Loading...
HomeMy WebLinkAboutWPO201400055 Bond 2014-06-09 Request for Pre-construction Meeting and Grading Permit h " from Albemarle County '"e'` 'i r. Approved Plan Number: WPO- -2b 1 W — 060 SS' Approved Plan Name: 11? Toe e (Plans must be approved prior to a pre-construction meeting.) Bond approved date: (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: G• �{�"� '0•00 State Certification Number: /363 17 003 b Address 14 a o i v0.4 Dtg.5 f a . City NAG/1 ur"`acA t.J Q State V4 • Zip 90210 Daytime Phone( I?g 53/s s i 8 E-mail iGti Li b eo4'1. 1 th.K. . Primary Contractor: Q �/� Print Name 1 CJ,JNI e..4 e • Address t •V• ill i 7 Sd p City O4 Avt-l s o State VG . Zip p•li°k Daytime Phone(77) 57/— u S Vc ) E-mail Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14,Revised: 8/29/14 Page 2 of 3 Project Name: Tiptop Restaurant WPO file number: WP0201400055 Erosion and Sediment Control Bond Estimate Item Item Number stabluation (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RW D) temporary stape drain (TSD) pipe length earthwork for trap/basin 0 ft cut at high side height of dam at too 0 ft height of fili at face 6 ft length of dam length of cut tap width 0 It (area above transition) 10 ft )total width of tlam) (area below transition) (height below Transition) 0 ft urea below transhion) 34 ft length of spillway (depth below 1-sitter width of spillway structures for basin (area above transition) 0 sf riser height ( tolal fill volume) rear diameter 10 ft barrel length 147 cy barrel diameter sift fence inlet protection (IP) 2.6 tons stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel onstruaim entrance (CE) 0 in wash rack -. . paved construction entrance barrel collars rip -rap, placed depth baffle length width survey and layout (price par 0.1 mi.) acres mobilization 0 ft stream crossing (computed independently) 0 ft pipe diameter 0 in 0 ft cut at high side 6 ft 0 ft cut at face 6 ft 0 ft length of cut 30 ft 0 It width of cut 10 ft 0 sf (area below transition) 132 sf 0 ft )total witlth of cut) 34 ft 0 ft (depth below 1-sitter 0 it 0 at (area above transition) 0 sf 0,0 cy ( tolal fill volume) 1463 cy 10 ft (TOAL Cy estimate) 147 cy 4.6 If (spillway stone tons) 2.6 tons Oft 0 in $9.99 0 ft base plate or fdn 0 0 in -. . barrel collars 0 baffle length 0 ft 0 ft width 0 ft 0 ft width 0 It 0 ft channel width 0 ft 0 ft length 0.0 ft 0.0 ins) 0 ton, 1 traps and basins 1 No. Unit Unit Cost Cost (installed) 0.5 acres 55.000.00 $2,500.00 260.0 ft $5M $1,300.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.09 $0.00 I cost sum prq mgmt contingency Total $1100 $1,911.00 $50.00 $130.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.000.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $1,000.00 $500.00 $0.00 $13,041.00 $1,956.15 $1.499.72 $16,500 11/6/2014 Internal Use Only _ (-( n • u , Date Received: 7 Fee Paid:C �"�01 A L0/vlj Noes Received by: Intake: Forward to Management Analyst , ,f 7 / �{ REQUEST TO ESTABLISH A BOND YV APPROVED PLAN# P O ZO 1 0005G PROJECT NAME: I i Q Top 4. `,%r°`1A (As listed on the approved plan) All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. TAX MAPs/PARCELs: ?g I0 A OWNER'S NAME: Y ASS A 105 LLG SIGNATURE: I date: / / / TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership, limited liability company, trust, association, etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; EeVESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207;$0 fee ❑ VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water Protection Ordinance section 17-208;$250 fee required ❑ Subdivision(roads,drainage,etc.) per Subdivision Ordinance section 14-435; &Water& Sewer per Subdivision Ordinance section 14-435;$250 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: Y-A--\--ct1/4CaY\..'5C7i '1Vt f 1 ( E) 1tiL OR REGULAR MAIL ADDRESS: , i C n 1M.l1rt4%e L,0 4 72-61 1. Revised 6/20/2014 , CZA /Y1/ Jti . i --/ - d � J r i