HomeMy WebLinkAboutSDP202200049 Action Letter 2022-10-20County of Albemarle
_ Community Development Department
Memorandum
To: Scott Collins, scott(rDcollins-engineering.com
Date: October 20, 2022
Re: SDP202200049 Maplewood Development — Initial Site Plan — Review Comments
Ben Holt
Senior Planner, Planning
bholt(rDalbemarle. org
Telephone: (434) 296-5832 ext. 3443
The Agent for the Board of Supervisors hereby grants administrative approval to the initial site plan. All comments in the
attached letter must be addressed prior to Final Site Plan approval.
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a
final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of
Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan.
In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are
received:
1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of
Albemarle.
2. Approval of all easements for facilities for stormwater management and drainage control.
The Final Site Plan must satisfy all requirements of section 32.6 of Chapter 18 of the County Code. Fees for the Final Site
Plan are required prior to review. Digital plan applications may be submitted on the County website.
Albemarle County Planning Services (Planner) — Ben Holt, bholt(7a.albemarle.org
1. [32.5.2.K] — Drainage. Provide a legend key for the storm drain connections on sheet 4 and indicate flow
direction.
Please contact Ben Holt in the Planning Division by using bholt(rDalbemarle.org or 434-296-5832 ext. 3443 for further
information.
Comments from Other Reviewers:
Albemarle County Engineering Services (Engineer) — John Anderson, landerson2oalbemarle.org — Requested
changes, see attached.
Albemarle County E911 Service — Andrew Slack, aslack(&albemarle.org — No objection.
Albemarle County Inspections — Betty Slough, bslough(cDalbemarle.org — No objection.
Rivanna Water & Sewer Authority — Dyon Vega, dvegaorivanna.org — Pending, comments will be forwarded upon
receipt.
Albemarle County Fire Rescue — Howard Lagomarsino, hlagomarsinooalbemarle.org — Requested changes, see
attached.
Albemarle County Service Authority — Richard Nelson, rnelsonoserviceauthority.org — No objection, comments
attached.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
Virginia Department of Transportation — Max Greene, max.greenena.vdot.virginia.gov — Requested changes, see
attached.
Albemarle County Planning (Transportation) — Jessica Hersh-Ballering, IhballeringCDalbemarle.org — Requested
changes, see attached.
Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski, mmaliszewski0albemarle.org — no
objection, comments attached.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
From:
John Anderson
To:
Ben H21S
Subject:
Planning Application Review for SDP202200049 MAPLEWOOD DEVELOPMENT - INIIIAL - DIGITAL. [
Engineering review comments 1
Date:
Thursday, August 18, 2022 12:18:07 PM
The Review for the following application has been completed
Application Number = SDP202200049 - ISP
Reviewer = John Anderson
Review Status = See Recommendations
Completed Date = 08/18/2022
This email was sent from County View Production
Ben, thanks for your patience.
Please share Engineering ISP review comments with applicant at your convenience, as Engineering has not.
CV recommendations
`For final site plan approval:
1. WPO plan approval is required prior to ESP approval.
a. Since on -site SWM facilities are proposed (underground detention), SWM facility and public
drainage easement (plat w/deeds) must be recorded prior to WPO plan approval, or with a
final subdivision plat.
b. Development proposes nutrient credit purchase; letter of nutrient credit availability from an
eligible nutrient bank is required prior to WPO plan approval.
2. If subdivision (not likely];
a. Road plan approval is required prior to final subdivision plat approval, and roads must be
built or bonded prior to final plat or final site plan approval.
b. SWM facility /public drainage easement may be recorded with a final subdivision plat.
3. Sheet 3:
a. At building 1 and 6, provide design that allows driver to reverse maneuver (3-point turn)
without using private drive /garage entrance. Design should allow vehicles (delivery, USPS,
private) entering development to reverse without using private entrances, to exit. 28' access
easement must be sufficient (small-scale t-type turnaround, etc. is required at last apartment
unit, building 1 and 6, with Autotum fig, with final site plan).
b. Revise building exit, N end building #4, such that residents do not virtually immediately
encounter curb /travelway. Proposed design must provide ADA compliant landing. Current
exit location (proximate to travelway, N end building #4) presents hazard to residents, a risk
to public health, safety, and welfare.
4. Sheet 4: Provide continuance of storm conveyance from Walgreen's underground SWM facility
(adjacent parcel to west), which releases runoff to the Maplewood Development in existing
condition. Make provision for off -site storm runoff that currently releases to Maplewood.'
Thanks, again,
John E. Anderson, PE I Civil Engineer II
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3069
SDP202249 Maplewood — Initial Site Plan
Albemarle Co Fire & Rescue — Howard Lagomarsino
hlaeomarsino@albemarle.org
08/25/22
1) Due to the proposed max. height of the buildings, the travelway widths of the fire apparatus access
roads must be 26 ft. in width, unobstructed. To ensure this occurs, there needs to be no parking, fire
lane signs and/or markings along the roads. There are signs depicted on the plan, but does not appear
they meet spacing requirement to allow enforcement.
2) Please indicate the need fire flow for the buildings as a note on the plans.
3) Please indicate the available fire flow as a note on the plans.
4) Hydrants are required for the proposal. Please indicate the location of hydrants to ensure they meet
the required number and spacing based on the needed fire flow (the least stringent which is every 500
feet with no building more than 250 feet from a hydrant).
5) If the buildings are equipped with a sprinkler system, please indicate the location of the fire
department connections (FDC) for each building and ensure there is a hydrant within 100 feet of the
FDC, arranged so that when hydrant and FDC are in sue, the travelway access is not obstructed.
