Loading...
HomeMy WebLinkAboutARB202200077 Certificate of Appropriateness 2022-09-06From: Khristopher Taggart Sent: Tuesday, September 6, 2022 12:27 PM To: Lhasa Pomolak Subject: ARB-2022-77: Ming Dynasty ARB CoA Attachments: ARB2022-77 Approved Sign Drawings.pdf RE: ARB-2022-77: Ming Dynasty; B2022-02700 (TMP 061U0-01-00-01500) Dear Applicant, We have reviewed your request for the above -noted sign and have approved the design for the Architectural Review Board as illustrated in the attached drawing(s) with the latest revision date of September 1, 2022. You may consider this letter your Certificate of Appropriateness. This approval is specifically conditioned on the following: 1. Execution of the design indicated on the final approved plans, attachments, materials, samples, and other submittal items presented. Please note the following: 1. Zoning, building, and other approvals may still be pending for your sign permit. This approval is only for the Architectural Review Board/Entrance Corridor. 2. ARB approval is only one of the approvals required prior to installing a sign. An approved sign permit is also required. DO NOT proceed with the construction or installation of your sign until you have received your signed permit. If you have questions about the status of a sign permit application, please contact the permit intake staff at 296-5832. 3. Any changes in the approved design will require a new application and additional review. Khris Taggart, Planner Albemarle County, Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 ext. 3278 ktaaaart@albemarle.ore Attach.: sign drawings approved for the ARB