HomeMy WebLinkAboutWPO201400030 Bond Estimates 2014-04-15Project Name: Briarwood Underground Detention, Amendment to WP0201300018
WPO file number: wpo201400030
Stormwater Management Plan Bond Estimate
Item Item
Number
1 earthwork -grass swale (2.5' x 10'x 115'-$13/yd)
2 outlet protection (OP) - outfall to swale from road 5 ft, L 9.5 ft, W
3 channel (SCC, matted) length 5 ft width
4 outlet protection (OP) - outfall to swale from detention 5 ft, L 9.5 ft, W
5 channel (SCC, matted) length 5 ft width
6 pipe, rep, cmp (15 to 48 ") - detention outfall pipe 24.0 in d 0 ES -1,2
7 survey and layout (price per 0.1 mi.) -Area, approx 200' x 200' acres 0.92 basins
8 mobilization ($0, included with gas station mobilization)
9 as -built drawings (per facility)
10 materials testing (per facility)
11 compaction testing (per dam)
12 manufactured facilities (attach manufacturer's or contractor's price as a base)
13 CONTECH - detention system -542 If of 66" CMP, 16 gage (8/1/14 FGM, P.E., email, Collins Engineering)
14 CONTECH - detention system installation (70 -100% of the material cost -use 85 %)
8/19/14, JEA
$42,275
$35,933.75
cost sum
No. Unit
Unit Cost
Cost
contingency
$10,172.70
installed
$111,900
106.5 yd
$13.00
$1,384.50
2 ft, D 95.0 cf
7 ton
$60.00
$427.50
10 ft
$65.00
2 ft, D 95.0 cf
7 ton
$60.00
$427.50
10 ft
$65.00
0 EC -1
58.4 ft
$50.00
$2,920.00
1
$960.00
$0.00
1 ea
$2,000.00
$2,000.00
1 ea
$2,000.00
$2,000.00
0 ea
$5,000.00
$0.00
$42,275
$35,933.75
cost sum
$88,458.25
proj mgmt
$13,268.74
contingency
$10,172.70
Total
$111,900
8/19/2014
In U e 'd
Date Received: Fee Paid: V e��IrAtl�l�l
Received by:
Intake: Forward to l�ie� ement Analyst Ll
I �RGiN�P
REQUEST TO ESTABLISH A BOND
APPROVED PLAN # l� 0(� 1G 14 Ooo3
PROJECT NAME: 1 I C.( I- A (C' to S
(As listed on the approved plan)
All parcels in the project, including any off -site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be
approved prior to bond estimates being prepared.
C't C �r C)6c' 3v
TAX MAPs / PARCELs:,- ,J0 Q -- a)— WNER'S NAME: cx d' A � t,L , tA
bq "'V 4
SIGNATURE: . / - �Z (tis date: Z I
TAX MAPS / PARCELs: OWNER'S NAME:
TAX MAPs / PARCELs:
TAX MAPs / PARCELs:
SIGNATURE:
OWNER'S NAME:
SIGNATURE:
OWNER'S NAME:
SIGNATURE:
TAX MAPs / PARCELs: OWNER'S NAME:
SIGNATURE:
date:
date:
date:
date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207; $0 fee
VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17 -208; $250 fee required
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14 -435;
& Water & Sewer per Subdivision Ordinance section 14 -435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: � -O C w cu cc () k W.)
OR REGULAR MAIL ADDRESS:
Revised 6/20/2014 C� ;` ) 1*
1