Loading...
HomeMy WebLinkAboutSUB201300032 Bond 2013-03-11 Christopher Perez From: Ana Kilmer Sent: Tuesday, November 19, 2013 3:03 PM To: Keith Lancaster; Max Greene; Christopher Perez Cc: Esther Grace Subject: Final Subdivision Plan for Grayrock West Subdivision (formerly Lanetown Subdivision) Bonds The following bonds have been posted and approved: 1. Subdivision/road performance bond -$359,890 2. Subdivision/road performance bond—Water&Sewer- $106,000 The $114,820 replacement water protection performance bond secured with a letter of credit has been approved. I will begin paperwork to release the wpo bond that you posted with cash on 9/5/2013. I will let you know when the check is ready. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer @albemarle.org Grayrock West (aka Lanetown) Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sew er) Plan # SUB2013000 Item Item No. Unit Unit Cost Cost Number (installed) % compete adjustment for inflationcost remaining Forloines Drive road length 477.0 ft aggregate base 6.0 in d 477.0 ft L 24.0 ft W 400.7 ton $35.00 $14,023.80 0%$14,023.80 blotted or prime&double seal 477.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0%$0.00 asphalt base 2.5 in d 477.0 ft L 24.0 ft W 175.3 tons $100.00 $17,529.75 0%$17,529.75 asphalt surface 1.5 in d 477.0 ft L 24.0 ft W 105.2 tons $120.00 $12,621.42 0%$12,621.42 curb CG-2 0.0 ft $13.00 $0.00 0%$0.00 curb CG-6 1000.0 ft $15.00 $15,000.00 0%$15,000.00 sidewalk, concrete (5') 840.0 ft $17.00 $14,280.00 0%$14,280.00 ramp CG-12 4 ft $350.00 $1,400.00 0%$1,400.00 street name sign 2 each $200.00 $400.00 0%$400.00 traffic control sign 1 each $200.00 $200.00 0%$200.00 Street Landscape 0 Each 0 each $150.00 $0.00 0%$0.00 guardrail 0 ES @ $3700 3000 0.0 ft $17.00 $0.00 0%$0.00 drop inlet or grate 8 each $3,500.00 $28,000.00 0%$28,000.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0%$0.00 manhole structure (per ft. rise) 33 ft $450.00 $14,850.00 0%$14,850.00 pipe, rcp, cmp (15 to 48") 15.0 in d 3 ES-1,2 3 EC-1 400.0 ft $35.00 $17,000.00 0%$17,000.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 0%$0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 0%$0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 $0.00 $0.00 0%$0.00 rip-rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0%$0.00 E&S Fabric, EC2,3 0.0 ft L 7.0 ft W 0.0 sy $60.00 $0.00 0%$0.00 clear and grub (for wooded sites) 500.0 ft L 54.0 ft W 0.6 acre $24,000.00 $14,876.03 0%$14,876.03 grading (per cy for cut or import only) 1066.0 cy fill 1800.0 cy cut 2155.3 cy $13.00 $51,419.33 0%$51,419.33 0 as-built drawings (1k + price per 0.1 mi.) 477.0 ft L 0.09034 mi. 1 lsum $2,000.00 $3,000.00 0%$3,000.00 survey and layout (price per 0.1 mi.) 477.0 ft L 0.09034 mi. 1 lsum $2,000.00 $3,000.00 0%$3,000.00 mobilization 1 lsum $500.00 $500.00 0%$500.00 materials testing 477.0 ft L 0.954 inc of 500' 2 each $200.00 $400.00 0%$400.00 compaction testing 477.0 ft L 0.954 inc of 500' 2 each $200.00 $400.00 0%$400.00 CBR tests (1 every 0.1 mi. per road) 477.0 ft L 0.954 inc of 500' 2 each $200.00 $400.00 0%$400.00 stone depth inspections 477.0 ft L 0.954 inc of 500' 2 each $200.00 $400.00 0%$400.00 pavement inspections 477.0 ft L 0.954 inc of 500' 2 each $200.00 $400.00 0%$400.