Loading...
HomeMy WebLinkAboutSUB201400064 Approval - Agencies 2014-04-15 -i = ' COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMARLE-CHARLOTTESVILLE State Department of Health FLUVANNA COUNTY(PALMYRA) 1138 Rose Hill Drive GREENE COUNTY(STANARDSVILLE) LOUISA COUNTY(LOUISA) Phone(434)972-6219 P. O. Box 7546 NELSON COUNTY(LOVINGSTON) Fax (434) 972-4310 Charlottesville, Virginia 22906 May 12,2014 Rachel Falkenstein, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,Virginia 22902-4596 RE: Review of Proposed Subdivision Plat and attached Soils Information for Individual Onsite Sewage Systems as part of a division of Tax Map 20 Parcel 14-B located in Albemarle County,Virginia. Dear Ms.Falkenstein: On April 16,2014,the County of Albemarle requested the Virginia Department of Health(via the Albemarle County Health Department)review the proposed subdivision plat identified above.This letter is to inform you that the above referenced subdivision plat is approved for individual Onsite Sewage Systems in accordance with the provisions of the Code of Virginia,the Sewage Handling and Disposal Regulations, and local ordinances. This request for subdivision review was submitted pursuant to the provisions of§ 32.1-163.5 of the Code of Virginia which requires the Health Department to accept private soil evaluations and designs from an Authorized Onsite Soil Evaluator(AOSE)or a Professional Engineer working in consultation with an AOSE for residential development. This subdivision was certified as being in compliance with the Board of Health's Regulations by: Steve Gooch; OSE#1940001284. This subdivision approval is issued in reliance upon that certification. Pursuant to §360 of the Regulations this approval is not an assurance that Sewage Disposal System Construction Permits will be issued for any lot in the subdivision identified above unless that lot is specifically identified on the above referenced plat as having an approved site for an onsite sewage disposal system, and unless all conditions and circumstances are present at the time of application for a permit as are present at the time of this approval. This subdivision may contain lots that to do not have approved sites for onsite sewage systems. This subdivision approval does pertain to the requirements of local ordinances. Sinc rely, mss.-► IL Travis T. Davis Environmental Health Specialist, Sr. Ap p ro if ec, " oFA`, o ,�*5, tett!, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Date: 04/16/2014 Teresa Batten i Virginia Department of Health 1138 Rose Hill Drive r' Charlottesville, VA 22906 Regarding: Project Name: SUB 2014-00064 Martin Investments LLC—Two lot subdivision Date Submitted: 4/16/14 Dear Ms. Batten: The County of Albemarle has received application to develop/subdivide Tax Map 20 Parcel 14- B. This project requires Health Department approval prior to receiving final County approval. The applicant has provided a soils report, which is attached. Please review the proposal for suitable subsurface drainfields that comply with the provisions of Chapter 18, Sections 4.2.2, 4.2.3, 4.2.4, and Chapter 14, Section 310 of the Albemarle County Code. Should you have any questions or comments please feel free to contact me. Sincerely, Rachel Falkenstein, Senior Planner County of Albemarle Department of Community Development Division of Zoning and Current Development 401 McIntire Road Charlottesville, VA 22902 rfalkenstein@albemarle.org (434)296-5832, ext 3272 phone (434)972-4126, fax S/0 S'nj hlgg 81 8d' saolAJe$ 4HIaOH Iewawuo4inu3 a3A13a31:1 Soils Study for Drain Field Sites Tracts 2A and 2B A Division of Revised Tract 2 Tax Map 20 Parcel 14B Albemarle County Prepared for: Martin Investments 9932 Seminole Trail Ruckersville,Virginia 22968 Prepared by: Steve Gooch Consulting Geologist,Inc. 703 