Loading...
HomeMy WebLinkAboutWPO201300030 Bond 2013-04-19 Ana Kilmer From: Ana Kilmer Sent: Thursday, To: 'Wm Ashwell'; Kenny Thacker; Ray Lilly Co: Esther Grace Subject: WPO 2013-00030 Surplus Soil Disposal Area Wetsel Property The $44,730 water protection performance bond has been posted and approved (erosion only). The permit and first year inspection fee has been paid. Please contact Ray Lilly to set up the pre-construction meeting. Thanks Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 Mclntire Road Charlottesville, VA 22902 434'296'5832 aki{mner0Da|bemade.urg Surplus Soil Disposal Area:Wetsel Property WPO file number: WP0201300030 Erosion and Sediment Control Bond Estimate Item Item yo.Unit Unit Cost Cost Number figstslledl stablieation(PS,TS) 3.0 acres $5,000.00 015,000.00 Mb fence(SF) 100.0 ft $5.00 $500.00 safety fence(SAF) 0.0 ft $0.00 $0.00 diversion(DD,FD,RWD) 1000 ft $13.00 $13,000.00 temporary slope drain(TOD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 temporary sediment trap(ST or CIP) Method for volume height of dam at toe 6 ft M at dam 0 ft (lents)z(total widt height of dam at face 4 ft cut at high side 0 ft assume face at 2: length of dam 50 ft length of cut 0 ft total width=34go, top width 6 ft width of cot 0 ft average height=( (comp.fill col) 296.3 cy (cut vol) 0.0 cy $13.00 length of spillway 15 ft (cy est) 296.3 width of spillway 18 ft (spillway stone tons) 0 050.00 03,851.85 nit fence inlet protection(IP) 0 $100.00 $0.00 stone inlet protection(IP) 0 $200.00 $0.00 outlet protection(OP) length 15 ft width 10 ft 0 $675.00 $000 channel(SCC,matted) length 0 ft width 0 ft $0.00 check dam depth in channel 0 ft channel width 0 ft 1 $0.00 $000 constructon entrance(CE) 1 $2,000.00 $2,00000 wash rack $2,000.00 paved construction entrance 0 $3,500.00 $0.00 hp-rap,placed depth 0 ft length 1.0 ft width 1.0 (tone) 0 060.00 $0.00 survey and layout(price per 0.1 mi.) acres 0 traps and basins 1 $500.00 mobil¢ation $500.00 stream crossing(computed independently) cost sum $35,351.85 prof mgmt $5,302.78 contingency $4,065.46 Total $44,730 • 4/24/2013