. If plans have not already been routed to RWSA, please submit them directly to RWSA for review. Acknowledged. Plans have been routed to RWSA and comments received and addressed. 6. A Flow Acceptance letter is required from the RWSA for this project. ACSA will request this from RWSA. Provide the anticipated schedule for full build -out of this site. Expected buildout to be completed April 2025. 7. Provide plumbing fixture counts for each building so that the meters can be sized. Fixture counts are provided on Sheet C1.3. 8. All onsite waterlines, except fire hydrant leads and lines to buildings, should be 8". Acknowledged. All onsite waterline sizing has been updated to 8" except fire hydrant leads and lines to buildings. 9. Shift the waterline connection in Rio Road to the northern entrance of the site. The new waterline tee where the northern entrance (Road 3) meets Road 2 should be fully valved (3 valves). If needed, lower storm sewer 259 to maintain 12" of separation between the waterline and the storm sewer. Waterline connection to Rio Road has been shifted to the Northern entrance and the new tee is fully valved. All possible utility conflicts have been cleared in waterline profiles. 10. Eliminate the waterline that runs through the open space south of Building 10. The waterline that is in the private access road, to provide service to Building 5, should be extended to the north and connect to the waterline in Road 1. Acknowledged. Waterline to Building 5 has been extended to Road 1 and removed waterline that runs through open space south of Building 10. 11. Extend the waterline that runs along the southern portion of Road 1 (south of Building 11) so that it connects to the waterline in Road 2. This should be a fully valved tee. The valves should not be located under any concrete. Acknowledged. Waterline has been extended and connected to the waterline in Road 2 with a fully valved tee. 12. Shift the waterline in Road 2 to the eastern side of the road. Waterline in Road 2 has been shifted to the eastern side of the road. 13. How will water service be provided to the clubhouse, pool and pool house? Water laterals has been called out on sheet C4.13 for clubhouse, pool, and pool house. 14. For the combination domestic and fire connections, on the 6" line there should be a 6"x4" tee, with a 4" GV and then a threaded plug to transition to 2" copper for the domestic line and a 6" GV on the fire line immediately after the 6"x4" tee. The fire line will be private after the 6" gate valve. None of the valves should be located under concrete or in a parking space. Due to space limitations, it may be beneficial to have the domestic service and the fire line tee off the 8" waterline separately for some buildings. Acknowledged. All utilities have been updated and checked for minimum separation with storm sewer and sanitary sewer. 15. Relocate the domestic and fire connections for the following buildings: The building numbers have been revised to match the architectural plans. The following revisions were made: • Building 1: Townhouse B • Building 2: Townhouse A • Building 4: Building 1 • Building 5: Building 2 • Building 6: Building 9 • Building 7: Building 8 • Building 8: Building 10 • Building 9: Building 11 • Building 10: Building 7 • Building 11: Building 3 • Building 12: Building 6 • Building 13: Building 5 • Building 14: Building 4 • Townhouse C is new • Building 12 is new a. Building 1— Locate all meters a minimum of 2' away from driveways and 10' from sewer laterals. Acknowledged. Water meters has been moved 2' away from driveways, and 10' from sewer laterals. b. Building 2- Locate all meters a minimum of 2' away from driveways and 10' from sewer laterals. Water meters has been moved 2' away from driveways, and 10' from sewer laterals. c. Building 4— Move to a location with more space. Possible locations are near the southeast corner of the building or in the island to the northeast that already has a fire hydrant in it. Domestic and fire connections have been revised with this submission based on feedback from MEP. d. Building 5— Move to a location with more space. A possible location is in the island to the northwest that already has a fire hydrant in it. Domestic and fire connections have been moved to the Northwest location by the proposed fire hydrant. e. Building 6—Shift the meter vault so that it is 10' away from the building. Shift the sidewalk so that it is centered between the two water meter vaults. Shift the 6"x4" tee and water meter vault to the north. The meter vault has been relocated to be at least 10' away from the building. The sidewalk is centered between the meter vaults. f. Building 7 - Shift the 6"x4" tee and water meter vault to the north. Location