Oliver Creek Road Troy, Virginia 22974 April 15, 2014 • Page 1 of 8 OSE/PE Report for: Construction Permit n Certification Letter n Subdivision Approval IN Property Location: 911 Address: City: Lot 2A Section Subdivision GPIN or Tax Map# 20-14B Health Dept ID# Latitude Longitude Applicant or Client Mailing Address: Name: Martin Investments Street: 9932 Seminole Trail City:Ruckersville State Virginia Zip Code 22968 Prepared by: OSE Name Steve Gooch License# 1940001284 Address 703 Oliver Creek Road City Troy State Virginia Zip Code 22974 PE Name: License# %ear Address City State Zip Code Date of Report 4/15/14 Date of Revision#1 OSE/PE Job# Date of Revision#2 Contents/Index of this report(e.g.,Site Evaluation Summary,Soil Profile Descriptions,Site Sketch,Abbreviated Design,etc.) OSE Cover Page Abbreviated Design Forms Soil Profile Sheets Survey Plat Soil Information Summary Sheets Certification Statement I hereby certify that the evaluations and/or designs contained herein were conducted in accordance with e e t an'. Disposal Regulations(12 VACS-610),the Private Well Regulations(12 VAC5-630)and all other a.pl t re_ . and policies implemented by the Virginia Department of Health. I further certify that I c i tly p. i 1 lic''se required by the laws and regulations of the Commonwealth that have been duly issued by the a. ble • h . licensure to perform the work contained herein. 171 I The work attached to this cover page has been conducted under an exemption to pra engineering,specifically the exemption in Code of Virginia Section 54.1-402.11 I recommend that a(select one): construction permit❑ certification letter El subdivision approval 51 be(select one)issued IN denied❑. ti.. OSE/PE Signature �'I �{/v Date V//f/f I Soil Profile Primary Drain Field Tract 2A A Division of Revised Tract 2 Tax Map 20 Parcel 14B Albemarle County Hole Depth Horizon Material Description Soil Texture (in.) Group 1 0-11 A Brown(7.5YR 5/4) loam 2 11-54 Bt Red(10R 4/6) silty clay loam 3 54-84 C Brownish yellow(10YR 6/8) sandy loam 2 2 0-6 A Dark grayish brown(7.5YR 3/3) clay loam 3 6-32 Bt Red(10R 4/8) silty clay loam 3 32-48 BC Red(2.5YR 5/8) clay loam and dark yellowish brown 3 (10YR 4/6) sandy loam 48-84 C Dark yellowish brown(10YR 4/6) sandy loam 2 6 0-8 A Dark grayish brown(7.5YR 3/3) clay loam 3 8-30 Bt Red(10R 4/8) silty clay loam 3 30-84 CB Dark yellowish brown(10YR 4/6) sandy loam and red 2 (2.5YR 5/8) clay loam 7 0-4 A Brown(7.5YR 5/4) loam 2 4-36 Bt Red(10R 4/6) silty clay loam 3 36-54 Bt2 Reddish brown(2.5YR 5/4) clay loam 3 54-84 C Yellowish brown(10YR 5/8) sandy loam 2 8 0-4 A Brown(7.5YR 5/4) loam 2 4-31 Bt Red(10R 4/6) silty clay loam 3 31-54 Bt2 Reddish brown(2.5YR 5/4) clay loam 3 54-84 C Yellowish brown(10YR 5/8) sandy loam 2 Page 3 of Appendix 2 Soil Summary Report GENERAL INFORMATION Date 4/15/14 Submitted to Albemarle County Health Department Applicant Martin Investments Telephone Number (434) 985-4151 Address 9932 Seminole Trail Ruckersville, Virginia 22968 Owner same Address same Location State Route 641 at Advance Mills Tax Map 20-14B Subdivision Block/Section Lot 2A SOIL INFORMATION SUMMARY — '-I v7 OriiK 1. Position in landscape satisfactory? X Yes i- No Describe side slope 2. Slope 17 % 3. Depth to rock or impervious strata: Max. Min. None x 4. Depth to seasonal water table(gray mottling or gray color) X No 7 Yes inches R. Free water present IX No r Yes range in inches '''mss. Soil percolation rate estimated r Yes Texture group I II III IV r No Estimated rate 60 min/inch 7. Permeability test performed I Yes X No If yes, note type of test performed and attach X Site Approved: Drainfield to be placed at 48" depth at site designated on permit. Site Disapproved: Reasons for rejection: 1. r Position in landscape subject to flooding or periodic saturation. 