Loading...
HomeMy WebLinkAboutWPO201400043 Bond Estimates 2014-05-09Project Name: Keswick Country Club Minor Site Plan Amendment Pole Barn at Golf Maintenance Facility WPO file number: wpo201400043 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 49') aggregate base or drainage stone earthwork for trapf..in structures for basin 4.0 in d 60.0 in d height of dam at toe height of fill at face length of dam top width (area above t, -Ron) (total width of dam) (height below transition (area below transition) (total fill volume) length of spillway width of spillway ser height riser diameter barrel length barrel diameter bass shrubs seedlings underdrain (LIF) biofilter soil mix (C1) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft length width 0.0 (tons) rvey and layout (pace per 0.1 mi.) acres 0.02 basins mobilization ae -built drawings, (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 0.0 ft 0 0 0 ft $13.00 $0.00 ass $500.00 $aw 0- $3,500.00 $0.00 0 ft $450.00 $0.00 100.0 ft $4.00 $400.00 33.6 ton $3500 $1,176.00 0 ES-1.2 0 EC -1 12.0ftL 8.0ftW 0 ft cut at high side 0 ft aft cut st face Oft 0 ft length of cut 0 ft a ft width of cut 0 ft 0 sf (area below transition) 0 sf 0 ft (total width of cut) 0 ft 0 ft (depth below transition 0 ft Oat (area above transition) 0 f 0.0 cy (total fill volume) Oe cy 0 ft (TOAL CV estimate) 0 cy 0 ft (spillway stone Ions) 0 Ions aft $50.00 $6,000.00 a In (rise unit price) $0.00 Oft base plate orfdn 0 0 in (barrel unit price) $0.00 2- barrel collars 0 2- battle length 0 ft bass shrubs seedlings underdrain (LIF) biofilter soil mix (C1) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft length width 0.0 (tons) rvey and layout (pace per 0.1 mi.) acres 0.02 basins mobilization ae -built drawings, (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 0.0 ft 0 0 0 ft $13.00 $0.00 ass $500.00 $aw 0- $3,500.00 $0.00 0 ft $450.00 $0.00 100.0 ft $4.00 $400.00 33.6 ton $3500 $1,176.00 6/42014 $13.00 $aw $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 a es $150.00 $0.0 0 as $50.00 $0,()0 ass $5.00 $0.00 0 ft $5.00 $0.00 0 cy $36.00 $0.00 0 ft $1,500.00 $0.00 1W ft $50.00 $6,000.00 $60.00 $0.00 $10.00 $500.0 2- $2,000.00 $4.000.00 2- $2,000.00 $4,000.00 0- $5,000.00 $0.00 $0.00 cost sum $16,066.00 prof mgmt $2,412:90 contingency $1,849.89 Total $20,350 6/42014 Internal U: f n A Date Received: /� _ Fee Pail: /'� Ot �%. Received by: I/J - (AI i „y — Intake: Forward to nagement Analyst � ;� �,. ; `1 ti (—Lek (�� . 6 BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.) K .SGT 1 -)01∎3-1-2.i ' t 630g. 9k""T"E,1'LA 1 ¢ `''l-tv:_h,:,t7 Vt tt's_(... 6atr-c µ tl6`TCIv Pc 1t—tT All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. 0600-ac--00-C (eOAU TAX MAPs/PARCELs: OWNER'S NAME: Geurry t4) .S • h. SIGNATURE: date: Jr f s '$Mit TAX MAPs/PARCELs: OWNER'S SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; ❑ Erosion&Sediment Control per Water Protection Ordinance section 17-207 Stormwater Management per Water Protection Ordinance section 17-306 0 Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: OR REGULAR MAIL ADDRESS: Revised 11/1/2011