RE: SDP2021-22 Albemarle Business Campus: Block 5 Letter of Revision 41
To Whom It May Concern,
SDP2021-22 Albemarle Business Campus: Block 5 is a site development plan on tax map parcels 07600-
00-00-046AB and 07600-00-00-05400. This site plan is the first phase of the Albemarle Business Campus
Neighborhood Model District, proposing the construction of a private road, Vision Lane, self -storage and
smaller commercial/office uses, and a Class B Type 2 pedestrian path in the rear. This letter of revision
seeks to revise the scope of phase 1 as the original phasing plan and the approved SDP2021-22 would
require the construction of the pedestrian path nearly 55' beyond the end of the parking area currently
proposed. At the time of adjacent block's construction (Block 2, phase 5), this parking area would be
expanded; if the frill extent of the pedestrian path were to be constructed in phase 1, the portion of the
phase 1 path would essentially require reconstruction at phase 5, as the extension of the parking area
would necessitate regrading and disturbance of the path area. To allow for a sensible sequencing of
construction, the developer requests this revision to the scope of phase 1.
Materials included in this submission are (1) full-size digital copy of the site plan sheet of the approved
SDP2021-22, with phasing lines. (4) full-size hard copies may be provided, at the request of the County.
If you have any questions, please do not hesitate to contact me at Rachelkshimp-en ing eering com or by
phone at 434-227-5140. You can also contact Justin Shimp at Justingshimp-en ing eering com.
Best regards,
Rachel Moon
Shimp Engineering, P.C.
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com