HomeMy WebLinkAboutSUB201300030 Certified Engineer's Report 2022-10-28Asphalt Placement Report CroOf &Robertson, Inc. VX�K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Client: Reciplerks: Stanley Martin Homes Lance Taylor 11710 Plaza America Drive Reston VA 20190 ' Project: Westlake Hills Phase II, III, and IV Westlake Hills Crozet VA 22932 Location: Road - Driving Lane Report #: Work Order #: Bldg Permit No.: ADEN:7120-05556 7120-05556 The results provided herein relate only to the items inspected and/or tested. This report shall not be reproduced, except in full, vnthout the prior written approval of F&R. Reviewed By: Taylor Lance J Review Date: 10/02/2020 Activity Date: 09/22/2020 cation Details 150' section of Eastern Ave. between Jonna and Westhall - grade corrections. Inspection Type: Observation Personnel: Gilmer Ronald A Frequency: Continuous Weather: Sunny Title: Technician Wind Speed: 3 mph Air Temp: 72°F . Field Notes W M F&R representative on site as requested for observation of asphalt placement and testing. Contractor SL Williamson making surface grade correction on approximate 150' section of Eastern Ave. between Jonna and Westhall. Picture attached. Two lifts of approximately 5 inches each being placed and the final scheduled for tomorrow with a surface lift, also. Middle of graded section being raised up to 15 inches and tapering to minimal at the ends. Testing at middle all three lanes and approximately 25' in from each of the tapered ends north and south. Form No: 190032 A -Asphalt Placement Report Page 1 of 4 Asphalt Placement Report Freehling &Robertson, Inc. X_ K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Activity Date: 09/22/2020 Report No.: ADEN:7120-05556 Client Name: Stanley Martin Homes Project Name: Westlake Hills Phase II, III, and IV Project No.: 71 V0037 Work Order No.: 7120-05556 1 Field Information 1.1 Asphalt Contractor: SL Williamson 1.2 Asphalt Supplier: SL Williamson ' 1.3 Paving Start Time: 1000 1.4 Paving Finish Time:1440 2 Equipment Type & Quanti . Paver, sweeper, skid steer, tack truck, and 2 Hamm H14 dual smoothdrum rollers. 3 Labor Type & Quantity: 14 men r4 Course Summary 4.1 Mix ID: IM19 4.2 Quantity Placed: 360.8 tons 4.3 Required Thickness: 5.00 in. 4.4 Tack Coat Applied? Yes 4.5 Required Compaction: 92.0 % 4.6 Roller Pattern: 4V:1S 5 Pre -Placement Location clean and slightly milled surface asphalt as lifts are to raise road elevation 6 Test Method: 6.1 Value: 2.619 6.2 Provided By: Supplier 7 Samples 7.1 Quantity Taken: 7.2 Performed By: Temperature Log middle of middle lane 1100 285.0 'F 308.0 'F middle N bound lane 1230 311.0 'F 315.0 'F middle of middle lane 1330 238.0 'F 290.0 'F 'F 'F 'F 'F 'F 'F 'F 'F 'F 'F Form No: 190032 A -Asphalt Placement Report Page 2 of 4 09/22/2020 Asphalt Placement Report Activity Date: ADEN:712 P P Report No.: ADEN:7120-05556 �^ ^ Freehling & Robertson, Inc. Client Name: Stanley Martin Homes VX�K Crozet Office Project Name: Westlake Hills Phase II, III, and IV 6185 Rockfish Gap Turnpike Crozet, VA 22932 Project No.: 71VO037 Phone: 434.823.5154 www.FandR.com Work Order No.: 7120-05556 9"a cy S '0-a sr Description: Easter Ave. paving grade correction 4 Date Taken: 09/22/2020 QAI.Mae's Taken By: AG i All highlighted areas paved. Yellow received deepest lifts with up to 15" in middle. Green minimal lifts as roadway tapered c% back to original surface. Red dots represent approximate locations of density tests conducted. Description: Date Taken: Taken By: Image Details Forth No: 190032 A -Asphalt Placement Report Page 3 of 4 ro&Robertson, Inc. Crozet "Y(K rozet zetOTfice v 