of 6" x 4" connection and water meter vault has been shifted in accordance with MEP. g. Building 8—Shift the entire assembly to the south so the 6"x4" tee, valves and water meter vault are in the island on the south side of the sidewalk. The entire assembly has been shifted to the island. h. Building 9 — Shift water meter vault to the north so it is 2' off the sidewalk. Water meter vault location has been revised. i. Building 10 - Move to a location with more space. Possible locations are the islands on the northwest or northeast corners of the building. Entire assembly has been moved based on feedback from MEP. j. Building 11- Move to a location with more space. Possible locations are the islands on the southwest or southeast corners of the building. Entire assembly has been moved based on feedback from MEP. k. Potential Future Building — Shift to the west to the open area next to the building. The future building has been added to this submission and full connections are now proposed based on feedback from the MEP. 16. South of Building 2, if the layout of the proposed building(s) is finalized, show the proposed building(s). Otherwise, remove the water services from the plans. Acknowledged. The plan has been revised to include the future buildings and utility connections are proposed accordingly. 17. Show and label an RPZ assembly on the private side of each meter. The MEP has the RPZ assembly inside the building, and therefore, it is not within the scope of Civil Plans. Please see building permit plans under separate cover for more information. 18. Show and label the DDCA for each fire line after the 6" isolation valve. If these will be located inside the building, note that on the plans. If they will be installed in vaults, show the vaults on the plans. The MEP has the DDCA inside the building, and therefore, it is not within the scope of Civil Plans. Please see building permit plans under separate cover for more information. A Note has been added to Utility Sheets (C4.10 — C4.17). 19. 1 recommend collocating hydrants in islands with water meters where practical to group ACSA infrastructure together and leave some of the islands for landscaping. Thank you for the recommendation, we have consolidated the water lines to the landscape islands as much as possible. 20. The water pressure at most meters will exceed 80 psi. Private PRV's may need to be installed on private portion of the service lines or in the buildings. Where needed, private PRV's are located within the building. 21. The hydrant north of building 2 should be shifted so the hydrant is between the curb and sidewalk. Acknowledged. Hydrant has been moved between curb and sidewalk by Building 2. 22. Show and label all tees on the waterline profiles. Show all crossings with other utilities including sanitary laterals. All tees and crossings have been shown and labeled on the waterline profiles. 23. Show the ACSA manholes with tops 6" above grade in unmaintained areas. All ACSA manholes that are in unmaintained areas have been adjusted to be 6" above grade. (Manhole #3-14) 24. The ACSA easements should extend around all appurtenances, including meter vaults and hydrants. Easement has extended around all appurtenances, including meter vaults and hydrants. 25. Show the proposed ACSA easements on the utility sheets, the landscaping sheet and the lighting sheet. Move all trees, shrubs and light poles out of ACSA easements. The proposed ACSA easements have been shown on all utility sheets. Easements are shown on the planting plan LP1.00. County of Albemarle Parks Department —Tim Padalino — 07-22-2022: 1. Proffered Trailhead Park (Design): ACPR staff met with representatives from Stony Point, Timmons Group, and Cline Design on 4/12/2022 to discuss this proffered trailhead park. SDP202200031 shows a different layout and design than the previous project materials (prepared by Cline Design, dated 4/25/2022), ACPR generally has no objections to the revised layout. However, please explain the proposed material(s) and design for the circular area within the turnaround (labeled as "Park Area" on Sheet C4.2). ACPR staff recommends that this area be designed and constructed as a landscaping bed with low -growing ground cover and three (3) canopy trees. ACPR staff recommends the use of Nyssa sylvatica, Platanus x acerifolia, or other canopy tree(s) tolerant of urban conditions. Response: In response to an ARB comment, the additional pavement of the turnaround area was removed and a turn around space is provided instead. This results in a lot less pavement and more greenspace. Please also note the following review comments specific to each proffered element in the proffered trailhead park: a. Entrance —complete