Loading...
HomeMy WebLinkAboutWPO201300036 Bond 2013-05-20 Ana Kilmer From: Ana Kilmer Sent: Tuesday, July 16, 2013 1:17 PM To: Rauzelle J. Smith (RJS4p @virginia.edu); Kenny Thacker Cc: Max Greene; Esther Grace; Glenn Brooks Subject: First Baptist Church Covesville Bond Estimates-wpo-2013-00036 The $43,890 water protection performance bond has been posted and approved (erosion $22,840; stormwater $21,050). The permit and first year inspection fee has been paid.The Stormwater agreement has been approved by the County. Please contact Kenny Thacker to determine when you can set up a pre-construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer @albemarle.org 1 First Baptisti Church Covesville WPO file number:WP0201300036 Erosion and Sediment Control Bond Estimate Item Item No.gm Unit Cost Cost Number (installed) stablizatlon(PS,TS) 1.6 acres $5,000.00 $8800.00 sit fence(SF) 50.0 ft $5.00 $250.00 safety fence(OAF) 00 ft $5.00 $0.00 diversion(00,FD,RWD) 170 ft $13.00 $2,210.00 temporary slope drain(TSD) pipe length 0 ft pipe diameter 0 in $0.00 $080 1 temporary sediment trap(ST or CIP) Method for volume height of dam at toe 3 ft cut at dam 0 ft (lenth)0(total wilt height of dam at face 3 ft cut at high side 5 ft assume face at 2: length of dam 50 ft length of cut 20 ft total width=3o(tot top width 28 ft width of cut 10 ft average height= (comp.61 vol) 97.2 cy (cut vol) 37.0 cy $13.00 length of spillway 12 ft (cy est) 1098 width of spillway 9 ft (spillway stone tors) 12 $50.00 $2,024.38 1 temporary sediment basin(SS) height of dam at toe 0 ft cut at dam 0 ft height of dam at face Ott cut at high side Oft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp.fa vol) 0.0 cy (ad vol) 0.0 cy $1380 length of spilway 0 ft (cy est) 0.0 width of spillway 0 ft (spillway stone tons) 0 $5000 $0.00 riser height 0 ft nser diameter 0 in (riser unit price) $0.00 barrel length 0 ft (price of base) $0 barrel diameter 0 in (barrel unit price) $0.00 bane)collars 0 baffle length 0 ft $0.00 sit fence inlet protection(IP) 0 $100.00 $0.00 stone inlet protection(IP) 0 $200.00 $0.00 outlet protection(OP) length 15 ft width 10 ft 0 $675.00 $0.00 channel(SCC,matted) length 200 ft width 6 ft 0 $1,560.00 check dam depth in channel 1 ft charnel width 10 ft 0 $22600 $0.00 construction entrance(CE) 1 $2,000.00 $2,00000 wash rack 02,00080 paved construction entrance 0 83,500.00 $0.00 rip-rap,placed depth 2 ft length 1.0 ft width 1.0 (tons) 815 $60.00 $9.00 sundry d layout(price per 0.1 mi.) acres 1 rvey traps and basins 2 $1,500.00 mobilization $50080 stream crossing(computed independently) cost sum $18,053.38 proj mgmt 02,708.01 contingency $2,076.14 Total $22,840 6/3/2013 Nrisre ,0000, zg * -n 3 3 « D ; cr 0 2 7 D I ° , 8a@ IVUIU 1IIII !§ a ; & ! -_ - } \; ' � ia 7F, k \ E * / i ; ; ;2 }] E2 }� ; ; § & CD * � } 4343\ \ / \ R. to,.. — 0 �� ` J k ) \ _ co b # ! 3 2 a, = e £ » E £ a7^# iT « ! m _ 55) !47, \ 8 4335 / ! } / Fo ! i7} ■ 33 E a a _�"3_ g. ! „ iiI) CL CI cn cn o : k� }\ 20 a 4343} � ES,* , , 000 , 0 = o § O /a / } \ 8 , 8 = =,2 � � . ` ° \ E ] \ 2 — & 0 0 0 0 8888888 8 8 88888 / \ # _- esama »aq _ d o „ o o , _ # 0 ; $ 004 - 07 §70 / � Gm « p , p o o o e o ao , , , o 8 8 888888 8888888 8 8 cacao , cn ry Ki o