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone: 434.823.5154 www.FandR.com 0 Asphalt Nuclear Density Report Stanley Martin Homes CC: Lance Taylor 11710 Plaza America Drive Reston, VA 20190 71VO037 Westlake Hills Phase II, III, and IV Westlake Hills Crozet, VA 22932 Report No: AND:7120-05556 Issue No: 2 Approved By: Taylor Lance J P—i—not.. fnnnnon Testing Details Tested By: Gilmer Ronald A Date Tested: 9/22/2020 Supplier: S.L. Williamson Plant: Mix: Gauge Make/Model: Nuclear Density Gauge /Troxler 13411-B Method of Measurement: Backscatter Density Standard Count: 1526 Gauge Serial: Moisture Standard Count: 637 Calibration Date: Weather: Sunny Calibration Source: Test Results Test Location No Layer Thickness (in) Count Rate MLD (lb/ft-) In Situ Density (IIoW) Comp (%) ASTM D 2950 Limit Results (% General Location: Eastern Ave. _ 1 Between Jenne & Westhall, Mid section S bound 5.0 15 sec. 163.43 161.40 98.8 >92 P lane 2 Between Jenne & Westhall, Middle middle lane 15 sec. 163.43 158.70 97.1 2:92 P 3 Between Jenne & Westhall, Middle N bound lane 15 sec. 163.43 161.20 98.6 2:92 P 4 Between Jenne & Westhall, Middle S bound lane 15 sec. 163.43 160.70 98.3 2:92 P 5 Between Jenne & Westhall, Middle middle lane 15 sec. 163.43 155.80 95.3 2:92 P 6 Between Jenne & Westhall, Middle N bound lane 15 sec. 163.43 165.00 101.0 2:92 P 7 Between Jenne & Westhall, 25' in from S taper 15 sec. 163.43 156.70 95.9 2:92 P 8 Between Jenne & Westhall, 25' in from N taper 15 sec. 163.43 159.50 97.6 2:92 P C',oirnirnenm Legend P = A results meet specification The results provided herein relate only to the items inspected andfortested. This report shall not be reproduced, except in full, without the prior written approval of F&R. Form No: 117025, Report No: AND:7120-05556 0 2000-2020 QESTLab by SpectmOEST.com Page 4 of 4 Asphalt Placement Report CroO&Robertson, Inc. VX�K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Client: Reciplerks: Stanley Martin Homes Lance Taylor 11710 Plaza America Drive Reston VA 20190 ' Project: Westlake Hills Phase II, III, and IV Westlake Hills Crozet VA 22932 Location: Road - Driving Lane Report #: Work Order #: Bldg Permit No.: ADEN:7120-05577 7120-05577 The results provided herein relate only to the items inspected and/or tested. This report shall not be reproduced, except in full, vnthout the prior written approval of F&R. Reviewed By: Taylor Lance J Review Date: 10/02/2020 Activity Date: 09/23/2020 NEF-Location Details: Eastern Avenue station 17+00 to 19+65 all lanes. 7 Inspection Type: Observation Frequency: Continuous Weather: Sunny Personnel: Gilmer Ronald A Title: Technician Wind Speed: 3 mph Air Temp: 750F Field Notes F&R representative on site as requested for observation of asphalt placement and testing. Contractor SL Williamson placing intermediate coat of asphalt on Eastern Avenue all lanes from station 17+00 to 19+65. These grade corrections today are a 5 inch lift in the middle stations tapering to minimal at the end stations. With placement yesterday this was a total of 15 inches in the middle section. Form No: 190032 A -Asphalt Placement Report Page 1 of 4 Asphalt Placement Report Freehling &Robertson, Inc. X_ K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Activity Date: 09/23/2020 Report No.: ADEN:7120-05577 Client Name: Stanley Martin Homes Project Name: Westlake Hills Phase II, III, and IV Project No.: 71 V0037 Work Order No.: 7120-05577 1 Field Information 1.1 Asphalt Contractor: SL Williamson 1.2 Asphalt Supplier: SL Williamson 1.3 Paving Start Time: 0930 1.4 Paving Finish Time:1300 2 Equipment Type & QuantIt99 Paver, skid steer + sweeper, tack truck water truck, and 2 Hamm HD 14 dual smooth drum rollers. 