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0%$0.00 VDOT surety (1 lane) 477.0 ft L 0.09034 mi. 1 Lanes $2,000.00 $1,806.82 0%$1,806.82 VDOT maintenance fee (1 ln rd, 1 yr) 477.0 ft L 0.09034 mi. 1 Lanes $150.00 $135.51 0%$135.51 VDOT admin. Cost recovery fee(1 lane) 477.0 ft L 0.09034 mi. 1 Lanes $100.00 $340.34 0%$340.34 cost sum $212,383.01 $212,383.01 proj mgmt $31,857.45 $31,857.45 contingency $24,424.05 $24,424.05 \\Cob-dts01\CityViewLnk\Docs\2013\SUB\SUB201300032 - Grayrock West\Grayrock West road bond estimate.xlsx 3/11/2013 Grayrock West (aka Lanetown) Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sew er) Plan # SUB2013000 Item Item No. Unit Unit Cost Cost Number (installed) % compete adjustment for inflationcost remaining Total $268,670 $268,670 \\Cob-dts01\CityViewLnk\Docs\2013\SUB\SUB201300032 - Grayrock West\Grayrock West road bond estimate.xlsx 3/11/2013 Grayrock West (aka Lanetown) Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sew er) Plan # SUB2013000 Item Item No. Unit Unit Cost Cost Number (installed) % compete adjustment for inflationcost remaining Francis Court road length 141.0 ft aggregate base 6.0 in d 141.0 ft L 24.0 ft W 118.4 ton $35.00 $4,145.40 0%$4,145.40 blotted or prime&double seal 141.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0%$0.00 asphalt base 2.5 in d 141.0 ft L 24.0 ft W 51.8 tons $100.00 $5,181.75 0%$5,181.75 asphalt surface 1.5 in d 141.0 ft L 24.0 ft W 31.1 tons $120.00 $3,730.86 0%$3,730.86 curb CG-2 0.0 ft $13.00 $0.00 0%$0.00 curb CG-6 200.0 ft $15.00 $3,000.00 0%$3,000.00 sidewalk, concrete (5') 200.0 ft $17.00 $3,400.00 0%$3,400.00 ramp CG-12 0 ft $350.00 $0.00 0%$0.00 street name sign 1 each $200.00 $200.00 0%$200.00 traffic control sign 1 each $200.00 $200.00 0%$200.00 Street Landscape 0 Each 0 each $150.00 $0.00 0%$0.00 guardrail 0 ES @ $3700 3000 0.0 ft $17.00 $0.00 0%$0.00 drop inlet or grate 0 each $3,500.00 $0.00 0%$0.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0%$0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 0%$0.00 pipe, rcp, cmp (15 to 48") 15.0 in d 3 ES-1,2 3 EC-1 0.0 ft $35.00 $3,000.00 0%$3,000.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 0%$0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 0%$0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 $0.00 $0.00 0%$0.00 rip-rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0%$0.00 E&S Fabric, EC2,3 0.0 ft L 7.0 ft W 0.0 sy $60.00 $0.00 0%$0.00 clear and grub (for wooded sites) 141.0 ft L 54.0 ft W 0.2 acre $24,000.00 $4,195.04 0%$4,195.04 grading (per cy for cut or import only) 0.0 cy fill 1400.0 cy cut 1400.0 cy $13.00 $36,400.00 0%$36,400.00 0 as-built drawings (1k + price per 0.1 mi.) 141.0 ft L 0.0267 mi. 1 lsum $2,000.00 $3,000.00 0%$3,000.00 survey and layout (price per 0.1 mi.) 141.0 ft L 0.0267 mi. 1 lsum $2,000.00 $3,000.00 0%$3,000.00 mobilization 1 lsum $500.00 $500.00 0%$500.00 materials testing 141.0 ft L 0.282 inc of 500' 1 each $200.00 $260.00 0%$260.00 compaction testing 141.0 ft L 0.282 inc of 500' 1 each $200.00 $260.00 0%$260.00 CBR tests (1 every 0.1 mi. per road) 141.0 ft L 0.282 inc of 500' 1 each $200.00 $260.00 0%$260.00 stone depth inspections 141.0 ft L 0.282 inc of 500' 1 each $200.00 $260.00 0%$260.00 pavement inspections 141.0 ft L 0.282 inc of 500' 1 each $200.00 $260.00 0%$260.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0%$0.00 VDOT surety (1 lane) 141.0 ft L 0.0267 mi. 1 Lanes $2,000.00 $534.09 0%$534.09 VDOT maintenance fee (1 ln rd, 1 yr) 141.0 ft L 0.0267 mi. 1 Lanes $150.00 $40.06 0%$40.06 VDOT admin. Cost recovery fee(1 lane) 141.0 ft L 0.0267 mi. 1 Lanes $100.00 $276.70 0%$276.70 cost sum $72,103.90 $72,103.90 proj mgmt $10,815.59 $10,815.59 contingency $8,291.95 $8,291.95 \\Cob-dts01\CityViewLnk\Docs\2013\SUB\SUB201300032 - Grayrock West\Grayrock West road bond estimate.xlsx 3/11/2013 Grayrock West (aka Lanetown) Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sew er) Plan # SUB2013000 Item Item No. Unit Unit Cost Cost Number (installed) % compete adjustment for inflationcost remaining Total $91,220 $91,220 \\Cob-dts01\CityViewLnk\Docs\2013\SUB\SUB201300032 - Grayrock West\Grayrock West road bond estimate.xlsx 3/11/2013