b. Minimum of 12 parking spaces — complete (14 spaces provided) c. Trail connections— partially addressed / revisions required i. SDP202200031 provides a concrete sidewalk connecting to a proposed Class A Type 2 low maintenance shared use path along Rio Road E and then connecting to existing shared use path along John Warner Parkway Response: Concrete sidewalk connection is provided at the north entrance of the development to the shared use path along Rio Road East. ii. Please revise to specify width of concrete sidewalk in Trailhead Park; please provide sidewalk with minimum width of 6'. Dimension has been added for 6' concrete sidewalk in Trailhead Park on sheet C4.2. iii. Please revise to add an additional short section of concrete sidewalk (approximately 20' in length, providing a short connection between the proposed concrete sidewalk and the proposed travelway) on the SE end of the parking bay in the Trailhead Park (in order to provide a sidewalk on both ends of the parking bay) (please see exhibit #1, bottom) An additional short section of concrete sidewalk has been added per exhibit #1. iv. Please revise to provide curb cuts where the Trailhead Park travelway meets the two sidewalk sections located alongside each end of the parking bay (please see exhibit #2, bottom) Curb cuts where the two sidewalk sections are located alongside each end of the parking bay has been provided per exhibit #2. d. Benches — not addressed / revision required i. please provide multiple benches around Trailhead Park site Additional benches have been added. ii. please provide product information for any/all proposed site furnishing amenities to ACPR for review and approval Please see SD2.40 for furnishings. e. Public Art— not addressed / revision required i. please specify location(s) of public art -related amenities Please see SD1.50 for location and SD2.40 for furnishing details and specifications. ii. please explain the strategy/intention for selecting and installing public art -related amenities Please see SD1.50 for location and SD2.40 for furnishing details and specifications. iii. please provide more information on proposed public art -related amenities Please see SD1.50 for location and SD2.40 for furnishing details and specifications. f. Gazebo or other small structure — partially addressed / revision required i. please provide product information for any/all proposed site furnishing amenities to ACPR for review and approval Please see SD1.50 for location and SD2.40 for furnishing details and specifications. Landscaping — no objection 2. Proffered Trailhead Park (Dedication): ACPR staff acknowledge Note #3 on Sheet C4.2. Albemarle County Parks & Recreation staff are in coordination with City Parks & Recreation staff regarding the dedication of the proffered Trailhead Park to public use. Discussions about which locality will own and maintain the proffered Trailhead Park are ongoing; ACPR will provide an update on this detail as soon as possible. Response: Acknowledged via email that the park will be dedicated to Albemarle county. Special Lot Plat will be submitted under separate cover. 3. Greenway Area(s) along Meadow Creek: Staff acknowledge the Notes on Sheet C4.7 ("Greenway to be dedicated to public use 0.12 ac" and "Greenway to be dedicated to public use, part of conservation area 0.32 ac"). However, the extents of the greenway easement area(s) are not clear and are not fully understood. a. Please revise SDP202200031 to include an exhibit or sheet clearly showing the full extents and boundaries of the greenway easement area(s), and/or reference the corresponding plat where the greenway easement area(s) will be shown and dedicated to public use. Please refer to sheet C4.9 "Open Space Plan" for clarification on greenway easement area(s). Special Lot Plat will be submitted under separate cover. b. At minimum, please revise Sheet C7.10 "Easement Plan" to clearly show and label all existing and proposed greenway easement area(s), including on all applicable portions of TMP #61-167C and new TMP #61-167A. Labels for proposed greenway easement area(s) has been included on sheet C7.10 "Easement Plan" and/or could refer to sheet C4.9 "Open Space Exhibit". 4. Photometric Plan (E1.01P): This lighting plan shows an outdated layout for the proffered trailhead park. Please revise the Photometric Plan to incorporate the correct / consistent Trailhead Park information, and provide at least some amount of outdoor lighting in the vicinity of the pavilion / "park shade structure" The site plan on the photometric has been updated to the current plan on sheet E1.01P We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at Jessica.denko@timmons.com . Sincerely, Jessica Denko, PE Project Manager