Loading...
HomeMy WebLinkAboutWPO201400063 Bond 2014-07-07Project Name WPO file number: wpo201400 Stormwater Management Plan Bond Estimate Item Item Number permanent diversm or ditch standard manhole frame top (not inle drop inlet or grate manhole struct (per ft. rise) pipe, rcp, cmp(15 to 48 ") 60.0 in tl pipe, top, cmp(15to48") 30.0 in d pipe, rcp, cmp (15 to 48 ") 15.0 in tl aggregate base or drainage stone 12.0 in tl earthwork for trapNasin 0 ES -1,2 $450.00 height of dam at toe 260.0 ft height of fill at face 25.0 ft W length of dam 0 ft top Wdth 0 ft (a-above Vansifien) 0 ft (total width of dam) 0 ft (height below transition 0 ft (area below Idensihon) 0 ft (total fill volume) 0 ft length of spillway 0 ft witlth of spillway structures for basin (arcs below Vansltlo,) 0 sf ser height 0 fl er diameter 0 ft barrel length 0 It barrel diameter trees shrubs seedlings undardrain(LF) bioflter soil mix (CV) trash deck/ anti wdex devices maintenance access road (LF) np -rap, placetl depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1 besets mobilisation as -built dm ings(per facility) materials testlng (par facility) compaction testing (per dam) manufactured facilities (attach manufacturers or contractor's price as a base 0.0 ft 0 1 No. Unit Unit Cost Cost (installed) 0 ft 0 ES -1,0 $0.00 0 EC -1 $500.00 0 ES -1,1 5 as 0 EC -0 $17,500.00 0 ES -1,2 $450.00 0 EC -1 260.0 ft 60.0 ft L 25.0 ft W 200.0 ft 0 ft cut at high side 0 ft $35.00 0 ft cut at face 0 ft $3,675.00 0 ft length of cut 0 ft 0 ft With of cut 0 ft 0 sf (arcs below Vansltlo,) 0 sf 0 fl (total wish of cut) 0 ft 0 It (depth low lransilion 0 fl 0 sf (area above transition) 0 sf 0.0 cy (total fill volume) 0.0 cy 0 ft (TOAL CV estimate) 0 cy 0 ft (spillway stone Ions) 0 tons 0 f 0 in (riser unit price) $000 0 ft base plate . or ton 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft trees shrubs seedlings undardrain(LF) bioflter soil mix (CV) trash deck/ anti wdex devices maintenance access road (LF) np -rap, placetl depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1 besets mobilisation as -built dm ings(per facility) materials testlng (par facility) compaction testing (per dam) manufactured facilities (attach manufacturers or contractor's price as a base 0.0 ft 0 1 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 4 as $500.00 $2,000.00 5 as $3,500.00 $17,500.00 32 ft $450.00 $14,400.00 260.0 ft $200.00 $52,000.00 200.0 ft $65.00 $13,000.00 205.0 ft $35.00 $7,175.00 105.0 ton $35.00 $3,675.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 4 ea $150.00 $600.00 12 ea $50.00 $600.00 0 as $5.00 $0.00 200 ft $5.00 $1,000.00 140 cy $38.00 $5,320.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $0.00 $1,000.00 $500.00 1 as $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 as $5,000.00 $5,000.00 i cost sum $127,770.00 pmt mgml $19,165.50 contingency $14,693.55 Total $161,630 9/12/2014 Project Name WPO file number: Erosion and Sediment Control Bond Estimate Item Item Number stabluation (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RW D) temporary stape drain (TSD) pipe length earthwork for tmp/basin 2 it cut at high side height of dam at too 2 ft height of fill at face 2 it length of dam length of cut tap width 2.5 It (area above transition) 67 it (total width of tlam) (area below transition) (height below Transition) 4 ft larea below Transition) 71 it length of spillway (depth below Imnsitior width of spillway structures for basin (area above transition) -75 sf riser height (total 811 volume) rear diameter 6 it barrel length 78 cy barrel diameter sift fence inlet protection (IP) 3.5 tons stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) 0 in wash rack -. . paved construction entrance barrel collars rip -rap, placed depth baffle length width survey and layout (price par 0.1 mi.) acres mobilization 780 it stream crossing (computed independently) 15 it pipe diameter 18 in 2 it cut at high side 0 it 2 ft cut at face 2 it 40 ft length of cut 29 it 2.5 It width of cut 67 it 13 sf (area below transition) 142 at 4 ft (total witlth of cut) 71 it 0 ft (depth below Imnsitior -2 ft 0 sr (area above transition) -75 sf (total 811 volume) 72.0 cy 6 it (TOAL CV estimate) 78 cy 10 ft (spillway stone tons) 3.5 tons 0 it 0 in $0.60 0 ft base plate or fdn 0 0 in -. . barrel collars 0 baffle length 0 it 15 it width 10 it 780 it width 4 It 1 it channel width 10 it 0 it length 0.0 it 0.0 ns) 0 Lon, 1 traps and basins 1 No. Unit Unit Cost cost (installed) 2.8 acres $5000.00 $14,000.00 1530.0 it $5M $7,650.00 0.0 it $5.00 $0.00 400 it $13.00 $5,200.00 $40.00 $1,100.00 I cost sum prq mgmt contingency Total $13.00 $50.00 i $200.00 $50.00 $100.00 $20000 $67500 :tom $1,014.00 $175.00 $0.00 $0 $0.00 $0 $0 $0.00 $1,400.00 $1,350.00 $4,056.00 $4,725.00 $0.00 $2,000.00 $3,500.00 $0.00 $1,000.00 $500.00 $0.00 $47,670.00 $7,150.50 $5,482.05 $60,310 9/12/2014 Internal Use O y 4°'1 AL l f Faid: 1 8110 aii Intake: Forward to Management Analyst w *-11k...11091 ,/ i �fiGlNl �/ REQUEST TO ESTABLISH A BOND APPROVED PLAN# (,ti1 U e O/ LI G 0 0 (o PROJECT NAME: (\l Q., C k.t)r- c11 (As listed on the approved plan) All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. TAX MAPs/PARCELs: / / / C )OWNER'S NAME: IV e. SIGNATURE: A� ttl. (2 L date: 9 14114 TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership, limited liability company, trust, association,etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; ❑ VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207; $0 fee VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water Protection Ordinance section 17-208; $250 fee required El Subdivision (roads,drainage, etc.)per Subdivision Ordinance section 14-435; &Water& Sewer per Subdivision Ordinance section 14-435; $250 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: P'\l e rn.ck c_0 OR REGULAR MAIL ADDRESS: Revised 6/20/2014