Loading...
HomeMy WebLinkAboutWPO201400015 Bond 2014-02-25 "fter Aof A s%we 715:411- . COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville, Virginia 22902-4596 Phone(434)296-5832 Fax (434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: i/P/-42(C•91— 01,..//7 PLAN/PERMIT NO. 70/1-/ DATE: 2 2- 311 This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. _ rovel.e,7/4„ Erosion Control In ector hi ifigite6 )"14°Commun tv Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer t1DEPTConaras5 DomMomnenePormeinsmalormIEROSiON CONTROL PERFORMANCE SONO RELEASE REAMED S 25 2012 Soc ate OF A i `"fir ; Na/" . tv Erosion & Sediment Control / Preconstruction Conference Checklist Name of Plan: v er t `" �rl Plan No.: ?-0/6/ -coats-- Date: /Z / A/ /7 1) Copies of approved plan given to: Owner or Authorized Agent ( Contractor 2) Have all the conditions been met? 3) Responsible Land Disturber: _� C f4O1-?I Cert./Lic.No.: 35-6 /D Type: Address/ Phone/ Mobil Phone: •1°0 A--- (e9 81// / ��r 22 Zy /� 6/3e/75-g/-////4/ 4) Name of Prime Contractor: /7/X 4t 4//7-10/5c74 Address/ Phone/ Mobil Phone: ( 2 a q‘ i/`` -Z 5.U// / '/A 32g02, 3z/ 53/ 6 ' — Name of Subcontractor: 5) Persons in Attendance: Name Firm 7 /4 ,4/ c, A4' ✓c,/ 4-//e' ' / , rA,/,56//, C/,/r (6) Date Permit Issued: S l Le` LI (7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement t of2 Revised 11/29/2011 based on documation submitted by the owner that clearmonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions. Notes: - :[ ! .A/A ..`.4l411141601, — 2 of2 Revised I I/29/2011 I:\DEPT\Community Development\Forms\inspections\Erosion Preconstruction ConfChecklist 1 129 2011.doc Awe Ana',Kilmer From: Ana Kilmer Sent: Friday, May 09, 2014 8:37 AM To: 'Lara Ignaczak'; 'Allan Pettit' Cc: Max Greene; Kenny Thacker; Mark Hopkins Subject: Verdant Lawn -wpo-2014-00015 The$94,300 water protection performance bond has been posted and approved (erosion only). The permit and first year inspection fee has been paid. You may contact Mark Hopkins to determine when you can set up the pre- construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer @albemarle.org Project Name: Verdant Lawn WPO file number: WPO201400015 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)9.6 acres $5,000.00 $48,000.00 silt fence (SF)1260.0 ft $5.00 $6,300.00 safety fence (SAF)0.0 ft $5.00 $0.00 diversion (DD, FD, RWD)640 ft $13.00 $8,320.00 temporary slope drain (TSD)pipe length 30 ft pipe diameter 21 in $0.00 $500.00 earthwork for trap/basin height of dam at toe 3.5 ft cut at high side 12 ft height of fill at face 7.5 ft cut at face 4 ft length of dam 40 ft length of cut 30 ft top width 3 ft width of cut 20 ft (area above transition)135 sf (area below transition)112 sf (total width of dam)7 ft (total width of cut)52 ft (height below transition)-4 ft (depth below transition)8 ft (area below transition)-30 sf (area above transition)144 sf (total fill volume)155.6 cy (total fill volume)284.4 cy length of spillway 18 ft (TOAL CY estimate)336 cy $13.00 $4,368.00 width of spillway 15 ft (spillway stone tons)15.5 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price)$0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price)$0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 culvert inlet protection 1 $300.00 $300.00 silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)7 $200.00 $1,400.00 outlet protection (OP)length 10 ft width 10 ft 3 $450.00 $1,350.00 channel (SCC, matted)length 1 ft width 0 ft $0.00 check dam depth in channel 1 ft channel width 0 ft 1 $0.00 $0.00 construction entrance (CE)1 $2,000.00 $2,000.00 wash rack $2,000.00 paved construction entrance 0 $3,500.00 $0.00 rip-rap, placed depth 0 ft length 1.0 ft width 0.0 (tons)0 tons $60.00 $0.00 survey and layout (price per 0.1 mi.)acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently)$0.00 cost sum $74,538.00 proj mgmt $11,180.70 contingency $8,571.87 Total $94,300 4/8/2014 Internal Use only, r Date Received: r Fee Paid: - i� 06piesire } t,Received by: �I)j iii t 'Fi/ " Intake: Forward a ement Analyst 11���/ i nali*' BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE: (Title on the approve plan from which the estimate will be prepared.) \t' C.-aWd v\ . All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. coQ v. TAX MAPs/PARCELs: 65100-6b-7, 02,000 OWNER'S NA i O Vti . ° QrrA, a A aCi SIGNATURE: // / ,�. , ;ate: 3 •3 1 • i TAX MAPs/PARCELs: OWNER'S NAME" / _ SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The request d estimates are; Erosion&Sediment Control per Water Protection Ordinance section 17-207 O Stormwater Management per Water Protection Ordinance section 17-306 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: J l 9 r a C z:,o k 4'l Q C . CO M OR REGULAR MAIL ADDRESS: ,2R15 731(,(2. Ridge-e- Li/ C2h arr esv/I1 c) Vet aaJ 0/ r lie-i1-71---- I ,,,,, pitte-P _ _ , , c--4, Revised 11/1/2011