HomeMy WebLinkAboutWPO201400015 Bond 2014-02-25 "fter Aof A s%we
715:411- .
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville, Virginia 22902-4596
Phone(434)296-5832 Fax (434) 972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE
PROJECT NAME: i/P/-42(C•91— 01,..//7
PLAN/PERMIT NO. 70/1-/
DATE: 2 2- 311
This project has been satisfactorily completed and the erosion control performance bond may be
released at this time if all erosion control inspection fees invoiced have been paid.
_
rovel.e,7/4„
Erosion Control In ector
hi ifigite6
)"14°Commun tv Development Department
All erosion control Inspection fees invoiced on the above project have been collected.
Director of Community Development/County Engineer
Date
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer
t1DEPTConaras5 DomMomnenePormeinsmalormIEROSiON CONTROL PERFORMANCE SONO RELEASE REAMED S 25 2012 Soc
ate OF A i
`"fir ;
Na/"
. tv
Erosion & Sediment Control
/ Preconstruction Conference Checklist
Name of Plan: v er t `" �rl
Plan No.:
?-0/6/ -coats--
Date: /Z / A/ /7
1) Copies of approved plan given to: Owner or Authorized Agent ( Contractor
2) Have all the conditions been met?
3) Responsible Land Disturber: _� C f4O1-?I
Cert./Lic.No.: 35-6 /D Type:
Address/ Phone/ Mobil Phone: •1°0 A--- (e9 81// / ��r 22 Zy
/� 6/3e/75-g/-////4/
4) Name of Prime Contractor: /7/X 4t 4//7-10/5c74
Address/ Phone/ Mobil Phone: ( 2 a q‘ i/`` -Z 5.U// / '/A 32g02,
3z/ 53/ 6 ' —
Name of Subcontractor:
5) Persons in Attendance:
Name Firm
7 /4 ,4/ c,
A4' ✓c,/
4-//e' ' / , rA,/,56//,
C/,/r
(6) Date Permit Issued: S l Le` LI
(7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit
from DCR. DCR has requested the County to check for the site posting.
(8) Article II, section 17-207
B. Each permit shall also be subject to the following:
1. The permitted land disturbing activity shall be deemed to have commenced on the
date the permit was issued, provided that the program authority may establish another date of commencement
t of2
Revised 11/29/2011
based on documation submitted by the owner that clearmonstrates that the land
disturbing activity commenced on that date.
2. Permanent vegetation shall be installed on all denuded areas within nine (9)
months after the date the land disturbing activity commenced, except for areas that the program authority
finds are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface"
includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete;
trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such
other surfaces that the program authority determines would adequately provide a permanent barrier to erosion.
3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may
be extended by either the program authority or the board of supervisors, or both, as follows:
a. The program authority may extend the time limit for installing permanent
vegetation up to an additional six (6) months, provided the owner submits a written request to the program
authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program
authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the
control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner
has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In
granting an extension, the program authority may impose reasonable conditions.
b. The board of supervisors may extend the time limit for installing permanent
vegetation for duration it determines to be appropriate, provided the owner submits a written request to the
clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent
vegetation. The program authority shall provide its opinion to the board as to the condition of the property with
respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and
install permanent vegetation for the land disturbance covered by this permit. The board may grant the
extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)
the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively
control or has effectively controlled erosion and sedimentation on the property during the land disturbing
activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions.
Notes: - :[ ! .A/A ..`.4l411141601,
—
2 of2
Revised I I/29/2011
I:\DEPT\Community Development\Forms\inspections\Erosion Preconstruction ConfChecklist 1 129 2011.doc
Awe
Ana',Kilmer
From: Ana Kilmer
Sent: Friday, May 09, 2014 8:37 AM
To: 'Lara Ignaczak'; 'Allan Pettit'
Cc: Max Greene; Kenny Thacker; Mark Hopkins
Subject: Verdant Lawn -wpo-2014-00015
The$94,300 water protection performance bond has been posted and approved (erosion only). The permit and first
year inspection fee has been paid. You may contact Mark Hopkins to determine when you can set up the pre-
construction meeting.