2. Insufficient depth of suitable soil over hard rock. 3. + Insufficient depth of suitable soil to seansonal water table. 4. r Rates of absorption too slow. 5. Insufficient area of acceptable soil for required drainfield, and/or Reverse Area. 6. Proposed system too close to well. '. r Other Specify (attach additional pages if necessary) Pa„ Y of e Abbreviated Design Form This form is for use with gravity,pump to gravity,enhanced flow,and low pressure distribution(LPD)sewage system designs and when applying for a certification letter or subdivision approval. This abbreviated design covers the ❑ primary and reserve area, C�'only the primary area, ❑ only the reserve area(check one)for_Tract 2A —A Division of Revised Tract 2 (TM 20-14B)(Property ID). Design Basis Total length of available area: 100' Total width of available area: 75' Estimated Perc.Rate: 60 at 48" in.(depth) Number of bedrooms(or GPD): 4 1 2 Conveyance Method : Gravi Distribution method (specify): Gravity 3c Dispersal system basis Table 5.4 LGMI required? No (Yes/No) Effluent quality required: Primary (Primary, Secondary,Advanced Secondary) Square feet per bedroom: 452 _ Total trench bottom area required: 1808 svir Area Calculations Number of trenches 7 Length of trenches: 90' Width of trenches: 3' Center to center spacing: 9' Reserve required? Yes Percent reserve area required: 100 Total width of absorption area required 57; Total trench bottom area provided: 1890 The required width is calculated by multiplying the center-to-center spacing by one less than the number of trenches and adding 1 trench width plus any required reserve area. If the topography is not uniform across the length of the site the trenches will need to flare apart on one end to maintain contour. When this occurs it is necessary to use a center-to-center spacing that accounts for the flair or the installer will not be able to fit the system within the approved area. It is perfectly acceptable to have more area available,especially up and down the slope,than is required. Page of AOSE Form E Revised July 18,2007 vQA � r� Soil Profile Reserve Drain Field Tract 2A A Division of Revised Tract 2 _- Tax Map 20 Parcel 14B Albemarle County Hole Depth Horizon Material Description Soil Texture (in.) Group 3 0-12 A Brown(7.5YR 5/4) loam 2 12-31 Bt Red(10R 4/6) silty clay loam 3 31-84 C Brownish yellow(10YR 6/8) sandy loam 2 4 0-7 A Brown(7.5YR 5/4) loam 2 7-23 Bt Red(10R 4/6) silty clay loam 3 23-55 C Brownish yellow(10YR 6/8) sandy loam 2 55- Cr Granite gneiss 5 0-6 A Brown(7.5YR 5/4) loam 2 6-30 C Brown(7.5YR 5/4) sandy loam with gneiss fragments 2 30- Cr 50%+gneiss fragments 6 0-8 A Dark grayish brown(7.5YR 3/3) clay loam 3 8-30 Bt Red(10R 4/8) silty clay loam 3 30-84 CB Dark yellowish brown(10YR 4/6) sandy loam and red 2 (2.5YR 5/8) clay loam Page of of I Appendix 2 Soil Summary Report 4 - GENERAL INFORMATION Date 4/15/14 Submitted to Albemarle County Health Department Applicant Martin Investments Telephone Number (434) 985-4151 Address 9932 Seminole Trail Ruckersville,Virginia 22968 Owner same Address same Location State Route 641 at Advance Mills Tax Map 20-14B Subdivision Block/Section Lot 2A SOIL INFORMATION SUMMARY- �?�� Drtmvit Fled 1. Position in landscape satisfactory? ;X Yes No Describe side slope 2. Slope 17 % 3. Depth to rock or impervious strata: Max. 84"+ Min. 30" None 4. Depth to seasonal water table(gray mottling or gray color) X No Yes inches c Free water present X No r Yes range in inches acs. Soil percolation rate estimated 5X Yes Texture group I II a IV r No Estimated rate 90 min/inch 7. Permeability test performed 1— Yes X No If yes, note type of test performed and attach 'X Site Approved: Drainfield to be placed at 18" depth at site designated on permit. ■ Site Disapproved: Reasons for rejection: 1. Position in landscape subject to flooding or periodic saturation. 