Loading...
HomeMy WebLinkAboutWPO201300007 Bond 2013-01-25 COUNTY OF AL0EMARLE Department of Community J)evelopment 401 Mclntirc Road,North Wing Charlottesville, Virginia 22902'4596 Phone(434)%96-5@3% Fax (434) 97%-4l20 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: ��-~�^���� ���� �� PLAN/P[RK�|TNO. —�_ ~—°~~ — ��r,�e�^' DATE: Ac / This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. osion intro! Inspector Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer <.; Pamela H. Brownfield N+S, LC P.O. Box 7861 Charlottesville, VA 22906 Jana H. Crutchfield N+S, LC 1625 Ingle Ct. Charlottesville, VA 22901 I. Harold Brownfield,Jr. Gambit, LLC P.O. Box 7861 Charlottesville,VA 22906 Thomas A. Dingledine Prana Land LLC Hummingbird Holdings, LLC P.O. Box 8336 Charlottesville, VA 22906 �oaA , '*ftwe' Al Hai 1ht Nvesi • Atti, Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: c.STi4-c/ 3// cs_l��- Plan No.:/ea—z /3-40000 Date: /3 20/3 1) Copies of approved plan given to: Owner or Authorized Agent V Contractor 2) Have all the conditions been met? YES 3) Responsible Land Disturber: /, A,4? �, Yi9�f/Ct�.CDak, Cert./Lic.No.: ' a 9 9 // Type: G Address/Phone/Mobil Phone: /03U Z,da?E,�/ ��j �iA�C�l�v�ll j • 2Z702 ' 74c 979- 5435- -- s3/-a6 z 4) Name of Prime Contractor: c. 9S Address/Phone/Mobil Phone: /O30 %IC �n �l��S�J.I, 229o' A10c— O LE' 971 W35- efe/�6:g/04 z/ Name of Subcontractor: 5) Persons in Attendance: Name Firm .4":",1447 7%.4c.ege_ de/44 .7Z.',41/4-.,/ef,‹A-- (6) Date Permit Issued: a— 00%3 (7) 17. Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8)Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement ] of 2 n.,..:...,a I I nnnni based on documetwodon submitted by the owner that clearly onstrates that the land disturbing activity commenced on that date. 2 Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete, trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a pen-ear-lent barrier to erosion The time limit for installing permanent vegetation as required by paragraph (13)(2) may he extended by either the program authority or the board of supervisors, or both, as follows: a The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity In granting an extension, the program authority'may impose reasonable conditions. b The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the,property during the land disturbing activity In granting an extension, the board shall set a time limit and may repose other.reasonable conditions. Notes •. 941 0 2 of 2 Revised 11/29/2011 1:\DcPT1Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 11 29 201 Ldoc Ana Kilmer From: Ana Kilmer Sent: Friday, May 10, 2013 2:14 PM To: 'Gretchen Wood'; Kenny Thacker Cc: Esther Grace Subject: wpo-2013-00007-5th street fill area erosion and sediment control plan The$27,660 water protection performance bond has been posted and approved (erosion only). The permit and first year inspection fee has been paid. Please contact Kenny Thacker to set up the pre-construction meeting. Thanks Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer @albemarle.org 1 5th Street Fill Area WPO file number: WPO201300007 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)2.5 acres $5,000.00 $12,500.00 silt fence (SF)0.0 ft $5.00 $0.00 safety fence (SAF)0.0 ft $5.00 $0.00 Temporary diversion ( FD )700 ft $5.00 $3,500.00 temporary slope drain (TSD)pipe length 0 ft pipe diameter 0 in $0.00 $0.00 1 temporary sediment trap (ST or CIP)Method for volume comp: height of dam at toe 6 ft cut at dam 0 ft (lenth) x (total width) x (average height) / 27 for cubic yards height of dam at face 4 ft cut at high side 8 ft assume face at 2:1, toe at 3:1 length of dam 20 ft length of cut 20 ft total width = 3x(toe height) + 2x(face height) + top width top width 3 ft width of cut 20 ft average height = (toe height + face height) / 2 (comp. fill vol)107.4 cy (cut vol)106.7 cy $13.00 length of spillway 10 ft (cy est)143.0 width of spillway 15 ft (spillway stone tons)0 $50.00 $1,858.52 1 temporary sediment basin (SB) height of dam at toe 4 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill vol)0.0 cy (cut vol)0.0 cy $13.00 length of spillway 0 ft (cy est)0.0 width of spillway 0 ft (spillway stone tons)0 $50.00 $0.00 riser height 0 ft 0 riser diameter 0 in (riser unit price)$0.00 barrel length 0 ft (price of base)$0 barrel diameter 0 in (barrel unit price)$0.00 barrel collars 0 baffle length 0 ft $0.00 silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)0 $200.00 $0.00 outlet protection (OP)length 0 ft width 0 ft 0 $0.00 $0.00 channel (SCC, matted)length 0 ft width 0 ft 0 $0.00 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 construction entrance (CE)0 $2,000.00 $0.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 0 $3,500.00 $0.00 rip-rap, placed depth 0 ft length 0.0 ft width 0.0 (tons)0 $60.00 $0.00 survey and layout (price per 0.1 mi.)acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently) cost sum $21,858.52 proj mgmt $3,278.78 contingency $2,513.73 Total $27,660 4/16/2013