Project: Peabody School WPO201300033
Plan preparer: Collins Engineering
Owner or rep.: Avon Holdings LLC
Plan received date: 30 April 2013
Date of comments: 14 June 2013
Reviewer: Max Greene
The Erosion& Sediment Control Plans (WP0201300033) submitted 30 April 2013 has received
Engineering Review and meets Albemarle County minimum checklist items for engineering
approval. After all other departments and agencies have approved the site plan; please submit 4
copies of the WPO plans for approval and distribution during the pre-construction meeting. A
stormwater management agreement is required and will be recorded prior to issuance of the
grading permit. Please note that the sediment traps are not to be removed or converted without
the approval of the WPO inspector. Also, the limits of construction that are off-site will require
VDOT permission and/or permitting prior to land disturbance.
The forms and instructions to request the Water Protection Ordinance Bond amount can be found
on the Community Development Department Web site at
http://www.albemarle.org/upload/images/forms center/departments/Community Development/f
orms/bonds/Bond Estimate_RequestForm.pdf
The County requires a Stormwater Management/BMP Facilities Maintenance Agreement
document recorded with the "Clerk of Circuit Court".
Please use the following links for the SWM agreement and procedures:
http://www.albemarle.org/upload/images/forms center/departments/Community Development/f
orms/Engineering and WPO_Forms/Plan Review -
Stormwater Management BMP Facilities Maintenance Agreement Procedures.pdf
http://www.albemarle.org/upload/images/forms_center/departments/Community Development/f
orms/Engineering and WPO Forms/Plan_Review_-
Stormwater Management BMP Facilities_Maintenance Agreement.pdf
You may contact Ana Kilmer(Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures and Maintenance Agreements.
Nimy Review Comments
Page 2 of 2
Once the E&SC bond has been posted and the final site plan is approved, you may contact the
Department of Community Development to arrange a pre-construction meeting with a County
Erosion& Sediment Control Inspector. Should the County Inspector find the limits of
disturbance increased or the need for additional control measures required to protect the site,
additional fees will be required.
[17-204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading,
building, or other permit for activities involving land disturbing activities within one(1)year after the date of the
approval.