2. Insufficient depth of suitable soil over hard rock. 3. i Insufficient depth of suitable soil to seansonal water table. 4. Rates of absorption too slow. 5. Insufficient area of acceptable soil for required drainfield, and/or Reverse Area. 6. Proposed system too close to well. Other Specify Allow (attach additional pages if necessary) rolc 7 e--1 Abbreviated Design Form This form is for use with gravity,pump to gravity,enhanced flow,and low pressure distribution(LPD)sewage system designs and when applying for a certification letter or subdivision approval. Niftw This abbreviated design covers the ❑ primary and reserve area, ❑ only the primary area, Ely the reserve area(check one)for Tract 2A —A Division of Revised Tract 2(TM 20-14B)(Property ID). Design Basis Total length of available area: 100' Total width of available area: 70' Estimated Perc.Rate: 90 at 18" in. (depth) Number of bedrooms(or GPD): 4 t 2 Conveyance Method : _ Gravi Distribution method (specify): Gravity 3c Dispersal system basis GMP 118A LGMI required? No (Yes/No) Effluent quality required: Second (Primary, Secondary,Advanced Secondary) Square feet per bedroom: 307 _ Total trench bottom area required: 1228 Area Calculations Number of trenches 5 Length of trenches: 100' Width of trenches: 3' Center to center spacing: 10' Reserve required?_This is reserve_ Percent reserve area required: 100 Total width of absorption area required 63' Total trench bottom area provided: 1500 The required width is calculated by multiplying the center-to-center spacing by one less than the number of trenches and adding 1 trench width plus any required reserve area. If the topography is not uniform across the length of the site the trenches will need to flare apart on one end to maintain contour. When this occurs it is necessary to use a center-to-center spacing that accounts for the flair or the installer will not be able to fit the system within the approved area. It is perfectly acceptable to have more area available,especially up and down the slope,than is required. %%"' Page of AOSE Form E Revised July 18,2007 Z Cr)X-Ca to " " ° OW Gv�w °Qo inam CO am cow..-' r-4 ca t 3 F- m H_iW 1-4zo OW o v J> t-am o O . X►m+m ZW m En ..= cnH W❑O w Qiii- cc Z u �4 tii c2,...... !a ' — �I3 4 m / Wit'; Ai: Q a Cr En / A1� \ 1.07 �ct/� W W N22.5� 7�' \rr' H CV zo°z S58 s�,o►00 Q ;AS.1 \ o�a.e,,v W•1 co E-4 w:� / nL E-i-mrn - w cl, N / I� c?om C CC ® Vi°D // •/ w o A ..@ I—a cu N / i"l,. LU ¢ _O con FcT ri. cn / sev I- a o a o a> / p a I- > W rn w Z MNe in a o F.. - / v I.4 W t- o a / CL I- ® �"� ° 11.,', �C// S z WQ cn a. _1O .+at++�'� iii• o0 I z OW !—Y ID CO `. ,,r. t^11 Mg = I . 1-4 ." �<W I 't''I''' 1 •�4` / m¢ 0 W CD N¢QOO z �* J�Ni,�'M ° / I a. 'QQ •°w¢mm O aim "_ " 3NI� M3P� 3tf1 ).- >WCav - M,. g .ei. a '-'N 0 ¢a °m a wW ® 4 a: U � z CO• H - r� `n In o I- I. • z°z ;c; x 0 0 �'w' 17 Q a U N W 1 < < r2 1�Q m ■ s os-u. ow) co tlE3un a 7S ,,;,.,,,s '- t Cr)WI -Il 11, m,., LL �_ t = ' \ _ sr,I,t ‘,„ '00' a- Soil Profile Hole yes. ��� A I �. ou = Well and Drain Field Area a�,,...< eo ■ • / w ,;3 ract 2A ��� m LL A Division of Revised Tract 2 cu a A /0)�m Tax Map 20 Parcel 14B 0.'5, .<5. I--< %L Albemarle County, Virginia "Ka� Cr V a �! Steve Gooch Consulting Geologist d • °� z 703 Oliver Creek Road N m Troy, Virginia 22974 Page 1 of 8 OSE/PE Report for: Nor Construction Permit ' 1 Certification Letter n Subdivision Approval IN Property Location: 911 Address: City: Lot 2B Section Subdivision GPIN or Tax Map# 20-14B Health Dept ID# Latitude Longitude Applicant or Client Mailing Address: Name: Martin Investments Street: 9932 Seminole Trail City:Ruckersville state Virginia Zip Code 22968 Prepared by: OSE Name Steve Gooch License# 1940001284 Address 703 Oliver Creek