COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax (434) 972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE
PROJECT NAME: C--rC27P71— (Add./7 c.,<„,4
PLAN/PERMIT NO. 2 13 - Jo/ z
DATE: 26 (bc_-'C._ /3
This project has been satisfactorily completed and the erosion control performance bond may be
released at this time if all erosion control inspection fees invoiced have been paid.
4�a ^ Erosion Contri I Inspector - 01Y\47.-\<--,, 14 zi A IZI -11 1-0/3
Community evelopment Department
All erosion control Inspection fees invoiced on the above project have been collected.
Director of Community Development/County Engineer
Date
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
-- Cc: Ana Kilmer -
I:IDEPT\Communhy Develop en0Forms1InspedlonslEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012.doc
(-)74/ i? 1. D
STQRMMWkTER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: (/9 Zl?F tA/1/ frY)I`1 cA,4
PLAN/PERMIT NO. 2- v/ 3 _.. 0 4.1- 1-z_
DATE: Z6 ✓Q-c (3
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all erosion control inspection fees invoiced have been paid.
,4,../
•
Erosion Control Inspector
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer
1:1DEPT1Communlly Development\FormslInspeclions1STORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc
Ana Kilmer
From: Ana Kilmer
Sent: Thursday, June 06, 2013 4:12 PM
To: 'Mike Carmagnola'; Mark Hopkins; Kenny Thacker
Cc: Mark Graham; Esther Grace; Glenn Brooks
Subject: Crozet United Methodist Church -wpo-2013-00012
The$51,860 water protection performance bond has been posted and approved (erosion$46,040; Mitigation $5,820).
The following fees have been paid:
1. Permit and first year inspection fee
2. Lickinghole basin fee
Please contact Mark Hopkins at 434-996-0810 to determine when you can schedule your pre-construction meeting.
Thanks
Ana D. Kilmer
Management Analyst
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
Crozet United Methodist Chruch renovations
WPO file number: WP0201300012
Erosion and Sediment Control Bond Estimate
Item Item No.Unit Unit Cost Cost
Number jjnstalledt
stabltrabon(PS,TS) 1.3 acres $5,000.00 $6,657.48
silt fence(SF) 5401 ft $5.00 $2,700.00
safety fence(SAF) 3010 ft $5.00 $1,50010
diversion(DD,FD,RWD) 480 ft $13.00 $6,240.00
temporary slope drain(TSD) pipe length 0 ft pipe diameter 15 in $3100 $0.00
1 temporary sediment trap(ST or CIP) Method for volume
height of dam at toe 0 ft cut at dam 4 ft (tenth)x(total veldt
height of darn at face 0 ft cut at high side 0 ft assume face at 2:
length of dam 0 ft length of cut 50 ft total width=3x(tot
top width 0 ft width of cut 20 ft average height=(
(comp.fill von 0.0 cy (cut vol) 1017 cy $13.00
length of spillway 10 ft (cy est) 103.7
Width of spilEnay 4 ft (spillway stone tons) 0 $50.00 $1148.15
1 temporary sediment trap(ST or CIP)
height of darn at toe 3 ft cut at darn 2 It
height of dam at face 4 ft cut at high side 0 ft
length of darn 60 ft length of cut 50 ft
top width 4 ft width of cut 10 ft
(comp.fill yob 1613 by (cut vol) 25.9 cy $1310
length of spilhvay 10 ft (cy est) 172.0
width of spillway 4 ft (spillway stone tons) 0 $50.00 $2,235.68
sit fence inlet protection(IP) 0 $100.00 $0.00
stone inlet protection(IP) 8 $200.00 $1.600.00
outlet protection(OP) length 60 ft width 10 tt 1 $2,700.00 $2,700.00
channel(SCC,matted) length 210 ft width 6 ft $1,638.00
check dam depth in channel 2 ft channel width Eft 1 $270.00 $27100
construction entrance(CE) 2 $2,000.00 $4,000.00
wash rack $2,000.00
paved construction entrance 1 $3,500.00 $3,500.00
rip-rap,placed depth 0 ft length 10 ft
width 01 (tons) 0 $60.00 $0.00
survey and layout(prise per 0.1 mi.) acres 1 traps and basins 2 $1,50100
mobilization $50100
cost sum $36,389.31
prof mgmt $5,458.40
contingency $4,184.77
Total 346,040
5/28/2013
`tare
Crozet United Methodist Church renovations
WPO file number:WPO201300012
Stonnwater Management Plan Bond Estimate
Item tern Na Unit Lint Cost Cyst
Number (installed)
trees 23 ea $150.00 $3,450.00
shrubs 13 ea $50.00 $650.00
seedldigs 0 ea $5.00 $0.00
uaerdrein(LF) 0 ft $500 $0.00
biker soil mix(CY) 0 cy $3800 $0.00
trash rack/anti vortex devices 0 ft $1,500.00 $0.00
maintenance access road(LF) 0 ft $50.00 $000
rip-rap.placed depth 0 ft length 0.0 ft
width 00 (tons) 0 $60.00 $0.00
survey and layout(vice per 0.1 mi.) sores 0 basins 0 $0.00
mobilization $500.00
as-built drawings(per facility) 0 ea $2.00000 $0.00
materiels testing(per facility) 0 ea $2,000.00 $0.00
compaction testing(par am) 0 ea $5,000.00 $0.00
manufactured facilities(attach manufacturer's or contractors take as a base)
cost sum $4.600.00
Pry mgmt $690.00
contingency $52900
Total $5,820
5/28/2013
teroal Use Only t Now"Now" / 'ono"
[n
Date Received: ;( j`,f// Fee Paid: / `f
Received by: I"'1'ii!�!
Intake: Form to Management Analyst
66p0 z /3 06)(9/ -
BOND ESTIMATE REQUEST
APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.)
All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
7M
A2-01-l7
TAX MAPs/PARCELs: OWNER'S, AME: C(9UT U/VI T i) /IE7.0b/Sf ckvecif
SIGNATURE: 4 Ol�N-
.•� ' date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
The requested estimates are;
Erosion&Sediment Control per Water Protection Ordinance section 17-207
❑ Stormwater Management per Water Protection Ordinance section 17-306
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
The estimate must be sent to the owner. Please provide contact information.