Loading...
HomeMy WebLinkAboutWPO201300022 Bond 2013-03-27 4tosoc Noe. E 45 Q 00 _C IS CO L L _ 0 O M C Co O .D O.) 0 CO V? a) O 0 ++ a O c E w *) a) 0.0 L a) Co a) E C U C O E V) L 4-, 0 C 4.+ L (C a.d Q IA O 3 ate c ) Z E 'a 0 -. NO O p 0 12 D. C iii O ++ N M a> M C m p p Lo L °u c N G m VI 00 ) -0 c0.) ,- ` a)Q LO N a 4- c6 p CO p N a) 0) I� v) > 0. 0 Y L co -0 C > N p co 0 of 0- v a) a) p d 'O > t N >.+.-, C > N O co O C 3 L C .� O 03 CC > O. L 'a CW .(A L a) a .," 1 1 2- a) c O Y • > Q ' "O "a E a) a co -o C C C a) a C m m m O C of U L(n a) c .a a1 0 0 (0 0) . E >` • 0. C co co L L]. a a) id,o c w Co E E c .E a) E (0 co X E O O p m 2 C O 4c L a) t a) a) p >- L Co. Q F—Q U 5. a) a) a s v 4., p a) a) C co co N c c0 4., N Co. O aC cc I C F- p aO, L u \ \ c0 Co > I E N O CH 4 C C 3 C T v FA N a O O p E v (o co O "O < O d .H (/) L ,_ Y E (0 CD C +p� "C 'C NO Q CO U a C a M.0 a) < y>, > 00 f0 CU CD r a) , VI vO) F- F. O O E p co C a) s Y >. Y >.. = t L 00 E s. d 0 v 7 L p L 6g 0 0 0 c M Yc < LL to F—0 cn F— a I— Q .e U O Tr O (o Project Name Whittington Subdivision - Phase A WPO file number: WPO201300022 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)23.7 acres $5,000.00 $118,500.00 silt fence (SF)5500.0 ft $5.00 $27,500.00 safety fence (SAF)1450.0 ft $5.00 $7,250.00 diversion (DD, FD, RWD)750 ft $13.00 $9,750.00 temporary slope drain (TSD)pipe length 20 ft pipe diameter 15 in 0.0 $35.00 $1,200.00 1 temporary sediment trap (ST or CIP)Method for volume comp: height of dam at toe 1.8 ft cut at dam 3 ft (lenth) x (total width) x (average height) / 27 for cubic yards height of dam at face 1.8 ft cut at high side 10 ft assume face at 2:1, toe at 3:1 length of dam 50 ft length of cut 50 ft total width = 3x(toe height) + 2x(face height) + top width top width 2 ft width of cut 15 ft average height = (toe height + face height) / 2 (comp. fill vol)36.7 cy (cut vol)493.5 cy $13.00 length of spillway 30 ft (cy est)505.7 width of spillway 9 ft (spillway stone tons)30 $50.00 $8,074.63 1 temporary sediment basin (SB) height of dam at toe 8 ft cut at dam 3 ft height of dam at face 6 ft cut at high side 6 ft length of dam 120 ft length of cut 119 ft top width 10 ft width of cut 96 ft (comp. fill vol)1431.1 cy (cut vol)2261.0 cy $13.00 length of spillway 100 ft (cy est)2738.0 width of spillway 15 ft (spillway stone tons)225 $50.00 $46,844.48 riser height 7 ft riser diameter 48 in (riser unit price)$150.00 barrel length 75 ft (price of base)$200 barrel diameter 24 in (barrel unit price)$50.00 barrel collars 2 baffle length 15 ft $5,700.00 2 temporary sediment basin (SB) height of dam at toe 8 ft cut at dam 0 ft height of dam at face 4 ft cut at high side 6 ft length of dam 150 ft length of cut 95 ft top width 10 ft width of cut 59 ft (comp. fill vol)1400.0 cy (cut vol)749.4 cy $13.00 length of spillway 160 ft (cy est)1649.8 width of spillway 10 ft (spillway stone tons)240 $50.00 $33,447.59 riser height 7 ft riser diameter 48 in (riser unit price)$150.00 barrel length 80 ft (price of base)$200 barrel diameter 24 in (barrel unit price)$50.00 barrel collars 2 baffle length 70 ft $7,050.00 3 temporary sediment basin (SB) height of dam at toe 4 ft cut at dam 0 ft height of dam at face 4 ft cut at high side 4 ft length of dam 220 ft length of cut 118 ft top width 10 ft width of cut 49 ft (comp. fill vol)977.8 cy (cut vol)498.2 cy $13.00 length of spillway 35 ft (cy est)1143.9 width of spillway 10 ft (spillway stone tons)52.5 $50.00 $17,495.07 riser height 2.4 ft riser diameter 18 in (riser unit price)$40.00 barrel length 50 ft (price of base)$200 barrel diameter 12 in (barrel unit price)$35.00 barrel collars 1 baffle length 136 ft $4,966.00 silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)5 $200.00 $1,000.00 outlet protection (OP)length 15 ft width 10 ft 6 $675.00 $4,050.00 channel (SCC, matted)length 3875 ft width 8 ft $40,300.00 check dam depth in channel 1 ft channel width 8 ft 6 $180.00 $1,080.00 construction entrance (CE)0 $2,000.00 $0.