Road City Troy State Virginia Zip Code 22974 PE Name: License# Nam., Address City State Zip Code Date of Report 4/15/14 Date of Revision#1 OSE/PE Job# Date of Revision#2 Contents/Index of this report(e.g.,Site Evaluation Summary,Soil Profile Descriptions,Site Sketch,Abbreviated Design,etc.) OSE Cover Page Abbreviated Design Forms Soil Profile Sheets Survey Plat Soil Information Summary Sheets Certification Statement I hereby certify that the evaluations and/or designs contained herein were conducted in accordance with the Sewa:- Disposal Regulations(12 VACS-610),the Private Well Regulations(12 VACS-630)and all other applicable I e_`' ..ti d policies implemented by the Virginia Department of Health. I further certify that I currently possess r ssi%:.al li se uired by the laws and regulations of the Commonwealth that have been duly issued by the applicable age g wi 1` ice;".ure to perform the work contained herein. 1• 1 The work attached to this cover page has been conducted under an exemptio •e p i eering,specifically the exemption in Code of Virginia Section 54.1-402.11 I recommend that a(select one): construction permit❑ certification letter';: subdivi on approval 5 be(select one)issued 0 denied❑. stow OSE/PE Signature � -Q,(� Date y//cl/Y ?a z- s I Soil Profile Primary Drain Field Tract 2B A Division of Revised Tract 2 `Now Tax Map 20 Parcel 14B Albemarle County Hole Depth Horizon Material Description Soil Texture (in.) Group 10 0-8 A Brown(7.5YR 5/4) loam 2 8-19 Bt Red(10R 4/6) silty clay loam 3 19-36 BC Yellowish red(5YR 5/8) sandy clay loam 2 36-72 C Strong brown(7.5YR 5/8) sandy loam 2 11 0-6 A Brown(7.5YR 5/4) loam 2 6-24 Bt Red(10R 4/6) silty clay loam 3 24-33 BC Yellowish red(5YR 5/8) sandy clay loam 2 33-72 C Brownish yellow(10YR 6/8) sandy loam 2 14 0-8 A Brown(7.5YR 5/4) loam 2 8-36 Bt Red(10R 4/6) silty clay loam 3 36-72 Bt2 Red(2.5YR 5/8) clay loam 3 15 0-8 A Brown(7.5YR 5/4) loam 2 8-29 Bt Red (10R 4/6) silty clay loam 3 29-54 Bt2 Red(2.5YR 5/8) clay loam 3 54-72 C Yellowish brown(10YR 5/8) sandy loam 2 16 0-7 A Brown(7.5YR 5/4) loam 2 7-36 Bt Red(10R 4/6) silty clay loam 3 36-60 Bt2 Red(2.5YR 5/8) clay loam 3 60-72 C Dark yellowish brown(10YR 4/6) sandy loam 2 Page 3 of 8 Appendix 2 Soil Summary Report GENERAL INFORMATION Date 4/15/14 Submitted to Albemarle County Health Department Applicant Martin Investments Telephone Number (434)985-4151 Address 9932 Seminole Trail Ruckersville, Virginia 22968 Owner same Address same Location State Route 641 at Advance Mills Tax Map 20-14B Subdivision Block/Section Lot 2B SOIL INFORMATION SUMMARY- pi-to/tot.? 0Tit 1I j 1. Position in landscape satisfactory? 15-<' Yes No Describe side slope 2. Slope 16 3. Depth to rock or impervious strata: Max. Min. None x 4. Depth to seasonal water table(gray mottling or gray color) +X No P Yes inches �. Free water present iX No I Yes range in inches N.e. Soil percolation rate estimated x Yes Texture group I II II IV No Estimated rate 60 min/inch 7. Permeability test performed r Yes X No If yes, note type of test performed and attach X Site Approved: Drainfield to be placed at 48" depth at site designated on permit. ■ Site Disapproved: Reasons for rejection: 1. 1 Position in landscape subject to flooding or periodic saturation. 2. Insufficient depth of suitable soil over hard rock. 3. Insufficient depth of suitable soil to seansonal water table. 4. Rates of absorption too slow. 5. r Insufficient area of acceptable soil for required drainfield, and/or Reverse Area. 6. Proposed system too close to well. 7. 