Loading...
HomeMy WebLinkAboutWPO201300012 Bond 2013-02-11 Nee 40Y AL, eXigiilly Nursof 8 Fromm COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax (434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: C--rC27P71— (Add./7 c.,<„,4 PLAN/PERMIT NO. 2 13 - Jo/ z DATE: 26 (bc_-'C._ /3 This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. 4�a ^ Erosion Contri I Inspector - 01Y\47.-\<--,, 14 zi A IZI -11 1-0/3 Community evelopment Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date -- Cc: Ana Kilmer - I:IDEPT\Communhy Develop en0Forms1InspedlonslEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012.doc (-)74/ i? 1. D STQRMMWkTER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: (/9 Zl?F tA/1/ frY)I`1 cA,4 PLAN/PERMIT NO. 2- v/ 3 _.. 0 4.1- 1-z_ DATE: Z6 ✓Q-c (3 This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. ,4,../ • Erosion Control Inspector Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer 1:1DEPT1Communlly Development\FormslInspeclions1STORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc Ana Kilmer From: Ana Kilmer Sent: Thursday, June 06, 2013 4:12 PM To: 'Mike Carmagnola'; Mark Hopkins; Kenny Thacker Cc: Mark Graham; Esther Grace; Glenn Brooks Subject: Crozet United Methodist Church -wpo-2013-00012 The$51,860 water protection performance bond has been posted and approved (erosion$46,040; Mitigation $5,820). The following fees have been paid: 1. Permit and first year inspection fee 2. Lickinghole basin fee Please contact Mark Hopkins at 434-996-0810 to determine when you can schedule your pre-construction meeting. Thanks Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org Crozet United Methodist Chruch renovations WPO file number: WP0201300012 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number jjnstalledt stabltrabon(PS,TS) 1.3 acres $5,000.00 $6,657.48 silt fence(SF) 5401 ft $5.00 $2,700.00 safety fence(SAF) 3010 ft $5.00 $1,50010 diversion(DD,FD,RWD) 480 ft $13.00 $6,240.00 temporary slope drain(TSD) pipe length 0 ft pipe diameter 15 in $3100 $0.00 1 temporary sediment trap(ST or CIP) Method for volume height of dam at toe 0 ft cut at dam 4 ft (tenth)x(total veldt height of darn at face 0 ft cut at high side 0 ft assume face at 2: length of dam 0 ft length of cut 50 ft total width=3x(tot top width 0 ft width of cut 20 ft average height=( (comp.fill von 0.0 cy (cut vol) 1017 cy $13.00 length of spillway 10 ft (cy est) 103.7 Width of spilEnay 4 ft (spillway stone tons) 0 $50.00 $1148.15 1 temporary sediment trap(ST or CIP) height of darn at toe 3 ft cut at darn 2 It height of dam at face 4 ft cut at high side 0 ft length of darn 60 ft length of cut 50 ft top width 4 ft width of cut 10 ft (comp.fill yob 1613 by (cut vol) 25.9 cy $1310 length of spilhvay 10 ft (cy est) 172.0 width of spillway 4 ft (spillway stone tons) 0 $50.00 $2,235.68 sit fence inlet protection(IP) 0 $100.00 $0.00 stone inlet protection(IP) 8 $200.00 $1.600.00 outlet protection(OP) length 60 ft width 10 tt 1 $2,700.00 $2,700.00 channel(SCC,matted) length 210 ft width 6 ft $1,638.00 check dam depth in channel 2 ft channel width Eft 1 $270.00 $27100 construction entrance(CE) 2 $2,000.00 $4,000.00 wash rack $2,000.00 paved construction entrance 1 $3,500.00 $3,500.00 rip-rap,placed depth 0 ft length 10 ft width 01 (tons) 0 $60.00 $0.00 survey and layout(prise per 0.1 mi.) acres 1 traps and basins 2 $1,50100 mobilization $50100 cost sum $36,389.31 prof mgmt $5,458.40 contingency $4,184.77 Total 346,040 5/28/2013 `tare Crozet United Methodist Church renovations WPO file number:WPO201300012 Stonnwater Management Plan Bond Estimate Item tern Na Unit Lint Cost Cyst Number (installed) trees 23 ea $150.00 $3,450.00 shrubs 13 ea $50.00 $650.00 seedldigs 0 ea $5.00 $0.00 uaerdrein(LF) 0 ft $500 $0.00 biker soil mix(CY) 0 cy $3800 $0.00 trash rack/anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road(LF) 0 ft $50.00 $000 rip-rap.placed depth 0 ft length 0.0 ft width 00 (tons) 0 $60.00 $0.00 survey and layout(vice per 0.1 mi.) sores 0 basins 0 $0.00 mobilization $500.00 as-built drawings(per facility) 0 ea $2.00000 $0.00 materiels testing(per facility) 0 ea $2,000.00 $0.00 compaction testing(par am) 0 ea $5,000.00 $0.00 manufactured facilities(attach manufacturer's or contractors take as a base) cost sum $4.600.00 Pry mgmt $690.00 contingency $52900 Total $5,820 5/28/2013 teroal Use Only t Now"Now" / 'ono" [n Date Received: ;( j`,f// Fee Paid: / `f Received by: I"'1'ii!�! Intake: Form to Management Analyst 66p0 z /3 06)(9/ - BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.) All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. 7M A2-01-l7 TAX MAPs/PARCELs: OWNER'S, AME: C(9UT U/VI T i) /IE7.0b/Sf ckvecif SIGNATURE: 4 Ol�N- .•� ' date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; Erosion&Sediment Control per Water Protection Ordinance section 17-207 ❑ Stormwater Management per Water Protection Ordinance section 17-306 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: �V)rc r ;loll ') rail. eau- [ Z 'c-e-'/fphrne)J OR REGULAR MAIL ADDRESS: &)r) (s_ Revised 11/1/2011 .11.