Loading...
HomeMy WebLinkAboutWPO201300032 Checklist - Project Closeout (Administrative) 2022-10-13 WATER PROTECTION (CONSTRUCTION) I FILE CLOSEOUT AT TIME OF COMPLETION IMAGING CENTER INSTRUCTIONS LEASE) CHECKLIST The Inspector/Management Analyst is to complete this form°;` n4 -` release;place the completed form in the WPO folder ' � of project completion and/or bond and forward to e'Ima nto LaserFiche. Once items have beenplaced in LaserFiche Imaging g Center staff will forward to Centralized Filing WPO# �(3 ^ 3� ' gm PROJECT TITLE FULL NAME INSPECTOR: FINAL ACTION CountyView— DATE: - 0 Statu s/Status � �. Date updated Hardcopy—File Folder Closeout: All items listed chronological order(latest on top). "�" �' shoal$be placed in project folder,in reverse Please check each item included in this folder. To indicate that an item is not P the checkt box. The Inspector/Management in tr/Mana provide ext to y the file,please indicate that item apincl ble to this file,place an"Nsar genet Analyst"Other"has thelines discretion at inch de any item deemed necessary to on the provided. Digital Closeout Instructions• � ,if the is already • Below each item please indicate if Imagin or,i the document f the is in digital format,can be saved to Center is to scan the document; document in the space provided. Pleaserovide the digital locat ion tlon Preconstruction Meeting Form ❑ Scan ❑ P 0 Saved location e� 1 Grading ermit ❑ Scan 0 Saved location ❑ Inspection Requests ❑ Scan 0 Saved location e4/ ❑ Inspection Results(Include an ❑ Scan Y inspection tickets,memos,photos,etc,) ❑Saved location • ❑ Bond Reduction/Bond Release Notices from Inspector to Man ❑ Scan Management Analyst ❑�Saved location ❑ Conservation Checklist ❑ Scan ❑Saved location �jt7' ❑ As-built/Construction Plans ❑ Scan ❑ Saved location ❑ Other(Please explain) ❑ Scan ' ❑ Saved location ❑ Other Plans - ' At the Inspector's discretion, copies of unapprovedarity plans/plats' may be placed in th approved and contain a note clari If such plans are Include a file if they ❑ Scan �g a'hY it was included. d' thy' should be clearly marked as ❑ Saved location NOTES: �►P0 project folders 1 will be accepted by the Imaging �� --------_____:_,__1) Checklist is completed and included in folder; g Center when the folio ""'—- 2) Documents are Acco-fastened(except plats/plans),and in chronological orde lg items are complete: 3) Documents are sufficiently Identified as to which need to be scanned or saved If the above items are not complete,Imaging (latest documents on Engineer for corrective action. g Center staff p i to LaserFiche. top); will circle the incomplete item aid return folder to the County I� Draft 12-5 2013