1- Other Specify (attach additional pages if necessary) fC(fr ç/6ç_e' Abbreviated Design Form This form is for use with gravity,pump to gravity,enhanced flow,and low pressure distribution(LPD)sewage system designs and when applying for a certification letter or subdivision approval. This abbreviated design covers the ❑ primary and reserve area, only the primary area, ❑ only the reserve area(check one)for_Tract 2B —A Division of Revised Tract 2 (TM 20-14B)(Property ID). Design Basis Total length of available area: 90' Total width of available area: 70' Estimated Perc. Rate: 60 at 48" in. (depth) Number of bedrooms(or GPD): 4 1 2 Conveyance Method : Pump _ Distribution method (specify): Pump_ 3c Dispersal system basis Table 5.4 LGMI required? No (Yes/No) Effluent quality required: Primary (Primary, Secondary,Advanced Secondary) Square feet per bedroom: 452 _ Total trench bottom area required: 1808 vow Area Calculations Number of trenches 7 Length of trenches: 90' Width of trenches: 3' Center to center spacing: 9' Reserve required? Yes Percent reserve area required: 100 Total width of absorption area required 57' Total trench bottom area provided: 1890 The required width is calculated by multiplying the center-to-center spacing by one less than the number of trenches and adding 1 trench width plus any required reserve area. If the topography is not uniform across the length of the site the trenches will need to flare apart on one end to maintain contour. When this occurs it is necessary to use a center-to-center spacing that accounts for the flair or the installer will not be able to fit the system within the approved area. It is perfectly acceptable to have more area available,especially up and down the slope,than is required. Page of AOSE Form E Revised July 18,2007 ).2c ccFr Soil Profile Reserve Drain Field Tract 2B A Division of Revised Tract 2 Tax Map 20 Parcel 14B Albemarle County Hole Depth Horizon Material Description Soil Texture (in.) Group 9 0-5 A Brown(7.5YR 5/4) loam 2 5-20 Bt Red(10R 4/6) silty clay loam 3 20-27 C Strong brown(7.5yR 5/8) sandy loam with weathered 2 granite gneiss fragments 27- Cr 50%+granite gneiss fragments 10 0-8 A Brown(7.5YR 5/4) loam 2 8-19 Bt Red(10R 4/6) silty clay loam 3 19-36 BC Yellowish red(5YR 5/8) sandy clay loam 2 36-72 C Strong brown(7.5YR 5/8) sandy loam 2 11 0-6 A Brown(7.5YR 5/4) loam 2 6-24 Bt Red(10R 4/6) silty clay loam 3 24-33 BC Yellowish red(5YR 5/8) sandy clay loam 2 33-72 C Brownish yellow(10YR 6/8) sandy loam 2 12 0-6 A Brown(7.5YR 5/4) loam 2 6-28 CB Yellow(10YR 7/8) sandy loam with seams of red 2 (10R 5/8) clay loam 28- Cr Granite gneiss 13 0-4 A Brown(7.5YR 5/4) loam 2 4-32 Bt Red(10R 4/6) silty clay loam 3 32-51 Cl Light red(2.5YR 6/8) clay loam 3 51-72 C2 Yellowish red(5YR 5/8) sandy loam 2 Page G of 4 Appendix 2 Soil Summary Report GENERAL INFORMATION Date 4/15/14 Submitted to Albemarle County Health Department Applicant Martin Investments Telephone Number (434) 985-4151 Address 9932 Seminole Trail Ruckersville, Virginia 22968 Owner same Address same Location State Route 641 at Advance Mills Tax Map 20-14B Subdivision Block/Section Lot 2B SOIL INFORMATION SUMMARY - ( . orzok .rill 1. Position in landscape satisfactory? 15-< Yes r No Describe side slope 2. Slope 18 3. Depth to rock or impervious strata: Max. 72"+ Min. 27" None 4. Depth to seasonal water table(gray mottling or gray color) iX No Yes inches 5. Free water present IX No [ Yes range in inches Soil percolation rate estimated IX Yes Texture group I II CD IV No Estimated rate 90 min/inch 7. Permeability test performed T Yes IX No If yes, note type of test performed and attach 5( Site Approved: Drainfield to be placed at 12" depth at site designated on permit. r Site Disapproved: Reasons for rejection: 1. Position in landscape subject to flooding or periodic saturation. 2. I Insufficient depth of suitable soil over hard rock. 3. r Insufficient depth of suitable soil to seansonal water table. 