Loading...
HomeMy WebLinkAboutWPO201100042 Bond 2011-07-06 Ana Kilmer From: Ana Kilmer Sent: Wednesday, November 09, 2011 4:06 PM To: 'Jamie C. Dunaway'; Kenny Thacker; Philip Custer Cc: Esther Grace Subject: Crown BMW Retail Parts&Service Building-Water Protection Performance Bond- W P0-2011-00042 The $283,700 water protection performance bond has been posted and approved(erosion$26,500;stormwater $257,200). The stormwater agreement was recorded on 9/20/2011. The permit and first year inspection fee has not been paid. Ms. Dunaway: Prior to setting up the preconstruction meeting, you need to pay the permit and first year inspection fee of$28 ($100/per disturbed acre). Please make check payable to the County of Albemarle and submit to my attention. Thank you. l ,t 2--- Ana D. Kilmer County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmerPalbemarle.org Philip Custer From: Philip Custer Sent: Friday, August 19, 2011 5:41 PM To: 'Ankita Kot'; 'Ankita Kot' Cc: Ana Kilmer Subject: Crown WPO Bonds Akita, The ESC and SWM bonds have been calculated for the Crown Project(WPO-2011-00042). The ESC bond has been computed to be$26,500. The SWM bond has been computed to be$257,200. To post the bond, please contact Ana Kilmer after reviewing the forms online. Please let me know if you have any questions. Thanks, Phil (434) 296-5832 x3072 1 PROJECT NAME: Crown BMW Retail Parts&Service Building FILE#: WPO-2011-00042 DATE APPROVED: Pending Item Unit Amount Unit Cost Subtotal Filterra 4x6 each 3 $8,100.00 $24,300 Filterra 4x12 each 1 $12,900.00 $12,900 Filterra 6x8 each 1 $11,700.00 $11,700 Filterra Installation per project 5 $12,225 Stormfilter 1 (2 cartridges) each 1.00 $9,020.00 $9,020.00 from engineer Stormfilter 2(3 cartridges) each 1.00 $11,550.00 $11,550.00 from engineer Stormfilter 3(3 cartridges) each 1.00 $11,550.00 $11,550.00 from engineer Stormfilter Installation per project 3 $8,030 CM underground detention each 1.00 $68,000.00 $68,000 from engineer detention installation each 1.00 $34,000.00 $34,000 (50%of cost of facility) subtotal $203,275 project management $30,491 subtotal $233,766 10%Contingency $23,377 TOTAL $257,143 ROUNDED TOTAL $257,200 min total after reduction $51,440 BOND ESTIMATE-EROSION CONTROL Spreadsheet last revised:12-5-01 PROJECT NAME: Crown BMW Retail Parts&Service Building PROJECT NUMBER: WPO-2011-00042 DATE OF ESTIMATE: 08/19/11 ESTIMATE BY: PBC BASED ON: plans signed 6-29-11 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED,FERTILIZE,MULCH ACRE 2.8 1500 4200 SILT FENCE LF 180 5 900 SAFETY FENCE LF 600 3 1800 TREE PROTECTION FENCE LF 360 3 1080 DIVERSION DIKE LF 420 3 1260 SEDIMENT BASIN 1 ACRES 2.5 1000 2500 INLET PROTECTION EA 16 200 3200 PAVED CONSTRUCTION ENTRANCE EA 3 2000 6000 subtotal 20940.00 project management 3141.00 subtotal 24081.00 CONTINGENCY LS 10% 2408.10 TOTAL 26489.10 BOND AMOUNT REQUIRED ( 26500.001