3 Labor Type & Quantity: 14 men r4 Course Summary 4.1 Mix ID: IM19 4.2 Quantity Placed: 180.0 tons 4.3 Required Thickness: 5.00 in. 4.4 Tack Coat Applied? Yes 4.5 Required Compaction: 92.0 % 4.6 Roller Pattern: 6V 5 Pre -Placement Location Condition: clean and swept 6 Test MethowlErniect Fast Method 6.1 Value: 2.619 6.2 Provided By: Contractor 7 Samples 7.1 Quantity Taken: 7.2 Performed By: Temperature Log Location left lane 1000 287.0 'F 320.0 'F middle lane 1100 279.0 'F 310.0 'F right lane 1230 294.0 'F 302.0 'F •F 'F •F 'F •F F •F 'F •F 'F Form No: 190032 A -Asphalt Placement Report Page 2 of 4 Asphalt Placement Report FroO & Robertson, Inc. CrozetzetOffice 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Activity Date: 09/23/2020 Report No.: ADEN:7120-05577 Client Name: Stanley Martin Homes Project Name: Westlake Hills Phase II, III, and IV Project No.: 71 VO037 Work Order No.: 7120-05577 Forth NO: 190032 A -Asphalt Placement Report Page 3 of 4 ro&Robertson, Inc. Crozet "Y(K rozet zetOTfice v 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone: 434.823.5154 www.FandR.com 0 Asphalt Nuclear Density Report Stanley Martin Homes CC: Lance Taylor 11710 Plaza America Drive Reston, VA 20190 71VO037 Westlake Hills Phase II, III, and IV Westlake Hills Crozet, VA 22932 Report No: AND:7120-05577 Issue No: 1 Approved By: Taylor Lance J Testing Details Tested By: Gilmer Ronald A Date Tested: 9/23/2020 Supplier: S.L. Williamson Plant: Mix: Gauge Make/Model: Nuclear Density Gauge /Troxler 13411-B Method of Measurement: Backscatter Density Standard Count: 1510 Gauge Serial: Moisture Standard Count: 638 Calibration Date: Weather: Sunny Calibration Source: Test Results Test Location No Layer Thickness (in) Count Rate MLD (Ib/ft') In Situ Density (Ib/f -) Comp (%) ASTM D 2950 Limit Results (%) General Location: Eastern Avenue 1 Station 17+25 left lane 5.0 15 sec. 163.43 158.70 97.1 >92 P 2 Station 17+75left lane 5.0 15 sec. 163.43 158.30 96.9 >_92 P 3 Station 18+25left lane 5.0 15 sec. 163.43 158.90 97.2 >_92 P 4 Station 18+75left lane 5.0 15 sec. 163.43 162.00 99.1 >92 P 5 Station 19+25left lane 5.0 15 sec. 163.43 163.00 99.7 >_92 P 6 Station 17+25 middle lane 5.0 15 sec. 163.43 156.50 95.8 >_92 P 7 Station 17+75 middle lane 5.0 15 sec. 163.43 162.60 99.5 >_92 P 8 Station 18+25 middle lane 5.0 15 sec. 163.43 160.10 98.0 >_92 P 9 Station 18+75 middle lane 5.0 15 sec. 163.43 161.50 98.8 >_92 P 10 Station 19+25 middle lane 5.0 15 sec. 163.43 155.20 95.0 >_92 P 11 Station 17+25 right lane 5.0 15 sec. 163.43 164.70 100.8 >_92 P 12 Station 17+75 right lane 5.0 15 sec. 163.43 161.00 98.5 >_92 P 13 Station 18+25 right lane 5.0 15 sec. 163.43 156.30 95.6 >_92 P 14 Station 18+75 right lane 5.0 15 sec. 163.43 158.70 97.1 >_92 P 15 Station 19+25 right lane 5.0 15 sec. 163.43 155.70 95.3 >_92 P Legend P = A results meet specification The resins, provided herein relate only to the items inspected andfortestep. This report shall not be reproduced, except in full, without the prior written approval of F&R. Form No: 117025, Report No: AND:7120-055T 0 2000-2020 QESTLab by SpectmOEST.com Page 4 of 4 Asphalt Placement Report CroO&Robertson, Inc. VX�K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Client: Reciplerks: Stanley Martin Homes Lance Taylor 11710 Plaza America Drive Reston VA 20190 ' Project: Westlake Hills Phase II, III, and IV Westlake Hills Crozet VA 22932 Report #: Work Order #: Bldg Permit No.: ADEN:7120-05652 7120-05652 The results provided herein relate only to the items inspected and/or tested. This report shall not be reproduced, except in full, vnthout the