4. Rates of absorption too slow. 5• r Insufficient area of acceptable soil for required drainfield, and/or Reverse Area. 6. r Proposed system too close to well. 7. r Other Specify (attach additional pages if necessary) rely 7 6r Abbreviated Design Form This form is for use with gravity,pump to gravity,enhanced flow,and low pressure distribution(LPD)sewage system designs and when applying for a certification letter or subdivision approval. This abbreviated design covers the ❑ primary and reserve area, ❑ only the primary area, Only the reserve area(check one)for Tract 2B—A Division of Revised Tract 2(TM 20-14B)(Property ID). Design Basis Total length of available area: 100' Total width of available area: 110' Estimated Perc. Rate: 90 at 12" in. (depth) Number of bedrooms(or GPD): 4 1 2 Conveyance Method : Pump Distribution method (specify): Pump 3c Dispersal system basis Table 5.4(LPD) LGMI required?_Noo(Yes/No) Effluent quality required: Secondary (Primary, Secondary,Advanced Secondary) Square feet per bedroom: 424 Total trench bottom area required:_5953* *includes 17% increase for slope New- Area Calculations Number of trenches 30 Length of trenches: 100' Width of trenches: 1" Center to center spacing: 2' Reserve required? This is reserve Percent reserve area required: 100 Total width of absorption area required 58' Total trench bottom area provided: 6000 The required width is calculated by multiplying the center-to-center spacing by one less than the number of trenches and adding 1 trench width plus any required reserve area. If the topography is not uniform across the length of the site the trenches will need to flare apart on one end to maintain contour. When this occurs it is necessary to use a center-to-center spacing that accounts for the flair or the installer will not be able to fit the system within the approved area. It is perfectly acceptable to have more area available,especially up and down the slope,than is required. Page of AOSE Form E Revised July 18,2007 W �+ Nm Pt 1;;) a Wa 1 v / / Xa`" Z 0 0 C-) H a,_ of/ -Oco, to Wt� n / tr puyC '~�Q c cu Es • NN / • W cr A o @ 1—Q N // ., W nW 11.4 Vn+ CO / v 1— 0 o4 St Q a as // 1v H W 2 _I W 41:: / 7 tL W UJ �: .. ,� Z W / ' w a CO O. k 1 I t .ti o .-i �tittli �''t' ®o/ ' X O W i'oat:imca w I�t�' �I ° LL- / mQ - QW OF-00) Z m iiv-ico - / ' a Q Q CU QOO Q pW - '� ,, 1— •w°CmaOD `J �cn - 3NT1 M3t. Stn >.. Z F-N`amv aL•pe„aF „,,, Q o u Z a ww°o W M. 4 .Zti• 4' O v CC f21 Cr)z CD o Z r , o ,-�-in o U t-i X o Z° ;n r cd ate, 0 t �'0 � I p QD LJ- 2 ; ®3y w Z ' i—, j ZI 0 W I o U'fN►a J 4 4' ^^O(O ` i'ii") a igiv � H Q Q� 1 err ."� "' 1 o t17J .- o ���; ;;�; ao 3 m?mt1 W 'vLn [9.r ii:,0'"," LL O, I.�C V' (T)C1.11 �� l's ,1;'� ` m� 0cat0 N I Z / LL d..;;I.,\y.��(D'9 CLIWNtD 2, 1 "� NIf xw •01 l A in N ~S�om Q 0. �3 _ cc ��� 1 tD Li1.� o) m 0 r I al CC A m i � h '5' �l v a i I rr b' 1 LC- ti 3 i 1 N m -.i 1 N.-(3)c9 Q1 cill Scale 1"= 200' Soil P i ole Isocn-cu5- 2 House Well and D i 1 .. �" Ion Tract 2B ih, .: . . (,) . . , CO 03 CD C11 CO C13 CO CU N c„ mr� rnotovv.vv0) ..-+ c000 31 A :1 vi ■ 1S.. raft 2 Q V.+ v r+ N �+ o o CL) � amo CO•- � c'v T. W . 4>a a ft 14B )- � mrnrnrmmw 0 Al -m.1 Co u nty, Virginia 3 3 3 3 3 3 3 W W W W W W ' I Steve Gooch Consulting Geologist a s s s - a s s s • a a . N fD N C) to Co h N v Q N- o) / mW mmmmo - Inolno �10ID (O`" 703 Oliver Creek Road F"-1 Q Nr N O .