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 1 $3,500.00 $3,500.00 rip-rap, placed depth 2 ft length 1.0 ft width 1.0 (tons)0.15 $60.00 $9.00 survey and layout (price per 0.1 mi.)acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently) cost sum $341,716.78 proj mgmt $51,257.52 contingency $39,297.43 Total $432,280 8/12/2013 Project Name Whittington Subdivision - Phase A WPO file number: WPO201300022 Stormwater Management Plan Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) site clearing permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet)0 ea $500.00 $0.00 manhole structure (per ft. rise)0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48")0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 1 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill vol)0.0 cy (cut vol)0.0 cy $13.00 length of spillway 0 ft (cy est)0.0 width of spillway 0 ft (spillway stone tons)0 $50.00 $0.00 (price of base)$0 barrel collars 0 baffle length 0 ft $0.00 trees 0 ea $150.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 570 ea $5.00 $2,850.00 underdrain (LF)0 ft $5.00 $0.00 biofilter soil mix (CY)0 cy $38.00 $0.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF)630 ft $50.00 $31,500.00 aggregate base or drainage stone 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $35.00 $0.00 2 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill vol)0.0 cy (cut vol)0.0 cy $13.00 length of spillway 0 ft (cy est)0.0 width of spillway 0 ft (spillway stone tons)0 $50.00 $0.00 (price of base)$0 barrel collars 0 baffle length 0 ft $0.00 trees 21 ea $150.00 $3,150.00 shrubs 63 ea $50.00 $3,150.00 seedlings 0 ea $5.00 $0.00 underdrain (LF)126 ft $5.00 $630.00 biofilter soil mix (CY)313 cy $38.00 $11,894.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF)1000 ft $50.00 $50,000.00 aggregate base or drainage stone 1.0 ft d 130.0 ft L 20.0 ft W 2600.0 ton $35.00 $91,000.00 3 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill vol)0.0 cy (cut vol)0.0 cy $13.00 length of spillway 0 ft (cy est)0.0 width of spillway 0 ft (spillway stone tons)0 $50.00 $0.00 (price of base)$0 barrel collars 0 baffle length 0 ft $0.00 trees 13 ea $150.00 $1,950.00 shrubs 38 ea $50.00 $1,900.00 seedlings 0 ea $5.00 $0.00 underdrain (LF)120 ft $5.00 $600.00 biofilter soil mix (CY)305 cy $38.00 $11,590.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF)0 ft $50.00 $0.00 aggregate base or drainage stone 1.0 ft d 80.0 ft L 30.0 ft W 2400.0 ton $35.00 $84,000.00 rip-rap, placed depth 0 ft length 1.0 ft width 0.0 (tons)0 $60.00 $0.00 survey and layout (price per 0.1 mi.)acres 1 basins 3 $2,000.00 mobilization $500.00 as-built drawings (per facility)1 ea $2,000.00 $2,000.00 materials testing (per facility)1 ea $2,000.00 $2,000.00 compaction testing (per dam)1 ea $5,000.00 $5,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) cost sum $308,714.00 proj mgmt $46,307.10 contingency $35,502.11 Total $390,530 8/12/2013 c„)q-' 1 .-(!) Internal Use Only 3 Date Received: G Fee Paid: �� ' . Received by: % +IQ(jj1A'r? p 0.7QA Intake: Forward t. anagement Analyst U ��■ tVlar." qt-1 BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.) E&SC Plan and SWM Plan for Whittington Subdivision-Phase A All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be approved prior to bond estimates being prepared. OX TM 89/95 Triumph W 't' ngton, LLC TAX MAPs/PARCELs: OWNER'S NAME: M� �. 45146,47, SIGNATURE: ��/7// fAlp date-77/773 (0( TAX MAPs/PARCELs: &48 OWNER'S NAME: Triumph W 'ttington, LLC SIGNATURE: date: 7M.../, 3 TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; ® Erosion&Sediment Control per Water Protection Ordinance section 17-207 ® Stormwater Management per Water Protection Ordinance section 17-306 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water& Sewer per Subdivision Ordinance section 14-435; $250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: ►✓fib✓ v1∎'GOr►7rnc-v'ci•ea-,•eari' OR REGULAR MAIL ADDRESS: It(LIAL "?.,{4 it.e./6/04 4wzo/2Q1 pi Revised 11/1/2011