prior written approval of F&R. Reviewed By: Taylor Lance J Review Date: 10/02/2020 Location: Road - Driving Lane Activity Date: 09/24/2020 cation Details Eastern Avenue all lanes from station 16+30/16+50 to 21+25. Also Eastern Avenue from station 22+95 to 23+55. Inspection Type: Observation Personnel: Gilmer Ronald A Frequency: Continuous Title: Technician Weather: Overcast Wind Speed: 1 mph Air Temp: 670F Field Notes F&R representative on site as requested for observation of asphalt placement and testing. Contractor (SL Williamson) placed 2 inch course of SM12.5 (rice 2.588) on Eastern Avenue all lanes from station 16+30/16+50 to station 21+25 and station 22+95 to 23+55. go Form No: 190032 A -Asphalt Placement Report Page 1 of 4 Asphalt Placement Report Freehling &Robertson, Inc. X_ K Crozetzet Office 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone:434.823.5154 www.FandR.com Activity Date: 09/24/2020 Report No.: ADEN:7120-05652 Client Name: Stanley Martin Homes Project Name: Westlake Hills Phase II, III, and IV Project No.: 71 V0037 Work Order No.: 7120-05652 1 Field Information 1.1 Asphalt Contractor: SL Williamson 1.2 Asphalt Supplier: SL Williamson 1.3 Paving Start Time: 1300 1.4 Paving Finish Time:1730 2 Equipment Type & QuantKfl Paver, (2) Hamm HD14 dual smooth drum rollers, tack truck, skidsteer with sweeper. 3 Labor Type & Quantity: 14 men r4 Course Summary 4.1 Mix ID: SM12.5 4.2 Quantity Placed: 371.0 tons 4.3 Required Thickness: 2.00 in. 4.4 Tack Coat Applied? Yes 4.5 Required Compaction: 92.5 % 4.6 Roller Pattern: 6V 5 Pre -Placement Location Condition: swept clean 6 Test d: Rice 6.1 Value: 2.588 6.2 Provided By: Contractor 7 Samples 7.1 Quantity Taken: 7.2 Performed By: Temperature Log Location left lane 1300 295.0 'F 341.0 'F left lane 1420 281.0 'F 341.0 'F middle 1530 294.0 'F 300.0 'F right lane 1600 281.0 'F 313.0 'F •F 'F •F 'F •F 'F •F 'F Form No: 190032 A -Asphalt Placement Report Page 2 of 4 09/2412020 Asphalt Placement Report Activity Date: ADEN:712 p p Report No.: ADEN:7120-05652 �^ ^ Froehling & Robertson, Inc. Client Name: Stanley Martin Homes VX�K Crozet Office Project Name: Westlake Hills Phase II, III, and IV 6185 Rockfish Gap Turnpike Crozet, VA 22932 Project No.: 71VO037 Phone: 434.823.5154 www.FandR.com Work Order No.: 7120-05652 Image Detail 0......e............ Description: Westlake Hills asphalt Date Taken: 09/24/2020 Taken By: AG I 1 —ROW—Notes: Highlight indicates asphalt placed and red dots represent approximate locations of density tests conducted. i-�-- a Forth No: 190032 A -Asphalt Placement Report Page 3 of 4 ro&Robertson, Inc. Crozet "Y(K rozet zetOTfice v 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone: 434.823.5154 www.FandR.com 0 Asphalt Nuclear Density Report Stanley Martin Homes CC: Lance Taylor 11710 Plaza America Drive Reston, VA 20190 71VO037 Westlake Hills Phase II, III, and IV Westlake Hills Crozet, VA 22932 Report No: AND:7120-05652 Issue No: 1 Approved By: Taylor Lance J Testing Details Tested By: Gilmer Ronald A Date Tested: 9/24/2020 Supplier: S.L. Williamson Plant: Mix: Gauge Make/Model: Nuclear Density Gauge/Troxler/3411-B Method of Measurement: Backscatter Density Standard Count: 1524 Gauge Serial: Moisture Standard Count: 629 Calibration Date: Weather: Overcast Calibration Source: Test Results Test Location No Layer Thickness (in) Count Rate MLD (Ib/fta) In Situ Density (Iblw) Comp (%) ASTM D 2950 Limit Results (%) General Location: Eastern Avenue _ 1 Left lane sta. 21+00 2.0 15 Sec. 161.49 162.00 100.3 _>92 P 2 Left lane sta. 20+50 2.0 15 sec. 161.49 153.10 94.8 >_92 P 3 Left lane sta. 20+00 2.0 15 sec. 161.49 158.60 