HomeMy WebLinkAboutWPO201300033 Approval - County 2013-04-30 "Aloe RGIN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Peabody School WPO201300033 Plan preparer: Collins Engineering Owner or rep.: Avon Holdings LLC Plan received date: 30 April 2013 Date of comments: 14 June 2013 Reviewer: Max Greene The Erosion& Sediment Control Plans (WP0201300033) submitted 30 April 2013 has received Engineering Review and meets Albemarle County minimum checklist items for engineering approval. After all other departments and agencies have approved the site plan; please submit 4 copies of the WPO plans for approval and distribution during the pre-construction meeting. A stormwater management agreement is required and will be recorded prior to issuance of the grading permit. Please note that the sediment traps are not to be removed or converted without the approval of the WPO inspector. Also, the limits of construction that are off-site will require VDOT permission and/or permitting prior to land disturbance. The forms and instructions to request the Water Protection Ordinance Bond amount can be found on the Community Development Department Web site at http://www.albemarle.org/upload/images/forms center/departments/Community Development/f orms/bonds/Bond Estimate_RequestForm.pdf The County requires a Stormwater Management/BMP Facilities Maintenance Agreement document recorded with the "Clerk of Circuit Court". Please use the following links for the SWM agreement and procedures: http://www.albemarle.org/upload/images/forms center/departments/Community Development/f orms/Engineering and WPO_Forms/Plan Review - Stormwater Management BMP Facilities Maintenance Agreement Procedures.pdf http://www.albemarle.org/upload/images/forms_center/departments/Community Development/f orms/Engineering and WPO Forms/Plan_Review_- Stormwater Management BMP Facilities_Maintenance Agreement.pdf You may contact Ana Kilmer(Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Nimy Review Comments Page 2 of 2 Once the E&SC bond has been posted and the final site plan is approved, you may contact the Department of Community Development to arrange a pre-construction meeting with a County Erosion& Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. [17-204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading, building, or other permit for activities involving land disturbing activities within one(1)year after the date of the approval.