Loading...
HomeMy WebLinkAboutWPO201400009 Bond 2014-02-18 ALk Niftre Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: no-e L. r�d.t:rs�'v� - I nr-J•-)hOc-c-L-eS Plan No.: k,J pc, a t L9 - cow c Date: 1) Copies of approved plan given to: Owner or Authorized Agent Contractor A 2) Have all the conditions been met? 3) Responsible Land Disturber: (Y)c 4k-t_k-r,s Cert./Lic.No.: 3y Type: Address/Phone/ Mobil Phone: (7)1:), - a fz_CX S4-. CL/Ca(r) s a at L)4 civ3 * L13,4-q81 - 419813 4) Name of Prime Contractor: 4-Oc ..r 11.5 (,t_c �c Address/Phone/ Mobil Phone: SI. G-Or ( 1.-e. OA 9:3,9O3 !+® v ieQ 43,-i - 24-1 -0001 Name of Subcontractor: (ton e 5) Persons in Attendance: Name Firm j.x)Nal Otto P(UR-Mcjl1 CO 42s Q(vi t.) at) be v-1C r'C.o. 1 �IUv IC \k lJlI1d4 �5t9,/, &�40LAr 6:91 'frctc /1'64 V 14‘ S Ex3A-1-" �.C9-'fi t OLAf em rl S I-CvCe- 4U✓1 (6) Date Permit Issued: 6- 9-C- 14 (7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 based on documenTation submitted by the owner that clearly Norinonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions. r Notes: — — 2 of2 Revised 11/29/2011 I:ADEP'1'VCornmuni(p Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 11 29 201 I.doc Jonney Otto From: Ana Kilmer Sent: Tuesday, June 17, 2014 8:56 AM To: Charlotte Harper; Kenny Thacker; Jonney Otto; Michelle Roberge Cc: Esther Grace Subject: wpo-2014-00009-Stonewater Townhomes erosion and sediment control plan The$21,490 water protection performance bond has been posted and approved (erosion only). The permit and first year inspection fee has been has been paid. Please contact Jonny Otto to determine when you can schedule the pre- construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmerPalbemarle.org 1 Project Name: Stonewater Townhomes, Erosion & Sediment Control Plan WPO file number: WPO20140009 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) silt fence inlet protection (IP) stone inlet protection (IP) construction entrance (CE) wash rack survey and layout (price per 0.1 mi.) acres 1.06 traps and basins mobilization No. Unit Unit Cost Cost installed 1.1 acres $5,000.00 $5,300.00 390.0 ft $5.00 $1,950.00 0.0 ft $5.00 $0.00 285 ft $13.00 $3,705.00 10 $100.00 $1,000.00 0 $200.00 $0.00 1 $2,000.00 $2,000.00 1 $2,000.00 $2,000.00 0 $530.00 $500.00 cost sum $16,985.00 proj mgmt $2,547.75 contingency $1,953.28 Total $21,490 5/28/2014 , Internal Use Only 0 1217] 0 Date Received: S) ( J2 l l Fee Paid CC •v t L p� r Received by: r� Intake: Forward to Management Analyst 11164L0F44 IMCtO' BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE: (Title on the approve plan from which the estimate will be prepared.) <1+ wa-t-&( T'Lc fr or ij All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. (6010 r TAX MAPs/PARCELs: (J(o(A2,-O(-GuWNER'S NAME: _ ,� 0/ / I /_ t, f LL� SIGNATURE: l �— date: TAX MAPs/PAIRCEL�C_GA bd DOWNER'S NAME: tLl O V�O1 10tl 1 L C— SIGNATURE: dater TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; Erosion&Sediment Control per Water Protection Ordinance section 17-207 ❑ Stormwater Management per Water Protection Ordinance section 17-306 IF/Subdivision(roads, drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required The estimate must sent to the owner. Please provide contact information. EMAIL: �-1M(lU�l °-l�'I'YIP i.TL vrajed{'�.( ` �1/ ' OR REGULAR MAIL ADDRESS: 1 1 Revised I 1,1'20::