From: Richard Nelson
TO: Ben Hol
Subject: SDP202200049 Maplewood Development — Initial Site Plan
Date: Friday, July 15, 2022 5:11:46 PM
CAUTION: This message originated outside the County of Albemarle email system. DO
NOT CLICK on links or open attachments unless you are sure the content is safe.
Ben,
I recommend SDP202200049 Maplewood Development — Initial Site Plan for approval with the
following conditions:
Submit a copy of the utility drawings to ACSA for review.
The ACSA has updated the typical easement widths for sanitary sewer mains, relative to depth. The
ACSA may require additional easement for the sanitary sewer main throughout the site.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
Stephen C. Brich, P.E.
Commissioner
(Z)
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1401 East Broad Street
Richmond, Virginia 23219
July 27, 2022
Mariah Gleason
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP-2022-00049 — Maplewood Development - ISP
Dear Ms. Gleason:
(804) 786-2701
Fax: (804) 786,2940
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced Maplewood Development, as submitted by Collins
Engineering, dated July 7, 2022 and find the following:
1. Please submit turn lane warrants for review per section 3 of RDM appendix F.
2. Pedestrian crosswalk warrant is required for mid -block crossings. Mid -block crossings are
crossings not associated with stop locations. These crossings must be evaluated in
accordance with the guidelines of IIM-TE-384.
3. Please show entrance throat dimensions per figure 4-9 commercial entrance designs along
highways with shoulders, RDM appendix F.
4. Show/label types of curbing and transition areas in entrance area.
5. CG-12 across proposed entrance do not appear to meet the standards. Please refer to Sheet
204.1 of the VDOT Road & Bridge Standards for detectable warning installed on a radius.
6. Entrance appears to be shown as CG-13 for commercial entrance with heavy truck traffic
anticipated sheet 203.10 instead of a CG-11 entrance. Please explain.
7. The proposed 10' asphalt pathway will need to be on one side of the right of way in its entirety.
If within the R/W, path will need to meet the Shared Use Path criteria per RDM appendix A(1).
8. Please show how existing off -site drainage from TMP 32-37C will be addressed and not affect
existing/proposed right of way on Rte. 649 (Proffit Rd.) and Rte. 1722 (Worth Xing).
9. Please show the proposed landscaping.
10. Appears to be a potential conflict with drainage structures and directional signs, please review.
11. Please show all proposed utility work within the R/W and mill/overlay areas per LUP-OC.
12. Due to the level of items noted in this review, these comments may not be exhaustive.
13. Please provide a comment response letter with each submission after the initial.
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
14. Note that the final plan must show conformance with the VDOT Road Design Manual
Appendices B(1) and F, as well as any other applicable standards, regulations or other
requirements.
A VDOT Land Use Permit will be required prior to any work within the right of way. The
owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399
for information pertaining to this process.
If you have further questions please contact Max Greene at (434) 422-9894.
Sincerely,
John C. Wilson, P.E.
Assistant Resident Engineer
Area Land Use
Charlottesville Residency
SDP202249 Maplewood — Initial Site Plan
Albemarle Co CDD Planning (Transportation) —Jessica Hersh-Ballering
hlaeomarsino@albemarle.org
07/21/22
1. Site plan should more clearly indicate that shared use path is to be constructed along Proffit
Road (rather than solely dedicating right-of-way), particularly on page 3.
2. CG-12 ADA ramp should be added to the shared use path on the northeast corner of the
property to allow for access to the splitter island.
3. There appear to be significant gaps in the plan's pedestrian infrastructure for internal
circulation. Specifically, there appear to be no sidewalks along Caspian, Keener, and Drexel
Lanes. Further, when sidewalks intersect these streets, the sidewalks end abruptly with the
sidewalk offset by at least 50' on the opposite side of the street (Drexel) or not continuing at all
(Keener).
4. Where the pedestrian infrastructure crosses Drexel (site entrance)there should be traffic
calming or at least an indication that drivers should expect pedestrians (as this is currently the
only pedestrian access to the recreational area/tot lot for most residents).
From:
Margaret Maliszewsld
To:
Ben Holt
Subject:
Planning Application Review for SDP202200049 MAPLEWOOD DEVELOPMENT - INHIAL - DIGI FAL .
Date:
Monday, August 15, 2022 4:55:04 PM
At today's meeting, the ARB took the following action:
Motion: Mr. Van Der Werf moved to approve the consent agenda for ARB-2022-70:
Maplewood Development Initial Site Plan and forward the recommendations outlined in the
staff report to the Agent for the Site Review Committee, as follows.
Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3)
and (5) and recommended conditions of initial plan approval:
• Prior to Initial Plan approval the following items shall be resolved to the satisfaction
of the ARB: None.
• The ARB recommends approval of the Initial Plan without conditions.
Regarding recommendations on the plan as it relates to the guidelines: None.
Regarding conditions to be satisfied prior to issuance of a grading permit: None.
Regarding the final site plan submittal:
A Certificate of Appropriateness is required prior to final site plan approval. The
following items and all items on the ARB Final Site Plan Checklist must be
addressed:
1. Provide architectural, landscape and lighting plans for review.
2. Indicate locations and heights of building -mounted equipment. Show how
visibility of the equipment will be eliminated from the Entrance Corridor.
3. Include the standard mechanical equipment visibility note on the
architectural plans: Visibility of all mechanical equipment from the
Entrance Corridor shall be eliminated."
Mr. Stoner seconded the motion.
The motion was carried by a vote of 5:0.
The Review for the following application has been completed:
Application Number = SDP202200049
Reviewer = Margaret Maliszewski
Review Status = See Recommendations
Completed Date = 08/15/2022
This email was sent from County View Production.