98.2 >_92 P 4 Left lane sta. 19+50 2.0 15 sec. 161.49 153.70 95.2 >92 P 5 Left lane sta. 19+00 2.0 15 sec. 161.49 157.10 97.3 >_92 P 6 Left lane sta. 18+50 2.0 15 sec. 161.49 158.30 98.0 >_92 P 7 Left lane sta. 18+00 2.0 15 sec. 161.49 157.50 97.5 >_92 P 8 Left lane sta. 17+50 2.0 15 sec. 161.49 152.50 94.4 >_92 P 9 Left lane sta. 17+00 2.0 15 sec. 161.49 162.50 100.6 >_92 P 10 Left lane sta. 16+50 2.0 15 sec. 161.49 156.00 96.6 >_92 P 11 Right lane sta. 21+00 2.0 15 sec. 161.49 150.60 93.3 >_92 P 12 Right lane sta. 20+50 2.0 15 sec. 161.49 152.20 94.2 >92 P 13 Right lane sta. 20+00 2.0 15 sec. 161.49 158.40 98.1 >_92 P 14 Right lane sta. 19+50 2.0 15 sec. 161.49 153.50 95.1 >_92 P 15 Right lane sta. 19+00 2.0 15 sec. 161.49 152.90 94.7 >92 P 16 Right lane sta. 18+50 2.0 15 sec. 161.49 155.30 96.2 >_92 P 17 Right lane sta. 18+00 2.0 15 sec. 161.49 150.70 93.3 >_92 P 18 Right lane sta. 17+50 2.0 15 sec. 161.49 159.50 98.8 >_92 P 19 Right lane sta. 17+00 2.0 15 sec. 161.49 152.90 94.7 >_92 P 20 Right lane sta. 16+50 2.0 15 sec. 161.49 153.10 94.8 >_92 P 21 Left lane sta. 23+25 2.0 15 sec. 161.49 160.80 99.6 >_92 P 22 Right lane sta. 23+25 2.0 15 sec. 161.49 153.90 95.3 >_92 P or Legend P = A results meet specification The resins, pewkhad herein relate only to the items inspected andfortestep. This report shall not be reproduced, except in full, without the prior written approval of F&R. Form No: 117025, Report No: AND:7120-05652 0 2000-2020 QESTLab by SpectmOEST.com Page 4 of 4 ro&Robertson, Inc. Crozet "Y(K rozet zetOTfice v 6185 Rockfish Gap Turnpike Crozet, VA 22932 Phone: 434.823.5154 www.FandR.com 0 Asphalt Nuclear Density Report Stanley Martin Homes CC: Lance Taylor 11710 Plaza America Drive Reston, VA 20190 71VO037 Westlake Hills Phase II, III, and IV Westlake Hills Crozet, VA 22932 Report No: AND:7120-05577 Issue No: 1 Approved By: Taylor Lance J Testing Details Tested By: Gilmer Ronald A Date Tested: 9/23/2020 Supplier: S.L. Williamson Plant: Mix: Gauge Make/Model: Nuclear Density Gauge /Troxler 13411-B Method of Measurement: Backscatter Density Standard Count: 1510 Gauge Serial: Moisture Standard Count: 638 Calibration Date: Weather: Sunny Calibration Source: Test Results Test Location No Layer Thickness (in) Count Rate MLD (Ib/ft') In Situ Density (Ib/f -) Comp (%) ASTM D 2950 Limit Results (%) General Location: Eastern Avenue 1 Station 17+25 left lane 5.0 15 sec. 163.43 158.70 97.1 >92 P 2 Station 17+75left lane 5.0 15 sec. 163.43 158.30 96.9 >_92 P 3 Station 18+25left lane 5.0 15 sec. 163.43 158.90 97.2 >_92 P 4 Station 18+75left lane 5.0 15 sec. 163.43 162.00 99.1 >92 P 5 Station 19+25left lane 5.0 15 sec. 163.43 163.00 99.7 >_92 P 6 Station 17+25 middle lane 5.0 15 sec. 163.43 156.50 95.8 >_92 P 7 Station 17+75 middle lane 5.0 15 sec. 163.43 162.60 99.5 >_92 P 8 Station 18+25 middle lane 5.0 15 sec. 163.43 160.10 98.0 >_92 P 9 Station 18+75 middle lane 5.0 15 sec. 163.43 161.50 98.8 >_92 P 10 Station 19+25 middle lane 5.0 15 sec. 163.43 155.20 95.0 >_92 P 11 Station 17+25 right lane 5.0 15 sec. 163.43 164.70 100.8 >_92 P 12 Station 17+75 right lane 5.0 15 sec. 163.43 161.00 98.5 >_92 P 13 Station 18+25 right lane 5.0 15 sec. 163.43 156.30 95.6 >_92 P 14 Station 18+75 right lane 5.0 15 sec. 163.43 158.70 97.1 >_92 P 15 Station 19+25 right lane 5.0 15 sec. 163.43 155.70 95.3 >_92 P Legend P = A results meet specification The resins, provided herein relate only to the items inspected andfortestep. This report shall not be reproduced, except in full, without the prior written approval of F&R. Form No: 117025, Report No: AND:7120-055T 02000-2020 QESTLab by SpectmOEST.com Pagel oft