HomeMy WebLinkAboutWPO201400043 Bond Estimates 2014-05-09Project Name: Keswick Country Club Minor Site Plan Amendment Pole Barn at Golf Maintenance Facility
WPO file number: wpo201400043
Stormwater Management Plan Bond Estimate
Item Item No. Unit Unit Cost Cost
Number installed
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 49')
aggregate base or drainage stone
earthwork for trapf..in
structures for basin
4.0 in d
60.0 in d
height of dam at toe
height of fill at face
length of dam
top width
(area above t, -Ron)
(total width of dam)
(height below transition
(area below transition)
(total fill volume)
length of spillway
width of spillway
ser height
riser diameter
barrel length
barrel diameter
bass
shrubs
seedlings
underdrain (LIF)
biofilter soil mix (C1)
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap, placed depth 0 ft length
width 0.0 (tons)
rvey and layout (pace per 0.1 mi.) acres 0.02 basins
mobilization
ae -built drawings, (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
0.0 ft
0
0
0 ft $13.00 $0.00
ass $500.00 $aw
0- $3,500.00 $0.00
0 ft $450.00 $0.00
100.0 ft $4.00 $400.00
33.6 ton $3500 $1,176.00
0 ES-1.2
0 EC -1
12.0ftL
8.0ftW
0 ft
cut at high side
0 ft
aft
cut st face
Oft
0 ft
length of cut
0 ft
a ft
width of cut
0 ft
0 sf
(area below transition)
0 sf
0 ft
(total width of cut)
0 ft
0 ft
(depth below transition
0 ft
Oat
(area above transition)
0 f
0.0 cy
(total fill volume)
Oe cy
0 ft
(TOAL CV estimate)
0 cy
0 ft
(spillway stone Ions)
0 Ions
aft
$50.00
$6,000.00
a In
(rise unit price)
$0.00
Oft
base plate orfdn
0
0 in
(barrel unit price)
$0.00
2-
barrel collars
0
2-
battle length
0 ft
bass
shrubs
seedlings
underdrain (LIF)
biofilter soil mix (C1)
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap, placed depth 0 ft length
width 0.0 (tons)
rvey and layout (pace per 0.1 mi.) acres 0.02 basins
mobilization
ae -built drawings, (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
0.0 ft
0
0
0 ft $13.00 $0.00
ass $500.00 $aw
0- $3,500.00 $0.00
0 ft $450.00 $0.00
100.0 ft $4.00 $400.00
33.6 ton $3500 $1,176.00
6/42014
$13.00
$aw
$50.00
$0.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
a es
$150.00
$0.0
0 as
$50.00
$0,()0
ass
$5.00
$0.00
0 ft
$5.00
$0.00
0 cy
$36.00
$0.00
0 ft
$1,500.00
$0.00
1W ft
$50.00
$6,000.00
$60.00
$0.00
$10.00
$500.0
2-
$2,000.00
$4.000.00
2-
$2,000.00
$4,000.00
0-
$5,000.00
$0.00
$0.00
cost sum
$16,066.00
prof mgmt
$2,412:90
contingency
$1,849.89
Total
$20,350
6/42014
Internal U: f n A
Date Received: /� _ Fee Pail: /'� Ot �%.
Received by: I/J - (AI i „y —
Intake: Forward to nagement Analyst � ;� �,. ; `1 ti
(—Lek
(�� .
6
BOND ESTIMATE REQUEST
APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.)
K .SGT 1 -)01∎3-1-2.i ' t 630g. 9k""T"E,1'LA 1 ¢ `''l-tv:_h,:,t7 Vt tt's_(...
6atr-c µ tl6`TCIv Pc 1t—tT
All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
0600-ac--00-C (eOAU
TAX MAPs/PARCELs: OWNER'S NAME: Geurry t4) .S • h.
SIGNATURE: date: Jr f s '$Mit
TAX MAPs/PARCELs: OWNER'S
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
The requested estimates are;
❑ Erosion&Sediment Control per Water Protection Ordinance section 17-207
Stormwater Management per Water Protection Ordinance section 17-306
0 Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
The estimate must be sent to the owner. Please provide contact information.
EMAIL:
OR REGULAR MAIL ADDRESS:
Revised 11/1/2011