Thank you
Ana D. Kilmer
Management Analyst
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer @albemarle.org
Project Name: Verdant Lawn
WPO file number: WPO201400015
Erosion and Sediment Control Bond Estimate
Item Item No.Unit Unit Cost Cost
Number (installed)
stablization (PS, TS)9.6 acres $5,000.00 $48,000.00
silt fence (SF)1260.0 ft $5.00 $6,300.00
safety fence (SAF)0.0 ft $5.00 $0.00
diversion (DD, FD, RWD)640 ft $13.00 $8,320.00
temporary slope drain (TSD)pipe length 30 ft pipe diameter 21 in $0.00 $500.00
earthwork for trap/basin
height of dam at toe 3.5 ft cut at high side 12 ft
height of fill at face 7.5 ft cut at face 4 ft
length of dam 40 ft length of cut 30 ft
top width 3 ft width of cut 20 ft
(area above transition)135 sf (area below transition)112 sf
(total width of dam)7 ft (total width of cut)52 ft
(height below transition)-4 ft (depth below transition)8 ft
(area below transition)-30 sf (area above transition)144 sf
(total fill volume)155.6 cy (total fill volume)284.4 cy
length of spillway 18 ft (TOAL CY estimate)336 cy $13.00 $4,368.00
width of spillway 15 ft (spillway stone tons)15.5 tons $50.00 $0.00
structures for basin
riser height 0 ft
riser diameter 0 in (riser unit price)$0.00 $0.00
barrel length 0 ft base plate or fdn 0 $200.00 $0
barrel diameter 0 in (barrel unit price)$0.00 $0.00
barrel collars 0 $200.00 $0
baffle length 0 ft $50.00 $0
culvert inlet protection 1 $300.00 $300.00
silt fence inlet protection (IP)0 $100.00 $0.00
stone inlet protection (IP)7 $200.00 $1,400.00
outlet protection (OP)length 10 ft width 10 ft 3 $450.00 $1,350.00
channel (SCC, matted)length 1 ft width 0 ft $0.00
check dam depth in channel 1 ft channel width 0 ft 1 $0.00 $0.00
construction entrance (CE)1 $2,000.00 $2,000.00
wash rack $2,000.00
paved construction entrance 0 $3,500.00 $0.00
rip-rap, placed depth 0 ft length 1.0 ft
width 0.0 (tons)0 tons $60.00 $0.00
survey and layout (price per 0.1 mi.)acres 1 traps and basins 2 $1,500.00
mobilization $500.00
stream crossing (computed independently)$0.00
cost sum $74,538.00
proj mgmt $11,180.70
contingency $8,571.87
Total $94,300
4/8/2014
Internal Use only, r
Date Received: r Fee Paid: - i� 06piesire } t,Received by: �I)j iii t 'Fi/ "
Intake: Forward a ement Analyst 11���/
i nali*'
BOND ESTIMATE REQUEST
APPROVED PROJECT PLAN TITLE: (Title on the approve plan from which the estimate will be prepared.)
\t' C.-aWd v\
. All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
coQ
v. TAX MAPs/PARCELs: 65100-6b-7, 02,000 OWNER'S NA i O Vti . ° QrrA, a A aCi
SIGNATURE: // / ,�. , ;ate: 3 •3 1 • i
TAX MAPs/PARCELs: OWNER'S NAME" / _
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
The request d estimates are;
Erosion&Sediment Control per Water Protection Ordinance section 17-207
O Stormwater Management per Water Protection Ordinance section 17-306
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
The estimate must be sent to the owner. Please provide contact information.
EMAIL: J l 9 r a C z:,o k 4'l Q C . CO M
OR REGULAR MAIL ADDRESS: ,2R15 731(,(2. Ridge-e- Li/
C2h arr esv/I1 c) Vet aaJ 0/
r
lie-i1-71---- I ,,,,, pitte-P
_ _ , ,
c--4,
Revised 11/1/2011