Loading...
HomeMy WebLinkAboutWPO201300005 Bond 2013-01-23 rau+ 01V A -, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434) 296-5832 Fax (434)972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: /1/1/75, rc,,t- PLAN/PERMIT NO. ? i2,' 3 - akt DATE: J I itvb 1' This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. ° ..--- Erosion ontrol Inspector // ', A` (`i , =�'�. nisi ,..._r 4.� z J � 7S Community Development Department � All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer trDE?T 00.00 OINNomINPFF RemPI+s is s1EROSION CONTROL PERFORMANCE BOND RELEABe REV,SeD 5 29 2012 00c. 4-J0'4 Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: Plan No.: 20/3 Date: 2 9,/h ay /i 1) Copies of approved plan given to: Owner or Authorized Agent 1 Contractor 2) Have all the conditions been met? y 3) Responsible Land Disturber: U/,e) $ )W Cert./Lic.No.: , 3 94/3- Type: /qC-' Address/ Phone/Mobil Phone: PO Pow -4 VA-- -jc9/ 906 J/ 4) Name of Prime Contractor: //��C li , Address/Phone/Mobil Phone: / Sox v/110 7l// , /► 2 Z 995 Name of Subcontractor: 5) Persons in Attendance: Name Firm /Y)c /41 -4/d, c y (11 a X G-PP1i_r }/6 c,14 akc(6) Date Per it Issued: 5-7719/76/.. (7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit O 9 p 9 P from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 based on documeri `ation submitted by the owner that clearly eemonstrates that the land` disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions. Notes: . .,� 41( 4 . / 1 4/9/ _ �f /hrd C =r'1 2 of 2 Revised 11/29/2011 I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 1 129 2011.doc Aria Kilmer From: Ana Kilmer Sent: Friday, May 24, 2013 3:19 PM To: 'Steve Nicholson'; 'Eric Shobe'; Kenny Thacker; Mark Hopkins Cc: Esther Grace; Elizabeth Allen Subject: wpo-2013-00005- Kings Grant Dams Erosion Control Plan The $629,940 water protection performance bond has been posted and approved (erosion only). The permit and first year inspection fee has been paid. Please contact Mark Hopkins to determine if you can set up the pre-construction meeting. Thanks Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 1