� r+ Q) it) t0 Cu � P 0 ¢ u r) £' LU7vmmLO �+ N Troy, Vlrglnla22974 W N (D t\ Q' co In in 0 O m tD to m mmma. t. tototomcummV* N U7 Steve Gooch, C.P.G./A.O.S.E STEVE GOOCH spgooch.geologist @gmail.com CONSULTING GEOLOGIST, INC. Phone: 434-531-0487 703 Oliver Creek Rd. Troy,Virginia 22974 April 15, 2014 Mr. Bill Fritz County Of Albemarle Dept. Of Planning and Community Development 401 McIntire Rd Room 227 Charlottesville, VA 22902-4579 Re: Proposed Drain Field Sites Tracts 2A and 2B A Division of Revised Tract 2 Tax Map 20 parcel 14B Albemarle County Dear Mr. Fritz: Enclosed are three (3) copies of the soils work associated with the proposed drain field sites for the above-referenced property. We request that you forward two (2) copies to the Charlottesville-Albemarle Health Department for their review. Also enclosed is the application for subdivision review form. If you have any questions,please do not hesitate to call. Sincerely, Steve Gooch Consulting Geologist, Inc. AX)TI/L, Steve Gooch Encl. Commonwealth of Virginia VDH Use Only Health Department ID# Application for Subdivision Review Due Date (Page 1 of 2 to be filled out by the Owner or Agent) Owner Robert and Donna Martin Phone (434)985-4151 Mailing Address 9932 Seminole Trail Phone Ruckersville,Virginia 22968 Fax Developer/Agent Steve Gooch Phone (434)531-0487 Mailing Address 703 Oliver Creek Road Phone Troy,Virginia 22974 Fax AOSE Steve Gooch Phone (434)531-0487 Mailing Address 703 Oliver Creek Road Phone Troy,Virginia 22974 Fax Directions to Property: From Charlottesville take 29 North,left on State Route 641 (Fray's Mill Road)to property on left just past 1873 Fray's Mill Road Name of Proposed Subdivision Tax Map 20-14B Other Property Identification Dimension/Acreage of Property 12.78 Ac. Number of lots proposed 2 Proposed water source(note:new or existing,public or individual) new,individual General size of lots 6.4 Ac.,6.78 Ac. (give range if appropriate) Additional description of subdivision Overview of soils and geology(optional but encouraged) In order for VDH to process a subdivision application you must attach a plat of the property showing the location of the proposed onsite sewage disposal systems and the reserve absorption areas(if required)and the location of the water supply system on each lot,if applicable. Each plat or subsection of a subdivision shall be accompanied by specific soil information for each lot(absorption area and reserve area). If not provided by the local subdivision ordinance,the district or local health department may require the plat to show streets,utilities,storm drainage,water supplies,easements,lot lines,and original topographic contour lines by detail survey or other information as required. When the AOSE site evaluations are reviewed,the property lines,building location and the proposed well and sewage system sites must be clearly marked and the property sufficiently visible to see the topography,otherwise this application will be denied. I give permission to the Virginia Department of Health(VDH)to enter onto the property described during normal business hours for the purpose of processing this application and to perform quality assurance checks of evaluations and designs certified by an Authorized Onsite Soil Evaluator(AOSE)or a Professional Engineer(PE)as necessary until the sewage disposal system has been constructed and approved. Vic/1y Signature of Owner/Agent Date a " ti Commonwealth of Virginia HealthDep neennt O n l y Application for Subdivision Review Due Date (page 2 of 2 to be filled out by the county official requesting a VDH review) County Office initiating request Contact Individual Phone Local offices of the Virginia Department of Health may review subdivision applications for compliance with state rules and regulations governing sewage treatment and dispersal and private water supplies,compliance with local ordinance governing sewage treatment and dispersal and private water supplies and potentially for compliance with other local ordinances. Please indicate the nature of review you are asking the health department to conduct. 1. Review for conformance with the Sewage Handling and Disposal Regulations 2. Review for conformance with local onsite wastewater ordinances 3. Other(describe below) Name and title of requestor Date OSE Form F Revised 7/02/09